Engineer Pamphlets

   Search     
Enter Search Value:
- without any prefix or suffix to find all records where a column contains the value you enter, e.g. Net
- with | prefix to find all records where a column starts with the value you enter, e.g. |Network
- with | suffix to find all records where a column ends with the value you enter, e.g. Network|
- with | prefix and suffix to find all records containing the value you enter exactly, e.g. |Network|

Pub Number Proponent Title Pub Date Latest Review Info
EP 310-1-6b CECW-CO-N Sign Standards Manual, VOL 2, Appendices 6/1/2006 The purpose of this manual is to provide guidance for effective management of the Corps sign program.
EP 1105-3-1 CEMP-OP Planning: Base Camp Development In The Theater Of Operations 1/19/2009 Base camps can act as power projection platforms throughout full spectrum operations while allowing the promulgation of the operational mission intent in a most effective, efficient, and sustainable manner that enables force protection and augmentation of the CCDR's mission assets
EP 5-1-1 CEMP-CN Management Capacity Development - International 6/30/2009 This pamphlet provides general guidance and a framework for the planning and implementation of international capacity development (CD) for programs and projects conducted or supported by the U.S. Army Corps of Engineers (USACE).
EP 400-2-1 CESPK-CO-O Enjoy Corps Lands and Waters Today 7/1/2009 Find the Corps recreation area near you.
EP 360-1-25 CEPA USACE Corporate Brochure 1/25/2010
EP 690-2-2 CECW-CO Career Development Guide for Civil Works Natural ResourcesManagement Team Members 5/14/2010 a.  This pamphlet is designed to provide guidance to proactive Natural Resources Management (NRM) team members in designing a path that can help lead to achieving long-term career goals or hight-level positions.
EP 500-1-2 CEDC-GP Emergency Employment of Army and Other Resources - Field Force Engineering - United States Army Corps of Engineers Support to Full Spectrum Operations 8/1/2010 This pamphlet fills a fundamental role in describing FFE as the means for USACE support to full spectrum operations.
EP 385-1-97 CESO-E Your Mission is to Work Safely 1/1/2011 Guide to a Successful Safety Program
EP 200-1-18 CEMP-RA Environmental Quality: Five-year Reviews of Military Munitions Response Projects 9/30/2011 This Engineer Pamphlet (EP) provides U.S. Army Corps of Engineers (USACE) personnel with procedural guidance for performing Five-Year Reviews for projects under the Military Munitions Response Program (MMRP).
EP 200-3-1 CEMP-CE Environmental Quality: Public Participation Requirements for Defense Environmental Restoration Program 9/30/2011 This pamphlet provides U.S. Army Corps of Engineers (USACE) personnel with information on public participation activities required during CERCLA actions, such as Military Munitions Response Program (MMRP) and Hazardous, Toxic, and Radioactive (HTRW) Response Actions.
EP 715-1-7 CECW-CE, CEPR-P Architect Engineer Contracting in USACE 2/29/2012 This pamphlet provides guidance and procedures for contracting for architect-engineer with the Brooks Architect-Engineer Act and the acquisition
regulations referenced below. The guidance and procedures in this pamphlet promote fair, efficient and consistent A-E contracting practices throughout the U.S. Army Corps of Engineers (USACE).
EP 360-1-33 CEPA USACE Building Strong People 1/25/2013
EP 1100-1-1 CECW-Z Federal Support Toolbox for IWRM 5/13/2013 Provide a comprehensive on-line toolbox
of water information across all levels of
government and organizations
EP 385-1-100 CESO Implementation of ARC Flash Hazard Program 9/30/2014
EP 690-1-824 CECW-HS Career Development and Training Guide for the Emergency Management Community of Practice and Contingency Operations Workforce 7/31/2015 Applicability. This guide applies specifically to HQUSACE elements, Divisions, Districts, Field Operating Activities (FOA), Labs, and Centers of Exprestise
EP 200-1-24 CEMP-CED Environmental Quality - Air Pathway Analysis for the Design of Remedial Action Projects 9/30/2015 Purpose.  This pamphlet describes Air pathway Analysis (APA) proceures. Applicability. Applies to all USACE commands responsibile for the design of remedial action projects that will be funded from USACE appropriations.
EP 360-1-31 CEPA Risk-Informed Dam Safety Program 2/29/2016
EP 415-1-260 CECW-CE Area/Resident Engineer Management Guide 3/31/2016 This Engineer Pamphlet supersedes EP 415-1-260, Dated 6 December 1990
EP 415-1-261_6 CECW-EC Quality Assurance Representative's Guide - Building Envelopes - Vol 6 4/21/2016 Building Envelopes
EP 1140-1-1 CEMP-CN USACE Interagency and International Services 5/17/2016
EP 200-1-15 CEMP-RT Environmental Quality: Standard Scopes of Work for HTRW Risk Assessments 6/30/2016 This pamphlet supersedes EP 200-1-15, dated 15 December 2001
EP 1100-1-2 CECW-EC U.S. Army Corps of Engineers Resilience Initiative Roadmap 10/16/2017 This document was originally provided USACE-wide via “The Chief Sends” (email) from LTG Bostick, 53rd Chief of Engineers, on 16 MAY 2016. Its issuance as an EP isdone so that the Roadmap is part of the permanent USACE publication record.
