EM 5-1-11
|
CECW/CEMP |
Project Delivery Business Process |
9/1/2022 |
|
|
EM 200-1-2
|
CEMP-RT |
Technical Project Planning (TPP) Process |
2/29/2016 |
|
|
EM 200-1-4
|
CEMP-RT |
Risk Assessment Handbook - Volume I: Human Health Evaluation |
1/31/1999 |
|
|
EM 200-1-4
|
CEMP-RT |
Risk Assessment Handbook: Volume II - Environmental Evaluation |
12/31/2010 |
|
|
EM 200-1-6
|
CEMP-RT |
Chemical Quality Assurance for Hazardous, Toxic, and Radioactive (HTRW) Projects |
10/10/1997 |
|
|
EM 200-1-10
|
CEMP-CE/CECW-EC |
Environmental Quality - Guidance for Evaluating Performance-Based Chemical Data |
3/1/2021 |
|
|
EM 200-1-12
|
CEMP-CE |
Environmental Quality: Conceptual Site Models |
8/11/2023 |
|
|
EM 200-1-13
|
CECW-CE |
Environmental Quality: Minimizing the Risk of Legionellosis Associated with Building Water Systems on Army Installations |
9/30/2016 |
|
|
EM 200-1-15
|
CEMP-CE |
Environmental Quality Technical Guidance For Military Munitons Response Actions |
10/30/2018 |
|
|
EM 200-1-16
|
CEMP-CE |
Environmental Quality - Environmental Statistics |
5/31/2013 |
|
|
EM 200-1-19
|
CEMP-CE |
IN-SITU AIR SPARGING |
12/31/2013 |
|
|
EM 200-1-21
|
CEMP-CE |
Design: IN SITU Thermal Remediation |
5/30/2014 |
|
|
EM 200-1-22
|
CEMP-CE |
Landfill Gas Collection and Treatment Systems |
4/30/2013 |
|
|
EM 385-1-1
|
CESO |
Safety and Occupational Health (SOH) Requirements |
3/15/2024 |
|
|
EM 385-1-80
|
CESO |
Radiation Protection Manual |
9/30/2013 |
|
|
EM 385-1-97
|
CESO-E |
Explosives - Safety and Health Requirements Manual |
5/17/2013 |
|
|
EM 405-1-03
|
CEMP-CR |
Real State Geospatial Data and Mapping |
9/30/2016 |
|
|
EM 500-1-24
|
CECW-OE-E |
Corps of Engineers Exercise Manual (COREM) - ANNEX L Classified CONFIDENTIAL -(Stocked and Issued by Proponent) |
9/1/1987 |
|
|
EM 1110-1-400
|
CECW-CO |
Recreation Facility and Customer Services Standards |
11/1/2004 |
|
|
EM 1110-1-501
|
CEMP-ET,
DAEN-CWE-BU,
DAEN-MPE-D |
Process Design Manual for Land Treatment of Municipal Wastewater |
5/20/1982 |
|
|
EM 1110-1-1000
|
CECW-CE |
Photogrammetric and LiDAR Mapping |
4/30/2015 |
|
|
EM 1110-1-1002
|
CECW-EE |
Survey Markers and Monumentations |
3/1/2012 |
|
|
EM 1110-1-1003
|
CECW-EE |
Navstar Global Positioning System Surveying |
2/28/2011 |
|
|
EM 1110-1-1005
|
CECW-CE |
Control and Topographic Surveying |
1/1/2007 |
|
|
EM 1110-1-1802
|
CECW-EG |
Geophysical Exploration for Engineering and Environmental Investigations |
8/31/1995 |
|
|
EM 1110-1-1804
|
CECW-ET |
Geotechnical Investigations |
1/1/2001 |
|
|
EM 1110-1-1904
|
CECW-EG |
Settlement Analysis |
9/30/1990 |
|
|
EM 1110-1-1905
|
CECW-EG |
Bearing Capacity of Soils |
10/30/1992 |
|
|
EM 1110-1-2009
|
CECW-EG |
Architectural Concrete |
10/31/1997 |
|
|
EM 1110-1-2907
|
CECW-EG |
Rock Reinforcement |
2/15/1980 |
|
|
EM 1110-1-2908
|
CECW-EG |
Rock Foundations |
11/30/1994 |
|
|
EM 1110-1-2909
|
CECW-CE |
Geospatial Data and Systems |
9/1/2012 |
|
|
EM 1110-1-2910
|
CECW-CE |
Remote Sensing |
3/10/2021 |
|
|
EM 1110-1-3500
|
CECW-EG |
Chemical Grouting |
1/31/1995 |
|
|
EM 1110-1-4006
|
CEMP-RT |
Removal of Underground Storage Tanks (USTs) |
9/30/1998 |
|
|
EM 1110-1-4008
|
CEMP-RA |
Liquid Process Piping |
5/5/1999 |
|
|
EM 1110-1-4011
|
CEMP-RA |
Construction Quality Assurance (CQA) Plan - Requirements for Hazardous Waste Landfills |
10/1/1999 |
|
|
EM 1110-1-4012
|
CECW-ET |
Precipitation/Coagulation/Flocculation |
11/15/2001 |
|
|
EM 1110-2-410
|
CECW |
Design of Recreation Areas and Facilities - Access and Circulation |
12/31/1982 |
|
|
EM 1110-2-501
|
CECW-ET |
Design, Construction, and Operation - Small Wastewater Systems |
2/1/1999 |
|
|
EM 1110-2-503
|
CECW-ET |
Design of Small Water Systems |
2/27/1999 |
|
|
EM 1110-2-504
|
CECW |
Engineering and Design - Land Treatment Systems Operation and Maintenance |
11/30/1983 |
|
|
EM 1110-2-1003
|
CECW-CE I CECW-OD |
Hydrographic Surveying |
11/30/2013 |
|
|
EM 1110-2-1009
|
CECW-EE |
Structural Deformation Surveying |
2/28/2018 |
|
|
EM 1110-2-1100
|
CECW-CE |
Coastal Engineering Manual - Part II |
4/30/2002 |
|
|
EM 1110-2-1100
|
CECW-CE |
Coastal Engineering Manual - Part III |
4/30/2002 |
|
|
EM 1110-2-1100
|
CECW-CE |
Coastal Engineering Manual - Part IV |
4/30/2002 |
|
|
EM 1110-2-1100
|
CECW-CE |
Coastal Engineering Manual - Part V |
4/30/2002 |
|
|
EM 1110-2-1100
|
CECW-CE |
Coastal Engineering Manual - Part VI |
4/30/2002 |
|
|
EM 1110-2-1100
|
CECW-CE |
Coastal Engineering Manual - Part I |
4/30/2002 |
|
|