US Army Corps of Engineers
Official Publications of HQ USACE

Engineer Manuals

   Search     
Enter Search Value:
- without any prefix or suffix to find all records where a column contains the value you enter, e.g. Net
- with | prefix to find all records where a column starts with the value you enter, e.g. |Network
- with | suffix to find all records where a column ends with the value you enter, e.g. Network|
- with | prefix and suffix to find all records containing the value you enter exactly, e.g. |Network|

Pub Number Proponent Title Pub Date Latest Review Info
EM 1110-2-1202 CECW Environmental Engineering for Deep-Draft Navigation Projects 5/29/1987 This manual provided guidance for incorporating environmental considerations in the planning, engineering and design, as well as, construction, operation and maintenance of deep-draft navigation projects.
EM 1110-2-1204 CECW-EH Environmental Engineering for Coastal Shore Protection 7/10/1989 Provides guidance in environmental engineering for coastal shore protection projects.
EM 1110-2-1205 CECW-EH-W Environmental Engineering for Flood Control Channels 11/15/1989 Provides guidance for incorporating environmental considerations in the planning, engineering, design, and construction of flood control channels, levees, and associated structures.
EM 1110-2-1206 CECW-EH-W Environmental Engineering for Small Boat Basins 10/31/1993 Incorporates environmental considerations into the planning, engineering, design, construction, operation, and maintenance of small boat basins.
EM 1110-2-1304 CECW-EC Civil Works Construction Cost Index System (CWCCIS) 3/31/2019 This engineer manual (EM) is to provide historical and forecasted cost indexes for use in escalating United States Army Corps of Engineers (USACE) Civil Works project costs.
EM 1110-2-1406 CECW-EH Runoff from Snowmelt 3/31/1998 Provides guidance for computing basin snowmelt runoff as is necessary in the design and operation of USACE water control projects.
EM 1110-2-1411 CECW STANDARD PROJECT FLOOD DETERMINATIONS 3/1/1965 Standard project flood determinations.
EM 1110-2-1413 CECW-CE HYDROLOGIC ANALYSIS OF INTERIOR AREAS 8/24/2018 The purpose of this manual is to provide guidance in hydrologic analysis of interior areas for planning, design investigations, and flood risk reduction.  The document was developed to supply the U.S. Army Corps of Engineers (USACE) field offices with procedural and technical guidance in performing hydrologic assessments of interior areas. *This Engineer Manual supersedes EM 1110-2-1413, dated 15 January 1987.
EM 1110-2-1415 CECW-EH-Y Hydrologic Frequency Analysis 3/5/1993 Provides guidance and procedures for frequency analysis of: flood flows, low flows, precipitation. water surface elevation, and flood damage.
EM 1110-2-1416 CECW-EH-Y River Hydraulics 10/15/1993 This manual presents basic principles and technical procedures for analysis of open channel flows in natural river systems.
EM 1110-2-1417 CECW-EH Flood-Runoff Analysis 8/31/1994 This manual describes methods for evaluating flood-runoff characteristics of watersheds. Guidance is provided in selecting and applying such methods to support the various investigations required for U.S. Army Corps of Engineers (USACE) civil works activities.
EM 1110-2-1418 CECW-EH-D Channel Stability Assessment for Flood Control Projects 10/31/1994 Provides assistance for determining potential channel instability and sedimentation effects in flood control projects.
EM 1110-2-1419 CECW-EH-Y Hydrologic Engineering Requirements for Flood Damage Reduction Studies 1/31/1995 This manual presents basic principles and technical procedures for hydrologic engineering analysis of flood damage reduction measures.
EM 1110-2-1420 CECW-EC Engineering and Design Hydrologic Engineering Requirements for Reservoirs 9/24/2018 This manual provides guidance to field office personnel for hydrologic engineering investigations for planning and design of reservoir projects
EM 1110-2-1421 CECW-EH Groundwater Hydrology 2/28/1999 Provides guidance to Corps of Engineers personnel who are responsible for groundwater-related projects.
Page 5  of  12 First Previous 1 2 3 4 [5] 6 7 8 9 10 Next Last
ESSAYONS