EM 1110-2-1619
|
CECW-EH-Y |
Risk-Based Analysis for Flood Damage Reduction Studies |
8/1/1996 |
|
|
EM 1110-2-1701
|
CECW-EH |
Hydropower |
12/31/1985 |
|
|
EM 1110-2-1810
|
CECW-EG |
Coastal Geology |
1/31/1995 |
|
|
EM 1110-2-1901
|
CECW-EG |
Seepage Analysis and Control for Dams |
9/30/1986 |
|
|
EM 1110-2-1902
|
CECW-EW |
Slope Stability |
10/31/2003 |
|
|
EM 1110-2-1906
|
CECW-EG |
Laboratory Soils Testing |
8/20/1986 |
|
|
EM 1110-2-1908
|
CECW-EG |
Instrumentation of Embankment Dams and Levees |
6/30/1995 |
|
|
EM 1110-2-1909
|
CECW-EG |
Calibration of Laboratory Soils Testing Equipment |
3/10/1986 |
|
|
EM 1110-2-1911
|
CECW-ED |
Construction Control for Earth and Rock-Fill Dams |
9/30/1995 |
|
|
EM 1110-2-1913
|
CECW-EG |
Design and Construction of Levees |
4/30/2000 |
|
|
EM 1110-2-1914
|
CECW-EG |
Design, Construction, and Maintenance of Relief Wells |
5/29/1992 |
|
|
EM 1110-2-2000
|
CECW-EG |
Standard Practice for Concrete for Civil Works Structures Proponent: CECW-EG |
3/31/2001 |
|
|
EM 1110-2-2002
|
CECW-EG |
Evaluation and Repair of Concrete Structures |
6/30/1995 |
|
|
EM 1110-2-2006
|
CECW-EG |
Roller-Compacted Concrete |
1/15/2000 |
|
|
EM 1110-2-2007
|
CECW-ED |
Structural Design of Concrete Lined Flood Control Channels |
4/30/1995 |
|
|