Engineer Manuals

   Search   Reset Search  
Enter Search Value:
- without any prefix or suffix to find all records where a column contains the value you enter, e.g. Net
- with | prefix to find all records where a column starts with the value you enter, e.g. |Network
- with | suffix to find all records where a column ends with the value you enter, e.g. Network|
- with | prefix and suffix to find all records containing the value you enter exactly, e.g. |Network|

Pub Number Proponent Title Pub Date Latest Review Info
EM 1110-3-141 CEMP-ET Airfield Flexible Pavement - Mobilization Construction 4/9/1984 Provides guidance for designing airfield flexible pavement for U .S  Army mobilization facilities .
EM 1110-3-142 CEMP-ET Airfield Rigid Pavement - Mobilization Construction 4/9/1984 Provides guidance for the design of Army airfield rigid pavement at U .S  Army mobilization installations .
EM 1110-2-2201 CECW-ED Arch Dam Design 5/31/1994 Provides information and guidance on the design, analysis, and construction of concrete arch dams.
EM 1110-1-2009 CECW-EG Architectural Concrete 10/31/1997 Provides guidance for the design and construction of architectural concrete, including planning and design, forms, materials and proportions, batching and transporting, placement, curing and form removal, exposed aggregate surfaces, finishing, and quality assurance.
EM 1110-2-3402 CECW-CE Barge Impact Forces For Hydraulic Structures 8/1/2022 This engineer manual (EM) provides guidance and information for design and evaluation of barge impact forces on inland and coastal navigation structures
EM 1110-2-2704 CECW-CE Cathodic Protection Systems for Civil Works Structures 3/31/2021 Provides guidance for the selection, design, installation, operation, and maintenance of Cathodic protection systems (CPSs) for navigation lock gates and other civil works hydraulic structures.
EM 1110-2-1100 CECW-CE Coastal Engineering Manual - Part I 4/30/2002 The purpose of the Coastal Engineering Manual (CEM) is to provide a comprehensive technical coastal engineering document. It includes the basic principles of coastal processes, methods for computing coastal planning and design parameters, and guidance on how to formulate coastal flood studies, shore protection, and navigation projects.
EM 1110-2-1100 CECW-CE Coastal Engineering Manual - Part II 4/30/2002 The purpose of the Coastal Engineering Manual (CEM) is to provide a comprehensive technical coastal engineering document. It includes the basic principles of coastal processes, methods for computing coastal planning and design parameters, and guidance on how to formulate coastal flood studies, shore protection, and navigation projects.
EM 1110-2-1100 CECW-CE Coastal Engineering Manual - Part III 4/30/2002 The purpose of the Coastal Engineering Manual (CEM) is to provide a comprehensive technical coastal engineering document. It includes the basic principles of coastal processes, methods for computing coastal planning and design parameters, and guidance on how to formulate coastal flood studies, shore protection, and navigation projects.
EM 1110-2-1100 CECW-CE Coastal Engineering Manual - Part IV 4/30/2002 The purpose of the Coastal Engineering Manual (CEM) is to provide a comprehensive technical coastal engineering document. It includes the basic principles of coastal processes, methods for computing coastal planning and design parameters, and guidance on how to formulate coastal flood studies, shore protection, and navigation projects.
EM 1110-2-1100 CECW-CE Coastal Engineering Manual - Part V 4/30/2002 The purpose of the Coastal Engineering Manual (CEM) is to provide a comprehensive technical coastal engineering document. It includes the basic principles of coastal processes, methods for computing coastal planning and design parameters, and guidance on how to formulate coastal flood studies, shore protection, and navigation projects.
EM 1110-2-1100 CECW-CE Coastal Engineering Manual - Part VI 4/30/2002 The purpose of the Coastal Engineering Manual (CEM) is to provide a comprehensive technical coastal engineering document. It includes the basic principles of coastal processes, methods for computing coastal planning and design parameters, and guidance on how to formulate coastal flood studies, shore protection, and navigation projects.
EM 1110-2-2902 CECW-EC Conduits, Pipes, and Culverts associated with Dams and Levee Systems 12/31/2020 Provides (a) guidance on the design and construction of conduits, culverts, and pipes, and (b) design procedures for trench/embankment earth loadings, highway loadings, railroad loadings, surface concentrated loadings, and internal/external fluid pressures.
