EM 1110-2-2502
|
CECW-EC |
Flood Walls and other Hydraulic Retaining Walls |
8/1/2022 |
|
|
EM 1110-2-2503
|
CECW-EP |
Design of Sheet Pile Cellular Structures Cofferdams and Retaining Structures |
6/11/1990 |
|
|
EM 1110-2-2602
|
CECW-ED |
Planning and Design of Navigation Locks |
9/30/1995 |
|
|
EM 1110-2-2607
|
CECW-ED |
Planning and Design of Navigation Dams |
7/31/1995 |
|
|
EM 1110-2-2610
|
CECW-CE |
Mechanical and Electrical Design for Lock and Dam Operating Equipment |
6/30/2013 |
|
|
EM 1110-2-2611
|
CECW-EW |
Engineering for Prefabricated Construction of Navigation Projects |
2/1/2004 |
|
|
EM 1110-2-2704
|
CECW-CE |
Cathodic Protection Systems for Civil Works Structures |
3/31/2021 |
|
|
EM 1110-2-2901
|
CECW-EG |
Tunnels and Shafts in Rocks |
5/30/1997 |
|
|
EM 1110-2-2902
|
CECW-EC |
Conduits, Pipes, and Culverts associated with Dams and Levee Systems |
12/31/2020 |
|
|
EM 1110-2-2906
|
CECW-ED |
Design of Pile Foundations |
1/15/1991 |
|
|
EM 1110-2-3001
|
CECW-ED |
Planning and Design of Hydroelectric Power Plant Structures |
10/10/2008 |
|
|
EM 1110-2-3006
|
CECW-EC |
Mechanical and Electrical Design of Hydroelectric Power Plants |
4/22/2024 |
|
|
EM 1110-2-3104
|
CECW-ED |
Structural and Architectural Design of Pumping Stations |
6/30/1989 |
|
|
EM 1110-2-3105
|
CECW-CE |
Mechanical and Electrical Design of Pumping Stations |
4/30/2020 |
|
|
EM 1110-2-3200
|
CECW-CE |
Wire Rope For Civil Works Structures |
11/30/2016 |
|
|
EM 1110-2-3400
|
CECW-EE |
Painting: New Construction and Maintenance |
4/30/1995 |
|
|
EM 1110-2-3401
|
CECW-ET |
Thermal Spraying: New Construction and Maintenance |
1/29/1999 |
|
|
EM 1110-2-3402
|
CECW-CE |
Barge Impact Forces For Hydraulic Structures |
8/1/2022 |
|
|
EM 1110-2-3506
|
CECW-EG |
Grouting Technology |
3/31/2017 |
|
|
EM 1110-2-3600
|
CECW-CE |
Management of Water Control Systems |
10/10/2017 |
|
|
EM 1110-2-3800
|
CECW-EC |
Engineering and Design Blasting for Rock Excavations. |
10/30/2018 |
|
|
EM 1110-2-4000
|
CECW-EH-Y |
Sedimentation Investigations of Rivers and Reservoirs |
10/31/1995 |
|
|
EM 1110-2-4300
|
CECW-ED |
Instrumentation for Concrete Structures |
11/30/1987 |
|
|
EM 1110-2-5025
|
CECW-EW |
Engineering and Design, Dredging and Dredged Material Management |
7/31/2015 |
|
|
EM 1110-2-6050
|
CECW-ET |
Response Spectra and Seismic Analysis for Concrete Hydraulic Structures |
6/30/1999 |
|
|
EM 1110-2-6051
|
CECW-EW |
Time-History Dynamic Analysis of Concrete Hydraulic Structures |
12/22/2003 |
|
|
EM 1110-2-6053
|
CECW-CE |
Earthquake Design and Evaluation of Concrete Hydraulic Structures |
5/1/2007 |
|
|
EM 1110-2-6054
|
CECW-ED |
Inspection, Evaluation and Repair of Hydraulic Steel Structures |
12/1/2001 |
|
|
EM 1110-2-6055
|
CECW-CE / CECW-CO |
Inland Electronic Navigational Chart Engineering Manual |
2/27/2015 |
|
|
EM 1110-2-6056
|
CECW-CE |
Standards and Procedures for Referencing Project Evaluation Grades to Nationwide Vertical Datum's |
12/31/2010 |
|
|
EM 1110-3-130
|
CEMP-ET |
Geometrics for Roads, Streets, Walks, and Open Storage Areas - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-131
|
CEMP-ET |
Flexible Pavements for Roads, Streets, Walks and Open Storage Areas - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-132
|
CEMP-ET |
Rigid Pavements for Roads, Streets, Walks and Open Storage Areas - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-135
|
CEMP-ET |
Standard Practice for Concrete Pavements - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-136
|
CEMP-ET |
Drainage and Erosion Control Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-137
|
CEMP-ET |
Soil Stabilization for Pavements - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-138
|
CEMP-ET |
Pavement Criteria for Seasonal Frost Conditions - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-141
|
CEMP-ET |
Airfield Flexible Pavement - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-142
|
CEMP-ET |
Airfield Rigid Pavement - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-150
|
CEMP-ET, DAEN-ECE-G |
Storage Depots - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-152
|
CEMP-ET |
Railroads - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-160
|
CEMP-ET |
Water Supply, General Considerations - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-161
|
CEMP-ET |
Water Supply, Water Sources - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-162
|
CEMP-ET |
Water Supply, Water Treatment - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-163
|
CEMP-ET |
Water Supply, Water Storage - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-164
|
CEMP-ET |
Water Supply, Water Distribution - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-166
|
CEMP-ET |
Water Supply, Fire Protection - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-172
|
CEMP-ET |
Domestic Wastewater Treatment - Mobilization Construction |
5/11/1984 |
|
|
EM 1110-3-173
|
CEMP-ET |
Sanitary and Industrial Wastewater Pumping - Mobilization Construction |
4/9/1984 |
|
|
EM 1110-3-174
|
CEMP-ET |
Sanitary and Industrial Wastewater Collection - Mobilization Construction |
4/9/1984 |
|
|