ER 1110-2-8166
|
CECW-EC |
Geotechnical, Geology, and Materials Community of Practice Organization |
5/15/2024 |
|
|
ER 1110-2-8165
|
CECW-EC |
Inundation Maps and Emergency Action Plans and Incident Management for Dams and Levee Systems |
9/24/2024 |
|
|
ER 1110-2-8164
|
CECW-CE/ CECW-CE |
Policies, Guidance, and Requirements for Hydrographic Surveying and Mapping Digital Products |
7/25/2017 |
|
|
ER 1110-2-8163
|
CECW-CE |
Ballistic Missile Defense System Mandatory Center of Expertise |
9/30/2016 |
|
|
ER 1110-2-8161
|
CECW-CE |
Structural Design And Evaluation Of Civil Works Buildings |
2/1/2020 |
|
|
ER 1110-2-8160
|
CECW-CE, CECW-CO, CECW-P |
Engineering and Design: Policies for Referencing Project Evaluation Grades To Nationwide Vertical Datums |
3/1/2009 |
|
|
ER 1110-2-8159
|
CECW-ED |
Life Cycle Design and Performance |
10/31/1997 |
|
|
ER 1110-2-8157
|
CECW-CE, CECW-CO |
Responsibility for Hydraulic Steel Structures |
6/15/2009 |
|
|
ER 1110-2-8156
|
CECW-EC |
Errata Sheet #1: Engineering and Design Preparation of Water Control Manuals |
11/11/2018 |
|
|
ER 1110-2-8154
|
CECW-EC |
Water Quality Management |
5/31/2018 |
|
|
ER 1110-2-8153
|
CECW-EH-Y |
Technical Project Sedimentation Investigations |
9/30/1995 |
|
|
ER 1110-2-8152
|
CECW-ED |
Planning and Design of Temporary Cofferdams and Braced Excavation |
8/31/1994 |
|
|
ER 1110-2-8151
|
CECW-EH |
Monitoring Completed Coastal Navigational Projects |
7/31/1997 |
|
|
ER 1110-2-4401
|
CECW-EC |
Clearances for Electric Power Supply Lines and Communication Lines Over Reservoirs |
2/28/2021 |
|
|
ER 1110-2-2902
|
CECW-EH-D |
Prescribed Procedures for the Maintenance and Operation of Shore Protection Works |
6/30/1989 |
|
|
ER 1110-2-1942
|
CECW-EG |
Inspection, Monitoring and Maintenance of Relief Wells |
2/29/1988 |
|
|
ER 1110-2-1941
|
CECW-EC |
Drought Contingency Plans |
2/28/2018 |
|
|
ER 1110-2-1925
|
CECW-EG |
Field Control Data for Earth and Rockfill Dams |
7/3/1969 |
|
|
ER 1110-2-1806
|
CECW-EC |
Earthquake Analysis, Evaluation, and Design for Civil Works Project - effective 29 June 2024 |
5/29/2024 |
|
|
ER 1110-2-1802
|
CECW-EC |
Post-Earthquake Inspections and Reporting for Civil Works Structures |
12/21/2023 |
|
|
ER 1110-2-1464
|
CECW-EH-Y |
Hydrologic Analysis of Watershed Runoff |
6/30/1994 |
|
|
ER 1110-2-1463
|
CECW-EH |
Hydrologic Engineering for Hydropower |
5/30/1992 |
|
|
ER 1110-2-1460
|
CECW-EH-Y |
Hydrologic Engineering Management |
7/7/1989 |
|
|
ER 1110-2-1458
|
CECW-EH |
Hydraulic Design of Shallow Draft Navigation Projects |
4/30/1998 |
|
|
ER 1110-2-1457
|
CECW-EH-D |
Hydraulic Design of Small Boat Navigation |
6/24/1985 |
|
|
ER 1110-2-1455
|
CECW-EC |
Cooperative Hydrologic Data Programs |
10/30/2020 |
|
|
ER 1110-2-1454
|
CECW-EH |
Corps Responsibilities for Non-Federal Hydroelectric Power Development under the Federal Power Act |
7/15/1983 |
|
|
ER 1110-2-1451
|
CECW-EH |
Acquisition of Lands Downstream from Spillways for Hydrologic Safety Purposes |
8/10/1978 |
|
|
ER 1110-2-1450
|
CECW-EH-Y |
Hydrologic Frequency Estimates |
8/31/1994 |
|
|
ER 1110-2-1407
|
CECW-EH |
Hydraulic Design for Coastal Shore Protection Projects |
11/30/1997 |
|
|
ER 1110-2-1406
|
CECW-EH |
Coastal Field Data Collection |
4/30/1990 |
|
|
ER 1110-2-1405
|
CECW-CE |
Hydraulic Design for Local Flood Protection Projects |
9/30/2021 |
|
|
ER 1110-2-1404
|
CECW-EH-D |
Hydraulic Design of Deep-Draft Navigation Projects |
1/31/1996 |
|
|
ER 1110-2-1403
|
CECW-EH, CERD-C |
Studies by Coastal, Hydraulic, and Hydrologic Facilities and Others |
1/1/1998 |
|
|
ER 1110-2-1400
|
CECW-CE |
Reservoir/Water Control Management |
5/30/2016 |
|
|
ER 1110-2-1302
|
CECW-EC |
Civil Works Cost Engineering, |
6/30/2016 |
|
|
ER 1110-2-1156
|
CECW-CE |
Safety of Dams - Policy and Procedures |
3/31/2014 |
|
|
ER 1110-2-1150
|
CECW-EP |
Engineering and Design for Civil Works Projects |
8/31/1999 |
|
|
ER 1110-2-500
|
CEMP-CE |
EPA/USACE Superfund Program Funding and Reporting Requirements |
10/31/2011 |
|
|
ER 1110-2-401
|
CECW-E |
Operation, Maintenance, Repair, Replacement, and Rehabilitation Manual for Projects and Separable Elements Managed by Project Sponsors |
9/30/1994 |
|
|
ER 1110-2-400
|
CEMP-ET |
Design of Recreation Sites, Areas, and Facilities |
5/31/1988 |
|
|
ER 1110-2-249
|
CECW-EH-W |
Management of Water Control Data Systems |
8/31/1994 |
|
|
ER 1110-2-240
|
CECW-CE |
Water Control Management |
5/30/2016 |
|
|
ER 1110-2-112
|
CECW-E
CECW-O |
Required Visits to the Construction Sites by Design Personnel |
4/15/1992 |
|
|
ER 1110-2-111
|
CECW-EC/CECW-CO |
USACE Bridge Safety Program |
1/31/2020 |
|
|
ER 1110-2-103
|
CECW-EC |
Strong-Motion Instruments for Monitoring and Recording Earthquake Motions |
1/3/2024 |
|
|
ER 1110-2-1
|
CECW-EG |
Provisions for Future Hydropower Installation at Corps of Engineers Projects |
1/29/1982 |
|
|
ER 1110-1-8716
|
CECW-CO |
Sign Standards Program Mandatory Center of Expertise |
10/21/2024 |
|
|
ER 1110-1-8175
|
CECW-EC |
Protective Design Mandatory Center of Expertise |
1/25/2024 |
|
|
ER 1110-1-8174
|
CECW-EC |
Military Programs Control System Cybersecurity Mandatory Center of Expertise (CSC-MCX) |
10/30/2020 |
|
|