EM 1110-1-4011 CEMP-RA Construction Quality Assurance (CQA) Plan - Requirements for Hazardous Waste Landfills 10/1/1999 This engineer manual transmits a document which describes CQA inspection requirements for hazardous waste landfill covers and liners. The appendix of this document is a template for landfill CQA plans to assist designers in incorporating the important aspects of CQA.
EM 1110-2-1913 CECW-EG Design and Construction of Levees 4/30/2000 Presents basic principles used in the design and construction of earth levees.
EM 1110-2-1614 CECW-EH-D Design of Coastal Revertments, Seawalls, and Bulkheads 6/30/1995 Provides guidance for the design of coastal revetment, seawalls, and bulkheads.
EM 1110-2-2107 CECW-EC Design Of Hydraulic Steel Structures 8/1/2022 This manual prescribes guidance for the design of Hydraulic Steel Structures (HSS) by load and resistance factor design (LRFD).
EM 1110-2-2906 CECW-ED Design of Pile Foundations 1/15/1991 Provides information, foundation exploration and testing procedures, load test methods, analysis techniques, allowable criteria, design procedures, and construction consideration for the selection, design, and installation of pile foundations.
EM 1110-2-410 CECW Design of Recreation Areas and Facilities - Access and Circulation 12/31/1982 Presents data compiled from experience and research that should be useful in the design of access and circulation to recreation sites, areas and facilities .
EM 1110-2-2503 CECW-EP Design of Sheet Pile Cellular Structures Cofferdams and Retaining Structures 6/11/1990 Provisions for the design of sheet pile cellular cofferdams are set forth in ER 1110-2-2901.
EM 1110-2-503 CECW-ET Design of Small Water Systems 2/27/1999 Provides guidance and criteria for the design of small water supply, treatment, and distribution systems.
EM 1110-2-1914 CECW-EC Design, Construction, and Maintenance of Relief Wells 3/7/2025 Provides guidance and information on the design, construction, and maintenance of pressure relief wells.
EM 1110-2-501 CECW-ET Design, Construction, and Operation - Small Wastewater Systems 2/1/1999 This manual is intended to provide guidance and criteria for the design and selection of small-scale wastewater treatment facilities.
EM 200-1-21 CEMP-CE Design: IN SITU Thermal Remediation 5/30/2014 This manual supersedes EM 1110-1-4015; dated 28 August 2009
EM 1110-3-172 CEMP-ET Domestic Wastewater Treatment - Mobilization Construction 5/11/1984 Provides guidance for the planning and design of domestic wastewater treatment plants at U .S  Army mobilization facilities .
EM 1110-2-6053 CECW-CE Earthquake Design and Evaluation of Concrete Hydraulic Structures 5/1/2007 Provides guidance for performance-based design and evaluation of concrete hydraulic structures (CHS).
EM 1110-2-504 CECW Engineering and Design - Land Treatment Systems Operation and Maintenance 11/30/1983 This manual has two basic  s  It can be used by the operators of existing and future systems to supplement the operation and maintenance (0&M) information furnished to them-on the mechanical elements in their systems  It can also be used as a guide for the preparation of future 0&M manuals .
EM 1110-2-3800 CECW-EC Engineering and Design Blasting for Rock Excavations. 10/30/2018 Describes theory, concepts, and procedures surrounding rock excavation through the use of blasting agents and methods for use on Civil Works and Military Construction projects. Provide guidance to U.S. Army Corps of Engineers personnel (USACE) involved in the planning, design, monitoring, or implementation of blasting programs for rock excavation
EM 1110-2-1420 CECW-EC Engineering and Design Hydrologic Engineering Requirements for Reservoirs 9/24/2018 This manual provides guidance to field office personnel for hydrologic engineering investigations for planning and design of reservoir projects
EM 1110-2-5025 CECW-EW Engineering and Design, Dredging and Dredged Material Management 7/31/2015 This manual supersedes EM 1110-2-5025, 25 March 1983; EM 1110-2-5026, 30 June 1987; and EM 1110-2-5027, 30 September 1987.
EM 1110-3-131 CEMP-ET Flexible Pavements for Roads, Streets, Walks and Open Storage Areas - Mobilization Construction 4/9/1984 Provides guidance for designing flexible pavements for roads, streets, walks, and open storage areas for U .S  Army mobilization facilities .
EM 1110-2-2502 CECW-EC Flood Walls and other Hydraulic Retaining Walls 8/1/2022 This manual provides guidance and information for the selection, design, inspection, evaluation, maintenance, repair, and rehabilitation of floodwalls and other hydraulic retaining walls.