EP 11-1-320 CECW-HS Civil Works Emergency Management Programs Financial Management Process 10/31/2017 This Engineer Pamphlet prescribes procedures for the US Army Corps of Engineers Emergency Management Community of Practice for the management and execution of programming, funding, and budgeting processes that support the USACE Emergency Management Program.
EP 1105-1-1 CE-CW-CE Sponsor's Guide to the USACE Levee Safety Program 6/1/2018 Levees are critical flood risk management infrastructure that help reduce the frequency of flooding for people and property. More than a trillion dollars of public and private property, including homes and businesses, are behind USACE levees. These leveed areas also contain critical infrastructure, such as highways, hospitals, schools and utilities, and significant environmental and cultural resources
EP 1100-1-3 CECW-EC USACE Sustainability: Definition and Concepts Guide 7/19/2018 This pamphlet clarifies sustainability-related terms and definitions to help orient and align staff on practices consistent with the Environmental Operating Principles (EOP), Guiding Principles for Sustainable Federal Buildings (GP), Civil Works Strategic Plan (CWSP), and other directives.
EP 1105-2-57 CECW-P Planning: Stakeholder Engagement, Collaboration, and Coordination 3/1/2019 This pamphlet explains the benefits of, and requirements for, stakeholder engagement, collaboration, and coordination in Civil Works planning studies.
EP 1105-2-58 CECW-P Continuing Authorities Program 3/31/2019 This appendix provides the policy and procedural guidance for planning, design, and implementation of projects pursued under the legislative and administrative provisions of the Continuing Authorities Program (CAP).  CAP consists of a group of nine legislative authorities under which the Secretary of the Army, acting through the Chief of Engineers, is authorized to plan, design, and implement certain types of water resources projects without additional project specific congressional authorization.  Table 1 lists the CAP authorities, the Authority/Title is the commonly referenced name based on the “section” of the Act which first provided the authority.  Overview and policies for each purpose are found in the identified Chapter 3 of Engineer Regulation (ER) 1105-2-100.  This EP supersedes/rescinds Appendix F of ER 1105-2-100 Planning Guidance Notebook.
EP 1110-2-17 CECW-EC A Guide to Public Alerts and Warning for Dam and Levee Emergencies 4/30/2019 To assist the emergency manager in issuing more timely and effective public alert and warning messages for floods caused by dam breaches, controlled dam releases, and levee breaches or overtopping.
EP 1110-2-18 CECW-CE Guidelines for Landscape Planting And Vegetation Management At Levees, Floodwalls, Embankment Dams, And Appurtenant Structures 5/1/2019 This EP provides guidelines to assure that landscape planting and vegetation management provide aesthetic and environmental benefits without compromising the reliability of levees, floodwalls, embankment dams, and appurtenant structures.
EP 310-1-6a CECW Sign Standards Manual, VOL 1 5/1/2019
EP 25-30-1 CEIT-OPI-PF Publications Formatting Quick Tips 6/11/2019 This Quick Guide (rack card) is designed to assist our customers with the publications review process. This information is derived directly from ER 25-30-1, but gives the customer a quick guide for preparing their publications
EP 1100-2-1 CECW-EC/CECW-P Procedures to Evaluate Sea Level Change: Impacts, Response, and Adaptation 6/30/2019 provides instructional and procedural guidance to analyze and adapt to the direct and indirect physical and ecological effects of projected future sea level change (SLC) on USACE projects and systems of projects needed to implement Engineer Regulation (ER) 1100-2-8162.
EP 1100-2-2 CECW-EC Civil Works Sustainable Infrastructure Practices Guidebook 12/1/2019 The U.S. Army Corps of Engineering (USACE) Environmental Operating Principles (EOP) encourages staff to “create mutually supporting economic and environmentally sustainable solutions” (Refs. 5.a., 5.b.).
EP 25-1-117 CECW-CO State of the Infrastructure-A Joint Report by the Bureau of Reclamation and the U.S. Army Corps of Engineers 12/1/2019 The December 2019, "State of the Infrastructure, A Joint Report by the Department of Interior, Bureau of Reclamation (Reclamation) and the U.S. Army Corps of Engineers Civil Works (USACE)" (EP-25-1-117) enhances public awareness of federal water resource infrastructure and the strengths and challenges of owning, operating and maintaining this infrastructure.
