Engineer Pamphlets

   Search     
Enter Search Value:
- without any prefix or suffix to find all records where a column contains the value you enter, e.g. Net
- with | prefix to find all records where a column starts with the value you enter, e.g. |Network
- with | suffix to find all records where a column ends with the value you enter, e.g. Network|
- with | prefix and suffix to find all records containing the value you enter exactly, e.g. |Network|

Pub Number Proponent Title Pub Date Latest Review Info
EP 750-1-1 CELD-MS Procedural Pamphlet for Materiel Maintenance Policies 11/30/1997 Describes the minimum procedures that are required to manage and maintain property within USACE. It describes the procedures that are needed to implement the USACE maintenance policies and responsibilities defined in ER 750-1-1
EP 715-1-8 CECT-ZA Contract Specialist Proficiency Guide 3/19/2021 This guide is for use by USACE Contract Specialist and the mentors, supervisors, and Contracting Officers involved in training Contracting Specialists.
EP 715-1-7 CECW-CE, CEPR-P Architect Engineer Contracting in USACE 2/29/2012 This pamphlet provides guidance and procedures for contracting for architect-engineer with the Brooks Architect-Engineer Act and the acquisition
regulations referenced below. The guidance and procedures in this pamphlet promote fair, efficient and consistent A-E contracting practices throughout the U.S. Army Corps of Engineers (USACE).
EP 715-1-2 CEMP-CE A Guide to Effective Contractor Quality Control (CQC) 2/1/1990 This booklet explains the Corps* concept of CQC and can assist the
contractor to bring about effective control
EP 690-2-3 CECW-CE Guidelines for the Career Development of Geotechnical Engineers, Geologists, and Material Engineers. 6/1/2021 The U.S. Army Corps of Engineers (USACE) must continue to develop and maintain a highly trained and experienced geotechnical staff to support all engineering activities. The guidelines in this pamphlet describe the experience, education, training, and skill development opportunities that USACE geotechnical, geology, and materials professionals (referred to collectively as geotechnics professionals) are suggested to acquire.
EP 690-2-2 CECW-CO Career Development Guide for Civil Works Natural ResourcesManagement Team Members 5/14/2010 a.  This pamphlet is designed to provide guidance to proactive Natural Resources Management (NRM) team members in designing a path that can help lead to achieving long-term career goals or hight-level positions.
EP 690-2-1 CERPO You, The Corps and The Future -Employment Options Upon Reorganization 11/1/1992 This document is to help you understand your employment options and entitlements if your job is affected by the Corps reorganization.
EP 690-1-827 CECI-HC CIO/G-6 Careers Brochure 1/15/2021 Careers Brochure” is intended to be a resource for use in career fairs or hiring events and an information source for potential new-hires.
EP 690-1-824 CECW-HS Career Development and Training Guide for the Emergency Management Community of Practice and Contingency Operations Workforce 7/31/2015 Applicability. This guide applies specifically to HQUSACE elements, Divisions, Districts, Field Operating Activities (FOA), Labs, and Centers of Exprestise
EP 690-1-808 CEMP-EA Civil Personnel - Training and Career Development Plans for Intern and Intermediate Level Architects 6/8/1991 This Engineer Pamphlet (EP) provides policy, guidance, and procedures concerning the development of training and career development plans for intern and intermediate level personnel in the occupational series of GS-0808-Architecture (architects) within the U.S. Army Corps of Engineers (USACE).
EP 690-1-807 CEMP-EA Civilian Personnel - Training and Career Development Plans for Landscape Architects 8/19/1994 This pamphlet provides, guidance, and procedures concerning the development of training and career development plans for personnel in the occupational series of GS-0807-Landscape Architecture (landscape architects) within the U.S. Army Corps of Engineers (USACE).
EP 500-1-12 CECW-HS Emergency Employment of Army and Other Resources: Emergency Management Continuous Improvement Program – Procedures 8/29/2023
EP 500-1-3 CECW-OE Emergency Operations 7/1/1982 This EP is dedicated to emergency preparedness and rapid reaction to major emergencies throughout the United States.
EP 500-1-2 CEDC-GP Emergency Employment of Army and Other Resources - Field Force Engineering - United States Army Corps of Engineers Support to Full Spectrum Operations 8/1/2010 This pamphlet fills a fundamental role in describing FFE as the means for USACE support to full spectrum operations.