EM 1110-2-2300 CECW-EG General Design and Construction Considerations For Earth and Rock-Fill Dams 7/30/2004 This manual presents fundamental principles underlying the design and construction of earth and rock-fill dams. The general principles presented herein are also applicable to the design and construction of earth levees.
EM 1110-3-130 CEMP-ET Geometrics for Roads, Streets, Walks, and Open Storage Areas - Mobilization Construction 4/9/1984 Provides guidance for design and layout of roads, streets, walks, and open storage areas for U .S  Army mobilization facilities .
EM 1110-2-2200 CECW-ED Gravity Dam Design 6/30/1995 Provides technical criteria and guidance for the planning and design of concrete gravity dams for civil works projects.
EM 1110-2-1606 CECW-EH-D Hydraulic Design - Surges in Canals - Change 1 3/1/1949 Problem of surges which occur in navigation canals as a result of lock operations, since a full discussion of other unsteady flow phenomena which may occur in open channels would be feasible only in a large treatise.
EM 1110-2-1613 CECW-CE Hydraulic Design of Deep Draft Navigation Projects 5/31/2006 Provides design guidance for improving deep-draft navigation projects. The design goal applicable to project development is to provide a safe, efficient, environmentally sound, and cost-effective waterway for ships and other vessels. An economic objective is to provide for these goals while minimizing and balancing the initial construction costs and future maintenance costs.
EM 1110-2-1601 CECW-EH-D Hydraulic Design of Flood Control Channels 7/1/1991 Presents procedures for the design analysis and criteria of design for improved channels that carry rapid and/or tranquil flows.
EM 1110-2-1610 CECW-CE Hydraulic Design of Lock Culvert Valves 9/30/2018 Presents hydraulic design data on control valves for navigation lock filling and emptying systems
EM 1110-2-1605 CECW-EH-D Hydraulic Design of Navigation Dams 5/12/1987 Provides current guidance and engineering procedures for the hydraulic design of navigation dams.
EM 1110-2-1604 CECW-EH-D Hydraulic Design of Navigation Locks 5/1/2006 Presents the results of research, design studies, and operation experience as guidance for the hydraulic design of navigation locks.
EM 1110-2-1602 CECW-EH-D Hydraulic Design of Reservoir Outlet Works 10/15/1980 This manual presents guidance for the hydraulic design  and analysis of reservoir outlet works facilities.
EM 1110-2-1615 CECW-EH-D Hydraulic Design of Small Boat Harbors 9/25/1984 Provides guidance for planning, layout, and design of small boat harbor projects.
EM 1110-2-1603 CECW-ED-H Hydraulic Design of Spillways 1/16/1990 Provides guidance for the hydraulic design of spillways for flood control or multi  dams.
EM 1110-2-1413 CECW-CE HYDROLOGIC ANALYSIS OF INTERIOR AREAS 8/24/2018 The purpose of this manual is to provide guidance in hydrologic analysis of interior areas for planning, design investigations, and flood risk reduction.  The document was developed to supply the U.S. Army Corps of Engineers (USACE) field offices with procedural and technical guidance in performing hydrologic assessments of interior areas. *This Engineer Manual supersedes EM 1110-2-1413, dated 15 January 1987.
EM 1110-2-1701 CECW-EH Hydropower 12/31/1985 Provides guidance on the technical aspects of hydroelectric power studies, from the preauthorization level through the General Design Memorandum (GDM) stage.
EM 1110-2-1612 CECW-EH Ice Engineering 10/30/2002 This manual, composed of three parts, presents in Part I the current guidance for the planning, design, construction, and operation and maintenance of is control and ice suppression measures for Corps of Engineers projects; provides in Part II the current guidance for dealing with ice jams and resultant flooding, including preventative measures; and gives in Part III the current guidance for engineering and operational solutions to ice problems on rivers used for navigation.
EM 1110-3-176 CEMP-ET Incinerators - Mobilization Construction 4/9/1984 Provides guidance for the design of incinerators for combustible waste materials at U.S  Army mobilization facilities .
EM 1110-2-1906 CECW-EG Laboratory Soils Testing 8/20/1986 This manual presents recommended testing procedures for making determinations of the soil properties to be used in the design of civil works projects.
EM 1110-2-1611 CECW-ED Layout and Design of Shallow-Draft Waterways 12/31/1980 Provides guidance for planning, layout and design of shallow-draft waterways
Page 1  of  2 First Previous [1] 2 Next Last