|
EP 1130-2-553
|
CECW-OP |
Guidance For Operational Condition Assessment of USACE Inland Navigation and Flood Risk Management Assests |
11/18/2022 |
|
|
|
EP 1130-2-554
|
CECW-CO |
Guidance for Operational Condition Assessments of USACE Recreation Condition Assessment |
5/1/2023 |
|
|
|
EP 360-1-36
|
CEPA |
Guidance For Preparation of Information Products in Print, Electronic and Internet Formats. |
6/3/2022 |
|
|
|
EP 1105-2-63
|
CECW-P |
Guide for Incorporating Life Risk in USACE Flood and Coastal Storm Risk Management Project Development. |
9/1/2022 |
|
|
|
EP 1110-2-18
|
CECW-CE |
Guidelines for Landscape Planting And Vegetation Management At Levees, Floodwalls, Embankment Dams, And Appurtenant Structures |
5/1/2019 |
|
|
|
EP 690-2-3
|
CECW-CE |
Guidelines for the Career Development of Geotechnical Engineers, Geologists, and Material Engineers. |
6/1/2021 |
|
|
|
EP 1130-2-510
|
CECW-CO |
Hydroelectric Power Operations and Maintenance Guidance and Procedures |
7/31/2022 |
|
|
|
EP 1130-2-551
|
CECW-CO |
Hydropower Operations and Maintenance Policy Implementation of Bulk Power System Reliability Compliance Program |
5/21/2025 |
|
|
|
EP 1165-2-317
|
CECW-MP |
Hydropower: The Role of the U.S. Army Corps of Engineers |
11/1/1987 |
|
|
|
EP 1110-2-11
|
CECW-EH |
Ice Jam Flooding: Causes and Possible Solutions |
11/30/1994 |
|
|
|
EP 385-1-100
|
CESO |
Implementation of ARC Flash Hazard Program |
9/30/2014 |
|
|
|
EP 672-1-1
|
CEHR |
Incentive Awards |
8/22/2024 |
|
|
|
EP 1110-2-19
|
CECW-EC |
Inundation Maps and Emergency Action Plans and Incident Management for Dams and Levee Systems |
6/12/2025 |
|
|
|
EP 1110-1-29
|
CEMP-RA |
Lead Hazard Clearance Inspection - Standard Scope of Work |
8/31/2001 |
|
|
|
EP 1110-1-28
|
CEMP-RA |
Lead Hazard Risk Assessment for Target Housing/Child-Occupied Facilities - Standard Scope of Work |
8/31/2001 |
|
|
|
EP 5-1-5
|
CEMP-MD |
Lessons Learned on Israeli Airbase Program |
9/1/1982 |
|
|
|
EP 5-1-1
|
CEMP-CN |
Management Capacity Development - International |
6/30/2009 |
|
|
|
EP 1110-2-14
|
CECW-EH |
Monograph Prepared by M. Petersen on Inland Navigation and Canalization |
11/30/1997 |
|
|
|
EP 1130-2-520
|
CECW-OD |
Navigation and Dredging Operations and Maintenance Guidance and Procedures |
11/29/1996 |
|
|
|
EP 1110-1-27
|
CEMP-RA |
Operation and Maintenance of Extraction and Injection Wells at HTRW Sites |
1/27/2000 |
|
|
|
EP 34-1-2
|
CECW-CO |
Parent/Child Work Order Relationships |
9/25/2025 |
|
|
|
EP 34-1-1
|
CECW-EC |
Partnering Playbook: Building Strong Relationships Across the Construction Project Delivery Life Cycle |
9/12/2024 |
|
|
|
EP 1130-2-500
|
CECW-O |
Partners and Support (Work Management Guidance and Procedures) |
12/27/1996 |
|
|
|
EP 1105-2-61
|
CECW-P |
Planning - Feasibility and Post-Authorization Study Procedures and Report Processing Requirements |
7/1/2023 |
|
|
|
EP 1105-2-62
|
CECW-P |
