Engineer Pamphlets

Enter Search Value:
- without any prefix or suffix to find all records where a column contains the value you enter, e.g. Net
- with | prefix to find all records where a column starts with the value you enter, e.g. |Network
- with | suffix to find all records where a column ends with the value you enter, e.g. Network|
- with | prefix and suffix to find all records containing the value you enter exactly, e.g. |Network|
   Search     

Pub Number Proponent Title Pub Date Latest Review Info
EP 200-1-2 CEMP-CE Process and Procedures for Shipping Hazardous Wastes and Other Hazardous Materials 12/1/2022 The enclosed appendix is a guide to the procedures and responsibilities primarily associated with the manifesting of hazardous wastes in accordance with the requirements of the Resource Conservation and Recovery Act and the Department of Transportation regulations.
EP 75-1-3 CECW-ET Explosives - Recovered Chemical Warfare Materiel (RCWM) Response Process 11/30/2004 This pamphlet provides detailed procedures on the process to be used to manage and execute all aspects of Recovered Chemical Warfare Materiel (RCWM) response actions.
EP 37-1-5 CERM-B Budget and Manpower Resource Management Cycle 2/25/1994 To provide time frame guidelines for the budget and manpower cycle from USACE Major Subordinate Commands to HQUSACE/OCE and to higher authority.
EP 37-1-3 CERM-B Budget Officer's Handbook 5/1/1998 This pamphlets prescribes procedures and sample formats to assist Commanders and Laboratory Directors in establishing and using operation budgets.
EP 34-1-2 CECW-CO Parent/Child Work Order Relationships 9/25/2025
EP 34-1-1 CECW-EC Partnering Playbook: Building Strong Relationships Across the Construction Project Delivery Life Cycle 9/12/2024 This engineer pamphlet establishes actionable guidance based on the core partnering principles detailed in Command Policy Notice CECG 34-1-5, which sets a consistent standard for how the U.S. Army Corps of Engineers should implement partnering on all construction projects.
EP 25-52-1 CECS US Army Corps of Engineers Task Management Software Solution Business Rules 6/8/2026
EP 25-40-1 CECI-PID Publishing Program Procedures 6/1/2026
EP 25-30-1 CEIT-OPI-PF Publications Formatting Quick Tips 6/11/2019 This Quick Guide (rack card) is designed to assist our customers with the publications review process. This information is derived directly from ER 25-30-1, but gives the customer a quick guide for preparing their publications
EP 25-1-117 CECW-CO State of the Infrastructure-A Joint Report by the Bureau of Reclamation and the U.S. Army Corps of Engineers 12/1/2019 The December 2019, "State of the Infrastructure, A Joint Report by the Department of Interior, Bureau of Reclamation (Reclamation) and the U.S. Army Corps of Engineers Civil Works (USACE)" (EP-25-1-117) enhances public awareness of federal water resource infrastructure and the strengths and challenges of owning, operating and maintaining this infrastructure.
EP 25-1-114 CECI-PID Emergency Operations Procedures for all Personnel During Natural and Man-made Disasters 3/31/2022 This Engineer Pamphlet establishes policies, responsibilities, and procedures for managing records created during an emergency operation natural and manmade disaster
EP 11-1-320 CECW-HS Civil Works Emergency Management Programs Financial Management Process 10/31/2017 This Engineer Pamphlet prescribes procedures for the US Army Corps of Engineers Emergency Management Community of Practice for the management and execution of programming, funding, and budgeting processes that support the USACE Emergency Management Program.
EP 11-1-5 CESI To Form A More Perfect Corps 7/22/1987 Contact publications representative for more information.
EP 11-1-4 CEMP-ZV Value Engineering: A Profitable Partership 5/15/1995 The VE Program also offers contractors a unique opportunity to increase profits - often substantially.
EP 11-1-3 CEMP-ZV, DAEN-ECE_V Value Engineering Officer's Operational Guide 1/1/1987 This pamphlet prescribes the basic duties and responsibilities of Value Engineering Officers (VEO) and procedures for operation of Value Engineer (VE) programs.
EP 5-1-5 CEMP-MD Lessons Learned on Israeli Airbase Program 9/1/1982 This document presents specific problems from a "Lessons Learned" standpoint with a view to advancing Corps-wide awareness of problems associated with projects of this nature.
EP 5-1-1 CEMP-CN Management Capacity Development - International 6/30/2009 This pamphlet provides general guidance and a framework for the planning and implementation of international capacity development (CD) for programs and projects conducted or supported by the U.S. Army Corps of Engineers (USACE).
Page 3  of  3 First Previous 1 2 [3] Next Last