ER 10-1-11
|
CERM-OO |
U.S. Army Engineer Housing Support Center |
7/20/1989 |
|
|
ER 10-1-16
|
CERM-O |
U.S. Army Coastal Engineering Research Board |
7/31/1992 |
|
|
ER 10-1-45
|
CERM-O |
U.S. Army Topographic Engineering Center (TEC) |
5/1/1993 |
|
|
ER 10-1-5
|
CERM-MO |
Mississippi River Commission |
6/15/1965 |
|
|
ER 10-1-50
|
CEMP-CE |
U.S. Army Corps of Engineers Environmental and Munitions Mandatory Center of Expertise |
4/30/2012 |
|
|
ER 10-1-51
|
CECW-CE |
Roles and Responsibillities - Dam Safety Modification Mandatory Center of Expertise |
9/28/2012 |
|
|
ER 10-1-52
|
CERM-M |
Missions, Organizational Structure, and Functions Humphreys Engineer Center Support Activity |
5/31/2013 |
|
|
ER 10-1-54
|
CECW-CE |
Roles and Responsibilities Modeling, Mapping, and Consequences Production Center |
6/30/2013 |
|
|
ER 10-1-55
|
CECW-CE |
Organization and Functions - Roles and Responsibilities Risk Management Center |
6/30/2013 |
|
|
ER 1100-2-8162
|
CECW-CE / CECW-P |
Incorporating Sea level Changes in Civil Works Programs |
6/15/2019 |
|
|
ER 1105-2-100
|
CECW-P |
Planning Guidance Notebook |
4/22/2000 |
|
|
ER 1105-2-101
|
CECW-CP /CECW-CE |
Risk Assessment for Flood Risk Management Studies with Errata Sheet |
7/15/2019 |
|
|
ER 1105-2-102
|
CECW-P |
Watershed Studies |
4/1/2022 |
|
|
ER 1105-2-103
|
CECW-P |
Policy for Conducting Civil Works Planning Studies |
11/7/2023 |
|
|
ER 1110-1-1300
|
CEMP-EC
CECW-EC |
Cost Engineering Policy and General Requirements |
3/26/1993 |
|
|
ER 1110-1-1401
|
CECW-EH
CECW-EG
CECW-EB |
Interlaboratory Testing Program for Chemical Analyses |
5/15/1989 |
|
|
ER 1110-1-1807
|
CECW-EC |
Drilling and Invasive Activities at Dams and Levees |
6/1/2023 |
|
|
ER 1110-1-1901
|
CECW-CE |
Engineering and Design, Construction PROJECT GEOTECHNICAL AND MATERIALS COMPLETION REPORT |
2/28/2017 |
|
|
ER 1110-1-2002
|
CECW-EG |
Cement, Slag, and Pozzolan Acceptance Testing |
9/30/1998 |
|
|
ER 1110-1-2005
|
CECW-EG |
Compilation of Concrete Aggregate and Stone Riprap Test Data |
1/1/1999 |
|
|
ER 1110-1-261
|
CECW-EG
CECW-EH
CECW-EC |
Quality Assurance of Laboratory Testing Procedures |
4/28/1999 |
|
|
ER 1110-1-5
|
CECW-EG |
Plant Pest Quarantined Areas and Foreign Soil Samples, ENG Form 1743, ENG Form 1743A |
7/25/1984 |
|
|
ER 1110-1-8100
|
CERD-C
CECW-EG
CEMP-RT |
Laboratory Investigations and Testing |
12/31/1997 |
|
|
ER 1110-1-8152
|
CEMP
CECW |
Professional Registration and Signature on Design Documents |
1/24/2012 |
|
|
ER 1110-1-8153
|
CEMP-CED |
Military Munitions Support Services |
10/15/2020 |
|
|
ER 1110-1-8155
|
CECW-CE |
Specifications |
10/30/2015 |
|
|
ER 1110-1-8156
|
CECW-CE |
Policies, Guidance, and Requirements for Geospatial Data and Systems |
9/1/2012 |
|
|
ER 1110-1-8157
|
CECW-CT |
Geotechnical Data Quality Management for Hazardous Waste Remedial Activities |
10/1/2002 |
|
|
ER 1110-1-8158
|
CECW-CE |
Centers of Expertise Program |
4/1/2022 |
|
|
ER 1110-1-8159
|
CECW-CE |
Engineering and Design - DRCHECKS |
1/1/2015 |
|
|
ER 1110-1-8162
|
CECW-CE |
Design and Construction Policy For Electronic Security Systems |
1/31/2014 |
|
|
ER 1110-1-8163
|
CECW-CE |
Design and Construction Policy for Utility Monitoring and Control Systems |
1/31/2014 |
|
|
ER 1110-1-8167
|
CECW-CE |
Petroleum Oil and Lubricants Mandatory Center of Expertise |
9/15/2016 |
|
|
ER 1110-1-8168
|
CECW-EC |
Roles and Responsibilities of the Inland Navigation Design Center Mandatory Center of Expertise |
4/30/2022 |
|
|
ER 1110-1-8169
|
CECW-EC |
Engineering and Design United States Army Corps of Engineers Facilities Explosive Safety Mandatory Center of Expertise |
10/1/2018 |
|
|
ER 1110-1-8170
|
CECW-CE |
Engineering and Design Policies for using the USACE Survey Monument Archival and Retrieval Tool (U-SMART) for Project Control and Boundary Monumentation |
4/28/2017 |
|
|
ER 1110-1-8173
|
CECW-EC |
Energy Modeling and Life Cycle Cost Analysis |
12/31/2017 |
|
|
ER 1110-1-8174
|
CECW-EC |
Military Programs Control System Cybersecurity Mandatory Center of Expertise (CSC-MCX) |
10/30/2020 |
|
|
ER 1110-1-8175
|
CECW-EC |
Protective Design Mandatory Center of Expertise |
1/25/2024 |
|
|
ER 1110-1-8716
|
CECW-CO |
Sign Standards Program Mandatory Center of Expertise |
10/21/2024 |
|
|
ER 1110-2-1
|
CECW-EG |
Provisions for Future Hydropower Installation at Corps of Engineers Projects |
1/29/1982 |
|
|
ER 1110-2-111
|
CECW-EC/CECW-CO |
USACE Bridge Safety Program |
1/31/2020 |
|
|
ER 1110-2-112
|
CECW-E
CECW-O |
Required Visits to the Construction Sites by Design Personnel |
4/15/1992 |
|
|
ER 1110-2-1150
|
CECW-EP |
Engineering and Design for Civil Works Projects |
8/31/1999 |
|
|
ER 1110-2-1302
|
CECW-EC |
Civil Works Cost Engineering, |
6/30/2016 |
|
|
ER 1110-2-1400
|
CECW-CE |
Reservoir/Water Control Management |
5/30/2016 |
|
|
ER 1110-2-1403
|
CECW-EH, CERD-C |
Studies by Coastal, Hydraulic, and Hydrologic Facilities and Others |
1/1/1998 |
|
|
ER 1110-2-1404
|
CECW-EH-D |
Hydraulic Design of Deep-Draft Navigation Projects |
1/31/1996 |
|
|
ER 1110-2-1405
|
CECW-CE |
Hydraulic Design for Local Flood Protection Projects |
9/30/2021 |
|
|
ER 1110-2-1406
|
CECW-EH |
Coastal Field Data Collection |
4/30/1990 |
|
|