%PDF-1.3 % 441 0 obj <> endobj xref 441 8 0000000016 00000 n 0000001490 00000 n 0000001595 00000 n 0000001772 00000 n 0000003874 00000 n 0000003979 00000 n 0000004082 00000 n 0000000456 00000 n trailer <<7014E39E46F05C4EB83F96A4912C7329>]/Prev 713188>> startxref 0 %%EOF 448 0 obj <>stream h_h[Usnor)ilII0Kc^89zAA82K6qSd ua$0Kp:FA(,U"{sw[烯>s| !b,A8)>@L'ΦvZ}tp `~DJ)O}~D]!V8\ߣ=36?r|JXu{mlכ7"$cu4}3qT q J:yKt *(txS: oTpgx,-}}sР6BY m.>HGίv gB}YOE΢35y?(Nrgx~K{u LQ_w'`2咒}k.isCJ`M\j׹h[X__tr%ȼ-:OI<:ܽ ׳gœ|1^ ϟ<*p'J'HHiOv7e#|CF41,)UWq6ޢ<`]5BFRK墤(~rN$$q-9uK&\Kڤ!·2ط43 u`+ӄ+ZiZ\4l7 N]̶0BY 2Vgjy62B\*PyGQ >4DF߰Plďb\R^<=x7Gaq,< fBŬ!ZlY76@xwxd . Ds8s1Y=9?> w#af# 1klW&b#0o\S% endstream endobj 442 0 obj <> endobj 443 0 obj <>/ProcSet 447 0 R>>/Rotate 0/Type/Page>> endobj 444 0 obj <>stream 0 0 0 rg 72 625.92 1.2 94.08 re f 72 718.8 108.24 1.2 re f 180 625.92 1.2 94.08 re f 180 718.8 252.24 1.2 re f 432 625.92 1.2 94.08 re f 432 718.8 108.24 1.2 re f 539.04 625.92 1.2 94.08 re f 72 489.6 1.2 136.56 re f 72 624.96 108.24 1.2 re f 180 489.6 1.2 136.56 re f 180 624.96 252.24 1.2 re f 432 489.6 1.2 136.56 re f 432 624.96 108.24 1.2 re f 539.04 489.6 1.2 136.56 re f 72 434.4 1.2 55.44 re f 72 488.64 108.24 1.2 re f 72 434.4 108.24 1.2 re f 180 434.4 1.2 55.44 re f 180 488.64 252.24 1.2 re f 180 434.4 252.24 1.2 re f 432 434.4 1.2 55.44 re f 432 488.64 108.24 1.2 re f 539.04 434.4 1.2 55.44 re f 432 434.4 108.24 1.2 re f BT 100.08 702.72 TD /F0 12 Tf 0.0103 Tc 0 Tw (CEMP-CE) Tj 3.12 -28.32 TD -0.105 Tc 0.225 Tw (Engineer ) Tj 0.72 -14.16 TD -0.117 Tc 0 Tw (Pamphlet) Tj -2.88 -14.16 TD 0.0187 Tc (415-1-261) Tj 1.44 -14.16 TD -0.1063 Tc 0.2263 Tw (Volume 4) Tj 156.24 72.72 TD /F0 9.84 Tf -0.107 Tc 0.047 Tw (Department of the Army) Tj -25.92 -13.68 TD /F0 12 Tf -0.076 Tc 0.196 Tw (U.S. Army Corps of Engineers) Tj 15.12 -12.24 TD /F0 9.84 Tf 0.0052 Tc -0.0652 Tw (Washington, DC 20314-1000) Tj 204.48 24 TD /F0 12 Tf 0.0295 Tc 0.0905 Tw (EP 415-1-261) Tj 10.08 -14.16 TD -0.1063 Tc 0.2263 Tw (Volume 4) Tj -12.72 -28.32 TD -0.07 Tc 0.19 Tw (2 January 1992) Tj -174.72 -51.36 TD -0.007 Tc 0 Tw (Construction) Tj -32.4 -28.32 TD -0.051 Tc 0.171 Tw (QUALITY ASSURANCE) Tj -12 -14.16 TD 0.0258 Tc 0.0942 Tw (REPRESENTATIVES GUIDE) Tj -35.52 -28.32 TD -0.0046 Tc 0.1246 Tw (SPECIAL CONSTRUCTION, CONVEYING) Tj 25.2 -14.16 TD -0.0289 Tc 0.1489 Tw (SYSTEMS, MECHANICAL, AND) Tj -23.76 -14.16 TD -0.033 Tc 0.153 Tw (ELECTRICAL FEATURES OF BUILDING ) Tj 63.12 -14.16 TD -0.002 Tc 0 Tw (CONSTRUCTION) Tj ET BT 0.9939 0 0 0.9939 193.92 468.96 Tm /F1 14 Tf -0.0432 Tc 0.0136 Tw (Distribution Restriction Statement) Tj ET BT 202.8 454.56 TD /F0 12 Tf -0.104 Tc 0.224 Tw (Approved for public release; distribution is ) Tj 79.68 -14.16 TD -0.1728 Tc 0 Tw (unlimited.) Tj ET endstream endobj 445 0 obj <> endobj 446 0 obj <> endobj 447 0 obj [/PDF/Text] endobj 1 0 obj <>/ProcSet[/PDF/Text/ImageB/ImageC]/XObject<>>>/Rotate 0/Type/Page>> endobj 2 0 obj <>stream HjA {=O˶Hs\@oBfZv)}jfzjfO_#ihZ.WUkmԭڪ)Cwzdjci &&T)-5<NU73FHfguj q #yj =:圅>:4B%9GLՖj6Sh(0I o0oդUb-n+̦ PUҷlWBֆ]v֣Q68h{޵?Z6;ys &bvuɑm˯agh*fAB; O98yQB]lixvdκe QX779r 5G) endstream endobj 3 0 obj <>stream Adobed  "$*$ $+(( $)%%1/%).*++9+*./45554/;;;;;;;;;;;;;;;;;;;;; $2(!(2;4222;;;;;;;;;;;;;;;;;@@@@@;@@@@@@@@@@@@@@@@@@@@@ $2(!(2;4222;;;;;;;;;;;;;;;;;@@@@@;@@@@@@@@@@@@@@@@@@@@@ `"    m!1AQaq"23BRr#$4CSb 5%&'()*6789:DEFGHIJTUVWXYZcdefghijstuvwxyz^C !"#$%&'()*123456789:ABCDEFGHIJQRSTUVWXYZabcdefghijqrstuvwxyz ?P(8]ÞֆXtppttppOpͩcA2@rh9Ӱ61091091091091093 36qQLpC`pttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttppttp|֩90**pNsv ql EU3Rpe 3-"vQ-+̩ j0H=2qG&)Ԑ8䜕>1I˶fNK9ʅ108e $,Nz'W1`= ]r3sT&I%%N1rLTbbBLbLltsx~'9<˧@r5R"zpKmq1Rz̺~)=2sа6e1T z&sc`cѱE::jTR!iSpRa=&˸OBpNBt&J} SauOLBZ2Ɋv8ܧ̜CќSC1IkfӀ \r)a \D2G$S#г%4 z&bh邝P8\4'eM:p0  n qG<;x{,j'8ls# B9𦁊jxpn N`bhtlͮ:&N 0N:p0R&)-<  Sw@`rAǢ~;⽐D7)-Wڡ=M(y *9Lt-dTM%&I`cT_f҄txLź,C*&7&.SJ"irGDr0HϢwсdԘe6OBɵy)x\Е.BtјP \ (@ !*hdᣠ`BQKj , dA@(A*$6s{3J˧e~^}6 pմrN1f&jr}1= NE2K:$>="Jr!BwT5 2D}*Π&*'@K PT ! `c FֽĹA3sbvC""'@d+\C>'C50'K!NDtʮGUpQj 2Q6L;͹Ԛaʓͮ2UH\&\cP H[2S eq1sjKU@28Q4ٿLCMz#I֫:蟍6oD[1ftZ,C>4YL@w^&Jb:6o?,ߦ ;hU+֫?]-j|mdt[,yku}u{TNjD=keuv%:뼇ob;ŁnN[k3޷Y=m~xQ(Q=na3޸Cfko!i>8Y\,m8|p}ٟ]wp1:Xξ=|p}vㅛxK,mw݃Zgp a;̾%t\, ~7پ'utA-p>8YIfhtO\m~8پ YD|sax띙~ ?m;tO\2ٗ[/鋼Vekk/-v@EUzeh!{/ć6_@|ǫ/^$x@㭗Gk7>lj/]E~w?{.kk/ć_@řuK׋*-yכ7] 6oek _Hek V_Bכ7]=y}e~ |y}ze_]w0>;eXƻDe~ =}0|:e~ @+ |}}G* ïW?mw0>:̾mw0>;slmw0>5fWmx0>J%EP$=(fӂ"L9,`{sv=qjʘg?,?w>Ϲl{>Ϲ/s>Ϫ ZgwlK>ϨO"@Gg_U>Z&|ZgƏ}}SJ P|B;:^ >_%ޠj+|Of>,Vw|O|;;>φϋ>*^DPlY_y^|(?|YZg_WĘ5Z8|O1> |7f?|YP,VٗgҀ>^-C^{"-EC|_}DU)UP5_VY @|;=>n<_" 3_7şN&huʾ2glK Fașevω<,e EaϤ߀Eevljċ3,X]*_f>,l6|YN[!k3cďe,e."4@WujE/Zf_SşHViRl#ŅvUPVUYj.9l~:eZ>t#g%|Ze5^_k@r8o>rHG!jM}{$zYWh\z5}pևR`|ī'hUF(BTG.RlpAFтX,/S4w̺MBG" R&.d*~&Yq;ءl7,7pOС;ތnZe*FʿB| bZe*V_PjwOС#⅗{B違2']=ĭN \ d*YH52]'Y?J|O~ ݸ^yjuHd*hI:T$|N~@~'Y?J|N~ ܓ@:WG#}w!*-L~Zd- /'POҡ;@:_OҡBwMT`tT,({ .==r†tCK;+6E)JV̯Gl[*rC2G(J<1m]SKoQӀu]29ThThfo3qw&jSx.o%:׀u 0g|=^ 0>slt`qmt,lϦn&ʉ_2cBɪ]]k)2nJ"ͮ}ޏ {N(7=7]|ß3{~z#iiww6q`{’%iiiw3pڙǸszf_ڇtĥKG=j'e/z<7fn軉؛? JP(tQ'ڏ PndGz$=l-Cq@suJ6 A  j(@ $U  Y(t!@$8m6l TeWm?ذ>8kqNvʗ)Z_yӰab6q|:eo3sGT|[N-yh2%y J8)w%Zߕ MpmB1v%ڔjW%2z5ZEhRuJڼO2sR R0´&n :% fyNRaJ#P+E@R8SZd9I.sfnxt(AC8\5!@D9iU)b'q) rLeCRG&u 9x >apNǰ:'C. *yAeJJwO!ٝbEC9owϖTM'dKQ4ۿA/({[_- cʭv]0;n̗9Y*/Kk_CGNjN۪,ڥtH^T=ĽzyKP|z{p,vAEpBE_|{{׸'S'@2>ZR:_Wѱq_==]gICKjz:_MTlYPYfAf-ϳ3*8Q|E'e~q4.(ACĐ BH`jXx #jwEE@BTdC^KDjSӼ_;굒HR8ԭ_LWdz6:ș_嚷 능pp{Y)bdR R]:K?L;U%yqLSΆh?`*'F7ZmV8\4 $]ao4ok9Btn=Fڽ. $͘N %Y`\8B][}hynSLkSA"/ɦ}FIҶHeU-w=gCAmRKm_uw =n[ j^ oGyB1s[@rBY1i TMno9U8"e% S?.0]Fzs¸30]@}x;Ü`@HR9kq~^'kx][_ 31﹫Ndp'E#5tE)m:*dju]z[W:m亪o9^uڳ (M4C $ym!m{ZbjEun#k\q'([]ɴY#G MGM[WmV2Ӻb{;<*LLP }oNlI5 ̥R>;VgSti\KՙPN~iM\b8񅜺oI&)U•m/IyqF.kJ]UZ3GkŪ)mv㠕(|2gOֿ#e^NcХdqwo28@ \lUȉ@ pE4%BjpJ Kn"DB*b .J.17uk 3%{}@BNҴ"X+J *4GRb-z *VI%qz f)V(8y8l_纓h_JQWgISӂ%TԽN?Ykou:󤠷a-R4lū"[Am%)1E/B>*.G* < !7K RڢX6} ҺhmLtt>}X`BLUI N=,oz_yyWttphm /DBrR-.Dit NsӲIrj'OZ'JW>{Hģu<_V}dpLm(⪧wG˲Fu>T)(aTK$d_$R2^G, *~:iָQlS4vêj&MB 6tq5ug@̢ Y`>f+1'EU>sX 5ğfgkr}n٦'w5^^_*蒺%sWI²Wް|Tg.C6 6!L6m;TPUdfBT8Mn*@7ZB8qq1dSrSfiS\iHf`PA W]ys<@:΂/ '[-1HZ744w]k]o,tsh)>JSawc*=>RN=;jd4e>Tp8 f͆'ތblƶj65*t{=Э͝U Yj.ﮏ^epe'DJC )dSeyH\}Kt(6 m+P1mErp @ (^&f.@;WLM>T862B(%Rq &:q2%"[d@[u4p8ٛ!1!W)c7Qbqd L1GKȊ'i@,zD0SRqaaJֹ#=SŦJ6;mf]k/6"3p]h(Ix1]r2m L.7E.ӇyMi4yR/:[͇t-ܺzGJB7xaի,58R@}ԽI17|De_Z6u a%kam|ؒk<˭EK"`赋Y$w߃ט$Ihˆ'[t;TP=TOL~WCvwX>{aQ3IC`S69d-͙K9CӮdj$wmZܸKz94_y`SI31g$ׁTG4v@P QͦP/׀SW8EK`7[e΁~ӵYuzO1遼>KL}G]a˭~yo*TZ[Kp䎷U5-1-`o.)~G{b8Xbi&2voqI},I'W6֏vQJNSW+R][yn;l西M%u:>%.N Pǣ羬K]zѧ9q$UnǪnȡߴMWxDq̊$: |ªWW_OŦ (Nr\4aUm/3$R DV^>7]U-1vy#}HK&|tV if]e;sG3zNY繚Q/H& c\͕Fr*P|rP: (:  ="d/#h 0H !