EP 500-1-1 CECW-OE Emergency Employment of Army and Other Resources - Civil Emergency Management Program - Procedures 9/30/2001 This pamphlet prescribes processes and procedures for the management and execution of the Civil Emergency Management (CEM) Program of the U.S. Army Corps of Engineers (USACE) under the authorities of 33 USC 701n (commonly referred to as Public Law (PL) 84-99); The Robert T. Stafford Disaster Relief and Emergency Assistance Act (42 U.S.C. 5121 et seq.) (The Stafford Act); Army Regulation (AR) 500-60, Disaster Relief; Engineer Regulation (ER) 500-1-1, Civil Emergency Management Program; and ER 1130-2-530, Flood Control Operations and Maintenance Policies.
EP 415-1-261_1 CECW-EC Quality Assurance Representative's Guide - General Information and Sitework - Vol 1 1/2/1992 Quality Assurance Representative's Guide - General Information and Sitework
EP 415-1-261_2 CECW-EC Quality Assurance Representative's Guide - Pile Driving, Dams, Levees and Related Items -Vol 2 3/31/1992 Quality Assurance Representative's Guide - Pile Driving, Dams, Levees and Related Items
EP 415-1-261_3 CECW-EC Quality Assurance Representative's Guide - Architectural and Structural Features in Building Construction -Vol 3 8/1/1992 Quality Assurance Representative's Guide - Architectural and Structural Features in Building Construction
EP 415-1-261_4 CECW-EC Quality Assurance Representative's Guide - Special Construction, Conveying Systems, Mechanical, and Electrical Features of Buidling Construction -Vol 4 12/1/1992 Quality Assurance Representative's Guide - Special Construction, Conveying Systems, Mechanical, and Electrical Features of Building Construction
EP 415-1-261_5 CEMP-C Quality Assurance Representative's Guide - Technologies used at hazardous, toxic, and radioactive waste (HTRW) sites to contain or clean up contamination. - Vol 5 7/15/1997 Quality Assurance Representative's Guide
EP 415-1-261_6 CECW-EC Quality Assurance Representative's Guide - Building Envelopes - Vol 6 4/21/2016 Building Envelopes
EP 415-1-261_7 CECW-EC Quality Assurance Representative’s Guide - Dredging and Dredge Inspection - Vol 7 6/1/2023 supersedes EP 1130-2-310 dated Jun 1963
EP 415-1-266 CEMP-EC Construction - Resident Engineer Management Guide (REMG) for Hazardous, Toxic, and Radioactive Waste (HTRW) Projects 5/31/2000 This Engineer Pamphlet (EP) provides information regarding remedial design; response actions (remedial actions and removals) involving hazardous, toxic, and radioactive wastes; and ordnance and explosives (OE) response actions.
EP 415-1-260 CECW-CE Area/Resident Engineer Management Guide 3/31/2016 This Engineer Pamphlet supersedes EP 415-1-260, Dated 6 December 1990
EP 415-1-4 CEMP-CE Network Analysis Systems Guide 10/31/1997 This pamphlet provides information for Corps of Engineers personnel in the application of Network Analysis Systems.
EP 400-2-1 CESPK-CO-O Enjoy Corps Lands and Waters Today 7/1/2009 Find the Corps recreation area near you.
EP 385-1-100 CESO Implementation of ARC Flash Hazard Program 9/30/2014
EP 385-1-97 CESO-E Your Mission is to Work Safely 1/1/2011 Guide to a Successful Safety Program
EP 385-1-96 CESO-I USACE Ergonomics Program Procedures 6/1/2000 This Engineer Pamphlet (EP) provides a framework for developing a local ergonomics program in accordance with ER 385-1-96, as part of the command's overall safety and occupational health program
EP 385-1-40 CESO-S Boards of Investigation 5/31/1991
EP 360-1-35 CEPA Value to the Nation 9/17/2017 This Engineer Pamphlet goes over how the Army Corps of Engineers continues the tradition of providing vital engineering services.
EP 360-1-33 CEPA USACE Building Strong People 1/25/2013
EP 360-1-31 CEPA Risk-Informed Dam Safety Program 2/29/2016
EP 360-1-25 CEPA USACE Corporate Brochure 1/25/2010
EP 360-1-23 CEAGC-GSC National Inventory of Dams 11/1/2016 The National Inventory of Dams (NID) is a congressionally authorized database,which documents dams in the U.S. and its territories.
