Engineer Manuals

   Search     
Enter Search Value:
- without any prefix or suffix to find all records where a column contains the value you enter, e.g. Net
- with | prefix to find all records where a column starts with the value you enter, e.g. |Network
- with | suffix to find all records where a column ends with the value you enter, e.g. Network|
- with | prefix and suffix to find all records containing the value you enter exactly, e.g. |Network|

Pub Number Proponent Title Pub Date Latest Review Info
EM 1110-3-177 CEMP-ET Sanitary Landfill - Mobilization Construction 4/9/1984 Provides guidance for the construction and operation of sanitary landfills at U.S  Army mobilization facilities .
EM 1110-3-176 CEMP-ET Incinerators - Mobilization Construction 4/9/1984 Provides guidance for the design of incinerators for combustible waste materials at U.S  Army mobilization facilities .
EM 1110-3-174 CEMP-ET Sanitary and Industrial Wastewater Collection - Mobilization Construction 4/9/1984 Provides guidance for the design of gravity systems for sanitary and industrial wastewater collection at U .S  Army mobilization facilities .
EM 1110-3-173 CEMP-ET Sanitary and Industrial Wastewater Pumping - Mobilization Construction 4/9/1984 Provides guidance for the design and construction of sanitary and industrial wastewater pumping facilities at U .S  Army mobilization installations .
EM 1110-3-172 CEMP-ET Domestic Wastewater Treatment - Mobilization Construction 5/11/1984 Provides guidance for the planning and design of domestic wastewater treatment plants at U .S  Army mobilization facilities .
EM 1110-3-166 CEMP-ET Water Supply, Fire Protection - Mobilization Construction 4/9/1984 This manual establishes the minimum water supply requirements for fire protection at U .S  Army mobilization facilities .
EM 1110-3-164 CEMP-ET Water Supply, Water Distribution - Mobilization Construction 4/9/1984 Provides information for the design and construction of water distribution systems at U.S., Army mobilization installations.
EM 1110-3-163 CEMP-ET Water Supply, Water Storage - Mobilization Construction 4/9/1984 Provides guidance in determining water storage requirements for U .S  Army mobilization facilities .
EM 1110-3-162 CEMP-ET Water Supply, Water Treatment - Mobilization Construction 4/9/1984 This manual establishes water quality standards and design criteria for water treatment processes at U .S  Army mobilization facilities .
EM 1110-3-161 CEMP-ET Water Supply, Water Sources - Mobilization Construction 4/9/1984 Provides guidance for developing or investigating water sources at U.S  Army mobilization installations.
EM 1110-3-160 CEMP-ET Water Supply, General Considerations - Mobilization Construction 4/9/1984 Provides guidance in determining water requirements and in selection and planning of water supply systems for U .S  Army mobilization facilities .
EM 1110-3-152 CEMP-ET Railroads - Mobilization Construction 4/9/1984 Provides guidance for the design and construction of railroad facilities at U .S  Army mobilization installations .
EM 1110-3-150 CEMP-ET, DAEN-ECE-G Storage Depots - Mobilization Construction 4/9/1984 Provides guidance for the design and layout of railroads, roadways, storage yards and warehouse site planning for U .S  Army mobilization facilities .
EM 1110-3-142 CEMP-ET Airfield Rigid Pavement - Mobilization Construction 4/9/1984 Provides guidance for the design of Army airfield rigid pavement at U .S  Army mobilization installations .
EM 1110-3-141 CEMP-ET Airfield Flexible Pavement - Mobilization Construction 4/9/1984 Provides guidance for designing airfield flexible pavement for U .S  Army mobilization facilities .
EM 1110-3-138 CEMP-ET Pavement Criteria for Seasonal Frost Conditions - Mobilization Construction 4/9/1984 Provides guidance for the design and construction of pavements placed on sub grade or base course materials subject to seasonal frost action .
EM 1110-3-137 CEMP-ET Soil Stabilization for Pavements - Mobilization Construction 4/9/1984 Provides guidance for the design and improvement of the structural quality and workability of soils used for base courses, sub base courses, select materials, and sub grades for pavements construction for U.S  Army mobilization facilities .
EM 1110-3-136 CEMP-ET Drainage and Erosion Control Mobilization Construction 4/9/1984 Provides guidance for standards to be used for drainage erosion control for U.S  Army mobilization construction .