ř54AaE=@$36 #gyݬ DH(*ހWFLNLLDbDG5+MIQUP& x#@DN(q9)Fq5:E/1e݆Y& R\t0SS&\TqU.+ͧa1:`G yz \ʒ$gpLbqRä 7GJV2DB7[3)N8xD۠L.-V(7'LL^tSuƟHkWZ `vj|aQ&LRbm c\yt:TvԳʴ5`s[{4Z2RhGA6mRmlkun5u+?y#2/I:fr8 U9Q(kyUU| )%WPPukP NF끚"_ R&YW3 V| ^2aR9k(3aMU78`[Dy+P !RHnqto2_}߉C <[ݏ7G9pJ1" %R btɘ%S:](v@&̈aO'S+d8x%g1w2cė=h{ 750# *g >^!^fP^'EM*spgqɎb0'꘤g7#cƈdLő2,,PZ nRT$`uu)jǬr-ob}ghG*&ҬN I*|JSƝzbujnnf06I䙮iQ~~ = BۅjF٬{#؎5^ڃ^Nt;pb 4/gmst-pHj4"E6W{ Oɂ;/:0ڥTwT3nN')΍̎k6jU$P6"U5m:R]ė[gAh[P49 pV7Zk;4FALtGh}mmj-E`t:۬_ʬ?>*Qy/Ymףm;T6h|\!Z!Įuv?=ꪮcX3k 6:;ZNZm18P=5*|k+ JAJр%2 ßM7 &9GgmwU=`sSLNi/O*9{Gˉf: ^L9I>cHU\GFJ DbILg1&aLWAy Rw͇(GE5e@c/.覬#>jEE&|C7^#/;z_qz|7t^!H/>BåØs8$+F2nBT%$TD#h $00)\`bᾦD-!1s%Gy1wᾄ Xs2WwE3Ϥm&f 5DCu1Ւ]eS٢Jnj!) *ͫa[A8 0`S6Uc^n"$y.p"@"Y8i[HnA!®)3KJIrqb}%QcʥC|^W%O[-:>S9-ĮOfh) 4YmM[N&Qţ5B}DΑQG tyv6lj+?Fp mectΘXt\9m^ꅲڜJٳ鈬z.pĤOWceҹTս]khUp7lz2t4q+G~FYbWOH*ay˪>ZvH5bn1δ&^YՁjJpR\Zi}Wfz|1͎\[.MhIt04ʝihyfs-m]Y ТUPhɮ \|7tJ.U%B+G)kRjlu}_Аy}uuuD|6JƩg,PZ٘Ks}Gm(h ugr/n((*Iy5ڮ>::Jd]99V] [;\%*P†R,st5kN(J+-6$pmA bXQ7Ƥ֑2Lʸ]coR5f[ʾ'WLowU:*(jwy#ssmm6]Os qG2i4Z|tMHTRBݩ NA="rߠ bwGys8gs3 1%đ j`kM(i>Uw3'l~ #)bL?xAz>Wq-IXaUw=G'LB8TmlUK10دyw05}  _DrFBUX9`sʡ22N-e8ES3fFlSNLSOrVɩ I3%Ü@"O.o&WpWe[^qQИ㿰)9椘7J&"t'P%0C1Ԙ$R U8(#g5 ٌ1_W֙} N3 R2W>03qQW3\R+[U0f1Dec `TH W@8⽓)x-И)9Mbc[遂M`Ehޣ>'z1w1cԎH" J-jˈwBU ĨB8}LRȝ8 =EH%<JS!_ %wt#%g3B J`l&=ʉGL}$r(W_JEO<7'H%@zdRTBJt{DJ8(NjmJofu]pݲvһ0n?MIbeC[N%Z4<݈bxU4o'֌K_vI*m^)Lnpm<ȕk7sM'hd]8[P\p6cir`}Ԭ`gimctRjnKsf3q)LO/Ҁ#lҿGX^|8'ojAjˍ' 5'@ˎtT-, Kʴʰ &kQMIfqLչT17 yP]U"+\7%w5IG:' SvͲYZ&ێ;@Vӊ.$YtS'.mˉEPLd5nж"was&φWiuʶA;ğS'Ckl~+zY=fU6|5mi]"J+uGLR͵wK=} NKܝ'tj^09mH-җuiӒfm z[.٤Dt}2)$u#NKJWTk5iKKX*gCړg7Touދՙ:6!{1Ҷwgte@k  ,ԣj٪-s:xʻ=:+4i/.ptQ%G_- )w;-HzEMl.dOz'GE@X7x'Y,ZC_>^=M-zg]d+5l;-:) <\(Qʬ*#%kvndIeJLaRN0 Z vJH(pF^D)T#>b#@pBe9aJ6SJl{ !t*GZ>k-^3 WD97ϗj+~'C*_M:RmvZyØ%4S~X\Iuϓ͵8\68[j{2՝;6;7F=f3tzw'K`z: XӖbU%qSGtLQD]74]8s[5KKͶOuͪTq<@[b_MѤ*1ulZ˕ѤPy6s4TnxN̛5YnŰ= L1ܚg!63tF2PLOnL|0ٜ1W3ˊcJot;Yi9an~ zc NuLMif&ם}vP]WNaM(K՛*>R@>,udHWIWqu% ]By&IR9đSq026hg%z8RZ.o/[&-f2)u"NJ"(8|p1nɷUDtC[O 8]r(1q?3o fa ;A8c\>nubl[71GFrôNen1n'hL.2c -Ԁv &GP@ D )*P ;Ja.׬ {f]g:ues8S>')9fWbK X9fC-35.PL2=2tZ#s%EY͢uӭpk &Uيh]AVxYirXXtˮ|iYvt^d*6gYΗLu>T=楻ύǷso-5 7u*e(d4TWdq{G՗Rz1HqWoj|q:S`NwڢzĪYV׽L^u3:o Lj\{PF]/H M8Zá᭎9Fg^Ę)MU궯Xt:zc3lr㕴H9âvqP<kS9-Z(y?R 9N-vZoTZm]TumR,gJY)kX`'=`*hz*\}_&F˶'Mʕ9lz>LSTW==g۽͋j\[)Al>LJڵDViˑg}"nר&F۾*YE:%T6mNd)}X5KG.w nsbqi*@$9$Q(*y=p7P3NF *bI| @&t (Db&bH bBH`&. k}s#K ape='P* AE@ 6hd)Vb[ )<D FF.' ̡wi yw3"r1]y (ADj \)BB2`@TW h  TdD@A.&A8y ĸ^La@^9u6Z93a8#T91ԉ@ ;7ᨡ 1)k#f.Cwaʭ6S9AKÿqJCWZ`/c3qRL9e˜@g 1ɜC @q {IpӯL = U&3֙aCWC3kAkHJx0*at{̥*36wf$ 5 o2`1#WRn j@&LKT )f(HT~`bUn'n֎dqjl͐2dYqLqTq $$"Rk@S"eǴq"puSms/]5s)kwΩs`l%@k9\0b67pK`NÃx`mSZ1qykm1}p[Иch #Ow-fpQuPᨨQt*WӚGGŴ!:q`pTqS#=4qg:*Cu8W}1ocR*3c]z0qR "kF1UsDS16H8brVÂd+i-d&'xN96} +BGLkEH&zLC`K H)7RQ lB@j*@*HJtu&bN8m]NqE"f ,r1K%#P lD@[)?pDL%2S )/ތ Nanz'ܺʘI>ݝdx޻ Jgۋ}{=>xHLYڷz<>%[/Cw~oLO{g}{ǿwrWU^xO}=3>=[Rw=3>=3>=-#J0]g}>ZeF ϴǿcOtV~ҿHϼqvDt++>=лyxWOj}gEn/ǿKmgG#Oqi~<9Z_Y1'm.? v}Q{ 6yzBw{Hj>`{Hm}exwOh/KK{_]to}9f7o.Go}㦋{/.iwwc{`{Ai o.xgNË}tzB_]ޚ-'={֐zKK{Y=A k.xgNOM=)-}e޿zO6=iIx.G²G{𬿴? KiwzGscF K5;oxC_iw:GnfW]|1+.x6=_iwԥz3H2Ŵ=fd=ExεGB6ֳp?Lì3xZg^*4Hpd=狀=={{?.wxos!lH{ fYe25y`eZy,CxҊCG?ۇ-m}{gp8Oo!lߦCx>6ٿL=m~y`dfp1x,ZbUKDt?s7II>09 h*; 8\n%*Waިu9\bC^ۍ8 e TҶۼYPՓki%]W 4P@j8!u]**HÉ"Kt! %K`*Pv (!L!&l1-2ƻNבħ+)HnM21*\wЊ1:>0-E;2^ï btĘoXy2Ro p&D*ڀpcKߴGF 7P_(3k\4yT1j$V$ǙJ ]ze ];T4kgT8>3P$c-mUڊyq:(n\B"WJ`a o!RE Ppۺa88k.%@8|"i~Ҫ8m^%o%z8_1ߍiJ &biʫpjLq`0cJ$O' U+}CD[2̘bڸ(WG.'UsǤcKS-cq1+Z-m#aO%`&E_kJ_"P!|Cg$.^̊dAb&*c& *_E w h8i}@(iNɕr E{t =.HkiEF7+KFj^ }1c2:gk fIlco ra.S)u<@fC{$A 5&X-_R",ߎY-mg%xR$7^ >*R@6;4%1%;$KdҡP@ ~y_T,Xn9tǜ ↷AY[( VDW^Hv;W2]6H[3{a=p?upl!`|84 NCT, qlatNWB`.cڼWT0Wu!"5Bg(6+w7 5{)j֦+r p"0*߼^81KT>L8WP=RE {%qYa¢"G^,Hا&-•;6{b0J',8.}|^%:=- Q*y41-%#z0J쀕AnE]6xgCuj8]i֎G  S-h4Hn;G}DJ,*7#[z~Cp @1{L"@(+@%d(hHFψJI li(>C&4IA 11Ql+(_< *ޙ""%٪%CU 6jIrcW^cZu[Ɇ/fkg#ig\n3Ɔ`L0T05^ QJRP܌.ڥIڮ._᱑{KB1Ci7cC(N4-GoEhŗ!K;x nYN9N>$߇%03.^ī"Fq—FNQ\wd \U.DSgz"%[Pԅ}RC ^T&'L"5N0m7JVUSKR8ӭ,ڼŴ$ b1b'Kyi=D7IN]d%jf3j5A K(v#`䧙ټ8iP 4ɥ bW;ӭL5u0RLxq;4T{=$%NiA8Lt4v7;Ya;D  @*@}z P# o=vZ(a}LIW 갾'7#[z~Cp*5!DN!q$'Py VkjB![!=H- !2@5 dHp@yf*do _w7"%;q ֨cTL*flp4wnW%CGS""m֜2Qm_C(m8[7 I%0nĔ*nRcd_Pҧ7 @7 5fj,dĩ{ǀt ̝T8ߠ0]f#;M.x of[ 1:pa*DqR!- Ʒ{"\fXQqQPRᢻs2UwN Ȇߟ,lŦFF1BҼ(jMkpjVa3pV)\i'xٯɭ%05[- ^QWK; qjn%6q%߈JP1P1 1n Vᷲf%B[WW\I> 6FDb u!EWJ5N&@5$+8H*@0ַP(:j_~{O9aUĖ53 w}LJ =qy?0>PPJ@|vdEjC W<1<@ɐ "h20;1qd5Ī`2F}fP!A&[F00F0P%3:#[X=;wЇ%+"'y-Vc2 ܀_։ v[#|masWc@qU2c| Pl *5GL w K"%a@Ju1*d]pL.1B7@%klL*TEky)ljvQ 6^s3E1bpfCrDDnaTe\5!LŪ:70%-;Hg݈Řs9R05 o)u!òCUx {Coʦ8҄T*j""LRuDEj+@'VDq8o3"+[3"E \@MC"$kha@I!+$ P$!\MHwHP@0*TwV}~x7:d @,ɺ g|ȓ3kf2~C\tfjZ.8A{8zO-ZzeWhZf{2[c4T]$Nn?sI/O)Wʊ6vH#Tkxje%=kP;.idƿR{n|[Q6ou1~jr΢)\ԩkܹjSzөIl1%u@v/TTY}wѫ?8h:-Cb]5$?6Q(m܏` TV7l HI Y;mQّ' J`F\cC{il2)Ntt=̆zWEs@|3%jU[>BE?OtTbŃԠ;SfTunTZ;E_;m^Ԙ#0<7 |ȡR=}l̈!|t֢L'2[څ*>XT I=4pGK7@yBT;jp艊\-o:@5sE-)9I4i]XRѓ\kJ'~&+Le<".5 N|jG<Ŵ7DAоCy,գN*+遽4Z#4wĸh7$͆g]k9 bi3Dų/ꆫEmsSs&[N*]_mU*s|dext̨e G 7*b@ke .7E}>vzI҉c}BKu궽AT=Z]$* >l[ډ:kp cM;1V:ߐf5 }!)p1|OіdG q`MU/+D7WX,x6b_ӦVCr:,&ӣF[>gBzhWʁ4n>%'Z3Yl>Ut=gPUl3ɓfULM*ʏ#ģݦ>/{:ʏ]l侣=GZ_`xٝQez~6t*\-L3Ե[Tiylmm5~qVzI5hE> {_7BǨi|Ir0?>}m+sr\/4xlrDuL?[Ol2|n?ARҬ`y/|y2rڧDqLx8ao}6) iwz݃\~<^eOڦPH)kvZ&[zɂj_u=&$Uz:s}% Vw}vhjn?̃tqS@}ǹ·Sv{4PO@>4.8#͟"_CtZm >zM[Q>)/)N.OJ,#V^_fMGMkND:I4=deV7V_zj)ZoxRl~Nr͆zܙJRX#=̢J(AV>kJQDJf:;kK{PIS97tm3 7pz#M\<^uXbT'z[͋;@+wv~?N _jG.^gITIrR=Ҡ~{,GŁZZI/~iuf<_<~zN@<M8TL_*n)Zt \G6r~K'ţ5bh-4fOkm@Lj%DtjvcKscnǨ/B aܩ鵟ZJ un*vE5^ObÊ!buRgǣS&*8T!*(j \[]ǻǃ|{ :}/hkw *㬳{jUx?vjmֱ3Dz9NJ8]SW3A+T2vbs6̫hҬ>hn) )UtzY";'Ea*ı Ig4˴q:XϢuN{2gah)ezGNSTg6jUƻg4[ѓbS;H߄beRN:~5YyxjR{='-fҍeepcKxrӯSִ>HґtPUDgmmkfxģ:\iі>\1FX͠^"DzN(FBD<8$$P՛=\KM\/3Hd%JiPf`Vᵉ0Eu@6HSU2@D0JXZ;,99g;&?upl!gG?"-{6Z:{)YP,!T<H󔕄 Ł łᗽ{fe,!Gh|Ns/@v8cQ*UﴼOK#izt\5ĨTx3H)1D]=aϭ z޺~H%zU]DGNjz]I˶-"Mpg)1EzOس^.({Q*Զc4o'Q%4.Jĥቴ1>&* yѱhIwuIsbIC;:ӼZj-1Mmr;P\}ǍC&(Ir˂dK蚈X`*DGhtX_C9li5jMv_n<Xj-q_9OG j6XDimv=dH9Nu#4{zיR~j@yϺgϋ>:Lgā:5Cq&)n;RPր}:}|{/ /6toj:.}T-\}V,UH`]R n>[^- .裭Xe˳"ˤk$YQ3$fxy}7tg`}G%}V|W͏z?t;3"_~g~?`=Kk;0./gsA.nJ؂oW캻;K :/tȩ&$y67>_QYݢ%.btGm1߶{FY%|/ \ClOjp=7Ttim}Wpi;rq닎= 4&J&}u][G0(iҭk\MnZ!pt_z<_Y:SNpE /`z_"b⏴;rƦE -^gZuFX0p xH;=N-ήdM^LkvHᘾLt>_\fKu.>D# Z^㰎d43E!"Tk&qƣiW.-$|1Wdy&?yOICϴv{Kc'xQ2+M=a;/?e-U0=CYm_oIl+<.7:},IPS +Cۙ뎳JCTpW|Ǩ>|ȣdiU(^öc_vl躅Krm ź30tiBx3L`{2ZEwmf~yƼM>K*%*WdjL-rn ,MhzN[U{1ՍcC0J4v8cIvEY[InwڹSqBmi k2WK(?t"E 7{$7Ft-7y6En豉-LD-S0MN nGh%Mѣ&ȷCPGx/d*jmlj8Xo6c4e/q%ڀVxʆN;(I+,onE6BNobixЬd8[2O*ֆުxaPHY(n`41by!3OUҒ*/%;JJ+i*j.)ˆ%ѪE#zf6 >h_uyпM^ge-;8ΣGMRCD_I [,$yi-ӔrQ%WMRˉuPG@{.