Engineer Manuals

   Search     
Enter Search Value:
- without any prefix or suffix to find all records where a column contains the value you enter, e.g. Net
- with | prefix to find all records where a column starts with the value you enter, e.g. |Network
- with | suffix to find all records where a column ends with the value you enter, e.g. Network|
- with | prefix and suffix to find all records containing the value you enter exactly, e.g. |Network|

Pub Number Proponent Title Pub Date Latest Review Info
EM 1110-2-1619 CECW-EH-Y Risk-Based Analysis for Flood Damage Reduction Studies 8/1/1996 This manual describes and provides procedures for risk and uncertainty for Corps of Engineers flood damage reduction studies.
EM 1110-2-4000 CECW-EH-Y Sedimentation Investigations of Rivers and Reservoirs 10/31/1995 Provides current guidance and engineering procedures for river and reservoir sedimentation investigations.
EM 1110-2-38 CECW-EM Environmental Quality in Design of Civil Works Projects 5/3/1971 This manual furnishes guidance on the environmental quality aspects of engineering design for Civil Works Projects.
EM 1110-2-2503 CECW-EP Design of Sheet Pile Cellular Structures Cofferdams and Retaining Structures 6/11/1990 Provisions for the design of sheet pile cellular cofferdams are set forth in ER 1110-2-2901.
EM 1110-1-1804 CECW-ET Geotechnical Investigations 1/1/2001 This manual establishes criteria and presents guidance for geotechnical investigations during the various stages of development for both civil and military projects.
EM 1110-1-4012 CECW-ET Precipitation/Coagulation/Flocculation 11/15/2001 This Engineer Manual (EM) was written to provide guidance for determining if precipitation, coagulation, flocculation (P/C/F) systems are applicable and guidance on how to properly design, specify, and operate P/C/F systems to remove dissolved heavy metals from aqueous waste streams.
EM 1110-2-3401 CECW-ET Thermal Spraying: New Construction and Maintenance 1/29/1999 Provides guidance on thermal spray coating systems to engineering, operations, maintenance, and construction personnel and other individuals responsible for the protection of U.S. Army Corps of Engineers (USACE) civil works structures.
EM 1110-2-501 CECW-ET Design, Construction, and Operation - Small Wastewater Systems 2/1/1999 This manual is intended to provide guidance and criteria for the design and selection of small-scale wastewater treatment facilities.
EM 1110-2-503 CECW-ET Design of Small Water Systems 2/27/1999 Provides guidance and criteria for the design of small water supply, treatment, and distribution systems.
EM 1110-2-6050 CECW-ET Response Spectra and Seismic Analysis for Concrete Hydraulic Structures 6/30/1999 Describes the development and use of response spectra for the seismic analysis of concrete hydraulic structures. The manual provides guidance regarding how earthquake ground motions are characterized as design response spectra and how they are then used in the process of seismic structural analysis and design.
EM 1110-2-1902 CECW-EW Slope Stability 10/31/2003 This engineer manual (EM) provides guidance for analyzing the static stability of slopes of earth and rock-fill dams, slopes of other types of embankments, excavated slopes, and natural slopes in soil and soft rock. Methods for analysis of slope stability are described and are illustrated by examples in the appendixes.
EM 1110-2-2611 CECW-EW Engineering for Prefabricated Construction of Navigation Projects 2/1/2004 Provides  guidance to help Districts in developing innovative plans to use precast concrete segments and other prefabricated elements for construction of navigation projects.
EM 1110-2-5025 CECW-EW Engineering and Design, Dredging and Dredged Material Management 7/31/2015 This manual supersedes EM 1110-2-5025, 25 March 1983; EM 1110-2-5026, 30 June 1987; and EM 1110-2-5027, 30 September 1987.
EM 1110-2-6051 CECW-EW Time-History Dynamic Analysis of Concrete Hydraulic Structures 12/22/2003 This manual describes procedures for the linear-elastic time-history dynamic analysis and development of acceleration time-history dynamic analysis for seismic design and evaluation of concrete hydraulic structures (CHS).
EM 500-1-24 CECW-OE-E Corps of Engineers Exercise Manual (COREM) - ANNEX L Classified CONFIDENTIAL -(Stocked and Issued by Proponent) 9/1/1987 Contact the proponent or publications POC for access to this document.