EP 1100-2-3 CECW-EC Civil Works Guide To Sustainable Infrastructure Requirements 6/1/2020 The U.S. Army Corps of Engineers (USACE) Environmental Operating Principles (EOP) encourage staff to “create mutually supporting economic and environmentally sustainable solutions” (Refs. 4.a., 4.b.)
EP 1100-1-5 CECW-EC USACE Guide to Resilience Practices 12/1/2020 Resilience is the ability to anticipate, prepare for, and adapt to changing conditions and withstand, respond to, and recover rapidly from disruptions.
EP 1110-1-15 CECW-EG Cooperation with State Geological Surveys 1/11/2021 The purpose of this pamphlet is to encourage USACE cooperation and coordination with State Geological Surveys.
EP 690-1-827 CECI-HC CIO/G-6 Careers Brochure 1/15/2021 Careers Brochure” is intended to be a resource for use in career fairs or hiring events and an information source for potential new-hires.
EP 715-1-8 CECT-ZA Contract Specialist Proficiency Guide 3/19/2021 This guide is for use by USACE Contract Specialist and the mentors, supervisors, and Contracting Officers involved in training Contracting Specialists.
EP 690-2-3 CECW-CE Guidelines for the Career Development of Geotechnical Engineers, Geologists, and Material Engineers. 6/1/2021 The U.S. Army Corps of Engineers (USACE) must continue to develop and maintain a highly trained and experienced geotechnical staff to support all engineering activities. The guidelines in this pamphlet describe the experience, education, training, and skill development opportunities that USACE geotechnical, geology, and materials professionals (referred to collectively as geotechnics professionals) are suggested to acquire.
EP 1110-1-8 CECW-EC Construction Equipment Ownership and Operating Expense Schedule 8/12/2021 This Engineer Pamphlet (EP) is authorized by and established consistent with Federal Acquisition Regulation (FAR) 31.105 and U.S. Army Corps of Engineers (USACE) Acquisition Instructions (UAI) Subpart 5131.1: Applicability, 5131.105: Construction and Architect-Engineer (A-E) Contracts. This EP establishes predetermined equipment ownership and operating expense rates for construction equipment. Rates and additional information can be found online at https://www.usace.army.mil/Cost-Engineering/EP1110-1-8/.
EP 1180-1-1 CECC-C Service Contract Act Labor Relations 1/31/2022 This pamphlet is designed to provide basic guidelines for all Corps employees tasked with the administration of Service Contract Act (SCA) responsibilities. Its primary aim is to effect a uniform and consistent program of administration of labor standards responsibilities throughout the Corps. With the exception of very complex and unusual problems, this pamphlet attempts to provide answers to questions that most generally arise in connection with service contract labor standards. Official acquisition policy is found in the Federal Acquisition Regulation, and its supplements. If there is any conflict between the FAR system requirements and this pamphlet, the current FAR system rules apply.
EP 25-1-114 CECI-PID Emergency Operations Procedures for all Personnel During Natural and Man-made Disasters 3/31/2022 This Engineer Pamphlet establishes policies, responsibilities, and procedures for managing records created during an emergency operation natural and manmade disaster
EP 360-1-36 CEPA Guidance For Preparation of Information Products in Print, Electronic and Internet Formats. 6/3/2022 This pamphlet prescribes policy for the consistent use of branding in internal and external information products by the members of USACE.
EP 1130-2-510 CECW-CO Hydroelectric Power Operations and Maintenance Guidance and Procedures 7/31/2022 This pamphlet establishes the guidance for the operation and maintenance (O&M) of USACE hydroelectric power generation facilities and related structures at civil works water resource projects and supplements Engineer Regulation (ER) 1130-2-510.
EP 1105-2-63 CECW-P Guide for Incorporating Life Risk in USACE Flood and Coastal Storm Risk Management Project Development. 9/1/2022 This guide provides information on how the U.S. Army Corps of Engineers  (USACE) incorporates life risk in the planning process for both new and existing projects, and in  inland and coastal environments.
EP 1130-2-553 CECW-OP Guidance For Operational Condition Assessment of USACE Inland Navigation and Flood Risk Management Assests 11/18/2022
EP 200-1-2 CEMP-CE Process and Procedures for Shipping Hazardous Wastes and Other Hazardous Materials 12/1/2022 The enclosed appendix is a guide to the procedures and responsibilities primarily associated with the manifesting of hazardous wastes in accordance with the requirements of the Resource Conservation and Recovery Act and the Department of Transportation regulations.
EP 1130-2-554 CECW-CO Guidance for Operational Condition Assessments of USACE Recreation Condition Assessment 5/1/2023
EP 415-1-261_7 CECW-EC Quality Assurance Representative’s Guide - Dredging and Dredge Inspection - Vol 7 6/1/2023 supersedes EP 1130-2-310 dated Jun 1963
Page 2  of  3 First Previous 1 [2] 3 Next Last