EP 200-1-24
|
CEMP-CED |
Environmental Quality - Air Pathway Analysis for the Design of Remedial Action Projects |
9/30/2015 |
|
|
EP 690-1-824
|
CECW-HS |
Career Development and Training Guide for the Emergency Management Community of Practice and Contingency Operations Workforce |
7/31/2015 |
|
|
EP 415-1-261_4
|
CECW-EC |
Quality Assurance Representative's Guide - Special Construction, Conveying Systems, Mechanical, and Electrical Features of Buidling Construction -Vol 4 |
12/1/1992 |
|
|
EP 415-1-261_2
|
CECW-EC |
Quality Assurance Representative's Guide - Pile Driving, Dams, Levees and Related Items -Vol 2 |
3/31/1992 |
|
|
EP 415-1-261_1
|
CECW-EC |
Quality Assurance Representative's Guide - General Information and Sitework - Vol 1 |
1/2/1992 |
|
|
EP 415-1-261_7
|
CECW-EC |
Quality Assurance Representative’s Guide - Dredging and Dredge Inspection - Vol 7 |
6/1/2023 |
|
|
EP 415-1-261_5
|
CEMP-C |
Quality Assurance Representative's Guide - Technologies used at hazardous, toxic, and radioactive waste (HTRW) sites to contain or clean up contamination. - Vol 5 |
7/15/1997 |
|
|
EP 1130-2-553
|
CECW-OP |
Guidance For Operational Condition Assessment of USACE Inland Navigation and Flood Risk Management Assests |
11/18/2022 |
|
|
EP 415-1-261_6
|
CECW-EC |
Quality Assurance Representative's Guide - Building Envelopes - Vol 6 |
4/21/2016 |
|
|
EP 1130-2-500
|
CECW-O |
Partners and Support (Work Management Guidance and Procedures) |
12/27/1996 |
|
|
EP 1130-2-540
|
CECW-ON |
Environmental Stewardship and Maintenance Guidance and Procedures |
11/15/1996 |
|
|
EP 415-1-261_3
|
CECW-EC |
Quality Assurance Representative's Guide - Architectural and Structural Features in Building Construction -Vol 3 |
8/1/1992 |
|
|
EP 1105-2-64
|
CECW-P |
Tribal Partnership Program (TPP) |
2/22/2024 |
|
|
EP 360-1-36
|
CEPA |
Guidance For Preparation of Information Products in Print, Electronic and Internet Formats. |
6/3/2022 |
|
|
EP 1100-1-1
|
CECW-Z |
Federal Support Toolbox for IWRM |
5/13/2013 |
|
|
EP 1100-1-2
|
CECW-EC |
U.S. Army Corps of Engineers Resilience Initiative Roadmap |
10/16/2017 |
|
|
EP 1100-1-3
|
CECW-EC |
USACE Sustainability: Definition and Concepts Guide |
7/19/2018 |
|
|
EP 1100-1-5
|
CECW-EC |
USACE Guide to Resilience Practices |
12/1/2020 |
|
|
EP 1100-2-1
|
CECW-EC/CECW-P |
Procedures to Evaluate Sea Level Change: Impacts, Response, and Adaptation |
6/30/2019 |
|
|
EP 1100-2-2
|
CECW-EC |
Civil Works Sustainable Infrastructure Practices Guidebook |
12/1/2019 |
|
|
EP 1100-2-3
|
CECW-EC |
Civil Works Guide To Sustainable Infrastructure Requirements |
6/1/2020 |
|
|
EP 1105-1-1
|
CE-CW-CE |
Sponsor's Guide to the USACE Levee Safety Program |
6/1/2018 |
|
|
EP 1105-2-10
|
CECW-MP |
Six Steps to a Civil Works Project |
5/1/1990 |
|
|
EP 1105-2-57
|
CECW-P |
Planning: Stakeholder Engagement, Collaboration, and Coordination |
3/1/2019 |
|
|
EP 1105-2-58
|
CECW-P |
Continuing Authorities Program |