EM 1110-3-135 CEMP-ET Standard Practice for Concrete Pavements - Mobilization Construction 4/9/1984 Provides information for the investigation of concrete materials, proportioning, and construction of concrete pavements at U .S  Army mobilization facilities .
EM 1110-3-132 CEMP-ET Rigid Pavements for Roads, Streets, Walks and Open Storage Areas - Mobilization Construction 4/9/1984 Provides guidance for the design of rigid pavements for roads, streets, walks and open storage areas at U .S  Army mobilization installations .
EM 1110-3-131 CEMP-ET Flexible Pavements for Roads, Streets, Walks and Open Storage Areas - Mobilization Construction 4/9/1984 Provides guidance for designing flexible pavements for roads, streets, walks, and open storage areas for U .S  Army mobilization facilities .
EM 1110-3-130 CEMP-ET Geometrics for Roads, Streets, Walks, and Open Storage Areas - Mobilization Construction 4/9/1984 Provides guidance for design and layout of roads, streets, walks, and open storage areas for U .S  Army mobilization facilities .
EM 1110-2-6056 CECW-CE Standards and Procedures for Referencing Project Evaluation Grades to Nationwide Vertical Datum's 12/31/2010 Provides technical guidance for referencing project elevation grades to nationwide vertical datum's established and maintained by the U.S. Department of Commerce. It supplements ER 1110-2-8160 (Policies for Referencing Project Elevation Grades to Nationwide Vertical Datum's) that requires controlling elevations and local datums on USACE projects shall be properly and accurately referenced to nationwide spatial reference systems used by other Federal, state, and local agencies responsible for flood forecasting, inundation modeling, water control, flood insurance rate maps, navigation charting, and topographic mapping.
EM 1110-2-6055 CECW-CE / CECW-CO Inland Electronic Navigational Chart Engineering Manual 2/27/2015 This manual provides technical and administrative guidance for development, production, publication, and maintenance oflnland Electronic Navigational Charts (IENCs).
EM 1110-2-6054 CECW-ED Inspection, Evaluation and Repair of Hydraulic Steel Structures 12/1/2001 Describes the inspection, evaluation, and repair of hydraulic steel structures, including preinspection identification of critical locations (such as fracture critical members and various connections) that require close examination.
EM 1110-2-6053 CECW-CE Earthquake Design and Evaluation of Concrete Hydraulic Structures 5/1/2007 Provides guidance for performance-based design and evaluation of concrete hydraulic structures (CHS).
EM 1110-2-6051 CECW-EW Time-History Dynamic Analysis of Concrete Hydraulic Structures 12/22/2003 This manual describes procedures for the linear-elastic time-history dynamic analysis and development of acceleration time-history dynamic analysis for seismic design and evaluation of concrete hydraulic structures (CHS).
EM 1110-2-6050 CECW-ET Response Spectra and Seismic Analysis for Concrete Hydraulic Structures 6/30/1999 Describes the development and use of response spectra for the seismic analysis of concrete hydraulic structures. The manual provides guidance regarding how earthquake ground motions are characterized as design response spectra and how they are then used in the process of seismic structural analysis and design.
EM 1110-2-5025 CECW-EW Engineering and Design, Dredging and Dredged Material Management 7/31/2015 This manual supersedes EM 1110-2-5025, 25 March 1983; EM 1110-2-5026, 30 June 1987; and EM 1110-2-5027, 30 September 1987.
EM 1110-2-4300 CECW-ED Instrumentation for Concrete Structures 11/30/1987 Provides guidance and information related to the instrumentation of concrete structures and the measurement of structural behavior.
EM 1110-2-4000 CECW-EH-Y Sedimentation Investigations of Rivers and Reservoirs 10/31/1995 Provides current guidance and engineering procedures for river and reservoir sedimentation investigations.
EM 1110-2-3800 CECW-EC Engineering and Design Blasting for Rock Excavations. 10/30/2018 Describes theory, concepts, and procedures surrounding rock excavation through the use of blasting agents and methods for use on Civil Works and Military Construction projects. Provide guidance to U.S. Army Corps of Engineers personnel (USACE) involved in the planning, design, monitoring, or implementation of blasting programs for rock excavation
EM 1110-2-3600 CECW-CE Management of Water Control Systems 10/10/2017 This publication supersedes EM 1110-2-3600 30 November 1987. This Engineer Manual (EM) provides guidance to field offices for water manage-ment at all U.S. Army Corps of Engineers (Corps) owned and Corps-operated reservoirs, locks, dams, and other water control projects in which water storage is managed and operated for multi-ple authorized purposes such as flood risk management, navigation, and other uses.
