EM 1110-1-501
|
CEMP-ET,
DAEN-CWE-BU,
DAEN-MPE-D |
Process Design Manual for Land Treatment of Municipal Wastewater |
5/20/1982 |
|
|
EM 5-1-11
|
CECW/CEMP |
Project Delivery Business Process |
9/1/2022 |
|
|
EM 385-1-80
|
CESO |
Radiation Protection Manual |
9/30/2013 |
|
|
EM 1110-3-152
|
CEMP-ET |
Railroads - Mobilization Construction |
4/9/1984 |
|
|
EM 405-1-03
|
CEMP-CR |
Real State Geospatial Data and Mapping |
9/30/2016 |
|
|
EM 1110-1-400
|
CECW-CO |
Recreation Facility and Customer Services Standards |
11/1/2004 |
|
|
EM 1110-1-2910
|
CECW-CE |
Remote Sensing |
3/10/2021 |
|
|
EM 1110-1-4006
|
CEMP-RT |
Removal of Underground Storage Tanks (USTs) |
9/30/1998 |
|
|
EM 1110-2-1201
|
CEEC-EH |
Reservoir Water Quality Analysis |
6/30/1987 |
|
|
EM 1110-2-6050
|
CECW-ET |
Response Spectra and Seismic Analysis for Concrete Hydraulic Structures |
6/30/1999 |
|
|
EM 1110-3-132
|
CEMP-ET |
Rigid Pavements for Roads, Streets, Walks and Open Storage Areas - Mobilization Construction |
4/9/1984 |
|
|
EM 200-1-4
|
CEMP-RT |
Risk Assessment Handbook - Volume I: Human Health Evaluation |
1/31/1999 |
|
|
EM 200-1-4
|
CEMP-RT |
Risk Assessment Handbook: Volume II - Environmental Evaluation |
12/31/2010 |
|
|
EM 1110-2-1619
|
CECW-EH-Y |
Risk-Based Analysis for Flood Damage Reduction Studies |
8/1/1996 |
|
|
EM 1110-2-1416
|
CECW-EH-Y |
River Hydraulics |
10/15/1993 |
|
|
EM 1110-1-2908
|
CECW-EG |
Rock Foundations |
11/30/1994 |
|
|
EM 1110-1-2907
|
CECW-EG |
Rock Reinforcement |
2/15/1980 |
|
|
EM 1110-2-2006
|
CECW-EG |
Roller-Compacted Concrete |
1/15/2000 |
|
|
EM 1110-2-1406
|
CECW-EH |
Runoff from Snowmelt |
3/31/1998 |
|
|
EM 385-1-1
|
CESO |
Safety and Occupational Health (SOH) Requirements |
3/15/2024 |
|
|
EM 1110-3-174
|
CEMP-ET |
Sanitary and Industrial Wastewater Collection - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-173
|
CEMP-ET |
Sanitary and Industrial Wastewater Pumping - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-177
|
CEMP-ET |
Sanitary Landfill - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-2-4000
|
CECW-EH-Y |
Sedimentation Investigations of Rivers and Reservoirs |
10/31/1995 |
|
|
EM 1110-2-1901
|
CECW-EG |
Seepage Analysis and Control for Dams |
9/30/1986 |
|
|
EM 1110-1-1904
|
CECW-EG |
Settlement Analysis |
9/30/1990 |
|
|
EM 1110-2-1902
|
CECW-EW |
Slope Stability |
10/31/2003 |
|
|
EM 1110-3-137
|
CEMP-ET |
Soil Stabilization for Pavements - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-2-2100
|
CECW-CE |
Stability Analysis of Concrete Structures |
12/1/2005 |
|
|
EM 1110-2-2000
|
CECW-EG |
Standard Practice for Concrete for Civil Works Structures Proponent: CECW-EG |
3/31/2001 |
|
|
EM 1110-3-135
|
CEMP-ET |
Standard Practice for Concrete Pavements - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-2-6056
|
CECW-CE |
Standards and Procedures for Referencing Project Evaluation Grades to Nationwide Vertical Datum's |
12/31/2010 |
|
|
EM 1110-3-150
|
CEMP-ET, DAEN-ECE-G |
Storage Depots - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-2-2104
|
CECW-CE |
Strength Design for Reinforced Concrete Hydraulic Structures |
11/30/2016 |
|
|
EM 1110-2-3104
|
CECW-ED |
Structural and Architectural Design of Pumping Stations |
6/30/1989 |
|
|
EM 1110-2-1009
|
CECW-EE |
Structural Deformation Surveying |
2/28/2018 |
|
|
EM 1110-2-2400
|
CECW |
Structural Design and Evaluation of Outlet Works |
6/2/2003 |
|
|
EM 1110-2-2007
|
CECW-ED |
Structural Design of Concrete Lined Flood Control Channels |
4/30/1995 |
|
|
EM 1110-1-1002
|
CECW-EE |
Survey Markers and Monumentations |
3/1/2012 |
|
|
EM 200-1-2
|
CEMP-RT |
Technical Project Planning (TPP) Process |
2/29/2016 |
|
|
EM 1110-2-2301
|
CECW-EG |
Test Quarries and Test Fills |
9/30/1994 |
|
|
EM 1110-2-3401
|
CECW-ET |
Thermal Spraying: New Construction and Maintenance |
1/29/1999 |
|
|
EM 1110-2-1607
|
CECW-EH-D |
Tidal Hydraulics |
3/15/1991 |
|
|
EM 1110-2-6051
|
CECW-EW |
Time-History Dynamic Analysis of Concrete Hydraulic Structures |
12/22/2003 |
|
|
EM 1110-2-2901
|
CECW-EG |
Tunnels and Shafts in Rocks |
5/30/1997 |
|
|
EM 1110-2-2102
|
CECW-EG |
Water stops and Other Preformed Joint Materials for Civil Works Structures |
9/30/1995 |
|
|
EM 1110-3-166
|
CEMP-ET |
Water Supply, Fire Protection - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-160
|
CEMP-ET |
Water Supply, General Considerations - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-164
|
CEMP-ET |
Water Supply, Water Distribution - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-161
|
CEMP-ET |
Water Supply, Water Sources - Mobilization Construction |
4/9/1984 |
|
|