Planning Studies, Reports, and Programs |
12/2/2025 |
|
|
|
EP 1105-3-1
|
CEMP-OP |
Planning: Base Camp Development In The Theater Of Operations |
1/19/2009 |
|
|
|
EP 1105-2-57
|
CECW-P |
Planning: Stakeholder Engagement, Collaboration, and Coordination |
3/1/2019 |
|
|
|
EP 1110-1-30
|
CEMP-RA |
PRE-DESIGN LEAD/ASBESTOS SURVEY
STANDARD SCOPE OF WORK |
8/31/2001 |
|
|
|
EP 750-1-1
|
CELD-MS |
Procedural Pamphlet for Materiel Maintenance Policies |
11/30/1997 |
|
|
|
EP 1100-2-1
|
CECW-EC/CECW-P |
Procedures to Evaluate Sea Level Change: Impacts, Response, and Adaptation |
6/30/2019 |
|
|
|
EP 200-1-2
|
CEMP-CE |
Process and Procedures for Shipping Hazardous Wastes and Other Hazardous Materials |
12/1/2022 |
|
|
|
EP 25-30-1
|
CEIT-OPI-PF |
Publications Formatting Quick Tips |
6/11/2019 |
|
|
|
EP 25-40-1
|
CECI-PID |
Publishing Program Procedures |
6/1/2026 |
|
|
|
EP 415-1-261_7
|
CECW-EC |
Quality Assurance Representative’s Guide - Dredging and Dredge Inspection - Vol 7 |
6/1/2023 |
|
|
|
EP 415-1-261_3
|
CECW-EC |
Quality Assurance Representative's Guide - Architectural and Structural Features in Building Construction -Vol 3 |
8/1/1992 |
|
|
|
EP 415-1-261_6
|
CECW-EC |
Quality Assurance Representative's Guide - Building Envelopes - Vol 6 |
4/21/2016 |
|
|
|
EP 415-1-261_1
|
CECW-EC |
Quality Assurance Representative's Guide - General Information and Sitework - Vol 1 |
1/2/1992 |
|
|
|
EP 415-1-261_2
|
CECW-EC |
Quality Assurance Representative's Guide - Pile Driving, Dams, Levees and Related Items -Vol 2 |
3/31/1992 |
|
|
|
EP 415-1-261_4
|
CECW-EC |
Quality Assurance Representative's Guide - Special Construction, Conveying Systems, Mechanical, and Electrical Features of Buidling Construction -Vol 4 |
12/1/1992 |
|
|
|
EP 415-1-261_5
|
CEMP-C |
Quality Assurance Representative's Guide - Technologies used at hazardous, toxic, and radioactive waste (HTRW) sites to contain or clean up contamination. - Vol 5 |
7/15/1997 |
|
|
|
EP 1130-2-550
|
CECW-CO |
Recreation Operations and Maintenance Guidance and Procedures |
11/15/1996 |
|
|
|
EP 1130-2-555
|
CECW-CO |
Recreation Use Fees |
8/17/2026 |
|
|
|
EP 360-1-31
|
CEPA |
Risk-Informed Dam Safety Program |
2/29/2016 |
|
|
|
EP 1165-2-316
|
CECW-ON |
Rules and Regulations Governing Public Use of Corps of Engineers Water Resource Development Projects |
5/1/2000 |
|
|
|
EP 1110-2-12
|
CECW-ED |
Seismic Design Provisions for Roller Compacted Concrete Dams |
9/30/1995 |
|
|
|
EP 1180-1-1
|
CECC-C |
Service Contract Act Labor Relations |
1/31/2022 |
|
|
|
EP 310-1-6a
|
CECW |
Sign Standards Manual, VOL 1 |
5/1/2019 |
|
|
|
EP 310-1-6b
|
CECW-CO-N |
Sign Standards Manual, VOL 2, Appendices |
6/1/2006 |
|
|
|
EP 1105-2-10
|
CECW-MP |
Six Steps to a Civil Works Project |
5/1/1990 |
|
|
|
EP 200-1-23
|
CEMP-CE |
Spill Reporting Procedures for U.S. Army Corps of Engineers Hazardous, Toxic, and Radioactive Waste Projects |
4/4/2025 |
|
|