ER 1110-2-1406
|
CECW-EH |
Coastal Field Data Collection |
4/30/1990 |
|
|
ER 1110-2-1407
|
CECW-EH |
Hydraulic Design for Coastal Shore Protection Projects |
11/30/1997 |
|
|
ER 1110-2-1451
|
CECW-EH |
Acquisition of Lands Downstream from Spillways for Hydrologic Safety Purposes |
8/10/1978 |
|
|
ER 1110-2-1454
|
CECW-EH |
Corps Responsibilities for Non-Federal Hydroelectric Power Development under the Federal Power Act |
7/15/1983 |
|
|
ER 1110-2-1458
|
CECW-EH |
Hydraulic Design of Shallow Draft Navigation Projects |
4/30/1998 |
|
|
ER 1110-2-1463
|
CECW-EH |
Hydrologic Engineering for Hydropower |
5/30/1992 |
|
|
ER 1110-2-8151
|
CECW-EH |
Monitoring Completed Coastal Navigational Projects |
7/31/1997 |
|
|
ER 1110-8-2(FR)
|
CECW-EH |
Inflow Design Floods for Dams and Reservoirs |
3/1/1991 |
|
|
ER 1110-1-1401
|
CECW-EH
CECW-EG
CECW-EB |
Interlaboratory Testing Program for Chemical Analyses |
5/15/1989 |
|
|
ER 1110-2-1403
|
CECW-EH, CERD-C |
Studies by Coastal, Hydraulic, and Hydrologic Facilities and Others |
1/1/1998 |
|
|
ER 1110-2-1404
|
CECW-EH-D |
Hydraulic Design of Deep-Draft Navigation Projects |
1/31/1996 |
|
|
ER 1110-2-1457
|
CECW-EH-D |
Hydraulic Design of Small Boat Navigation |
6/24/1985 |
|
|
ER 1110-2-2902
|
CECW-EH-D |
Prescribed Procedures for the Maintenance and Operation of Shore Protection Works |
6/30/1989 |
|
|
ER 1110-2-249
|
CECW-EH-W |
Management of Water Control Data Systems |
8/31/1994 |
|
|
ER 1110-2-1450
|
CECW-EH-Y |
Hydrologic Frequency Estimates |
8/31/1994 |
|
|
ER 1110-2-1460
|
CECW-EH-Y |
Hydrologic Engineering Management |
7/7/1989 |
|
|
ER 1110-2-1464
|
CECW-EH-Y |
Hydrologic Analysis of Watershed Runoff |
6/30/1994 |
|
|
ER 1110-2-8153
|
CECW-EH-Y |
Technical Project Sedimentation Investigations |
9/30/1995 |
|
|
ER 1110-2-1150
|
CECW-EP |
Engineering and Design for Civil Works Projects |
8/31/1999 |
|
|
ER 11-1-320
|
CECW-HS |
Civil Works Emergency Management Programs |
2/28/2014 |
|
|
ER 500-1-28
|
CECW-HS |
Emergency Employment of Army and Other Resources - National Response Planning Guide |
1/31/2011 |
|
|
ER 200-1-4
|
CECW-I; CEMP-CE; CECC-E |
Formerly Utilized Sites Remedial Action Program |
8/29/2014 |
|
|
ER 1150-2-301
|
CECW-OC |
POLICIES AND PROCEDURES - LOCAL COOPERATION |
9/1/1967 |
|
|
ER 415-2-100
|
CECW-OC |
Staffing for Civil Works Projects |
1/15/1993 |
|
|
ER 1130-2-520
|
CECW-OD |
NAVIGATION AND DREDGING OPERATIONS AND MAINTENANCE POLICIES |
11/29/1996 |
|
|
ER 140-1-2
|
CECW-OE |
U.S. Army Corps of Engineers Individual Mobilization Augmentee (IMA) Program |
9/1/1991 |
|
|
ER 500-1-1
|
CECW-OE |
Emergency Employment of Army and Other Resources - Civil Emergency Management Program |
