ER 1110-2-1464
|
CECW-EH-Y |
Hydrologic Analysis of Watershed Runoff |
6/30/1994 |
|
|
ER 1110-2-1925
|
CECW-EG |
Field Control Data for Earth and Rockfill Dams |
7/3/1969 |
|
|
ER 1110-2-1941
|
CECW-EC |
Drought Contingency Plans |
2/28/2018 |
|
|
ER 1110-2-1942
|
CECW-EG |
Inspection, Monitoring and Maintenance of Relief Wells |
2/29/1988 |
|
|
ER 1110-2-240
|
CECW-CE |
Water Control Management |
5/30/2016 |
|
|
ER 1110-2-249
|
CECW-EH-W |
Management of Water Control Data Systems |
8/31/1994 |
|
|
ER 1110-2-2902
|
CECW-EH-D |
Prescribed Procedures for the Maintenance and Operation of Shore Protection Works |
6/30/1989 |
|
|
ER 1110-2-400
|
CEMP-ET |
Design of Recreation Sites, Areas, and Facilities |
5/31/1988 |
|
|
ER 1110-2-401
|
CECW-E |
Operation, Maintenance, Repair, Replacement, and Rehabilitation Manual for Projects and Separable Elements Managed by Project Sponsors |
9/30/1994 |
|
|
ER 1110-2-500
|
CEMP-CE |
EPA/USACE Superfund Program Funding and Reporting Requirements |
10/31/2011 |
|
|
ER 1110-2-8151
|
CECW-EH |
Monitoring Completed Coastal Navigational Projects |
7/31/1997 |
|
|
ER 1110-2-8152
|
CECW-ED |
Planning and Design of Temporary Cofferdams and Braced Excavation |
8/31/1994 |
|
|
ER 1110-2-8153
|
CECW-EH-Y |
Technical Project Sedimentation Investigations |
9/30/1995 |
|
|
ER 1110-2-8154
|
CECW-EC |
Water Quality Management |
5/31/2018 |
|
|
ER 1110-2-8157
|
CECW-CE, CECW-CO |
Responsibility for Hydraulic Steel Structures |
6/15/2009 |
|
|
ER 1110-2-8159
|
CECW-ED |
Life Cycle Design and Performance |
10/31/1997 |
|
|
ER 1110-2-8160
|
CECW-CE, CECW-CO, CECW-P |
Engineering and Design: Policies for Referencing Project Evaluation Grades To Nationwide Vertical Datums |
3/1/2009 |
|
|
ER 1110-2-8161
|
CECW-CE |
Structural Design And Evaluation Of Civil Works Buildings |
2/1/2020 |
|
|
ER 1110-2-8164
|
CECW-CE/ CECW-CE |
Policies, Guidance, and Requirements for Hydrographic Surveying and Mapping Digital Products |
7/25/2017 |
|
|
ER 1110-2-8165
|
CECW-EC |
Inundation Maps and Emergency Action Plans and Incident Management for Dams and Levee Systems |
9/24/2024 |
|
|
ER 1110-3-113
|
CECW-CE |
Department of the Army Facilities Standardization Program |
4/21/2016 |
|
|
ER 1110-3-1300
|
CEMP-EE |
Military Programs Cost Engineering |
8/26/1999 |
|
|
ER 1110-3-1301
|
CECW-EC |
ENVIRONMENTAL REMEDIATION AND REMOVAL PROGRAMS |
12/30/2016 |
|
|
ER 1110-34-1
|
CECW-CE |
Transportation Systems Mandatory Center of Expertise |
10/31/2016 |
|
|
ER 1110-345-100
