EP 385-1-97
|
CESO-E |
Your Mission is to Work Safely |
1/1/2011 |
|
|
EP 690-2-1
|
CERPO |
You, The Corps and The Future -Employment Options Upon Reorganization |
11/1/1992 |
|
|
EP 360-1-35
|
CEPA |
Value to the Nation |
9/17/2017 |
|
|
EP 11-1-4
|
CEMP-ZV |
Value Engineering: A Profitable Partership |
5/15/1995 |
|
|
EP 11-1-3
|
CEMP-ZV, DAEN-ECE_V |
Value Engineering Officer's Operational Guide |
1/1/1987 |
|
|
EP 1100-1-3
|
CECW-EC |
USACE Sustainability: Definition and Concepts Guide |
7/19/2018 |
|
|
EP 1140-1-1
|
CEMP-CN |
USACE Interagency and International Services |
5/17/2016 |
|
|
EP 1100-1-5
|
CECW-EC |
USACE Guide to Resilience Practices |
12/1/2020 |
|
|
EP 385-1-96
|
CESO-I |
USACE Ergonomics Program Procedures |
6/1/2000 |
|
|
EP 360-1-25
|
CEPA |
USACE Corporate Brochure |
1/25/2010 |
|
|
EP 360-1-33
|
CEPA |
USACE Building Strong People |
1/25/2013 |
|
|
EP 1110-3-6
|
CEMP-ET |
United States Army Corps of Engineers (USACE) Technology Transfer Systems |
8/14/1992 |
|
|
EP 1100-1-2
|
CECW-EC |
U.S. Army Corps of Engineers Resilience Initiative Roadmap |
10/16/2017 |
|
|
EP 1105-2-64
|
CECW-P |
Tribal Partnership Program (TPP) |
2/22/2024 |
|
|
EP 11-1-5
|
CESI |
To Form A More Perfect Corps |
7/22/1987 |
|
|
EP 25-1-117
|
CECW-CO |
State of the Infrastructure-A Joint Report by the Bureau of Reclamation and the U.S. Army Corps of Engineers |
12/1/2019 |
|
|
EP 34-1-1
|
CEMP-IS |
Standardization Construction Project Partnering Playbook |
4/30/2022 |
|
|
EP 1105-1-1
|
CE-CW-CE |
Sponsor's Guide to the USACE Levee Safety Program |
6/1/2018 |
|
|
EP 200-1-23
|
CEMP-RA |
Spill Reporting Procedures for USACE Hazardous, Toxic, and Radioactive Waste (HTRW) Projects |
1/31/2012 |
|
|
EP 1105-2-10
|
CECW-MP |
Six Steps to a Civil Works Project |
5/1/1990 |
|
|
EP 310-1-6b
|
CECW-CO-N |
Sign Standards Manual, VOL 2, Appendices |
6/1/2006 |
|
|
EP 310-1-6a
|
CECW |
Sign Standards Manual, VOL 1 |
5/1/2019 |
|
|
EP 1180-1-1
|
CECC-C |
Service Contract Act Labor Relations |
1/31/2022 |
|
|
EP 1110-2-12
|
CECW-ED |
Seismic Design Provisions for Roller Compacted Concrete Dams |
9/30/1995 |
|
|
EP 1165-2-316
|
CECW-ON |
Rules and Regulations Governing Public Use of Corps of Engineers Water Resource Development Projects |
5/1/2000 |
|
|
EP 360-1-31
|
CEPA |
Risk-Informed Dam Safety Program |
2/29/2016 |
|
|
EP 1130-2-550
|
CECW-CO |
Recreation Operations and Maintenance Guidance and Procedures |
11/15/1996 |
|
|
EP 415-1-261_5
|
CEMP-C |
Quality Assurance Representative's Guide - Technologies used at hazardous, toxic, and radioactive waste (HTRW) sites to contain or clean up contamination. - Vol 5 |
7/15/1997 |
|
|
EP 415-1-261_4
|
CECW-EC |
Quality Assurance Representative's Guide - Special Construction, Conveying Systems, Mechanical, and Electrical Features of Buidling Construction -Vol 4 |
12/1/1992 |
|
|
EP 415-1-261_2
|
CECW-EC |
Quality Assurance Representative's Guide - Pile Driving, Dams, Levees and Related Items -Vol 2 |
3/31/1992 |
|
|
EP 415-1-261_1
|
CECW-EC |
Quality Assurance Representative's Guide - General Information and Sitework - Vol 1 |
1/2/1992 |
|
|
EP 415-1-261_6
|
CECW-EC |
Quality Assurance Representative's Guide - Building Envelopes - Vol 6 |
4/21/2016 |
|
|
EP 415-1-261_3
|
CECW-EC |
Quality Assurance Representative's Guide - Architectural and Structural Features in Building Construction -Vol 3 |
8/1/1992 |
|
|
EP 415-1-261_7
|
CECW-EC |
Quality Assurance Representative’s Guide - Dredging and Dredge Inspection - Vol 7 |
6/1/2023 |
|
|
EP 25-30-1
|
CEIT-OPI-PF |
Publications Formatting Quick Tips |
6/11/2019 |
|
|
EP 200-1-2
|
CEMP-CE |
Process and Procedures for Shipping Hazardous Wastes and Other Hazardous Materials |
12/1/2022 |
|
|
EP 1100-2-1
|
CECW-EC/CECW-P |
Procedures to Evaluate Sea Level Change: Impacts, Response, and Adaptation |
6/30/2019 |
|
|
EP 750-1-1
|
CELD-MS |
Procedural Pamphlet for Materiel Maintenance Policies |
11/30/1997 |
|
|
EP 1110-1-30
|
CEMP-RA |
PRE-DESIGN LEAD/ASBESTOS SURVEY
STANDARD SCOPE OF WORK |
8/31/2001 |
|
|
EP 1105-2-57
|
CECW-P |
Planning: Stakeholder Engagement, Collaboration, and Coordination |
3/1/2019 |
|
|
EP 1105-3-1
|
CEMP-OP |
Planning: Base Camp Development In The Theater Of Operations |
1/19/2009 |
|
|
EP 1105-2-61
|
CECW-P |
Planning - Feasibility and Post-Authorization Study Procedures and Report Processing Requirements |
7/1/2023 |
|
|
EP 1130-2-500
|
CECW-O |
Partners and Support (Work Management Guidance and Procedures) |
12/27/1996 |
|
|
EP 1110-1-27
|
CEMP-RA |
Operation and Maintenance of Extraction and Injection Wells at HTRW Sites |
1/27/2000 |
|
|
EP 415-1-4
|
CEMP-CE |
Network Analysis Systems Guide |
10/31/1997 |
|
|
EP 1130-2-520
|
CECW-OD |
Navigation and Dredging Operations and Maintenance Guidance and Procedures |
11/29/1996 |
|
|
EP 360-1-23
|
CEAGC-GSC |
National Inventory of Dams |
11/1/2016 |
|
|
EP 1110-2-14
|
CECW-EH |
Monograph Prepared by M. Petersen on Inland Navigation and Canalization |
11/30/1997 |
|
|
EP 5-1-1
|
CEMP-CN |
Management Capacity Development - International |
6/30/2009 |
|
|
EP 5-1-5
|
CEMP-MD |
Lessons Learned on Israeli Airbase Program |
9/1/1982 |
|
|