Engineer Regulations

Enter Search Value:
- without any prefix or suffix to find all records where a column contains the value you enter, e.g. Net
- with | prefix to find all records where a column starts with the value you enter, e.g. |Network
- with | suffix to find all records where a column ends with the value you enter, e.g. Network|
- with | prefix and suffix to find all records containing the value you enter exactly, e.g. |Network|
   Search     

Pub Number Proponent Title Pub Date Latest Review Info
ER 37-1-24 CERM-B Operating Budgets 12/31/2001 Provides policy guidance for the preparation and utilization of operating budgets.
ER 37-1-31 CERM-B Financial Administration - Planning, Programming, Budgeting and Executing Operations 8/1/2002 Establishes the policies, responsibilities and basic procedures for the management of the U.S. Army Corps of Engineers (USACE) resources (Executive Direction and Management & Operation and Maintenance, Army) (ED&M & OMA).
ER 1110-1-8157 CECW-CT Geotechnical Data Quality Management for Hazardous Waste Remedial Activities 10/1/2002 Prescribes Geotechnical Data Quality Management responsibilities and requirements, from initial investigation through closeout at sites contaminated with hazardous, toxic, and radioactive waste
ER 690-1-1212 CEHR-E / CECW-E / CEMP-ZB Professional Registration as a Selective Placement Factor 3/31/2004
ER 37-1-18 CERM-B U.S. Army Corps of Engineers Sponsored and Co-sponsored Meetings 8/10/2004 Provides guidance and instructions for conducting all USACE sponsored/co-sponsored meetings and outlines specific procedures for all USACE non-training meetings/conferences/workshops that involve 25 or more Department of Army (DA) personnel in a TDY status.
ER 1110-2-8160 CECW-CE, CECW-CO, CECW-P Engineering and Design: Policies for Referencing Project Evaluation Grades To Nationwide Vertical Datums 3/1/2009 Establishes U.S. Army Corps of Engineers (USACE) policies for referencing project elevation grades to nationwide vertical datums established and maintained by the U.S. Department of Commerce.
ER 1110-2-8157 CECW-CE, CECW-CO Responsibility for Hydraulic Steel Structures 6/15/2009 Defines engineering responsibilities for design, construction and operation of hydraulic steel structures.
ER 5-1-16 CEMP-CN Management Capacity Development - International 6/30/2009 Establishes policies for capacity development (CD) for international programs and projects conducted by the US Army Corps of Engineers (USACE) and serves as requirements basis documents for CD planning and implementation for USACE international programs and projects.
ER 385-1-31 CESO The Control of Hazardous Energy 11/1/2009 Errata Sheet No.2, Page 7-4, Paragraph 7-3(a): change the word “oversee” to the phrase “coordinate with” To establish consistent procedures and criteria for the safe and reliable control of hazardous energy at USACE operated facilities with full implementation as is practical, but within no longer than two years from the date of this regulation only for items that require budget adjustments to accomplish.
ER 385-1-80 CESO Ionizing Radiation Protection 6/30/2010 Assigns safety and health responsibilities to Safely and effectively, use radioactive materials.
ER 385-1-40 CESO Occupational Health Program 9/20/2010 Prescribes policies, outlines responsibilities, and provides procedures for the development and execution of the U.S. Army Corps of Engineers (USACE) Occupational Health (OH) Program
ER 11-1-321 CECW-CE Army Programs - Value Engineering 1/1/2011 Provides general policy, procedures, and a framework for the execution of the Value Engineering (VE) elements within the Project Management Business Process (PMBP) of  the USACE.
ER 500-1-28 CECW-HS Emergency Employment of Army and Other Resources - National Response Planning Guide 1/31/2011 Establishes policy, provides planning guidance and assigns responsibilities to ensure timely execution of Emergency Support Function (ESF) #3, Public Works and Engineering, in support of the National Response Framework (NRF), and for high impact, low probability catastrophic events, as determined by Headquarters, USACE (HQUSACE).
ER 1125-2-307 CECW-CO SUBSISTENCE, QUARTERS, AND ALLOWANCES 2/1/2011 Prescribes procedures for the operation of messing and quartering facilities on Civil Works floating plant and the requirements and conditions for furnishing subsistence and/or quarters.
ER 1110-2-500 CEMP-CE EPA/USACE Superfund Program Funding and Reporting Requirements 10/31/2011 Provides general policy and guidance for establishing procedures governing the funds management and reporting requirements for Interagency
Agreements (IAAs) issued by the U.S. Environmental Protection Agency (EPA) to the U.S. Army Corps of Engineers (USACE) for the EPA Superfund Program.