絷V>8~kL \ؔ1¾JCn$Pof8M%4>El٬2,L}L\}x35R3";+m*=͓FtҀ}G{3>>Y:eh^f)zKc9`gs}8񚑬lv&Fޑ4"Lx:G9Ҋd%oyNzR=(n%NNS|7qD҅G{uE%Kiy:NTXG-|>kN(kDPuS܉2:'&\bXvզ>"O<5|LrZFySGs6=;I<6uo_%́K=o}<5"w͙~ |f9pFӅd> <4PPi{ r>CYrl]@jk7YtyLQ8^, &I25X``; //Cp['ܬVL;;澦qY0o&2q maU(fPb V`e>=_f*% kzf?upl!gG?BTJ!@`dqhBwPbB[hN8M@6$jj d'y4" P5P47@@@C{7C \K PP (lЪeWT :t0$*ȾK\dw/v_by?3#[ÀήjuNosnre S~󴄹/f(|X ~zyQ]{l/D]]^ QLQގXd6Qˋ5wXKD"'C@@U T7 2K+$ HX&Y w\t4ד<U P+4iK(-)P}|)j,I ѮzdAwڟ\u>?s<*+G&EDiu~+3Mm*vee14jbz:88L:o13a `&ZU놫JRi ܨ+t_@U PB TP 0%@tއfTL;&T,]<hӖ8jw3ˀ~C\H[ٔ6g& m:b9gҮW>u#Ghx+DIO}[@xHRm1y[=>8Ƭ'2rDj'| {I>īğk=cVXT(RHkN-.i>cJhI1bߑPZ *^:#-Ǽ6t}fC&b.M蘴d)mj։_H|2sNJjv GΉkFfVT]| dTQơfrZ=#V OI},06ѝS z*fbb4dMy ѹqc EEC"GopMSkM:CcPUP -7ӻ'hsi٪N5w^A}E|TIWߊgF6)/1I{[Jh1Q]#lVUV\IbcdB\RW4wKףE%9{C=+6k к;J?i}$rʛ=gXp`RR^Z-Y|J>ok_6o|>gNj]=oj8TȷaƪsXKė}e 艛?V,?SB<>hܾ7Jaڣ6xQS_yĦDW*s(B3eZl֜1Fr߳7YcSM% Zۖ\m=3tG*"B\SuMJ2*:$LP6ĵ.Ngi_C5 m=]16*[:^^)֕ڹQn'U_9}|0yʦ>_l+4L-7Қ"FX#Ck)E T[u"vN;*ÁNBx4zϢ ]B,#3I' 4`0ܨ|vl,d"\8i.51( Uv^=;*qWcЮOnpzΔT*)&訏8׍9/J-uگm)_:+kfִio[ϦܷeW/s%xҦ+,e\څg)[5k ggi*n4vx\jmhا#⚥ǽMm4x|{^}N,ZZ_LپlҏH;j6/yI^U@k׼sbt*33Խ-a;/Y,21D{cEhiN-k䏰[C>Ahh4\*^T6eIq`|\~<&Y_sɶ8v彵~lZfTSMF{.淐CVԤT>V}- tM1HX@93FWtյZDFК7J~L;Xl2&K,6hTU@|TrWϘT48̥ȗb>Lk4f?bu=}ϊZҞ,n\[|gΒJdw5NJ(oLt] F0 U|<$! *C N l WP\@B扊`ߴuъ`k/@#wv39c6L;#[z~Cp9_ ;vRzU:nt QE#:-td}u xK~LjSR׉k?Yc=֏C%RD (\ߠsմL=xڥE6UQw{=->TnR|mՉ]k(]5=.)e9t|n8wu]q \S>#Y]ys|IWޱLMhVp$6h_Gu*BB+е[HW_H| l;?t:յKL>`{LnۧX_n'{OtKd2&kN>-mLֈYXbS>ӜKt{J{gs=&7GA0OR=hxޢ~z]~hz&ÇkkkСB|ƊQ[D=#qī=)He*$'?&]t]72LPȗI⧅tnl[S!M5gj}+XځMpU\UQht]$$̏isGtrrNzK ;AH$ztM}?c.)p:8%Vpm=FD̸Z-6bf}J>Hjċbp.qzoA Cd浣L)*]GSr[O|$91lDӽ3&VŚ[=SO}-&[9lUO.TfȴncG.&=B[}&z8^p0Tdt fe>T 5t,t-3GG֣?C~@|$Q^'.D`Ow>1H YI駚,O?ukWVtV{ɞVz/,5O[hyN\iniitIs M:aiZ#Cǥ#害4O2Ngˋ.ϣ 2|fQa$h /\=w* 3?tN%?tұ=E} GKtg诡(L_gP?z}~pkelߜ'ǃŵR32usI> :bu,Da]P] nV0MY^ϝFtT|fh~ _aIR̬;N9+m)08 0<ITFU j>WvMn6)DϬ1I̍ 36:({0=|ՏFʎ5|Y}"؏w;h_blH I. kK6qKU4xGARkY/lZ&%`T)u{[CD,au=Ck' KhK&LR|YHk*nWQȆ7zN<@z&ôu9tξ='*) m,j}=R{h?!m8>p%@B"U %C@N"0/@`C$TP6toAUUxFt^g0FS8eV\#[z~Cp>Ugşa|/=R8>=ofOtQu/ >d䓉g)с^sy7>J.%9n M!ځ<2d4ѫqȖPG1?33 +w;cґ$6 aWwfP6lwcRmhڂ95O* ?#_FM`p>ɨy0%5i* roʍ*qjOA>ͣ@T>+i 6n^VFnTkz\܎X"rܧ6wh1DZ2.'F}VjlvXyʍ`O>G伏NCtOk\YVDpȅb_R//ܳc;ߞrbto>PtEKB_Gʁڃ3fz!´%3al-(uNkOѳnҸ?3^1]mSK(fJ ǰX6 D9<ھߑ/^Nwڱ{/Ej}vXʅ$[vIyfžlf Vz&gҼ0i>"inmC^*uT!Kp˅(^Zl:[`z:M@ڋ3uWWmNfˆ][w`zچpwT ϥi+4ʫt"سS9});,nҀ ?i*8Qk :Χ)_5|90@j4j~s}sXuit m~'X52EP(ź^KN-0qXb[M>g͞a *dT5StOKp_yz7%Uv2)j/ =_ty_A?]gȾD(1ltN@RtYGï.eF̥VhyEF̰M=?PlM18kvcI-*)GR-_fޟOIIOWG\] ܮ03[-Q7/G^;PLٚ>gO9$ҹU;_tIW3}U&Ax4E%l<> WYD~P10OV׽3HJRQawK~` j22#ge/'GϼάuR3Pmgߊcj.)o4yi?3*Otz6 K'^~|i~sbC|a궒>rO7qOXm2J<_9)N+Y- .a[N$]:lӣڇ>VN .7`yZ~ю]Л5n([ų;>CV[<8{ NeЦNHlѫ. ACg5KzVX]Ǭh&N34oKOF,b!(YU&| Uv:7^/Je4ZeE-:KБNDӥSè4&)oYu^Zqd\O:덢s㦙5̾'^9􎐊f~x1j{6_H< jAb Q,NT<fZ>=2HӨP+bE(``,xTڧP}8Dy,|N8lE+Cڍ@wړ-gEoUw!zi>T_&(W}+TԔP4fс--6|;8;;`zJ˲B≤x_ZUAmZFeomz)Q-'ˊ 3. Ooex%HL]L띪Mf]gO:/Fˉ<ѭBӅU6tS]bm,}#o13hvxp4q=kV5]n(ω*qųz;+.Z,f:LBfIz9lQܲ<լRي7NdQ8`li !767Vĺse%U8oG{ڡѨZwr>m!mDDԒz< 8Zw<[oy tMIX-rp]~iTg*ktk4G{|?\|:il]jGj{QCd^ =ǤJ(iSc슐F"/]r*߹#-z>ԩmojI!QtLϘי4cn ڐ]L9vPȉ *Uuؒ:4z%.Զ5sI#DSK3Z'F&UdgӳEMfQn`v:NǦ&t\n:V(]׹v{1, JC1m&!D^I$ q.hs"mR]mL%yk_ϡp{>jm)u8P+@@@PŁ|zיvEHWQOsGYa]Hb@lT%"&@ˣ1 K S1K3 PmC: f6:3Z|?upl!gG?;MZ+i՛Z69f$@3̽a;~鰤}f FJ@t @ qP+(  ֏zԏּ{:RjA&mU> kp3Xdr& 85k/7f|iءK#[z~Cpp 8kq4@T*'PbhD.)p!u 'P5R "@pE@F`Kt"Ud׀lnFH f* 7@1 P TW"@JUGXd=GX&tq +yI IV88n8LFڈ0[eп[8S}]F؀G?=q3ߐp>i25XH,ACP'V?)p>r})f$[R}&i! TTi=Jsbj>t>SpC55HQť*fΉC8LCt@U L &:ȅPm^U %xL wc 1J2ahQV ȒH@T*EkyiA "8@"{7P6Cb<@"4((B%p$IW QP-@tCt$@)  k']ghR<YZ?/$A e7CW/sFYau?upl!gG?46vXꮤ[Pd{GؠBQ- 6k2d%cNیU\om'3[QD Iv庨z.: dizN&R{9m+=ʏj:tɞlRtdjO4[QAK6v^1UAOFMioj5Ṟɪ{_I~g_=uWݰi#QIml>| :ioC j 416UjIQlՁ)f  0% Hnq)PuR  뉈%u%RX@M 3%d'R@&C J BDҸC +KCī P`Y:?.x%#4Uz8kap@@Ha_$pU>kY!|"nbN ""H t@NP!$0 F!nC@06* TNV(`RCGhK(WgZ74^H !!P9ܤk { skT \p)C:̕P%q<enO41T?upl!gG?mHp}߹֓PE]}ղZAPlXT<\LV)EO>b)0O9dڢ[]L|ԎhcQ`xD+6'Mzf.NoY~g~GIeu3#ť[/[2&}NRvrٝ;:۴ [2e^GOc}^gw}|_Ѯ0GZk5_}d"b`y 䪰=@}&Ž];;=_;< xR:u36]%ZW=JL=GV^Vdl~xV}ZϮFqm&:hWt~ }+ 𣏕C∋A/ V|zb51QSPEn"D*iCq`#d HI@\YfJ14 qE"B VUā J"$*D  T^H+@[@BQT-dJܲ"8kʀ ̈ahPP bd  Zq4 Ie:5a<:6!^@mB dנ@J[7œdv@{a=p?upl!`|8m30@xf+D*8]SFPX\c>Vu-Iq_y⺏K[¦@Eubn&UdHao2L1C,2$TԈL 'gʇ+r5mF ;q4|x0&Y~g~GJb"g~G욍;nTvZj"<MfV7L&'T3fG@ͱFvZ-SP*UCcZZ^}IoOE%C~fKO|;4i=`y۬viG &>RXNkE!lXOxq{.fm&LVʮ嚯QMKXϬ6XUhϥ6 <;N>Yu*ɳ3sbWN3H@ I-"*b ԈCUH$ @ 4)[a*O-T PdE}ĐPBu%Aq ;4*`kH&" 4K P挓"Ӂ$RH"0+!JbIDND * @ @MH$9l9ueZ5~N%X9a*R`pCq§/F׉q,IP({@ic4Xx>N s{a=p?upl!`|8h}u|wT)4~&djYQY.fq; z|7G(bٽ9NB'5rIӓtڙxdu zrt m%ŘZ4Jَ&i16Jن&Y۝T6ʦD4t:hkjtzKO."}YpzN%(!Fh[1y7q*e5v8[;ip]>P bo8Ju$P$D&H@! $@MLSXO E`c\5 "k0 Ab@IlCU$dІHQVj1$y nP %#޴\U^HY${ƈfT+t0 7 И@\{$z2( UY{Uy)Z\w'[bbǃ4{Fw'ihL?upl!gG?*1@ А@YԆ% V`M'uI$S $7Bh(3\d { &&@2b]8 ` ЈI$7[R5! * T5$ !^!P`7@y)(B"CU 61u9,9u~<=Eʃ$%*=@b*JCvLpCuJǰfTipUhXiG4.r$ *PJ ӴPT PP"BR*P )A5)X z<B J!G54r6:_ =qy?0>S@ Ԁ "k0}|# {R`؀'DkUU57C@6@#[z~Cp9rˡU0;]FL_UBg8wsπ[9=1}V!ѳ/Ϸ+*sx et_oe}R# 9,u?Ǽ&}} _CNyP>3+MR^'x> |'.}3$|3?һ/e Xp:=8SW؁ͪ[.i詰}W}k)}>"1W@d]_}~>-2XF̊Ow _;YF_Ueyn^zĈRy "CfErs*ײ{wqBs>#٘l  G_U+GLUxU98WE|?>'ٟeqUw9"(waw4掯>* 6?c/}7f~r!ókӀl_p:g}C~~>oۿfU*Wy}. >hPORԢ_'|6^^$;^>^k{xbcϯӖ|d6;wg;gir3㑌K//➌ FMw(_q R_vDA{+>h~ m4\8=;ޥE dv]yfKDm-}:74ř*v_f&?Z.ogۧ<mv0sߐ\߲C&E~½oN~rz&jCMS9n[ϡ_)`oo@f%]> YXažD<[ևf/E_U^O^z v/E_Ug:+ݐPÇ=0ណnE}չ-\9sPԍ2z*T]<3x߽`D6- 6a_ ~&話]z}-{ 7qgSW0>/੸켼L:U$ʞ^52W]ozjݚf㳕{ϴKk{_2k~]|Tzlÿ?kg}~8WÈ ԫEq 7}S vpKz1AMҞ+u|zjtr!,1虸]yelOu(/FֆM{8cqw_5pv7w}_GhﳿŸ?NdhaJwݒWL݋oUxZk(&}nvynθb᛼nh aLg()?#aCxb>F=]YWūVXW‡()wn߹ܮ&8iytNHV?;8b<=T8o"1Gq tϞ}f.yϰ%\y=J|c9 ֙]4yfT<0po]]12Qs>@9lY<Xwe9^y<z oq-˞b`Q=%/^^xz33pcg,0Ky%,yLN8{W+y{Bw>I]o:y |5twi4!E]06Ý۝y:\~xZUJUms}Mϛs}憌pϫropaOgyxXyzǁ=*~8 K<.ӖJ?{0ڭs~og3ngu|7nrw<2d]piJ|yy{mZW}}dn~]\1yJ߼(y^PS n&Ö}2""T~˽F:)$k.9n[(n%>Fų.?V{3>}%Î +vW57nx,x~i+N{b|N RnnN{VE9 v௩cuuNy_SѾtxpY<#fhחG.Sѻ~?sߐJP8[up"N{9Y߮pw}~. ET5Xӯ)'Nyy *pwf3f4W>>76gW~߁_< :uu-,ⶽ"Ω|1nsƋFx}V|tnL>VVh;i ệi*<߿2+Noθ׿ %oN"jxvfDrᗣʩ]}W~άL"to:abU*"XS wtutN_b$|0ͺw=nXׁ.*;_[ 2Þp 'vo<8{0Ӆ߿1=LyǶ񯧅)**)O FŬ:X*OuQzܸuvnb Y~$NX;dݕ8e*:s}6Z~7%D^_< 7־7nq캷pƷd׳m}gz8~O/-QCݝ^8\z1:*wYqU-q~;;2*0E}>5Ӆ3=XukX9ְ~C\Cw=Rq(眀Ϝ9u\<"uyĚRznzoZs8]~{Ϙ˞{@l< 5+с6(hrC }<u.W8z1<᭥G?$yFzʵ ? yKX5p2S˛iϤ Jל3+*xxSƝȄ2v.~qwʁ4;3}^KӏhXC|ƱN<7gٙ|q N^Gi> ǟV0F^<81 N_84\}9/Vjae1Uw71P__Wg%_\;]Wμ"ݗoL\;8uÆ+߻?uKʡpỲ\ܼat]V]5|}]kqk\|t]\w]|Q-.^@m柇% },jUycnKS3$ ຟv<]|_V<}wn_g i\w+8#.qOVR\uz0'\w+ Noon"N{2ivow=+47PUk^oY!ǯJ g75wWi*'G\wfW;wxq0{xeS(n_ܺn6jôŴ{6i^3w \| Y>>;1柇]_ƙa j1Qzy6x׀ 76x:uwa^Ys<]VwP=;Jno\7\]'<{UN`L,Cy Ϩ<@8y5o|w,sW!͢J\gcjC+h,jx#nnJNjE9ϷҚ=Zk32,W<ĞtǞТs7=Įy1nW}B$A#j偓y5y{2'iye"Sg!C<ݞ$k ? =|ejϢ㞜PYcġvwd7 >%{1*Lj,.>69NSjoq'>mS{}nO!\sk[{Iogi1w=C}vE+s;' r,3W- |ѷKnϜM\2緝Ʀ\=Km+@})h![\N{w*{rỴuz2偔Nq ySʼ>^{= ޮ/ݾ6uyy/=v'Zݍ||oq)枌J/F9Qs݀t߆~vy.|[0ֱ:]*zOJz? l:;E\0ᾝ}UpYv{$_6bg:~9xI*ZGBAmN跜΂^n(o[P{i Z[q@gǯ'btIy]S (]RuGŸu/neN>V]n{-<9柅dq+vKBv|ߟ=_B[^~;!hKtzCWsJ~FB?.