Engineer Pamphlets

   Search     
Enter Search Value:
- without any prefix or suffix to find all records where a column contains the value you enter, e.g. Net
- with | prefix to find all records where a column starts with the value you enter, e.g. |Network
- with | suffix to find all records where a column ends with the value you enter, e.g. Network|
- with | prefix and suffix to find all records containing the value you enter exactly, e.g. |Network|

Pub Number Proponent Title Pub Date Latest Review Info
EP 385-1-97 CESO-E Your Mission is to Work Safely 1/1/2011 Guide to a Successful Safety Program
EP 690-2-1 CERPO You, The Corps and The Future -Employment Options Upon Reorganization 11/1/1992 This document is to help you understand your employment options and entitlements if your job is affected by the Corps reorganization.
EP 360-1-35 CEPA Value to the Nation 9/17/2017 This Engineer Pamphlet goes over how the Army Corps of Engineers continues the tradition of providing vital engineering services.
EP 11-1-4 CEMP-ZV Value Engineering: A Profitable Partership 5/15/1995 The VE Program also offers contractors a unique opportunity to increase profits - often substantially.
EP 11-1-3 CEMP-ZV, DAEN-ECE_V Value Engineering Officer's Operational Guide 1/1/1987 This pamphlet prescribes the basic duties and responsibilities of Value Engineering Officers (VEO) and procedures for operation of Value Engineer (VE) programs.
EP 1100-1-3 CECW-EC USACE Sustainability: Definition and Concepts Guide 7/19/2018 This pamphlet clarifies sustainability-related terms and definitions to help orient and align staff on practices consistent with the Environmental Operating Principles (EOP), Guiding Principles for Sustainable Federal Buildings (GP), Civil Works Strategic Plan (CWSP), and other directives.
EP 1140-1-1 CEMP-CN USACE Interagency and International Services 5/17/2016
EP 1100-1-5 CECW-EC USACE Guide to Resilience Practices 12/1/2020 Resilience is the ability to anticipate, prepare for, and adapt to changing conditions and withstand, respond to, and recover rapidly from disruptions.
EP 385-1-96 CESO-I USACE Ergonomics Program Procedures 6/1/2000 This Engineer Pamphlet (EP) provides a framework for developing a local ergonomics program in accordance with ER 385-1-96, as part of the command's overall safety and occupational health program
EP 360-1-25 CEPA USACE Corporate Brochure 1/25/2010
EP 360-1-33 CEPA USACE Building Strong People 1/25/2013
EP 1110-3-6 CEMP-ET United States Army Corps of Engineers (USACE) Technology Transfer Systems 8/14/1992 This pamphlet identifies various methods for design and construction technology transfer available to USACE and other Army agencies. Technology transfer within USACE is defined as a system of processes, both formal and informal, that provides a structured approach for developing, submitting, and achieving modifications and additions to technical criteria, standards, and policy. Further, this pamphlet provides references and rationale for both formal and informal modes of technology transfer. Policy and procedures for the formal modes of technology transfer are governed by the documents referenced below.
EP 1100-1-2 CECW-EC U.S. Army Corps of Engineers Resilience Initiative Roadmap 10/16/2017 This document was originally provided USACE-wide via “The Chief Sends” (email) from LTG Bostick, 53rd Chief of Engineers, on 16 MAY 2016. Its issuance as an EP isdone so that the Roadmap is part of the permanent USACE publication record.
EP 1105-2-64 CECW-P Tribal Partnership Program (TPP) 2/22/2024 Supersedes EP 1105-2-64 dated 8Feb24
EP 11-1-5 CESI To Form A More Perfect Corps 7/22/1987 Contact publications representative for more information.
EP 25-1-117 CECW-CO State of the Infrastructure-A Joint Report by the Bureau of Reclamation and the U.S. Army Corps of Engineers 12/1/2019 The December 2019, "State of the Infrastructure, A Joint Report by the Department of Interior, Bureau of Reclamation (Reclamation) and the U.S. Army Corps of Engineers Civil Works (USACE)" (EP-25-1-117) enhances public awareness of federal water resource infrastructure and the strengths and challenges of owning, operating and maintaining this infrastructure.
EP 34-1-1 CEMP-IS Standardization Construction Project Partnering Playbook 4/30/2022 The purpose of this engineer pamphlet (EP) is to establish actionable guidancebased on the core partnering principles detailed in Command Policy Notice CECG 34-1-5,Command Partnering Philosophy, which sets a consistent standard for how the U.S. Army Corpsof Engineers (USACE) should implement partnering on all construction projects.