ER 1110-1-8152 CEMP CECW Professional Registration and Signature on Design Documents 1/24/2012 Provides policy and guidance on professional registration of USACE civilian team members in all occupations included in career program (CP)-18 (Engineers & Scientists � Resources & Construction).
ER 1180-1-9 CECW-CE DESIGN-BUILD CONTRACTING 3/31/2012 Prescribes authorities and procedures for the use of design-build contracting by USACE.
ER 10-1-50 CEMP-CE U.S. Army Corps of Engineers Environmental and Munitions Mandatory Center of Expertise 4/30/2012 Defines the mission and the organization of the U.S. Army Corps of Engineers (USACE) Environmental and Munitions Mandatory Center of Expertise (EMMCE).
ER 415-1-10 CECW-CE Contractor Submittal Procedures 4/30/2012
ER 350-3-3 CEHR-M USACE/USMA/ROTC Cadet Training Program (CDEP) 5/12/2012 Defines procedures for the USACE/Military Academy (USMA) /Cadet Command (USACC) Cadet Engineer Program (CDEP).
ER 385-1-224 CESO USACE Safety Award and Recognition Program 6/29/2012 Establishes the criteria and procedures for the Chief of Engineers Safety Awards and Recognition Program, guidance for USACE participation in Department of the Army Safety Awards, and guidance for the establishment of safety award and recognition programs at Subordinate Commands
ER 1110-1-8156 CECW-CE Policies, Guidance, and Requirements for Geospatial Data and Systems 9/1/2012 Provides a framework that promotes interoperability through the use of data standards and an open platform to move data seamlessly throughout the organization
ER 10-1-51 CECW-CE Roles and Responsibillities - Dam Safety Modification Mandatory Center of Expertise 9/28/2012 Establishes the roles and responsibilities of the Dam Safety Modification Mandatory Center of Expertise (DSMMCX) located within the Huntington District, U.S. Army Corps of Engineers (USACE).
ER 385-1-89 CESO Hearing Conservation Program 10/15/2012 The purpose of this document is to prevent occupational related hearing loss among U.S. Army Corps of Engineers (USACE) personnel
ER 15-2-13 CECW-CE Greater Mississippi River Basin Water Management Board 4/30/2013 Establishes and prescribes the objectives, composition, responsibilities and authority for the U.S. Army Corps of Engineers (Corps) Greater Mississippi River Basin Water Management Board.
ER 37-1-28 CERM-F Continuing Resolution Authority (CRA) 4/30/2013 Change 1 - Establishes the procedures by which the U.S. Army Corps of Engineers (USACE) activities will operate under and immediately following the enactment and the subsequent termination of one or more Continuing Resolutions.
ER 10-1-52 CERM-M Missions, Organizational Structure, and Functions Humphreys Engineer Center Support Activity 5/31/2013 Designates the major organizations, missions and functions of the Corps of Engineers, Humphreys Engineer Center Support Activity (CEHEC).
ER 10-1-54 CECW-CE Roles and Responsibilities Modeling, Mapping, and Consequences Production Center 6/30/2013 Establishes the roles and responsibilities of the national Modeling, Mapping, and Consequences (MMC) Production Center mandatory center of expertise and standardization located within the Vicksburg District, US Army Corps of Engineers (USACE).
ER 10-1-55 CECW-CE Organization and Functions - Roles and Responsibilities Risk Management Center 6/30/2013 Establishes the roles and responsibilities of the Risk Management Center (RMC) located within the Institute For Water Resources, USACE.
ER 405-1-20 CEMP-CR Real Estate - Federal Legislative Jurisdiction and Annexation 9/30/2013 This Regulation describes the types of legislative and general procedures and responsibilities relates to the acquisition and retrocession of federal legislative jurisdiction over land areas under the control of the Dept of the Army.
ER 405-3-10 CEMP-CR Planning - Military 10/31/2013 This regulation sets forth the authority, policy, responsibility and delegations for Military-Planning for acquisition of real property for use by DA
ER 1110-1-8162 CECW-CE Design and Construction Policy For Electronic Security Systems 1/31/2014 This regulation establishes policies, roles, responsibilities, and procedures for the USACE to execute electronic security (ESS) projects and ESS portions of projects.
ER 1110-1-8163 CECW-CE Design and Construction Policy for Utility Monitoring and Control Systems 1/31/2014 This regulation establishes policies, roles, responsibilities, and procedures for the USACE to execute utility monitoring and control systems (UMCS) projects and UMCS Portions of projects.