9/30/2001 |
|
|
ER 500-1-20
|
CECW-OE-D |
USACE R&D and Other Separate FOA Support to Preparedness, Response and Recovery for Emergencies and Disasters |
10/15/1985 |
|
|
ER 500-1-24
|
CECW-OE-E |
Corps of Engineers Command Readiness Exercise Program |
9/1/1987 |
|
|
ER 500-1-18
|
CECW-OE-P |
Corps of Engineers Continuity of Operations Planning System (CECOPS |
3/30/1985 |
|
|
ER 500-1-2
|
CECW-OE-P |
Corps of Engineers Mobilization and Operations Planning and Execution Systems (CEMOPES) Theater of Operations (TO) |
10/30/1995 |
|
|
ER 1130-2-530
|
CECW-OM |
FLOOD CONTROL OPERATIONS AND MAINTENANCE POLICIES |
10/30/1996 |
|
|
ER 1150-2-302
|
CECW-OM |
ANNUAL REPORT ON LOCAL COOPERATION AGREEMENTS |
3/20/1981 |
|
|
ER 1130-2-406
|
CECW-ON |
SHORELINE MANAGEMENT AT CIVIL WORKS PROJECTS |
10/31/1990 |
|
|
ER 1130-2-540
|
CECW-ON |
ENVIRONMENTAL STEWARDSHIP APERATIONS AND MAINTENANCE POLICIES |
11/15/1996 |
|
|
ER 1130-2-550
|
CECW-ON |
Recreation Operations and Maintenance Policies |
11/15/1996 |
|
|
ER 200-2-3
|
CECW-ON |
Environmental Compliance Policies |
11/30/2022 |
|
|
ER 385-1-91
|
CECW-ON, CESO-P |
Training, Testing, and Licensing for Operator of Class A and Class 1 Motorboats |
9/1/2019 |
|
|
ER 1130-2-337
|
CECW-OP |
ASSIGNMENT OF OPERATION AND MAINTENANCE EXPENSES TO PROPER COST ACCOUNTS FOR MULTIPLE-PURPOSE PROJECTS WITH POWER |
7/15/1969 |
|
|
ER 1105-2-100
|
CECW-P |
Planning Guidance Notebook |
4/22/2000 |
|
|
ER 1105-2-102
|
CECW-P |
Watershed Studies |
4/1/2022 |
|
|
ER 1105-2-103
|
CECW-P |
Policy for Conducting Civil Works Planning Studies |
11/7/2023 |
|
|
ER 1165-2-208
|
CECW-P |
In-Kind Contribution Credit Provisions of Sections 221(a)(4) of the Flood Control Act of 1970, as amended |
12/6/2015 |
|
|
ER 1165-2-209
|
CECW-P |
Studies of Water Resources Development Projects by Non-Federal Interest |
2/4/2016 |
|
|
ER 1165-2-211
|
CECW-P |
Operation and Maintenance of Improvements Carried out by Non-Federal Interests to Authorized Harbor or Inland Harbor Projects |
1/27/2025 |
|
|
ER 1165-2-502
|
CECW-P |
Delegation of Review and Approval Authority for Post-Authorization Decision Documents |
3/31/2014 |
|
|
ER 1165-2-504
|
CECW-P |
Construction of Water Resource Development Projects by Non-Federal Interests |
7/12/2017 |
|
|
ER 1165-2-121
|
CECW-PD |
FLOOD CONTROL COST-SHARING REQUIREMENTS UNDER THE ABILITY-TO-PAY PROVISION SECTION 103(M) OF PL 99-662 |
11/1/1989 |
|
|
ER 1-2-2
|
CECW-PL |
Water Resources Policies and Authorities Substantive Congressional Contacts (RCS: CECW-P-21) |
7/1/1991 |
|
|
ER 1165-2-132
|
CECW-PO |
HAZARDOUS, TOXIC AND RADIOACTIVE WASTE GUIDANCE FOR CIVIL WORKS PROJECTS |
6/26/1992 |
|
|