}v0}FSϗ}tpύ>F}8|n}c*{ɺ_ƾ|XK>y-n?]_S<&1W5]e\xQ57ջv<z׽QoL0^/~v/[S< ]TЮ ά3ڭW7~1ݿ/^e4<=_1[.4-WXwwpú-Oc*vqy`D]^=*E[4hXҷ3,"Ni{*sgLEa涞t>.ty[֭{1nK<+\weLLbVV;SǛvWNޛ)枏a}߿j3]~[\Dunw+c 2]x.$z綯3+]xt;0C~ CPpEy88e'eo&3#pNTUOA7-VH aӰzYҰ6~C\Ӟbvz8usG9Un\XCyB2N箒wsC*(9sLs"%N9/㩉%W@Nk^x<=D0מyƀqx9 /{TĝiuQ0*ϯ)Kк3߱U qV.8wF0BTX#l6o`q:?ӑ>-?΃{| bww~'к }ak"^uv N: ˇsm(rˇ7khȫ.xr* iK^!緎jsWy7Ʃy6{Ӗmsuzo& S>y߸^47kßNf.y{)r=XxwsGxߏr쾤*c|:AAY:~ܻ2OT+W;W&¸G{VwogBMcئE\]ۿ΋e7>x (UOӫۻٚ ΔGCon?k<^s=cbIѨg"+ wqnN=| >{}{; ; 'Euq·Z3Y{7إwsp9# nCuLJ=C[])~a:^wygc]W<@eǯX kǰ|-Wp)}:xz0x:}cGۿ\2>`}cU^gg~oƻ+}ħCtt[RXr`l+<9b.sߏ>mEÆKc\Ry U9ȝX]ݻiiﺙNwי(𧢸Pϵ%uSۇ$;_>l|~D{]Wb껽 іϧӞ_j4%LPx5ㇳw= q]>$\ݻNNכ\8i7pݘ a9~wLp3VM_1SsZ-n,y,8^OzWYlAZ\1ة8`ߙШrnβڛ.zYo:g9KTν$L4zބ+k.\2>nvSpr39 M 6ui ։vPG s.J,@qR]U1y\w0}N}>ۀZ˯fp߿_~FPm@U)ë—]BUK4q7{hP֜};g/9p^}I6 q9n<=X+Eku+cv׀m/eU?ԗήS8-blUNq_L7Wcy _5 p_&E1/Fy4UЮ{)vZoUoE]~$;8-7ߞ[oJno]׍YЅەzxᓼ+? `Mϧ xSw(™y w [N}4L@Xa_G_ v>wP=2Bޙ.^| Kj. ׉Aq2 c5T%*(jiXU{ټ+y?3#[À_c:ߓcKx:8w 5 i*2R2RU&%KYjRltиm6W"' zLtzS 󼊼xAG< pυ7e }=~%r#fsʔ:C{nsm mO-X ϧN ɪW.3@pDM.2 l^ Jjpςc3Yci>yCT#u翖KTu%DG/ z;NX}^kvuu|<חJUaэ!w8ˆ=[84kx¹i[}|NkF0C{Ǟ&<>jBUÝ ݖ{\;O_|scv⳨ pߖA ewW#ߏ8QcǚxsLs%_N9 c_ၒO+0;=^fj[MjwZ.t026.I#X]ż19q:{m݅@Vp(GDӖWe\Quzjahtyժ`~<+~|~0bϚvx_ r(o|E%\gϝsY21$K/>eT2R?o^xֳ |Ҧ<#f e{ǚne7gxwW^sfXTC@W5g;]oc~~;5[QQO^U"ׯ^Icrs]K~s3*}@k9|Q6 oX+Oiu6s(n /FݖX6\}dCMSǝEhsJ1wfU}^z1835a_; { aW7s"c>=~1*ȚWgRٻ. !wuuo۽,FT_^}01ܯڷģMQf]Xzή-MCǏ8C-.F >r-Ei;^X'Kҥ’ EEC )ƶwO#kp}i{g&8Isw rp*5}=_Wd9`u1ι&u~8e5صa|N{:&%\R4*]JM!g;W ln2(^m}t>WOϕimT7aZdž | -]v'Ysj_gLgA[StgSMtOٿ. vg \w#NkՂȝ9ycó7xǟ=uYq ̔oÈz˯ƾ"Y,7x-@2PҞSč*{:LUײ(69}z^'{~: = J\uxSݝLQ{=g~}~>Pv ><\)Q-4/G/ˮwqPC~~^=I{0BJWÎyrzͺNq./.{&ӆ@b/Y;λX>.5s;(o(i%w5hߣyͪqѷKsǁWW<2Gfvn(Ps wa^o)LcvDl_~];:ӯeيמkas ͘J2O.-᜺Hjnkϰ/kV&fwkR뻝, JP2+qK⒗^KwvGgbŋJ u4m!sgŊ'ELפjŗq;isUDVhCw,[dR4v*'{¼|-:*+MpJH|Ȼ]Uu6s|T f*H~o:8JsO#TŬǚq:5.4ͅZj w;: '9*qS{:5Oa/SvD+ᄑb,iϱ߁0_g5偂8xz=ȕ onoRֻᑅ;}wӞdD>~Nx ]Տ 3*SW:ciKi|Z?A 欕{|16&eϯ @O^]1Ǟ2&8k=<Sז˱n ;Le<^@7r2# 깙\x߀W ~q R)LxS^&X]vo1~kw1? dq\<ߟӞ,2ueJܺ^8PO^oFM7Dž39$آZ.9'Y"ƔkvU^X .(f$v>΋H8Ra:IJ^æ%lGuxS_ WWó74[M剄5.Uk[0{Z:9N\ ytœn콻FҪM跾{>Ee gw]@oJUrJXWD pS^lV8\Ȳbu8-vlj7DteQKj |on>zu9ډ<|dmQE6<'K{mōqW~zq:|{ Mok5N>}g͊=yb|,ض|@Zk{4smO>ip(*N_{$Ǖ~ 2N]Crцd-,0}]woIKkxunwV1S pEKb}`3Ysv}fCfK䏊ՓUw.=[6gk؞4ލ[6[MWuOo1_}18+w'f0ءxl5o /|lVά3["zqmu:>aT_ĈzM돫bxs{{_;7/Oo}  :Sf {[uƩ=3!7Yupb+]w%xڭ{1pſ~Km< óvȊ]ޭoX (_v[`8.מK5T4~]X^#ognWbKu.>w]Ccٗ kapveWP WT$wH +aT`oG?=qqƗtq?@O ˜E o8TUT]G)if|n^}ɰ t.h8ms([Lb&?7-TU/z>btu~tS1w =/ Cfx76VS"_7?Nxϊdȧn޷z졳d*yfcb{/si Bx31ˋ^iyëpӎ?{>ZzIMͻˬ9>@ʴ\ 1nz2v^4WdwqrTU˞y<<;3-3Y_x麝W_w D8z> Uڹϖ>X%_ѯj\{ZWfon|pޭKNU_wӂ.r^A%=EfŲ+&Kp۸ޙĽu2,[c_Y7ogbՕZw%+KWO?)TW>%CL%l¨1K[Mqa$y jftOX ž{GڭZon_Su K 8*ZW'>hҭ|)G z7\I*Ry'Vsw6ҿ*}|oD_o(r\0:{[Kݛ>o, +^r/N 3ϻ n˳Ébo MpmKys^s>d\UݟfcNȅ~z{\9r}|; Wo+*OW^s%ׁkך+RՖ'}S<7S>\|o 7u*`2m~o̊]ח~G5ӵžozMÝ{ǁIP%c@y6jQ\ڭPٖNo)bŴX, Iꪒsq4cxSw %|{[čxW 􎌊U^~sWE_. )ddF'TH 3灓A# !v,_[7a7#[z~Cp=to0>:<<BozMi^@Nz;}ZWΦfJ Oz@`D2bt$u3k =_>Ѥ݉ZujO>n9n1o{޷iʔFmryusJ^y ٚMeIs/%9=y]iRW;΃J~|nϟimVxy~@`|ayE\c ;{;&A>q>=޿oLVP j;aٚd\y}Xt%hl;NJiYnKringaww7~0M.盳7sѭ)psngG5 X7Hpe5ZyC 1wt&9=澽{2)\/ >W%lJO{~g@s#4\T)`|F g .5E_Y̹LwfɮUcqnLe~FDSk^4͙Q>i83\}Ya٥Gh}4EtUz 5fBᢤwվIh5tɗw>n;%4[rKsΞ u3o =ic{pBupSQ~4|ű ~4t֔)yZ;>]yΐT~~|r }}vo=vo'o/E9D5偂x`LW_L92;sǀֽ|}]˞[4׿"6o}9QuRWgϨY]>>>}ƊGR嗣|9.*X/G6rw]د[1oۻQY_`mX mu"?]ɪGISWiIv*(RmY& Ń@uX/ug#XGuZ+nW_s4wz>I[=-̆#CAIr.|MM)}n6KiKTmW4KYm,}svڽdecw;>zT1[&mSE\}{Ϲ%@`|Fܼ]}sS5=Í(rTT0ω:N=q>*RPKNNؕ>g@'C{;O>)*lvfkryWu97}3}%Y!P]^ߙ[bX,w(ъ-]n2:}k9n|xu8j}4Op .@yƹWgzm_s^ӺQuO*uoy hO8ջwcuwONvP-%w1K#CUˮb҉R{[ oWsrLVݗTKޱƞ7v]bۗÉȼ:,b쿛߈U}'vtƨ :@h~=l4~}|ҎG T0GoqPN5c{A .㿬wZVpJ]C wn:];ᔺ()\Eͮ+ /1٥sԲze;1w1f.-V;n޸xgؘ8u|)gf>7e8*8kiR\w%[}n\QU{P]!`Kv**C`-zuk҉]=|g' J.(b*:7ik$vHU_5YnʢmnNgq+E\8nx]"q޸bGgh烾N%_=CD.HAfMW[4lY1C _Yh.Y|m[ܯ|0hw(z73 nDUȕ~$1J@ T4lX|ұ7Fvz.-<7jiJ>(Լ^8S黇ffTW4nO5v 0a9gy Ϧ6zi˜5 izE G~9O)?ԣ%+r5,)4.9'[35u}%o{w^|I^K˚b}_\7@qltpiI4}6)pOE$4, qU֐+9vZK{o4uvcns׿#W'_~`oC wP*rۆTO;n݇keKzJl Dkz%i2 Jv I`(v0*Q< M:|*YBô*+_i;|s= ~X׻ 5"<;wݿt;ʿ2$=˞7v 8wcޮ{<3wy 1wsaُ g]7qBV8Owg~uZ«-i>_>PZ5mA 7_ϢOR/=q}ŝ;wwwJ?B+ߟӞd%mOK%TڮS_XƮO{Ni@:D[<_+Gff攖uǂwMc^]ݻso}*_e7boRQ'Mykh{,s@tuzqmf\<e˳d}6[5ROj}Ql|pUَx\w?EV.n|W R5JENNcuYm4[S"wֽpW;{nÆDߗEۨ9whׅz=7=uu"wxaݻIo |}>^>5a ~kwxn߻E/w5GoQ|yvfg ễk}RWgK廆v<ừȉĔwz~vD^ iD'N8a y0}8^8=wimYQ-Ҩ>]o*x}FX)ϧեIoq޸Y0r*NW<Ɣ[a__0žV\wv*_ BS#KyyPJS 8W1Kew+r>Xa[mw0[{*$ۮ{>⺼z3zʭ3*wg:5?= pi5/{fg͚*ߎ~jtΕVy7㗣 \o]~ sCNi|7wzYlw q;yݑZJ!oLq^Q$[no2 0,^1Q<'8y;}\UGK9Y;1^8d"X$YiGi}&~`NpmmR&5*j;/> +5~}Yܱ>DW↜:J d4QuT 0*2HP1WbM2$ٱ}o͛CUCJŏH{a=p?upl!`|8%Duo>zus2Q.y'K(r% bn Sy:{9i-yhLUQ Ӟ{H]92<@lE;v[7vi]#^\}b8:m[Ѫ?]G  I$ f/1j/Z)K}47o^VgV2Bycy"њQ-s@$=ChLwa<k\q `\ٖ!^}8aϧ9盲2x,&+]\$ֽ."|{ =9t<`og8e3CNJoջM{khYp,xz;Mw#fw=`e ;7ɥwqPD۟5*NNybB8ۑoӞf}5{U_+זjG[]zCOG:KwﴄNT07t\KHNCɮ9zt7;-'!Kݓ埤 )aG/4ujq(T7"ѴljwPfTa\W3~[jf#aR Qp2@ 9cۙ[o~|ݖ'_U^'uuyg_`E yެ8[ur9}<)^D87P".{.qVGN˻eNwn5[!%4Ӊ*~=7IOw=X(}NѾǞO}t ÷g跳.\W= m7U*oݕz;H_'Ougx.Cݞ@54ݙgtS!|Ui݆}_ӭno[#jfscPy]y|܀uFu]|`htlVCq@ܮ^cX+n[-ٮ.eݿ~Ou{9u )+uv+TkoZnm~R);|U9qvݿx]|ƉޯW|[kְWUiJO@բ-[y$MٟҶ\OH_RS_Ghwן ]FIŐ-|:˯z, 8~Ofο qs/oxw SckF[u|zpپOFgo>S{s篆U':q+b[9,R+,3Yl z1xNX^znAD+H}$]oiz+Lq`kM& /|ˠ{ϟ^`wKwYXu޼BܷӺƛŵ= >F9Ǜc~n)SǞfrx{k~uμ;wW}+u,1 ,ǫ+ Wݟf_~h  *^>g@|GX/cvOfQXSsNn8[wS{+eڢs/s*7v]|v@D+ wa~ʼk Quw 5+7<6{6j.x}\@Vj:%~4:/>C<*%!p:sϬ_?c\%w<ȢB%wsy.FzwG{LQ14#y@{4tJD[-V\=KÏmCÞo#_E].໽@}::_{n2Nz;{;< ׫;ȍ_{kPqݎc*.|[9s܆^8uǚ>< x7/,/mYnmqw5alT7-VBf7任+LǷ {GBZXv0:nY(ao(YeM&Ciw7(D%are_ai[#AEJ3 ( ŵ GO1pJYsnRnWaP͇i^W }fg3ZSY6Sځ*q}~'AZܼ<1w NYms῎Çj৪گX}N6xvWuD+`wwN%+n眻o_xO}pBwWg|Y8~ w.iS0[^~>>X_ϯ:(=|^7mʯU16UW5偓Wsݐq%w9@ߣwMDžk‡hɐhJc-Ω?ӿZݡu7;kV*+|14'i]jW៧+ᅳ_w;9*9g[cT~=W+cʯ>2!Þင} _5^8dJSóL˷g j}CI)oz>7ewN=mQ^|ֻew~Sθ{;hƝ~U[ó 7_}2ƵǞNXJde=t2%g~8xvxqS\/n?o qN{N#^b昆p|3)_gmݕU8u%Gdz~k"[u(rӞh@ee׺HwTuۏnW/*sבZC";Lwn{4ȺjyϧYwo~ w?7?O, wg"+ϣ;-usw ᅦÉu^^wpJώ4%KT&{=ybW;;0ڰZU51ZƏ`},Bђh/vjn(wSߚxmbv;5.{?ǯߑ3e׺yusñ^]P"=+zTkTR<=u*UW,<1s2ݎ[>m;n.Z Zf1ó|j[.aنu1W+XSfrqܩLHOwtfQEwW>}ɖ޲7LHU{|ku]%UݿۏeTxqjr瘈'݇UՀpwuw3] ^pin=DK}pΝe~F;Ogq*<10  y^=hwYPn]sG'(z n(]tTd00@r8n3I!*@ U NԱ֛`{~{a=t?upl!`|8hxYh(@(A)TџGW3”z;jj8wSs܉Sw5=wט9Ÿ p|\T'\MW9xy,T];(c O^{& w9KTUw(eTڪÛ;}PLUy8l&Ruh=;3U]l:v_MpYzmp _wxgP;>*GIbÛcyZ"qE ם;Lv~5.5usl-*0NIL!i+]ω/Z=oJHf' [2X$«^9*ZzgSHkFpK]̞^ʕ NM^r:*/aw _}9`c k de=4y-xq1jE&y(~N9{0\=L1\e};o!K}wuYN;=*}^Jy^vzO}{0B.{x}_rb=z}>gW.y\ |ʼ;|IRܹ 6vDSw 9׷^#bx*^ww9MTQ_`NW oXOOF\,Eiw<;3A*칮qhma*\W«J*rgI׶acymǂs1ڧs\r1^owm!ߏS8vR3Rq ZݻaF|gD&v;{s7[xs^ZOcup +*vҞD5LxRnwWkƙXۏÈNW>~Gjs{ .+}Xnn T+}[O_$ӭyf1የ}yó‹-"x\ٻ{}xqIg{\}]_kuOQR[\_qY?%uo0ga~o}gZu.;Ia{jǻ |i.Sµmlߗ ~.>w5׷-f`[ÊkwuǶrkq4+ 縅K,Ϗ}2J<( ֔m)Uޜo"{8%u7^= n˯<ߊP pʝpĄn\:7nwwc/~{)RK·W"OFx |"(\W%K"urnMiN%J?G ;݇9pdž7 WGpý]-Pu#媺bz|OJ~J̛;-uE( ټ'RHJ&ѵu68]]wy?3#[ÀUaH) `92Tp,w,9D*Ʌwx{ ><*e_2i?ǟ@|Ϥ ˟W).