ER 405-1-16 CEMP-CR Relocation Assistance Program 1/31/2014 This regulation provides guidance and procedures supplementing the Uniform Regulation at 49 CFR part 24, which implement the uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, as amended, codified at 42 U.S.C. Section 4601, et Seq., the "uniform Act"
ER 11-1-320 CECW-HS Civil Works Emergency Management Programs 2/28/2014 This regulation prescribes policies for the Emergency Management Community of Practice (EM CoP) in the area of Office Homeland Security (CECW-HS) programming, funding, managing and execution of USACE for all hazards preparedness, response, recovery and other contingency operations.
ER 1110-2-1156 CECW-CE Safety of Dams - Policy and Procedures 3/31/2014 NOTE:  Chapters 13 & 16 are RESCINDED on 1Oct2022 --   This regulation supersedes EC 1110-2-6071; EC 1165-2-210; PB 2013-01; ECB 2012-17 and ER 1110-2-1156, Dated 26 Oct 2011
ER 1165-2-502 CECW-P Delegation of Review and Approval Authority for Post-Authorization Decision Documents 3/31/2014 This regulation supersedes ER 1165-2-502; dated 31 March 2007
ER 200-1-4 CECW-I; CEMP-CE; CECC-E Formerly Utilized Sites Remedial Action Program 8/29/2014 This ER Supersedes ER 200-1-4 Dated 30 August 2003
ER 385-1-100 CESO-E ARC Flash Hazard Program 9/30/2014
ER 25-1-106 CECI-ZA Information Techonology Capital Planning and Investment Management 10/31/2014 This regulation establishes policy, roles and responsibilities for the U.S. Army Corps of Engineers (USACE) Information Technology (IT) Capital Planning and Investment Management (CPIM) process as prescribed by the Clinger Cohen Act of 1996 and Army Regulation 25-1, Army Information Technology. This ER supersedes ER 25-1-106, dated 22 June 2006 and ER 25-1-2, dated 31 August 1999.
ER 405-1-11 CEMP-CR Real Estate Acquisition 11/28/2014 This regulation supesedes ER 405-1-12, Chapter 5, dated 20 November 2985
ER 385-1-95 CESO Safety and Requirements for Operations and Activities Involving Munitions and Explosives of COncern 12/31/2014 This ER supersedes ER 385-1-95, dated 30 Mar 07
ER 1110-1-8159 CECW-CE Engineering and Design - DRCHECKS 1/1/2015 This ER supersedes ER 1110-1-8159, dated 10 May 2001
ER 10-1-53 CECW-CE Roles and Responsibilities, Hydroelectric Design Center 4/30/2015 This regulation updates the roles and responsibilities of the U.S. Army Corps of Engineers District, Portland, Hydroelectric design Center (HDC) as the Mandatory Center of Expertise (MCX) for hydroelectric power economic evaluation, engineering and design and a Technical Center of Expertise (TCS) for pumping plant engineering and design. It also prescribes the requirements for the level of involvement by HDC in U.S. Army Corps of Engineers (UACE) hydropower work provides guidance for interfacing the resources of HDC with ose of the requesting USACE command.
ER 700-1-1 CELD-ZA USACE Supply Policies and Procedures 4/30/2015 Provides policy for the acquisition, accountability, management, and disposal of supplies and personal property used within USACE.
ER 405-1-19 CEMP-CR Real Estate: Acquisition By Condemnation Proceedings 5/29/2015 ER 405-1-12, Chapter 5, Acquistion, 5 Sept 78, was rescinded by ER 405-1
ER 1165-2-208 CECW-P In-Kind Contribution Credit Provisions of Sections 221(a)(4) of the Flood Control Act of 1970, as amended 12/6/2015 This regulation supersedes ER 1165-2-208, dated 17 February 2012.
ER 405-1-4 CEMP-CR Appraisal 1/29/2016 This ER rescinds ER 405-1-12, Chapter 4, dated 18 December 1998
ER 1165-2-209 CECW-P Studies of Water Resources Development Projects by Non-Federal Interest 2/4/2016 This Engineer Regulation supersedes ER 1165-2-122, dated 26 August 1991
ER 1110-3-113 CECW-CE Department of the Army Facilities Standardization Program 4/21/2016 This Engineer Regulation supersedes ER 1110-3-113, dated 27 September 1993
Page 3  of  6 First Previous 1 2 [3] 4 5 6 Next Last