EM 1110-2-1606
|
CECW-EH-D |
Hydraulic Design - Surges in Canals - Change 1 |
3/1/1949 |
|
|
EM 1110-1-2907
|
CECW-EG |
Rock Reinforcement |
2/15/1980 |
|
|
EM 1110-1-501
|
CEMP-ET,
DAEN-CWE-BU,
DAEN-MPE-D |
Process Design Manual for Land Treatment of Municipal Wastewater |
5/20/1982 |
|
|
EM 1110-2-504
|
CECW |
Engineering and Design - Land Treatment Systems Operation and Maintenance |
11/30/1983 |
|
|
EM 1110-3-130
|
CEMP-ET |
Geometrics for Roads, Streets, Walks, and Open Storage Areas - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-131
|
CEMP-ET |
Flexible Pavements for Roads, Streets, Walks and Open Storage Areas - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-132
|
CEMP-ET |
Rigid Pavements for Roads, Streets, Walks and Open Storage Areas - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-135
|
CEMP-ET |
Standard Practice for Concrete Pavements - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-136
|
CEMP-ET |
Drainage and Erosion Control Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-137
|
CEMP-ET |
Soil Stabilization for Pavements - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-138
|
CEMP-ET |
Pavement Criteria for Seasonal Frost Conditions - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-141
|
CEMP-ET |
Airfield Flexible Pavement - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-142
|
CEMP-ET |
Airfield Rigid Pavement - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-150
|
CEMP-ET, DAEN-ECE-G |
Storage Depots - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-152
|
CEMP-ET |
Railroads - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-160
|
CEMP-ET |
Water Supply, General Considerations - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-161
|
CEMP-ET |
Water Supply, Water Sources - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-162
|
CEMP-ET |
Water Supply, Water Treatment - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-163
|
CEMP-ET |
Water Supply, Water Storage - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-164
|
CEMP-ET |
Water Supply, Water Distribution - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-166
|
CEMP-ET |
Water Supply, Fire Protection - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-173
|
CEMP-ET |
Sanitary and Industrial Wastewater Pumping - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-174
|
CEMP-ET |
Sanitary and Industrial Wastewater Collection - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-176
|
CEMP-ET |
Incinerators - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-177
|
CEMP-ET |
Sanitary Landfill - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-172
|
CEMP-ET |
Domestic Wastewater Treatment - Mobilization Construction |
5/11/1984 |
|
|
EM 1110-2-1701
|
CECW-EH |
Hydropower |
12/31/1985 |
|
|
EM 1110-2-1901
|
CECW-EG |
Seepage Analysis and Control for Dams |
9/30/1986 |
|
|
EM 1110-2-4300
|
CECW-ED |
Instrumentation for Concrete Structures |
11/30/1987 |
|
|
EM 1110-2-3104
|
CECW-ED |
Structural and Architectural Design of Pumping Stations |
6/30/1989 |
|
|
EM 1110-2-1603
|
CECW-ED-H |
Hydraulic Design of Spillways |
1/16/1990 |
|
|
EM 1110-2-2503
|
CECW-EP |
Design of Sheet Pile Cellular Structures Cofferdams and Retaining Structures |
6/11/1990 |
|
|
EM 1110-1-1904
|
CECW-EG |
Settlement Analysis |
9/30/1990 |
|
|
EM 1110-2-2302
|
CECW-EG |
Construction with Large Stone |
10/24/1990 |
|
|
EM 1110-2-2906
|
CECW-ED |
Design of Pile Foundations |
1/15/1991 |
|
|
EM 1110-2-1601
|
CECW-EH-D |
Hydraulic Design of Flood Control Channels |
7/1/1991 |
|
|
EM 1110-1-1905
|
CECW-EG |
Bearing Capacity of Soils |
10/30/1992 |
|
|
EM 1110-2-2201
|
CECW-ED |
Arch Dam Design |
5/31/1994 |
|
|
EM 1110-1-2908
|
CECW-EG |
Rock Foundations |
11/30/1994 |
|
|
EM 1110-1-3500
|
CECW-EG |
Chemical Grouting |
1/31/1995 |
|
|
EM 1110-2-2007
|
CECW-ED |
Structural Design of Concrete Lined Flood Control Channels |
4/30/1995 |
|
|
EM 1110-2-3400
|
CECW-EE |
Painting: New Construction and Maintenance |
4/30/1995 |
|
|
EM 1110-2-2002
|
CECW-EG |
Evaluation and Repair of Concrete Structures |
6/30/1995 |
|
|
EM 1110-2-2607
|
CECW-ED |
Planning and Design of Navigation Dams |
7/31/1995 |
|
|
EM 1110-1-1802
|
CECW-EG |
Geophysical Exploration for Engineering and Environmental Investigations |
8/31/1995 |
|
|
EM 1110-2-1911
|
CECW-ED |
Construction Control for Earth and Rock-Fill Dams |
9/30/1995 |
|
|
EM 1110-2-2102
|
CECW-EG |
Water stops and Other Preformed Joint Materials for Civil Works Structures |
9/30/1995 |
|
|
EM 200-1-6
|
CEMP-RT |
Chemical Quality Assurance for Hazardous, Toxic, and Radioactive (HTRW) Projects |
10/10/1997 |
|
|
EM 1110-1-2009
|
CECW-EG |
Architectural Concrete |
10/31/1997 |
|
|
EM 1110-2-1406
|
CECW-EH |
Runoff from Snowmelt |
3/31/1998 |
|
|