EP 1105-1-1 CE-CW-CE Sponsor's Guide to the USACE Levee Safety Program 6/1/2018 Levees are critical flood risk management infrastructure that help reduce the frequency of flooding for people and property. More than a trillion dollars of public and private property, including homes and businesses, are behind USACE levees. These leveed areas also contain critical infrastructure, such as highways, hospitals, schools and utilities, and significant environmental and cultural resources
EP 200-1-23 CEMP-RA Spill Reporting Procedures for USACE Hazardous, Toxic, and Radioactive Waste (HTRW) Projects 1/31/2012 This pamphlet is intended to support: (i) the USACE policy for the prevention, control, reporting, and contingency planning for spills of oil and hazardous substances; and (ii) the USACE goal to use, generate, transport, store, handle, and dispose of oil and hazardous substances in a manner that protects the environment and public health.
EP 1105-2-10 CECW-MP Six Steps to a Civil Works Project 5/1/1990 Contact publications representative for more information.
EP 310-1-6b CECW-CO-N Sign Standards Manual, VOL 2, Appendices 6/1/2006 The purpose of this manual is to provide guidance for effective management of the Corps sign program.
EP 310-1-6a CECW Sign Standards Manual, VOL 1 5/1/2019
EP 1180-1-1 CECC-C Service Contract Act Labor Relations 1/31/2022 This pamphlet is designed to provide basic guidelines for all Corps employees tasked with the administration of Service Contract Act (SCA) responsibilities. Its primary aim is to effect a uniform and consistent program of administration of labor standards responsibilities throughout the Corps. With the exception of very complex and unusual problems, this pamphlet attempts to provide answers to questions that most generally arise in connection with service contract labor standards. Official acquisition policy is found in the Federal Acquisition Regulation, and its supplements. If there is any conflict between the FAR system requirements and this pamphlet, the current FAR system rules apply.
EP 1110-2-12 CECW-ED Seismic Design Provisions for Roller Compacted Concrete Dams 9/30/1995 The purpose of this engineer pamphlet (EP) is to provide preliminary guidance and direction for the earthquake-resistant design of new roller compacted concrete (RCC) dams, and for the evaluation of safety and serviceability of existing RCC dams subjected to earthquake loading.
EP 1165-2-316 CECW-ON Rules and Regulations Governing Public Use of Corps of Engineers Water Resource Development Projects 5/1/2000 A purpose statement is not given in this pamphlet, instead the Policy statement is entered here:                                                                                                                                                   It is the policy of the Secretary of the Army, acting through the Chief of Engineers, to manage the natural, cultural and developed resources of each project in the public interest, providing the public with safe and healthful recreational opportunities while protecting and enhancing these resources.
EP 360-1-31 CEPA Risk-Informed Dam Safety Program 2/29/2016
EP 1130-2-550 CECW-CO Recreation Operations and Maintenance Guidance and Procedures 11/15/1996 This chapter establishes guidance for the management of recreation programs and activities, and for the operation and maintenance of U.S. Army Corps of Engineers (USACE) recreation facilities and related structures, at civil works water resource projects and supplements ER 1130-2-510, Recreation Operations and Maintenance Policies.
EP 415-1-261_5 CEMP-C Quality Assurance Representative's Guide - Technologies used at hazardous, toxic, and radioactive waste (HTRW) sites to contain or clean up contamination. - Vol 5 7/15/1997 Quality Assurance Representative's Guide
EP 415-1-261_4 CECW-EC Quality Assurance Representative's Guide - Special Construction, Conveying Systems, Mechanical, and Electrical Features of Buidling Construction -Vol 4 12/1/1992 Quality Assurance Representative's Guide - Special Construction, Conveying Systems, Mechanical, and Electrical Features of Building Construction
EP 415-1-261_2 CECW-EC Quality Assurance Representative's Guide - Pile Driving, Dams, Levees and Related Items -Vol 2 3/31/1992 Quality Assurance Representative's Guide - Pile Driving, Dams, Levees and Related Items
EP 415-1-261_1 CECW-EC Quality Assurance Representative's Guide - General Information and Sitework - Vol 1 1/2/1992 Quality Assurance Representative's Guide - General Information and Sitework
EP 415-1-261_6 CECW-EC Quality Assurance Representative's Guide - Building Envelopes - Vol 6 4/21/2016 Building Envelopes
EP 415-1-261_3 CECW-EC Quality Assurance Representative's Guide - Architectural and Structural Features in Building Construction -Vol 3 8/1/1992 Quality Assurance Representative's Guide - Architectural and Structural Features in Building Construction
EP 415-1-261_7 CECW-EC Quality Assurance Representative’s Guide - Dredging and Dredge Inspection - Vol 7 6/1/2023 supersedes EP 1130-2-310 dated Jun 1963
EP 25-30-1 CEIT-OPI-PF Publications Formatting Quick Tips 6/11/2019 This Quick Guide (rack card) is designed to assist our customers with the publications review process. This information is derived directly from ER 25-30-1, but gives the customer a quick guide for preparing their publications
EP 200-1-2 CEMP-CE Process and Procedures for Shipping Hazardous Wastes and Other Hazardous Materials 12/1/2022 The enclosed appendix is a guide to the procedures and responsibilities primarily associated with the manifesting of hazardous wastes in accordance with the requirements of the Resource Conservation and Recovery Act and the Department of Transportation regulations.
