Engineer Regulations

   Search     
Enter Search Value:
- without any prefix or suffix to find all records where a column contains the value you enter, e.g. Net
- with | prefix to find all records where a column starts with the value you enter, e.g. |Network
- with | suffix to find all records where a column ends with the value you enter, e.g. Network|
- with | prefix and suffix to find all records containing the value you enter exactly, e.g. |Network|

Pub Number Proponent Title Pub Date Latest Review Info
ER 95-1-1 CECS-A Control and Use of Aircraft 3/1/1982 Prescribes the policies and procedures for the control and use of aircraft and/or operated within the Corps of Engineers.
ER 1110-2-1 CECW-EG Provisions for Future Hydropower Installation at Corps of Engineers Projects 1/29/1982 Prescribes procedures for obtaining the Secretary of the Army's approval to provide minimum facilities for future hydroelectric power development at Corps projects.
ER 1150-2-302 CECW-OM ANNUAL REPORT ON LOCAL COOPERATION AGREEMENTS 3/20/1981 This regulation states procedure for reporting requirements of Section 221 of the Flood Control Act of 1970 (P.L. 91-611.
ER 1165-2-21 CECW-PR FLOOD DAMAGE REDUCTION MEASURES IN URBAN AREAS 10/30/1980 Provides policies and guidance for COE participation in urban flood damage reduction projects and establishes criteria to distinguish between improvements to be accomplished by the Corps under flood control authorities and storm sewer systems to be accomplished by local interests.
ER 1165-2-25 CECW-PR NAVIGATION POLICY: COST APPORTINMENT OF BRIDGE ALTERATIONS 5/30/1979 Provides policies and guidelines for the apportionment of bridge alteration costs required in connection with navigation improvements recommended in reports transmitted to the Chief of Engineers for approval or submitted to Congress for authorization.
ER 1110-2-1451 CECW-EH Acquisition of Lands Downstream from Spillways for Hydrologic Safety Purposes 8/10/1978 Provides guidance on the acquisition of lands downstream from spillways for the purpose of protecting the public from hazards imposed by spillway discharges. Guidance contained herein is in addition to ER 405-2-150.
ER 70-1-12 CERD, DAEN-RD In-House Laboratory Independent Research Program 7/24/1978 Prescribes policies and responsibilities for conducting the In-House Laboratory Independent Research (ILIR) Program.
ER 405-1-1020 CERE-PS, DAEN-REP-S Records and Reports - Leaseholds (RCS: DAEN-RE-8 (R4)) 8/30/1974 Prescribes real estate records and reports pertaining to real estate leases, allocations and rent-free space and contains instructions for the preparation thereof.
ER 1130-2-337 CECW-OP ASSIGNMENT OF OPERATION AND MAINTENANCE EXPENSES TO PROPER COST ACCOUNTS FOR MULTIPLE-PURPOSE PROJECTS WITH POWER 7/15/1969 Establishes standard guidelines for making charges to cost account numbers for specific operation and maintenance duties and other expenses at multiple-purpose projects with power and project without at-site power which provide down stream hydroelectric power benefits.
ER 1110-2-1925 CECW-EG Field Control Data for Earth and Rockfill Dams 7/3/1969 Prescribes responsibilities and procedures for reporting field control data for earth and rockfill dams.
ER 1150-2-301 CECW-OC POLICIES AND PROCEDURES - LOCAL COOPERATION 9/1/1967 States the policies and procedures for all USACE elements performing Civil Works functions with regard to the construction of project which require local cooperation.
ER 10-1-5 CERM-MO Mississippi River Commission 6/15/1965 Sets forth the organization of the Mississippi River Commission and defines its mission.
ER 1165-2-114 CECW-PR USE OF EXCESS POWER REVENUES TO ASSIST IN REPAYMENT OF IRRIGATION COSTS 6/25/1964 Summarizes the position of the Chief of Engineers with respect to the use of excess power revenues to assist in repayment of irrigation costs associated with Federal irrigation projects.
Page 6  of  6 First Previous 2 3 4 5 [6] Next Last