=yٍ{Ã}NHtńOgM/N־Xǥ毭-G}灬VA<]r800nӟunݘ.y0&i^{{&7>yZ]>@D_)]EC.7ϫͷ GC}qXSE{CXvs7DQVO5/ . o<Qlj݁x.o݁1%D+2R`nHnWxsQCў&՞]ܟi{㏯~y#9t?8i_.^l)t[P竉a8%Btsxq:ZM&l±(8ajM'g ъ.'mxwzu0qmvsN_o}wqߗxsLLTuoUfp~=o,KsmRu•hB_5びRw,w]v@rG(]}.L/8ˏ_;+'w+~샅^ĝR>C|1*z=]aC&ӿnC4*o4,UVG5 {ݗ*%xYd{k!yv@c^<k|jy`+u.uvX<\w[Ƿ K,Dyԟf_OFܯg^XsS:܏."}ך ou`kO/>}^'MR׿zpS^uǎ>Jqۏ 9VsT")w_p̘w.'$q'\x8-ٕ$SuޮKw4~WW|:YOeۿSLM|nZnƹZgԳudF}'cSxsr%D{:pau ׯ5T̚ c.7ۈ>[v6wysq0P(SpÎ^3f)m]ϫE;c3 f>;Jy61q7^b3W77}+/W5.c{o/{wӎ-ȧze<\MQW1}}wBWë_W}9+׷>BBkL_Wr 8e&5lʎ. F[`?upl!gG?72Nnf)3O>K5 __QiimR). b{rQ'wb*\uy;U/q~i? KY]<@%U\4ҒӢk7|)/o<9:qsZNRgvoמyJ-1.Qsĭ-.7",mg>I9o.y y_aݿjGj>~Ly|껻];I*sϳI9ke8LZZZX \]ϞO9o,W4EeMw< 77s׼ʔp4"rU=<߼_ϣIj_73zZT*pYK!_;znRwD=5)9 *\ICIQ.ʽۻ%a ~ U_>CKw9ao:]ɖ޹ipQm+aw ׁ1 T=<4aRjyUקHϒK3 U8p%Q|S,6.)5WᇣqE[usLH~3" ~f3*Wj"֗]7fyqqӲsW8n$nS[XvcIjD9\JڿNjo:էWx>oȘVxs;(wAszU1^$ça_۹;3\I{G \߾ lC#o5νQJZ}s}}0 7pƼ !~o랱ʦ<ߞ|7xq/1ڧ/ïX%Bu.|`\p]۽v|糛T]]] s UǶ.woyP;(<{nć[7z0gZ㗤iMWi{xy t⬨<߼鴦h)sϙ}P_<}ǟItR:4Mwn:Pϫo}_OfCӲJƝ^rj>G 5tыMߏѿv˹È<<=볯ar1aѻdߟ+ю`v[7WW2"o~_[:}(PnO7/eWa¸nᓼs =f&1iN+xَ<=yDݾ$ך/,7S ~|)vX}H7Nx\i7**ǞPnn`ؾ.nć~+їfxKwuevyNJ_[Ϟ \gЃOII_߶MYe=v)z}*e7z *߾]ᑡ / F[n旪Z_3rOWvau1{4_;}[:e/ϯHOJ¿ex*qpݹvwy&t4]_ߝDZnT_[j(6*o>K{l28WpIPVÞ;oʚүu}KJ_W2 랰Id;%}o~Kg1'7~;z% eZ~Skދpǎꑳ]ftܬ];U;0;on:]v~wIkgIzO~.nݕN8ÍM/d^]ďwl;_8 Fc ki(j-3+8?f^~;:*oU~N!ݿ{K%dᵏ ם8Pnw/ ~(ʽuzrJmso5f1)osq/KU[K,<: 6o..˯e3CPxz8dfkMJ\.8ݛ¼ ǷzfVJ}7B^Vҿz`*ǜo]wP^TW<tܧsEΑp\djjٝﭛGh?upl!gG?-ԀK %B&A5 4 @H !*Ạl"JSm@/)qQ},0>ᒨ9 E8~C\}HzߘPa 3 b?upl!gG? : @ J j@5 %P[u{h;HzߙҢ=?̰/8e*8בkɏDy?3#[À$)jK dZ`Ug5+ٽ_HzߘTkɃD GZ?upl!gG?P aM@J &B hP*m}x̼Oe6_W`}`%sWʋp=qy?0> LP f6TD=*R .q?upl!gG?"$%:@Z&^=Wj9ߝW`}X%|s b?upl!gG? c]2*I@t@ T;Td6@`  H V"'@$tl)0^̓B*eZ?sXӳ/G{:Yڃ]al  ^L6 9p?upl!gG? @ (Nj` 5P@KJ % T sHkg/s4aqF`?upl!gG?HT V` "vn$bP@!J %X5J=*YgKwg,S_5e/@{a=p?upl!`|8B*!p @J@`@H4 G{L<^5=sRw`}-2 I.6Y5ۋ~C\7ٿ_i`}%8VM =qy?0>rj vf ebI%*Ku*@(hb25V߼s~`g9&h?upl!gG?Z% ԀJ@@3O ^ C~,sK3o1V yJl2t]@sG?=qZ:ᗽ LR2c]+W߽M[v}~s^puE˖ɺ 'P ŀZ$P.@%P mV)kkfu-JSRx JE)}`M3 ;LE^rE6So_sZ'ZSzN~g$D/pEj5K2}fT0Һ.V~LJ9%ȊgM 8p8.jd%P &9n S]h @3SRg2StIgPiw[4,:*b otTPq^%P i*ᅵThLP8.w>'e5i ʉ7 iVfĖtH# 5vS,ɲOvbV5mCMpM Jr"M>&)W ){)66@q6=2e| \ MREx}&Xt;,)8qɺiwiϡkݢTJ(Vi hUgCٍ4%[g {):sqɾ(ZM Kj@&\W!. 5equ*ied.TCCT Js^*䈆kE"S Udn[pFf'={LdJ(kg.wpk๻;{lt5@92b,M|\I,]#ġۣK0&@@MH UgD՝yjr@jjKFٯ}@lG??=Aq+4cyDsqؖszN"$V\dojvhYGGz;Z0.0B[f8TYKZ&]X(o]͍aVuoIќ:Uva k P(76gtԈṔ^YsbmUQWQ`庁+F|)f2ųQe\dZ%mU NaPJ+cqZ&}NV-VڭM%+W)g:UZ%$KP̅m&]: eF~JuTL2UULXM8!TIͪn+25TpߠCC5£Н[bRˆ:\/VY%2`c=ҽGJ>9pwSM=p[ג7mO?FDf|ծsQ[gjj8u[ɰ8 VapCPR5EӶʊ!8kC|+7a{|:/D{< f[FCf7>gmV2B-US:ի246F8t}S@6TS"W,ɢ4bd D1ܗͨ]B1{Қj^P٥Aҁm6t>GHDZ:6>N VI%wuP 6]C KŁjGp8T{Q%]w0jKⲷ IaW>Vgvi\X^(CK>n(kWFX 9GF='u?J~`li-cdDM8\O{TYa&ϲO9şU" Ѯe/wӉϴk} ݘl7wS\VC:HIs(} ٵ5zvݕ Tw][=7F*>>+LjW{|j!C+ϳBvT[/Wc骺3ސ:Nps&}W߷R#rC qퟝO>{BԩI5LPLIN\>c@-0AQѮӶ;Ot.%kNœ.ÏA SqBS1u/"5 T_ -ՂLIV{^tog1USүftǺ8ϫ*n3$P:`S&/-7҆p?iDV^@nicz/yRJ{yJe+-'+ ]Mm=,΍LXu{q*z3YlR)~[`puLE{kƪ'[t'EhJuzY-7bӌW7Ոz`[Qc_&\/>ՙ=u;|š0ʅdQjx }aT_HϴZ$4Lp(>Jxu.KX^1K .ʔW:2rV_C_>K/94,t׋׫Cj6- )'4| gmj[2J14뽞r}ޑQf꺪| @M&]2 %n&86@ԂC`dr}ӛJNCZXq>TG^Qu2l1Rڂ's\N+W"bU|t6䶡p̚|@usIjZ>oP n9KjU6dn&Q~ .)VBtI$7\8Xn-%|cJF?K>NBAq5&Ίm65V=T=əkj\Qe:^}蘴NXWu#W}ijS+{gK+涺s\wuF hT؎uLm6l@@Ai?gC;s3tK6x9zg.kzttuZɥVҤMo8#>Si͉Q&ɓ9zEwg1KSlOc5b)p?z[D :x9^zyͦV$Z j5 I{>Ze|u̚_Yw&+Nͮ Pyj:D|JJu1b}oq&7E2.IN}UPgRNTv}mEѺ7]jӂ7\p>,Lk7i eSiΛL/:ziWJN}3GGةN=qcUk|\SX*^3Fm=A2cCˊ~>8}}\:gRE6uΏUqV f#[vZiVP(c|jMq~gyv vbo O;u* ^>/tZ2b)q4dkbPJ9pJ[7pD*֍?.L`|sh8lUTo滟S;+nY1QSjQ4JRRCQO`/60D;ΨZ1Gi[j,. {^%aϢ # LgȀ>^m|)Qn:^ 4w5jbjfw_"ɢ1OdJ¯>:v4N7g{Z?2w!ωA-eu~= d'lKuޭ8~lDij LΪl1-iid^gig*.>dٙ iyM=M˪jޕomlUA*E'B-,: dyKНx9iqJꨐM-VH[I']6r`MȀ$Q @  TIMY~忝9<_}`\?*'s|{a=p?u?iun~[PCv?Q2vS`|bұj8-xb5FgHmujv͖Jt~:g6Sڭ:M7ce J@7`P5Thz&=%^)V4nSptiLZRb uD:BS"\.FY2%: WrG rߒ yol|]@lG?=qލ+Dp.j9J5i:׬,JنXdWiXȺM3͗W.%Zm-pGU>aYp{;9`}&HV3^ |ʬ8zJ=D;8GykGXhߘ#eGj{0&zv$a*`DXy_ɭDmx)-_\ءAJ}6i{|wM'GgOӳ!A:*&\נ){1*56:upeK7RX"Y&1?mljiӢş]4ZMubtoN -05 ]p:~ 1Ϗ/]!K]5UvbtvY.lJGid;9MiO#WTluUo6XGhU&ORq}}ylƗRT>B/ndK|O]fIp#n۪V"p-ןC:YXa4JbuZZ&ʍ(q@M;nh7HP֘;msѐ٭ ApGkg\K*/۩֋$;nMhgțӿOQ6ׁ덒;L<0*HԛLVM|f$]ZZ'JQ6UM: ܶQFo{2o5Τbptyϣe]6&w3Qm0*>ӣbD4Lvml=Qɘ"p1"b 0Rjֶᆉ6 >lj \:ԦJXqVl9uEK-\>~\;1ӉZ7YT w#zӨv+ilO2JgnaTUQZ:hai֔jzl>m/95BhLk~2&8Rp“|P1Zbn +yڬY"rTo;KO1Ln;tII*jW Xlۢ'jT;tN'y2-[I)FmZrrQ*5ѵ޴S{jޝ眀>i]Qy0}?EiIfB$M:?oAgN96cx@hEָSuh _>oO$٣PȋjcZKPmX-1~>Ǩs筸0'襤'yk/:1TU;E`Ptjm=# V9ՊM>E:Ez']$ t^ηC6O _aRnB0Zb=ˁ]chm.j.>-♱2LWl6&"k[m\nc]h[][ze\S̼wvQe1$LϦYȳ͎%Ta;:]YwdO")?BU}U.1V,M , O-Ucۙ0Wg]jnQXtzBkD܍>)x쳛x84`tK,Vb},)>U&tVӭ33mӉΙչ&y ES>+4شt]:K i|*a~L Ml7z*ZB:(MF${Z,"T8q=gܲȋ~>ׁ7l/<LIF^{/ [ٷj3R ˬ5SI[3}!.*Z_>RD{,j1[a.GiOr>F;/φkysqƋI.`yD/;{>S$jtl2t͝YjRz2bPU 1)oEz;;gދQ^8ms6`J;eJؔx u1A>ӡtܩS90֧I"cY`}.ĔnI5"NTvp:حhS"Tђz>8S)HR>^Dj,U}>fˮkL3@u:=I$_O7i>D`Os Z^5,qyC d  Vٶ8YUƊy+\a|Dc[GiꖒPM*vS. m˙y:cD٭6hxv\-UU㏭Z2rڊ6S.Yeڦ':C~tޖ4Ä14@O>mmxB>%nu/ kThѶy?"Ft}> wNW+GL=%Ygų2\栅Ub`G1Qac}2b])盹p~FG#l}&-R{*u#,lğ>_!}M=ͣlZ2ctt녮Lbqz 5e2=JmJ֨] 0A~PMt(jCo0Z*͠K2bC6%iZ!(OSBSvC|.{\Ҋ*Qgkoӿ,)FۮhM $KezjnmF@_w(V̅MuUYadKctr]*n- J7}Kgx"&TT=hVuMi:&cf `/ST#PDNa%J0P^4#MYtLj.c)}_._fʱΤwq trT2`|>S{D5'3רif&09v|Fiw5AsOӱݙR8k_iN$PCq՗YacWґnJ)OܖkZٵLyl>G_0ț%Gw6Ғ$Ɂ(Rp5gˬt i>\t2T]x| ,M)1W#eA V;OGS7c+ݨ+l:17iilJ1'E ܰ>L=Qy0wn>!U u:Sme768S]K?0>Xi-߳NY{œN} eYDpĒ놀s{BNi5.&n:movq UæOW 4nmRRtWU.VQn[4܍ )٬j83l6qӨZ!ȴL/c8^H[0շC6d}ĨƗWJY\f=pSŮZi3 qTL^F+ 'E1_}dj_%ͪ'ßMtlʍ]N4hX+fosؔJtњj\4NH&ELSafS6z;T竡oJmD:br`6_Zé:\ޒ6dln΅RJ})z`&YEho[_e{4|ɳ[*#Ro;Hˎ5(%Hio]%&T|/Hn7zӝZϙ6 ܎5 )R 7QBJz׹Zo~y*x#}ʾ/@}ϋ>.8~T =p?upl!`|8S06viaV=%2^&]gKGY[UGO{Q' {@S)ЀRJt 6,QJ(ErODxS;U+4:@Z%:K d$2*L T w#V& hzgGz׹g}}H5-yy?3#[À{;fq!@}^!4c#mZRdԆ&Jbo} =1hq']Hs->{o:/BLQlKXb׃fjUTP9jeˍQ8AtLzF-jϷ yʙ˔] Q4dv( Gq(\Hiw>c͵N~Dm.1:.{Pô';tJhh8r̓nѪS,ҜTXfF cű-UHۇkw,q&*W&z#Cǥ"؃%Vh"HS!qn?mbˍQ54'ĵۑ@fqi9D7W>R4b+&}nj_)K;@j&)HQmDgH? Vuc$e\~LjLvzX"Q±|K6})l c` t Lpt6GCHUeLpXt6tEciV6h 2mcm u{A/lE+:8Ep}Vlq>Z'[]U'L_t>598O~LVN6r+ZRvLN6p\9q T]H k~VIZvgNv 2Dm1EXbh]_K8*Ճ,ZvG <|==4BQ.sPBPjG |eU>HTdQBEUI\gf)N kIH;ήz_֒,q̬]|bAH+ |4Qm^/tXҭQ-RՍez&'|+iDL N`i4>LG/{~Czbk*~&sE"'J;éfJ|%[=S>OOpҿȏZ=E3<΀ոN% ԩSīD1G٧&_OZT埡NVi%WOBzmq.Ǭ.ڰmMiUa'/PcdRiA>[W:U%X:u*piT΅(^@hG&9J-Bi\)vFCkZtj\ ]U_J9ޢhgk-z_"sڬQhTIoM ٮLQ(5zz>\ub3\apKƝ|hzEƦųH&CX&Wu}*-\+GW N Ӡ5Bj&̾5JO&ЏR S, ogf@& =3C)Db&(]Kz:-+ ~F/tfz{#x(g(w x~{6 u`{a=p?upl!`|8&@ToFH_OɠscيN=ZC*G[}|kR6dhL#@寗9յN4f4UwoZJt)Zk"iVZ>/#iKJẘ/X!ңH~tU8ghk$#Gw&EtԤvL7N]Bp  n<r~i\Vۿ34+(|]iW^QϪ%}Rbz5 KH,Wa612ۊ'GZurŢ], 3J>]LSޓ]}[<~ܿ;m5,ύR9q5zVyJGNn6D8*Ne 5i Fj$Nυvbp(Uyc)f8w4pPAi o$ǀ&lς, dG1Z$t'Z>!t|a|_&|)cϕM95tً߽{Qc2+pjLT~@tBk8];#8vW5V"%">h5zKhۇ~yjVu颧~aq箳b[ߖ)i.8l:A8+46g8#'_,]ǔiS u3LGfA &'F55ZLU^͝xRW]kG{{z:^I"PEvۦTUWtt~+m_>/ϲ s=^ӯ}-tUofKm*\إVI&S )UM#~/3hSit ֚>y}nxp^f8[I߾/aP5Ş]ZPLnp֌{d2ļRt:sf$WaWk 6RJ_tX m4VVоlPҧ9(a{ء6xov'GKwĒY{TQ%}Ho9[Z:O`'gEj4kZТ!pBώ>^eYm czVSJb*=jQ) l^)P ¢t-Q%N8sQ_8Q%K:/icO_s JWlv?B>>_qNmC QZ3`uT@jjyyyuvDKo/3nE^@9}mlGU >إ"|GoufqΎ:\:slQ^Ȁ}дs!B6FLSVXqk9Nyh]C/r-}ΊrTۍuw1 2͊RuPFz]tE^7̙UjbE7&}_mQ`wɯZR+M)U0\F[].p6GEgE2&;4b.c+ڢPO)RBWӂGk68CD*'?