EM 1110-2-1201 CEEC-EH Reservoir Water Quality Analysis 6/30/1987 Provides guidance for the assessment of reservoir water quality conditions, including reservoir pool, releases and tail waters.
EM 200-1-12 CEMP-CE Environmental Quality: Conceptual Site Models 8/11/2023 Provides guidance to assist any organization or project deliver team involved in evaluation and decision-making for environment response actions where munitions and explosives of concern, chemical warfare material,  and/or hazardous, toxic, and radioactive waste/munitions constituents are known or suspected to be present.
EM 200-1-15 CEMP-CE Environmental Quality Technical Guidance For Military Munitons Response Actions 10/30/2018 This manual provides the United States Army Corps of Engineers (USACE) Project Delivery Team with the processes for executing the technical aspects of munitions response (MR) projects. The foundation of Corps of Engineers environmental work is the Environmental Operating Principles as specified in ER 200-1-5. These seven tenets serve as guides and must be applied in all Corps business lines as we strive to achieve a sustainable environment.
EM 200-1-16 CEMP-CE Environmental Quality - Environmental Statistics 5/31/2013 Provides practical guidance for statistical evaluations of environmental chemical data to ultimately improve the quality of decisions.
EM 200-1-19 CEMP-CE IN-SITU AIR SPARGING 12/31/2013 the primary purpose of this EM is to provide guidance for evaluation of the feasibility of in-situ air sparging (IAS) for remediation of contaminated groundwater and soil.
EM 200-1-21 CEMP-CE Design: IN SITU Thermal Remediation 5/30/2014 This manual supersedes EM 1110-1-4015; dated 28 August 2009
EM 200-1-22 CEMP-CE Landfill Gas Collection and Treatment Systems 4/30/2013 Establishes criteria and guidance for landfill gas collection and treatment systems. The foundation of Corps of Engineers environmental work is the Environmental Operating Principles as specified in ER 200-1-5.
EM 200-1-10 CEMP-CE/CECW-EC Environmental Quality - Guidance for Evaluating Performance-Based Chemical Data 3/1/2021 This Engineer Manual (EM) provides specific guidance, procedures, criteria, and tools to improve the evaluation of chemical environmental data. This Engineer Manual supersedes EM 200-1-10, dated 30 June 2005.
EM 405-1-03 CEMP-CR Real State Geospatial Data and Mapping 9/30/2016 This manual provides detailed technical guidance and procedures for compliance with the policy in Engineer Regulation (ER) 405-1-3, Real Estate Geospatial Data and Mapping.
EM 1110-3-130 CEMP-ET Geometrics for Roads, Streets, Walks, and Open Storage Areas - Mobilization Construction 4/9/1984 Provides guidance for design and layout of roads, streets, walks, and open storage areas for U .S  Army mobilization facilities .
EM 1110-3-131 CEMP-ET Flexible Pavements for Roads, Streets, Walks and Open Storage Areas - Mobilization Construction 4/9/1984 Provides guidance for designing flexible pavements for roads, streets, walks, and open storage areas for U .S  Army mobilization facilities .
EM 1110-3-132 CEMP-ET Rigid Pavements for Roads, Streets, Walks and Open Storage Areas - Mobilization Construction 4/9/1984 Provides guidance for the design of rigid pavements for roads, streets, walks and open storage areas at U .S  Army mobilization installations .
EM 1110-3-135 CEMP-ET Standard Practice for Concrete Pavements - Mobilization Construction 4/9/1984 Provides information for the investigation of concrete materials, proportioning, and construction of concrete pavements at U .S  Army mobilization facilities .
EM 1110-3-136 CEMP-ET Drainage and Erosion Control Mobilization Construction 4/9/1984 Provides guidance for standards to be used for drainage erosion control for U.S  Army mobilization construction .
EM 1110-3-137 CEMP-ET Soil Stabilization for Pavements - Mobilization Construction 4/9/1984 Provides guidance for the design and improvement of the structural quality and workability of soils used for base courses, sub base courses, select materials, and sub grades for pavements construction for U.S  Army mobilization facilities .
EM 1110-3-138 CEMP-ET Pavement Criteria for Seasonal Frost Conditions - Mobilization Construction 4/9/1984 Provides guidance for the design and construction of pavements placed on sub grade or base course materials subject to seasonal frost action .