|
CEMP-EA |
DESIGN POLICY FOR MILITARY CONSTRUCTION |
2/15/1994 |
|
|
ER 1110-345-53
|
CEMP-ET |
STRUCTURAL STEEL CONNECTIONS |
7/22/1994 |
|
|
ER 1110-345-700
|
CEMP-EA |
DESIGN ANALYSIS, DRAWINGS AND SPECIFICATIONS |
5/30/1997 |
|
|
ER 1110-345-723
|
CECW-CE |
TOTAL BUILDING COMMISSIONING PROCEDURES |
3/31/2017 |
|
|
ER 1110-8-2(FR)
|
CECW-EH |
Inflow Design Floods for Dams and Reservoirs |
3/1/1991 |
|
|
ER 1-1-11
|
CECW-EC |
Project Schedules |
9/18/2017 |
|
|
ER 11-1-320
|
CECW-HS |
Civil Works Emergency Management Programs |
2/28/2014 |
|
|
ER 1125-2-307
|
CECW-CO |
SUBSISTENCE, QUARTERS, AND ALLOWANCES |
2/1/2011 |
|
|
ER 1130-2-337
|
CECW-OP |
ASSIGNMENT OF OPERATION AND MAINTENANCE EXPENSES TO PROPER COST ACCOUNTS FOR MULTIPLE-PURPOSE PROJECTS WITH POWER |
7/15/1969 |
|
|
ER 1130-2-406
|
CECW-ON |
SHORELINE MANAGEMENT AT CIVIL WORKS PROJECTS |
10/31/1990 |
|
|
ER 1130-2-500
|
CECW-O |
PARTNERS AND SUPPORT (WORK MANAGEMENT POLICIES) |
12/27/1996 |
|
|
ER 1130-2-520
|
CECW-OD |
NAVIGATION AND DREDGING OPERATIONS AND MAINTENANCE POLICIES |
11/29/1996 |
|
|
ER 1130-2-530
|
CECW-OM |
FLOOD CONTROL OPERATIONS AND MAINTENANCE POLICIES |
10/30/1996 |
|
|
ER 1130-2-540
|
CECW-ON |
ENVIRONMENTAL STEWARDSHIP APERATIONS AND MAINTENANCE POLICIES |
11/15/1996 |
|
|
ER 1130-2-550
|
CECW-ON |
Recreation Operations and Maintenance Policies |
11/15/1996 |
|
|
ER 1130-2-551
|
CECW-CO |
HYDROPOWER OPERATIONS AND MAINTENANCE POLICY BULK POWER SYSTEM RELIABLILITY COMPLIANCE PROGRAM |
9/30/2009 |
|
|
ER 1130-2-554
|
CECW-CO |
USACE Conditions Assessment. |
3/30/2021 |
|
|
ER 1150-2-301
|
CECW-OC |
POLICIES AND PROCEDURES - LOCAL COOPERATION |
9/1/1967 |
|
|
ER 1150-2-302
|
CECW-OM |
ANNUAL REPORT ON LOCAL COOPERATION AGREEMENTS |
3/20/1981 |
|
|
ER 1165-2-111
|
CECW-PR |
CORPS OF ENGINEERS ACTIVII9TIES UNDER THE SMALL RECLAMATION PROJECT ACT OF 1956, AS ADMEMDED |
5/28/1982 |
|
|
ER 1165-2-114
|
CECW-PR |
USE OF EXCESS POWER REVENUES TO ASSIST IN REPAYMENT OF IRRIGATION COSTS |
6/25/1964 |
|
|
ER 1165-2-119
|
CECW-PR |
MODIFICATIONS TO COMPLETED PROJECTS |
9/20/1982 |
|
|
ER 1165-2-121
|
CECW-PD |
FLOOD CONTROL COST-SHARING REQUIREMENTS UNDER THE ABILITY-TO-PAY PROVISION SECTION 103(M) OF PL 99-662 |
11/1/1989 |
|
|
ER 1165-2-123
|
CECW-PR |
SINGLE-OWNER SITUATIONS |
10/30/1992 |
|
|
ER 1165-2-130
|
CECW-PR |
FEDERAL PARTICIPATION IN SHORE PROTECTION |
6/15/1989 |
|
|
ER 1165-2-131
|
CECW-RN |
LOCAL COOPERATION AGREEMENTS FOR NEW START CONSTRUCTION PROJECTS |
4/15/1989 |
|
|