-IPiO||I}wV -y>T@KT B8flT#>ߠOrȩ*%BfRT9LU5_-yp@mG?=q=jo 3k5L[4@}.iiN\V[Ow>hRuW1DU.i߄[7A]tܘ$DgX{&|4Y)Fbuzۤ1&vfmȋiE{vKIJv;C5l@=yQmX.K[4KaJ@AtY3%EWwP{OcNLYqbo^oȀ;aP۶eT.ir?@[%m^iτIp`:j U{I.k;dӫH`R\8kH`G:%>(Y{X{?ջqzCFLo\6X/b|@i-2-r|hVMf[Q7J6H4 (L/`/Ƨi4\ʸfjf6mvO'OYe"}5e{mEUX]m)'Rv}*-WuUt-ʆ9g -;+U8:iaLO[$[RV*}~ҴgZ-6m'`mh b:<S{!mxڝ1K2fRVxĩ]ώ-W5w["KmKݸ=j},p-kPil^/|H}VeC܍Zrţ>\*ύsZqZs#uOC>'*/;?aPJ&8Zu_Ҁ>W$.>QeҺ>Yrۍ`>0i3vuYYd pqZ!7JpG6kIsҢi*u*p93\XS잵ٴ Zn(V+3e#]"ؕ/fRNgZ4qMWmD{8Yu-YPm³䝭lp,\Y5oOXʝs >L֝Z&(j(ZLQ8m@kL M XLmd)vI{1Dx q:Yk-,Jl/A9lXTHRou@$P Orˤ OU-U>0_n+@mG?=qf@&@'g1P ΊJn ɭa=_ܩ~JgX7US>5l0Ԁ_Hp(>]xy?3O#[À@J T4̀HMH jIJoQԀ%x![Y "e'{KT*R(LYy 1|#t0~C\JD8 (Worh/yܼjz7CSzI5_' _=u09#[z~Cph@j$HI"$j ]N'7I2ᣮG{1~Hk̺56kp=qy?0>S Y ĀtP'AP 19\9%8]wy?>oRzYA(u3=0|S/@<[=ܡRdϺ/8˩]}T+@:ApMt@{a=p?upl!`|8 @M &$J*`Bd@&>ܮoLʡ_qyH}f>h{a=p?upl!`|8 (@P,@h hЕ+. Ԁ9a3ʢ|eOV"nvh{a=p?upl!`|8,j-KT j H= A%Hq7x{/}|*n>ܾ*Z_~hY8f*Nc^{P6#[z~Cp @@*%:@@J A%*LeԆH 'b)s`io|D'~yq@|/6z|Q}>Kϵ/O\]l8-8~C\:Zgğge} ԓa^l֥]6@#[z~Cp n@ jj@KT  ` P&+LpA:"+[/s(ij_r#aypgz_v =xᜪ9 @{a=p?upl!`|8 %Q&@&4&'[3ٯibu@F Д8~CsjOyg{[\?v*w  a9F]~0~C\ ;1~'[6T`{8juഺ%րm[%G|.`}W˭[ޣ@ N8mv9#[z~CpM3 Mr4 j JUA;7T &+"d C[8NNw1_foI5>lO#Ηk`{(hU.8~C\e53+ÝjW\_`{H?s6;W{a=p?upl!`|8 R(]5 $v J**^A-P%PIJ-!M5U8P2Z*(jd1q f}7ꭶWsUn>"8U:C+ #[z~Cr[(RMLJ<0S 5 $S.*. pbB`g KoYh7P9+J*}/~Ys[d~@E^(8mv09#[z~CpM3 %2 @KD-Ԁe ;W'e '@ R d'ڮ CD}{4_ZM}uWrϜW}.~}XqU]g!^`{a=p?upl!`|8 "H $ B U h(xJJ@ *Mh<ڦ&(Rr("aN%c K%r I҇ +/ܳ擭u~Uv/J0=qy?0>2B d$R d&4  2٥=d.0%nø-Pѓ12nހ;NGG r̚L6v^$9Ȣ>P>,ōCeǔ"3f7>PٶJ|_n8err@sI mPl!gڻ 蔴O$>Do5ڈz3z&jNj]Ũs!>:CSI5DZ9fAQ=cwp*NG-Hø3}fqLԩQCsb >`I͇SbS'9}#QH|OPSgnAg/Séω/Sg>|ꊞ$ũ;:{$=M|@A߽L)ۼP;5Z|79A|THz??u^{tχ~&+V}:v_H;;$GS9|[_Vj_d-^-Ւ?n{1Ճz=}G^bչVR ]@C xX;'}d~swWC" r{;Aq:kt}uZswp&- 5}G^ :< }Ľ9:l>:n5ݰzl7>:o :/znPE7гb.4 f_͆<}̗~3biv5W&j ,a ̇w04A4v"g#S]:o= 9:l: g,`} v Cb,w3_:dJP(vJy|L%y]%BBU;t7("*g#@ϊRsnɲp i7FpEw^c%cWp!hia_`DvUd 1}HL ,Mע&/H4 ]u ޮOי&'E] vhZlKiA:x7ctPE؟LZdpy-Pz2d.# d^We.m`z>5_s'ގST V`kk<d{-ΝO]l K'ò8qO c-Yx5mj0\8-08 Wuohfr!E#Н\uArڶJ_gF#5),kpP'y) 8-8v^u"jwـ/Lm4}JCpNUvJ6qX+ Wn:n4ZwQ?}Kϰ| />~[=nC ?>[Or7|#pz܇r7^\ R`-{ ^\|> ;0WO> Nxx/u|v`hWuB> q:a> q:a> q:a܉Z.7?ù\;*-o4ѐ<0z&CL;׭ aY#h-> r7CD/$vw">r;]4 ˞ñuAܹ;]4=h7.{| ` @wnCh7.{|  #uAH| $N| 4<uC2[;Z,a'j`Zv8H }ja+AB|>"u_BOy: "GjAD ća;PU$- WP^t hQڀ:!BvDZ;`MA&KWXWρ^_tkV \,Չk wzո"ǟtoUer/=z*Kܻe#VᢉfvV}^ n4cޑn:Rq©"Ob}fo:xe#Fn7 endstream endobj 4 0 obj <>/ProcSet 8 0 R/XObject<>>>/Rotate 0/Type/Page>> endobj 5 0 obj [6 0 R 7 0 R] endobj 6 0 obj <>stream 0 0 0 rg 18 246.24 269.76 1.2 re f q 116.88 0 0 24.72 154.08 302.88 cm /im1 Do endstream endobj 7 0 obj <>stream Q BT 150.96 30.72 TD /F0 6.96 Tf -0.096 Tc 0 Tw (i) Tj -47.28 510.96 TD (DEPARTMENT OF THE ARMY) Tj 126.24 0 TD (EP 415-1-261) Tj -138.48 -7.2 TD (U.S. Army Corps of Engineers) Tj -73.44 -7.2 TD (CEMP-CE) Tj 75.6 0 TD (Washington, D.C. 20314-1000) Tj -75.6 -14.4 TD (Pamphlet) Tj 0 -7.2 TD (No.415-1-261) Tj 220.32 0 TD (1 Dec 1992) Tj -109.68 -14.4 TD (Construction) Tj -57.12 -7.2 TD (QUALITY ASSURANCE REPRESENTATIVE) Tj 130.56 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (S GUIDE) Tj -69.36 -7.2 TD (FOREWORD) Tj -100.8 -14.4 TD (This guide is one of four volumes reprinted with revisions) Tj -18 -7.2 TD (from guides first published in 1964. The reason for their) Tj 0 -7.2 TD (existence and continuance is to provide Quality Assurance ) Tj T* (Representatives \(QARs\), those with either quality control or) Tj T* (quality assurance responsibilities, a reliable checklist type) Tj T* (reference for each phase of construction.) Tj 18 -14.4 TD (QARs will find the information fundamental and appropriate to) Tj -18 -7.2 TD (their role of controlling and assuring quality in accordance with) Tj 0 -7.2 TD (the plans and specifications. The guide will, therefore, become a) Tj T* (valuable reference to supplement the project plans and) Tj T* (specifications. Its contents will also help refresh the memory of) Tj T* (experience, training, and good old common sense. The use of) Tj T* (knowledge with appropriate responsibility and authority will) Tj T* (result in the decisions and actions so necessary for successful ) Tj T* (quality assurance. The objective is to produce quality products) Tj T* (for our customers throughout the world.) Tj 0 -14.4 TD (FOR THE COMMANDER:) Tj 139.44 -36 TD (WILLIAM D. BROWN) Tj 0 -7.2 TD (Colonel, Corps of Engineers) Tj T* (Chief of Staff) Tj -139.44 -43.2 TD (This Volume 4 of EP 415-1-261 supersedes Volume 4 EP 415-1-261,) Tj 0 -7.2 TD (December 1986) Tj ET endstream endobj 8 0 obj [/PDF/Text/ImageB] endobj 9 0 obj <>/Filter/CCITTFaxDecode/Height 103/Length 666/Name/im1/Subtype/Image/Type/XObject/Width 487>>stream &jy6}; j@pPN d̂7n#No  n}Շ\/Wڷ!oz iJV>nopOpa=ـ҃ {~_8lG~w /א8 ^?(v.Akm] sh x0p=itۖx`%j=-H=i?d6w(GE@Q_rY뮁O!~uq_pָum{~W }r=tTVB_Z yuX ˶INv1_^RNR߯ZN ]iE_IB Wҵ"uwoCڿWPQ_Rפ}u tdrxxH~Π}HOW fڪNm ,.*VPdHP jA ALSi _[hބ^( 60! *ڹˆe,[I Qخ  endstream endobj 10 0 obj <>/ProcSet 371 0 R>>/Rotate 0/Type/Page>> endobj 11 0 obj <>stream BT 18 541.44 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 131.04 -503.04 TD (ii) Tj -30.72 483.6 TD (TABLE OF CONTENTS) Tj -82.32 -14.4 TD (Chapter) Tj 0 -7.2 TD (Number) Tj ET 36 491.28 24.48 0.72 re f BT 234 492.72 TD (Page) Tj ET 234 491.28 16.32 0.72 re f BT 36 478.32 TD (13A) Tj 67.44 0 TD (X-RAY SHIELDING) Tj 130.56 0 TD (13A-1) Tj -198 -7.2 TD (13B) Tj 67.44 0 TD (PRE-ENGINEERED BUILDINGS) Tj 130.56 0 TD (13B-1) Tj -198 -7.2 TD (13C) Tj 67.44 0 TD (SOLAR ENERGY SYSTEMS) Tj 130.56 0 TD (13C-1) Tj -198 -7.2 TD (13D) Tj 67.44 0 TD (LIQUID AND GAS STORAGE TANKS) Tj 130.56 0 TD (13D-1) Tj -198 -7.2 TD (14A) Tj 67.44 0 TD (ELEVATORS) Tj 130.56 0 TD (14A-1) Tj -198 -7.2 TD (14B) Tj 67.44 0 TD (HOISTS AND CRANES) Tj 130.56 0 TD (14B-1) Tj -198 -7.2 TD (14C) Tj 67.44 0 TD (MATERIAL HANDLING SYSTEMS) Tj 130.56 0 TD (14C-1) Tj -198 -7.2 TD (15A) Tj 67.44 0 TD (PIPING SYSTEMS) Tj 130.56 0 TD (15A-1) Tj -198 -7.2 TD (15B) Tj 67.44 0 TD (DUCTWORK) Tj 130.56 0 TD (15B-1) Tj -198 -7.2 TD (15C) Tj 67.44 0 TD (MECHANICAL INSULATION) Tj 130.56 0 TD (15C-1) Tj -198 -7.2 TD (15D) Tj 67.44 0 TD (PLUMBING SYSTEMS) Tj 130.56 0 TD (15D-1) Tj -198 -7.2 TD (15E) Tj 67.44 0 TD (HEATING SYSTEMS) Tj 130.56 0 TD (15E-1) Tj -198 -7.2 TD (15F) Tj 67.44 0 TD (VENTILATING, AIR SUPPLY AND) Tj 130.56 0 TD (15F-1) Tj -130.56 -7.2 TD (DISTRIBUTION SYSTEMS) Tj -67.44 -7.2 TD (15G) Tj 67.44 0 TD (REFRIGERATION AND AIR) Tj 130.56 0 TD (15G-1) Tj -130.56 -7.2 TD (CONDITIONING) Tj -67.44 -7.2 TD (15H) Tj 67.44 0 TD (FIRE PROTECTION SYSTEMS) Tj 130.56 0 TD (15H-1) Tj -198 -7.2 TD (16A) Tj 67.44 0 TD (INTERIOR ELECTRICAL) Tj 130.56 0 TD (16A-1) Tj -198 -7.2 TD (16B) Tj 67.44 0 TD (EXTERIOR ELECTRICAL) Tj 130.56 0 TD (16B-1) Tj -198 -7.2 TD (16C) Tj 67.44 0 TD (ELECTRICAL HEATING) Tj 130.56 0 TD (16C-1) Tj -198 -7.2 TD (16D) Tj 67.44 0 TD (ALARM AND DETECTION SYSTEMS) Tj 130.56 0 TD (16D-1) Tj -198 -7.2 TD (16E) Tj 67.44 0 TD (ALUMINUM CONDUCTORS) Tj 130.56 0 TD (16E-1) Tj -198 -14.4 TD (Chapters numbered in the guides contain the same subject) Tj -18 -7.2 TD (information as the numbered divisions in the specifications for) Tj 0 -7.2 TD (both military and civil works construction projects. They are) Tj T* (identified by specific volume as follows:) Tj 18 -14.4 TD (Chapter) Tj 0 -7.2 TD (Number) Tj ET 36 268.08 24.48 0.72 re f BT 103.44 269.52 TD (Volume 1) Tj ET 103.44 268.08 32.64 0.72 re f BT 180 269.52 TD (Subject) Tj ET 180 268.08 28.56 0.72 re f BT 36 255.12 TD (1) Tj 144 0 TD (General Reguirements.) Tj -144 -7.2 TD (2) Tj 144 0 TD (Sitework: earthwork,) Tj 0 -7.2 TD (underground utilities,) Tj T* (paving, plantings, and) Tj T* (railroads.) Tj -144 -14.4 TD (2) Tj 67.44 0 TD (Volume 2) Tj ET 103.44 210.48 32.64 0.72 re f BT 180 204.72 TD (Sitework \(continued\):) Tj 0 -7.2 TD (piles, levees, dams,) Tj T* (relief wells, drilling,) Tj T* (lock and dam gates,) Tj T* (penstocks, revetments,) Tj T* (dredging, jetty,) Tj T* (breakwater, and groin) Tj T* (construction.) Tj -76.56 -14.4 TD (Volume 3) Tj ET 103.44 138.48 32.64 0.72 re f BT 36 125.52 TD (3) Tj 144 0 TD (Concrete) Tj -144 -7.2 TD (4) Tj 144 0 TD (Masonry) Tj -144 -7.2 TD (5) Tj 144 0 TD (Metals) Tj -144 -7.2 TD (6) Tj 144 0 TD (Wood and Plastics) Tj -144 -7.2 TD (7) Tj 144 0 TD (Thermal & Moisture) Tj 0 -7.2 TD (Protection) Tj -144 -7.2 TD (8) Tj 144 0 TD (Door & Windows Finishes) Tj -144 -7.2 TD (9) Tj 144 0 TD (Finishes) Tj -144 -7.2 TD (10) Tj 144 0 TD (Accessories &) Tj 0 -7.2 TD (Specialties) Tj -144 -7.2 TD (12) Tj 144 0 TD (Furnishing & Casework) Tj ET endstream endobj 12 0 obj <>/ProcSet 371 0 R>>/Rotate 0/Type/Page>> endobj 13 0 obj <>stream q 234.48 539.52 53.28 7.68 re W n BT 239.04 541.44 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 531.84 36.96 7.68 re W n BT 255.36 533.76 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 146.88 30.72 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (iii) Tj -110.88 483.6 TD (Chapter) Tj 0 -7.2 TD (Number) Tj ET 36 505.68 24.48 0.72 re f BT 103.44 507.12 TD (Volume 4) Tj ET 103.44 505.68 32.64 0.72 re f BT 234 507.12 TD (Subject) Tj ET 234 505.68 28.56 0.72 re f BT 36 492.72 TD (13) Tj 198 0 TD (Special) Tj 0 -7.2 TD (Construction) Tj -198 -7.2 TD (14) Tj 198 0 TD (Conveying) Tj 0 -7.2 TD (Systems) Tj -198 -7.2 TD (15) Tj 198 0 TD (Mechanical) Tj -198 -7.2 TD (16) Tj 198 0 TD (Electrical) Tj ET endstream endobj 14 0 obj <>/ProcSet 16 0 R>>/Rotate 0/Type/Page>> endobj 15 0 obj <>stream BT 18 541.44 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 131.04 -503.04 TD (iv) Tj -18.48 483.6 TD (CHAPTER 13A) Tj ET 130.56 512.88 44.88 0.72 re f BT 122.4 499.92 TD (X-RAY SHIELDING) Tj ET 122.4 498.48 61.2 0.72 re f BT 142.8 485.52 TD (INDEX) Tj -88.8 -14.4 TD (Para.) Tj ET 54 469.68 20.4 0.72 re f BT 144 471.12 TD (Title) Tj ET 144 469.68 20.4 0.72 re f BT 243.12 471.12 TD (Page) Tj ET 243.12 469.68 16.32 0.72 re f BT 54 456.72 TD (13A-01) Tj 49.44 0 TD (GENERAL) Tj 139.68 0 TD (13A-1) Tj -189.12 -14.4 TD (13A-02) Tj 49.44 0 TD (MATERIALS) Tj 139.68 0 TD (13A-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Shop Drawings) Tj 121.68 0 TD (13A-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Lead-Lined Materials) Tj 0 -7.2 TD (and Equipment) Tj 121.68 0 TD (13A-1) Tj -189.12 -14.4 TD (13A-03) Tj 49.44 0 TD (ERECTION) Tj 139.68 0 TD (13A-2) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (General) Tj 121.68 0 TD (13A-2) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Construction of X-ray) Tj 0 -7.2 TD (shielded rooms) Tj 121.68 0 TD (13A-2) Tj -189.12 -14.4 TD (13A-04) Tj 49.44 0 TD (VERIFICATION) Tj 139.68 0 TD (13A-5) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Survey Test) Tj 121.68 0 TD (13A-5) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Certification) Tj 121.68 0 TD (13A-5) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Designations) Tj 121.68 0 TD (13A-5) Tj ET endstream endobj 16 0 obj [/PDF/Text] endobj 17 0 obj <>/ProcSet 373 0 R>>/Rotate 0/Type/Page>> endobj 18 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (13A-1) Tj -12.24 469.2 TD (CHAPTER 13A) Tj ET 130.56 505.68 44.88 0.72 re f BT 122.4 492.72 TD (X-RAY SHIELDING) Tj ET 122.4 491.28 61.2 0.72 re f BT 21.6 478.32 TD (13A-01 ) Tj 28.56 0 TD (GENERAL) Tj ET 50.16 476.88 28.56 0.72 re f BT 45.12 463.92 TD (a.) Tj 13.44 0 TD (This chapter covers specific information for the) Tj -36.96 -7.2 TD (materials and construction of medical and dental radiation) Tj 0 -7.2 TD (facilities.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Check for specific structural features which may be) Tj -36.96 -7.2 TD (different than usual, such as:) Tj 23.52 -14.4 TD (\(1\)) Tj 18 0 TD (Recessed floor slab) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Closer wall stud spacing) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Blocking between wall studs) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Heavier steel bar joists for support of lead-lined) Tj -41.52 -7.2 TD (ceiling) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Lead-lined floor above structural flooring) Tj -18 -14.4 TD (c.) Tj 13.44 0 TD (Make spot checks of the lead sheet and lead linings for) Tj -36.96 -7.2 TD (specified thickness and uniformity.) Tj 23.52 -14.4 TD (d.) Tj 13.44 0 TD (During erection check for continuity of protection with) Tj -36.96 -7.2 TD (specified laps, joint strips, patches and sleeves of lead.) Tj 0 -14.4 TD (13A-02 ) Tj 28.56 0 TD (MATERIALS) Tj ET 50.16 289.68 36.72 0.72 re f BT 45.12 276.72 TD (a.) Tj 13.44 0 TD (Shop Drawings) Tj ET 58.56 275.28 53.04 0.72 re f BT 45.12 262.32 TD (\(1\)) Tj 18 0 TD (Check for conflicts between approved shop drawings,) Tj -41.52 -7.2 TD (contract drawings, and specifications.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check for details of joints to make the required lead) Tj -41.52 -7.2 TD (shielding laps or joint strips.