EM 1110-3-141 CEMP-ET Airfield Flexible Pavement - Mobilization Construction 4/9/1984 Provides guidance for designing airfield flexible pavement for U .S  Army mobilization facilities .
EM 1110-3-142 CEMP-ET Airfield Rigid Pavement - Mobilization Construction 4/9/1984 Provides guidance for the design of Army airfield rigid pavement at U .S  Army mobilization installations .
EM 1110-3-152 CEMP-ET Railroads - Mobilization Construction 4/9/1984 Provides guidance for the design and construction of railroad facilities at U .S  Army mobilization installations .
EM 1110-3-160 CEMP-ET Water Supply, General Considerations - Mobilization Construction 4/9/1984 Provides guidance in determining water requirements and in selection and planning of water supply systems for U .S  Army mobilization facilities .
EM 1110-3-161 CEMP-ET Water Supply, Water Sources - Mobilization Construction 4/9/1984 Provides guidance for developing or investigating water sources at U.S  Army mobilization installations.
EM 1110-3-162 CEMP-ET Water Supply, Water Treatment - Mobilization Construction 4/9/1984 This manual establishes water quality standards and design criteria for water treatment processes at U .S  Army mobilization facilities .
EM 1110-3-163 CEMP-ET Water Supply, Water Storage - Mobilization Construction 4/9/1984 Provides guidance in determining water storage requirements for U .S  Army mobilization facilities .
EM 1110-3-164 CEMP-ET Water Supply, Water Distribution - Mobilization Construction 4/9/1984 Provides information for the design and construction of water distribution systems at U.S., Army mobilization installations.
EM 1110-3-166 CEMP-ET Water Supply, Fire Protection - Mobilization Construction 4/9/1984 This manual establishes the minimum water supply requirements for fire protection at U .S  Army mobilization facilities .
EM 1110-3-172 CEMP-ET Domestic Wastewater Treatment - Mobilization Construction 5/11/1984 Provides guidance for the planning and design of domestic wastewater treatment plants at U .S  Army mobilization facilities .
EM 1110-3-173 CEMP-ET Sanitary and Industrial Wastewater Pumping - Mobilization Construction 4/9/1984 Provides guidance for the design and construction of sanitary and industrial wastewater pumping facilities at U .S  Army mobilization installations .
EM 1110-3-174 CEMP-ET Sanitary and Industrial Wastewater Collection - Mobilization Construction 4/9/1984 Provides guidance for the design of gravity systems for sanitary and industrial wastewater collection at U .S  Army mobilization facilities .
EM 1110-3-176 CEMP-ET Incinerators - Mobilization Construction 4/9/1984 Provides guidance for the design of incinerators for combustible waste materials at U.S  Army mobilization facilities .
EM 1110-3-177 CEMP-ET Sanitary Landfill - Mobilization Construction 4/9/1984 Provides guidance for the construction and operation of sanitary landfills at U.S  Army mobilization facilities .
EM 1110-1-501 CEMP-ET, DAEN-CWE-BU, DAEN-MPE-D Process Design Manual for Land Treatment of Municipal Wastewater 5/20/1982 Provides a description of  the basic principles of land treatment and to present a rational procedure for the planning and design of land treatment systems.
EM 1110-3-150 CEMP-ET, DAEN-ECE-G Storage Depots - Mobilization Construction 4/9/1984 Provides guidance for the design and layout of railroads, roadways, storage yards and warehouse site planning for U .S  Army mobilization facilities .
EM 1110-1-4008 CEMP-RA Liquid Process Piping 5/5/1999 Provides information for the design of liquid process piping.
EM 1110-1-4011 CEMP-RA Construction Quality Assurance (CQA) Plan - Requirements for Hazardous Waste Landfills 10/1/1999 This engineer manual transmits a document which describes CQA inspection requirements for hazardous waste landfill covers and liners. The appendix of this document is a template for landfill CQA plans to assist designers in incorporating the important aspects of CQA.
EM 1110-1-4006 CEMP-RT Removal of Underground Storage Tanks (USTs) 9/30/1998 Provides practical guidance for removal of underground storage tanks (USTs). The manual addresses site evaluation, monitoring, testing, removal, and site restoration.
Page 3  of  4 First Previous 1 2 [3] 4 Next Last