EP 1100-2-1 CECW-EC/CECW-P Procedures to Evaluate Sea Level Change: Impacts, Response, and Adaptation 6/30/2019 provides instructional and procedural guidance to analyze and adapt to the direct and indirect physical and ecological effects of projected future sea level change (SLC) on USACE projects and systems of projects needed to implement Engineer Regulation (ER) 1100-2-8162.
EP 750-1-1 CELD-MS Procedural Pamphlet for Materiel Maintenance Policies 11/30/1997 Describes the minimum procedures that are required to manage and maintain property within USACE. It describes the procedures that are needed to implement the USACE maintenance policies and responsibilities defined in ER 750-1-1
EP 1110-1-30 CEMP-RA PRE-DESIGN LEAD/ASBESTOS SURVEY STANDARD SCOPE OF WORK 8/31/2001 The Standard Scope of Work (SOW) described in this Engineer Pamphlet (EP) provides a framework for developing project-specific scopes of work to complete pre-design lead/asbestos surveys preliminary to DA project design.
EP 1105-2-57 CECW-P Planning: Stakeholder Engagement, Collaboration, and Coordination 3/1/2019 This pamphlet explains the benefits of, and requirements for, stakeholder engagement, collaboration, and coordination in Civil Works planning studies.
EP 1105-3-1 CEMP-OP Planning: Base Camp Development In The Theater Of Operations 1/19/2009 Base camps can act as power projection platforms throughout full spectrum operations while allowing the promulgation of the operational mission intent in a most effective, efficient, and sustainable manner that enables force protection and augmentation of the CCDR's mission assets
EP 1105-2-61 CECW-P Planning - Feasibility and Post-Authorization Study Procedures and Report Processing Requirements 7/1/2023 This EP supersedes Appendix H of ER 1105-2-100
EP 1130-2-500 CECW-O Partners and Support (Work Management Guidance and Procedures) 12/27/1996 This operations and maintenance (O&M) pamphlet establishes guidance and procedures for the management of activities at U.S. Army Corps of Engineers water resource development projects and supplements Engineer Regulation (ER) 1130-2-500.
EP 1110-1-27 CEMP-RA Operation and Maintenance of Extraction and Injection Wells at HTRW Sites 1/27/2000 Describes requirements for carrying out Operations & Maintenance for extraction and injection wells at HTRW sites.
EP 415-1-4 CEMP-CE Network Analysis Systems Guide 10/31/1997 This pamphlet provides information for Corps of Engineers personnel in the application of Network Analysis Systems.
EP 1130-2-520 CECW-OD Navigation and Dredging Operations and Maintenance Guidance and Procedures 11/29/1996 This pamphlet establishes the guidance for navigation and dredging operation and maintenance (O&M) activities of the U.S. Army Corps of Engineers and supplements Engineer Regulation (ER) 1130-2-520. If any conflict exists between this guidance and the Federal Acquisition System, the latter governs.
EP 360-1-23 CEAGC-GSC National Inventory of Dams 11/1/2016 The National Inventory of Dams (NID) is a congressionally authorized database,which documents dams in the U.S. and its territories.
EP 1110-2-14 CECW-EH Monograph Prepared by M. Petersen on Inland Navigation and Canalization 11/30/1997 This pamphlet disseminates a monograph complied by Margaret Sara Petersen, Emerita Associate Professor, Department of Civil Engineering and Engineering Mechanics, the University of Arizona.
EP 5-1-1 CEMP-CN Management Capacity Development - International 6/30/2009 This pamphlet provides general guidance and a framework for the planning and implementation of international capacity development (CD) for programs and projects conducted or supported by the U.S. Army Corps of Engineers (USACE).
EP 5-1-5 CEMP-MD Lessons Learned on Israeli Airbase Program 9/1/1982 This document presents specific problems from a "Lessons Learned" standpoint with a view to advancing Corps-wide awareness of problems associated with projects of this nature.
Page 1  of  3 First Previous [1] 2 3 Next Last