EP 310-1-6a CECW Sign Standards Manual, VOL 1 5/1/2019
EP 310-1-6b CECW-CO-N Sign Standards Manual, VOL 2, Appendices 6/1/2006 The purpose of this manual is to provide guidance for effective management of the Corps sign program.
EP 310-1-6 CECW-CO Corporate Information: Graphic Standards Manual - Change 1 6/1/2006 The guidance provided within this Graphic Standards Manual was developed to assure that the visual presentation of the Corps of Engineers is accomplished with consistency and forethought.
EP 200-3-1 CEMP-CE Environmental Quality: Public Participation Requirements for Defense Environmental Restoration Program 9/30/2011 This pamphlet provides U.S. Army Corps of Engineers (USACE) personnel with information on public participation activities required during CERCLA actions, such as Military Munitions Response Program (MMRP) and Hazardous, Toxic, and Radioactive (HTRW) Response Actions.
EP 200-2-3 CECW-ON Environmental Compliance Guidance and Procedures 10/30/1996 This pamphlet establishes guidance for the management of environmental compliance-related operations and maintenance (O&M) activities at U.S. Army Corps of Engineers (USACE) civil works and military projects and facilities and supplements Engineer Regulation (ER) 200-2-3.
EP 200-1-24 CEMP-CED Environmental Quality - Air Pathway Analysis for the Design of Remedial Action Projects 9/30/2015 Purpose.  This pamphlet describes Air pathway Analysis (APA) proceures. Applicability. Applies to all USACE commands responsibile for the design of remedial action projects that will be funded from USACE appropriations.
EP 200-1-23 CEMP-RA Spill Reporting Procedures for USACE Hazardous, Toxic, and Radioactive Waste (HTRW) Projects 1/31/2012 This pamphlet is intended to support: (i) the USACE policy for the prevention, control, reporting, and contingency planning for spills of oil and hazardous substances; and (ii) the USACE goal to use, generate, transport, store, handle, and dispose of oil and hazardous substances in a manner that protects the environment and public health.
EP 200-1-18 CEMP-RA Environmental Quality: Five-year Reviews of Military Munitions Response Projects 9/30/2011 This Engineer Pamphlet (EP) provides U.S. Army Corps of Engineers (USACE) personnel with procedural guidance for performing Five-Year Reviews for projects under the Military Munitions Response Program (MMRP).
EP 200-1-15 CEMP-RT Environmental Quality: Standard Scopes of Work for HTRW Risk Assessments 6/30/2016 This pamphlet supersedes EP 200-1-15, dated 15 December 2001
EP 200-1-10 CEMP-RT Green Building Technology in Hazardous Waste Cleanup Applications 12/10/1999 This Engineer Pamphlet (EP) identifies Green Building technologies and opportunities at Hazardous, Toxic, and Radioactive Waste (HTRW) sites and provides guidance to U.S. Army Corps of Engineers (USACE) personnel and their contractors for use of Green Building technologies at HTRW sites.
EP 200-1-2 CEMP-CE Process and Procedures for Shipping Hazardous Wastes and Other Hazardous Materials 12/1/2022 The enclosed appendix is a guide to the procedures and responsibilities primarily associated with the manifesting of hazardous wastes in accordance with the requirements of the Resource Conservation and Recovery Act and the Department of Transportation regulations.
EP 75-1-3 CECW-ET Explosives - Recovered Chemical Warfare Materiel (RCWM) Response Process 11/30/2004 This pamphlet provides detailed procedures on the process to be used to manage and execute all aspects of Recovered Chemical Warfare Materiel (RCWM) response actions.
EP 37-1-5 CERM-B Budget and Manpower Resource Management Cycle 2/25/1994 To provide time frame guidelines for the budget and manpower cycle from USACE Major Subordinate Commands to HQUSACE/OCE and to higher authority.
EP 37-1-3 CERM-B Budget Officer's Handbook 5/1/1998 This pamphlets prescribes procedures and sample formats to assist Commanders and Laboratory Directors in establishing and using operation budgets.
EP 34-1-1 CEMP-IS Standardization Construction Project Partnering Playbook 4/30/2022 The purpose of this engineer pamphlet (EP) is to establish actionable guidancebased on the core partnering principles detailed in Command Policy Notice CECG 34-1-5,Command Partnering Philosophy, which sets a consistent standard for how the U.S. Army Corpsof Engineers (USACE) should implement partnering on all construction projects.
Page 2  of  3 First Previous 1 [2] 3 Next Last