3/31/2019 |
|
|
EP 1105-2-61
|
CECW-P |
Planning - Feasibility and Post-Authorization Study Procedures and Report Processing Requirements |
7/1/2023 |
|
|
EP 1105-2-63
|
CECW-P |
Guide for Incorporating Life Risk in USACE Flood and Coastal Storm Risk Management Project Development. |
9/1/2022 |
|
|
EP 1105-2-70
|
CECW-P |
Aquatic Ecosystem Restoration Civil Works Mission and Evaluation Procedures |
3/28/2025 |
|
|
EP 1105-3-1
|
CEMP-OP |
Planning: Base Camp Development In The Theater Of Operations |
1/19/2009 |
|
|
EP 1110-1-15
|
CECW-EG |
Cooperation with State Geological Surveys |
1/11/2021 |
|
|
EP 1110-1-16
|
CECW-EP |
Handbook for the Preparation of Storm Water Pollution Prevention Plans for Construction Activities |
2/28/1997 |
|
|
EP 1110-1-22
|
CEMP-RA |
Asbestos Surveys and Assessments - Standard Scope of Work |
9/15/2000 |
|
|
EP 1110-1-23
|
CEMP-RT |
Asbestos Abatement Air Monitoring - Standard Scope of Work |
1/31/1999 |
|
|
EP 1110-1-24
|
CEMP-RA |
Establishing and Maintaining Institutional Controls for Ordnance and Explosives (OE) Projects |
12/15/2000 |
|
|
EP 1110-1-27
|
CEMP-RA |
Operation and Maintenance of Extraction and Injection Wells at HTRW Sites |
1/27/2000 |
|
|
EP 1110-1-28
|
CEMP-RA |
Lead Hazard Risk Assessment for Target Housing/Child-Occupied Facilities - Standard Scope of Work |
8/31/2001 |
|
|
EP 1110-1-29
|
CEMP-RA |
Lead Hazard Clearance Inspection - Standard Scope of Work |
8/31/2001 |
|
|
EP 1110-1-30
|
CEMP-RA |
PRE-DESIGN LEAD/ASBESTOS SURVEY
STANDARD SCOPE OF WORK |
8/31/2001 |
|
|
EP 1110-1-31
|
CEMP-RA |
Engineering and Design - Combined Lead Inspection/Risk Assessment for Target Housing Property Transfers - Standard Scope of Work |
8/31/2001 |
|
|
EP 1110-1-8
|
CECW-EC |
Construction Equipment Ownership and Operating Expense Schedule |
8/12/2021 |
|
|
EP 1110-2-11
|
CECW-EH |
Ice Jam Flooding: Causes and Possible Solutions |
11/30/1994 |
|
|
EP 1110-2-12
|
CECW-ED |
Seismic Design Provisions for Roller Compacted Concrete Dams |
9/30/1995 |
|
|
EP 1110-2-14
|
CECW-EH |
Monograph Prepared by M. Petersen on Inland Navigation and Canalization |
11/30/1997 |
|
|
EP 1110-2-17
|
CECW-EC |
A Guide to Public Alerts and Warning for Dam and Levee Emergencies |
4/30/2019 |
|
|
EP 1110-2-18
|
CECW-CE |
Guidelines for Landscape Planting And Vegetation Management At Levees, Floodwalls, Embankment Dams, And Appurtenant Structures |
5/1/2019 |
|
|
EP 1110-3-2
|
CEMP-ET |
Electromagnetic Pulse (EMP) and Tempest Protection for Facilities |
12/31/1990 |
|
|
EP 1110-345-102
|
CEMP-ET |
Explosives Storage Magazines |
8/31/1995 |
|
|
EP 1110-3-6
|
CEMP-ET |
United States Army Corps of Engineers (USACE) Technology Transfer Systems |
8/14/1992 |
|
|
EP 11-1-3
|
CEMP-ZV, DAEN-ECE_V |
Value Engineering Officer's Operational Guide |
1/1/1987 |
|
|
EP 11-1-320
|
CECW-HS |
Civil Works Emergency Management Programs Financial Management Process |
10/31/2017 |
|
|