Engineer Pamphlets

   Search   Reset Search  
Enter Search Value:
- without any prefix or suffix to find all records where a column contains the value you enter, e.g. Net
- with | prefix to find all records where a column starts with the value you enter, e.g. |Network
- with | suffix to find all records where a column ends with the value you enter, e.g. Network|
- with | prefix and suffix to find all records containing the value you enter exactly, e.g. |Network|

Pub Number Proponent Title Pub Date Latest Review Info
EP 1110-3-2 CEMP-ET Electromagnetic Pulse (EMP) and Tempest Protection for Facilities 12/31/1990 This pamphlet provides unclassified engineering and design information about protecting fixed ground facilities against the effects of an electromagnetic pulse (EMP) produced by a nuclear explosion. It also provides unclassified engineering and design information about satisfying TEMPEST requirements.
EP 1110-3-6 CEMP-ET United States Army Corps of Engineers (USACE) Technology Transfer Systems 8/14/1992 This pamphlet identifies various methods for design and construction technology transfer available to USACE and other Army agencies. Technology transfer within USACE is defined as a system of processes, both formal and informal, that provides a structured approach for developing, submitting, and achieving modifications and additions to technical criteria, standards, and policy. Further, this pamphlet provides references and rationale for both formal and informal modes of technology transfer. Policy and procedures for the formal modes of technology transfer are governed by the documents referenced below.
EP 1110-2-11 CECW-EH Ice Jam Flooding: Causes and Possible Solutions 11/30/1994 This pamphlet disseminates the results of research conducted by the U.S. Army Corps of Engineers Cold Regions Research and Engineering Laboratory on the causes and possible solutions to ice jam flooding problems.
EP 1110-345-102 CEMP-ET Explosives Storage Magazines 8/31/1995 Appendix A provides a ready reference of explosives storage magazine information such as shape, size, explosive limits, and operational features. It is intended to
provide planners and designers sufficient information to select the most suitable standard magazine design to satisfy the user's requirements.
EP 1110-2-12 CECW-ED Seismic Design Provisions for Roller Compacted Concrete Dams 9/30/1995 The purpose of this engineer pamphlet (EP) is to provide preliminary guidance and direction for the earthquake-resistant design of new roller compacted concrete (RCC) dams, and for the evaluation of safety and serviceability of existing RCC dams subjected to earthquake loading.
EP 1110-1-16 CECW-EP Handbook for the Preparation of Storm Water Pollution Prevention Plans for Construction Activities 2/28/1997 This pamphlet provides guidance for the preparation and development of plans for the prevention
of storm water pollution at construction projects. Section 402 of the Federal Water Pollution Control Act (the Clean Water Act) requires that such plans be made.
EP 1110-2-14 CECW-EH Monograph Prepared by M. Petersen on Inland Navigation and Canalization 11/30/1997 This pamphlet disseminates a monograph complied by Margaret Sara Petersen, Emerita Associate Professor, Department of Civil Engineering and Engineering Mechanics, the University of Arizona.
EP 1110-1-23 CEMP-RT Asbestos Abatement Air Monitoring - Standard Scope of Work 1/31/1999 Provides guidance for developing project scopes of work to conduct air monitoring during asbestos abatement (IAW CEGS 13280), to include environmental air quality control and/or air sampling for baseline (pre-abatement) and final clearance phases.
EP 1110-1-27 CEMP-RA Operation and Maintenance of Extraction and Injection Wells at HTRW Sites 1/27/2000 Describes requirements for carrying out Operations & Maintenance for extraction and injection wells at HTRW sites.
EP 1110-1-22 CEMP-RA Asbestos Surveys and Assessments - Standard Scope of Work 9/15/2000 Provides a framework for developing site and project specific scopes of work for completion of asbestos surveys and assessments at Army facilities.
EP 1110-1-24 CEMP-RA Establishing and Maintaining Institutional Controls for Ordnance and Explosives (OE) Projects 12/15/2000 Provide general guidance on the process to be used to develop, implement, and maintain institutional controls on Ordnance and Explosives project sites.
EP 1110-1-28 CEMP-RA Lead Hazard Risk Assessment for Target Housing/Child-Occupied Facilities - Standard Scope of Work 8/31/2001 Provides a framework for developing site and project specific scopes of work for completion of lead hazard risk assessments at Army target housing, Family Child Care homes, child development centers, and other child occupied facilities.
EP 1110-1-29 CEMP-RA Lead Hazard Clearance Inspection - Standard Scope of Work 8/31/2001 Provides a framework for developing site and project specific scopes of work for completion of lead hazard clearance inspections at Army target housing/child-occupied facilities that have undergone lead hazard control activities.
EP 1110-1-30 CEMP-RA PRE-DESIGN LEAD/ASBESTOS SURVEY STANDARD SCOPE OF WORK 8/31/2001 The Standard Scope of Work (SOW) described in this Engineer Pamphlet (EP) provides a framework for developing project-specific scopes of work to complete pre-design lead/asbestos surveys preliminary to DA project design.
EP 1110-1-31 CEMP-RA Engineering and Design - Combined Lead Inspection/Risk Assessment for Target Housing Property Transfers - Standard Scope of Work 8/31/2001 The standard Scope of Work (SOW) described in this Engineer Pamphlet (EP) provides a framework for developing site- and project-specific scopes of work for completion of combined lead inspections/risk assessments for DA property transfers.
EP 1110-2-17 CECW-EC A Guide to Public Alerts and Warning for Dam and Levee Emergencies 4/30/2019 To assist the emergency manager in issuing more timely and effective public alert and warning messages for floods caused by dam breaches, controlled dam releases, and levee breaches or overtopping.
EP 1110-2-18 CECW-CE Guidelines for Landscape Planting And Vegetation Management At Levees, Floodwalls, Embankment Dams, And Appurtenant Structures 5/1/2019 This EP provides guidelines to assure that landscape planting and vegetation management provide aesthetic and environmental benefits without compromising the reliability of levees, floodwalls, embankment dams, and appurtenant structures.
EP 1110-1-15 CECW-EG Cooperation with State Geological Surveys 1/11/2021 The purpose of this pamphlet is to encourage USACE cooperation and coordination with State Geological Surveys.
EP 1110-1-8 CECW-EC Construction Equipment Ownership and Operating Expense Schedule 8/12/2021 This Engineer Pamphlet (EP) is authorized by and established consistent with Federal Acquisition Regulation (FAR) 31.105 and U.S. Army Corps of Engineers (USACE) Acquisition Instructions (UAI) Subpart 5131.1: Applicability, 5131.105: Construction and Architect-Engineer (A-E) Contracts. This EP establishes predetermined equipment ownership and operating expense rates for construction equipment. Rates and additional information can be found online at https://www.usace.army.mil/Cost-Engineering/EP1110-1-8/.
EP 1110-2-19 CECW-EC Inundation Maps and Emergency Action Plans and Incident Management for Dams and Levee Systems 6/12/2025
Page 1  of  1 First Previous [1] Next Last