EM 1110-2-3506 CECW-EG Grouting Technology 3/31/2017 This manual supersedes EM 1110-2-3506, dated January 1984. The purpose of this manual is to provide detailed technical guidance and criteria for civil works grouting applications..
EM 1110-2-3402 CECW-CE Barge Impact Forces For Hydraulic Structures 8/1/2022 This engineer manual (EM) provides guidance and information for design and evaluation of barge impact forces on inland and coastal navigation structures
EM 1110-2-3401 CECW-ET Thermal Spraying: New Construction and Maintenance 1/29/1999 Provides guidance on thermal spray coating systems to engineering, operations, maintenance, and construction personnel and other individuals responsible for the protection of U.S. Army Corps of Engineers (USACE) civil works structures.
EM 1110-2-3400 CECW-EE Painting: New Construction and Maintenance 4/30/1995 Provides painting guidance to engineering, operations, maintenance, and construction personnel and other individuals responsible for the protection of U.S. Army Corps of Engineers (USACE) structures.
EM 1110-2-3200 CECW-CE Wire Rope For Civil Works Structures 11/30/2016 This manual supersedes EM 1110-2-3200, dated 30 September 1998
EM 1110-2-3105 CECW-CE Mechanical and Electrical Design of Pumping Stations 4/30/2020  This manual provides guidance and information to engineering, operations, maintenance, and to other individuals responsible for the mechanical and electrical design, operation, and maintenance of civil works (CW) pump stations including for flood risk management, environmental projects, lock dewatering and temporary pumping.
EM 1110-2-3104 CECW-ED Structural and Architectural Design of Pumping Stations 6/30/1989 Presents the primary features common to pumping station facilities intended for interior drainage on civil works flood protection projects and to present guidance for their architectural and structural design.
EM 1110-2-3006 CECW-EC Mechanical and Electrical Design of Hydroelectric Power Plants 4/22/2024 Supersedes EM 1110-2-3006 dated 30JUN1994 and EM 1110-5-4205 dated 30JUN1995
EM 1110-2-3001 CECW-ED Planning and Design of Hydroelectric Power Plant Structures 10/10/2008 Provides guidance for structural planning and design of hydroelectric power plants.
EM 1110-2-2906 CECW-ED Design of Pile Foundations 1/15/1991 Provides information, foundation exploration and testing procedures, load test methods, analysis techniques, allowable criteria, design procedures, and construction consideration for the selection, design, and installation of pile foundations.
EM 1110-2-2902 CECW-EC Conduits, Pipes, and Culverts associated with Dams and Levee Systems 12/31/2020 Provides (a) guidance on the design and construction of conduits, culverts, and pipes, and (b) design procedures for trench/embankment earth loadings, highway loadings, railroad loadings, surface concentrated loadings, and internal/external fluid pressures.
EM 1110-2-2901 CECW-EG Tunnels and Shafts in Rocks 5/30/1997
EM 1110-2-2704 CECW-CE Cathodic Protection Systems for Civil Works Structures 3/31/2021 Provides guidance for the selection, design, installation, operation, and maintenance of Cathodic protection systems (CPSs) for navigation lock gates and other civil works hydraulic structures.
EM 1110-2-2611 CECW-EW Engineering for Prefabricated Construction of Navigation Projects 2/1/2004 Provides  guidance to help Districts in developing innovative plans to use precast concrete segments and other prefabricated elements for construction of navigation projects.
EM 1110-2-2610 CECW-CE Mechanical and Electrical Design for Lock and Dam Operating Equipment 6/30/2013 Provides  guidance in the mechanical and electrical design of navigation lock and dam operating equipment and control systems for both new construction and the rehabilitation of existing projects.
EM 1110-2-2607 CECW-ED Planning and Design of Navigation Dams 7/31/1995 This manual is issued for guidance of individuals and elements within the Corps of Engineers engaged in the structural planning, layout, and design of navigation dams for civil works projects. The structural design of gates is not covered in this manual.
EM 1110-2-2602 CECW-ED Planning and Design of Navigation Locks 9/30/1995 This manual is issued for guidance of engineers and design offices within the Corps of Engineers engaged in the planning, engineering layout, analysis, and design of navigation locks for civil works navigation projects on inland waterways.
Page 1  of  4 First Previous [1] 2 3 4 Next Last