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Shielding of penetrations is crucial. Check for these) Tj -41.52 -7.2 TD (requirements on the details of penetrations. Get clarification) Tj 0 -7.2 TD (from your supervisor where no details exist.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Lead-Lined Materials and Equipment) Tj ET 58.56 188.88 138.72 0.72 re f BT 45.12 175.92 TD (\(1\)) Tj 18 0 TD (The grade of lead sheet specified indicates product) Tj -41.52 -7.2 TD (quality, purity. Check label and make a close inspection for) Tj 0 -7.2 TD (conformance.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Masonry units for shielding are different than usual) Tj -41.52 -7.2 TD (CMU and manufactured to provide a \275-inch mortar joint with) Tj 0 -7.2 TD (extended lead liner to lap the lead liner of adjacent units.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Approve surface texture of masonry when a plaster) Tj -41.52 -7.2 TD (finish will be applied or for painted finish.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (For prefinished wall panels, check the labeling with) Tj -41.52 -7.2 TD (inspection of the sample and representative units for contract) Tj 0 -7.2 TD (requirements.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Do the shop drawings detail the lead liner joints at) Tj -41.52 -7.2 TD (corners of rooms for panel construction?) Tj ET endstream endobj 19 0 obj <>/ProcSet 373 0 R>>/Rotate 0/Type/Page>> endobj 20 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (13A-2) Tj -97.68 469.2 TD (\(6\)) Tj 18 0 TD (Are the lead\227lined lath segments designed to lap the) Tj -41.52 -7.2 TD (lead at joints? Lap the lath?) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Check for type fasteners to attach lath.) Tj -18 -14.4 TD (\(8\)) Tj 18 0 TD (Lead lined gypsum wallboard is very difficult to) Tj -41.52 -7.2 TD (handle and avoid damage. The \275\227inch GWB is usually specified.) Tj 23.52 -14.4 TD (\(9\)) Tj 18 0 TD (Closely check door and frame and the other special) Tj -41.52 -7.2 TD (lined items for proper labels and compliance with requirements.) Tj 23.52 -14.4 TD (\(10\)) Tj 22.32 0 TD (Is the lead liner in the door and frame the same and) Tj -45.84 -7.2 TD (specified thickness as the wall its hung in?) Tj 23.52 -14.4 TD (\(11\)) Tj 22.32 0 TD (Check edges of prefinished door and all surfaces of) Tj -45.84 -7.2 TD (unfinished materials for proper fit, alignment, and damage.) Tj 0 -14.4 TD (13A-03 ) Tj 28.56 0 TD (ERECTION) Tj ET 50.16 383.28 32.64 0.72 re f BT 45.12 370.32 TD (a.) Tj 13.44 0 TD (General) Tj ET 58.56 368.88 28.56 0.72 re f BT 45.12 355.92 TD (Construction of x-ray shielded rooms requires close) Tj -23.52 -7.2 TD (attention to contract requirements. The work will be performed) Tj 0 -7.2 TD (in strict accordance with the following:) Tj 23.52 -14.4 TD (\(1\)) Tj 18 0 TD (Contract drawings and specifications.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Approved manufacturer) Tj 85.68 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s recommendations.) Tj -107.76 -14.4 TD (\(3\)) Tj 18 0 TD (NCRP Reports 33, 34, and 35.) Tj -18 -14.4 TD (b.) Tj 13.44 0 TD (Construction of X-Ray Shielded Rooms) Tj ET 58.56 282.48 146.88 0.72 re f BT 45.12 269.52 TD (\(1\)) Tj 18 0 TD (Lead shielding under 3MM thick will be installed in a) Tj -41.52 -7.2 TD (single layer.) Tj 23.52 -14.4 TD (\(a\)) Tj 18 0 TD (Check for minimum 1-1/2 inch lap at all joints) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Check for minimum specified thickness.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Lead shielding that is more than 3MM thick will be) Tj -41.52 -7.2 TD (installed in two or more layers.) Tj 23.52 -14.4 TD (\(a\)) Tj 18 0 TD (Check for minimum 1-1/2 inch lap at all joints.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Check for minimum specified thickness.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Vertical wall shieldings will be erected on lead) Tj -41.52 -7.2 TD (strips prior to the installation of floor linings in the) Tj 0 -7.2 TD (shielded room.) Tj 23.52 -14.4 TD (\(a\)) Tj 18 0 TD (Check to see that lead strips project approximately 3) Tj -41.52 -7.2 TD (inches into the shielded room area.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (Check door sill lead shielding for extending 1 foot) Tj -41.52 -7.2 TD (beyond each door jamb and 1 foot into shielded room area.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (Check for coat of asphalt paint on top surface of the) Tj -41.52 -7.2 TD (sheet lead prior to application of concrete surface.) Tj 23.52 -14.4 TD (\(d\)) Tj 18 0 TD (Check to see that traffic and other work is not) Tj -41.52 -7.2 TD (performed in the area until lead floor lining is protected from) Tj 0 -7.2 TD (damage.) Tj ET endstream endobj 21 0 obj <>/ProcSet 373 0 R>>/Rotate 0/Type/Page>> endobj 22 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (13A-3) Tj -97.68 469.2 TD (\(4\)) Tj 18 0 TD (Check for continuity of shielding at all built\227in) Tj -41.52 -7.2 TD (feature of walls, columns, outlet and junction boxes, ducts,) Tj 0 -7.2 TD (conduits, and other wall penetrations.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Lead\227lined blocks installation) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Check for use of staggered block joints.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Check for 1 inch tight lead laps, without soldering or) Tj -41.52 -7.2 TD (burring.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (Check to see that no mortar is placed between the lead) Tj -41.52 -7.2 TD (laps.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Lead-lined panel installation. Use pilot holes drilled) Tj -41.52 -7.2 TD (to receive lead-headed nails, to prevent distortion of butt) Tj 0 -7.2 TD (jointed panels.) Tj 23.52 -14.4 TD (\(a\)) Tj 18 0 TD (Check to see that all joints are placed over supports.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Check to see that all joints and covers are lapped or) Tj -41.52 -7.2 TD (covered with 2 inch wide lap strips, or the joints are backed) Tj 0 -7.2 TD (with 1-1/2 inch wide strips.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (Check finish molding strips for same finish as the) Tj -41.52 -7.2 TD (panels.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Lead\227lined lath installation. Use pilot holes, as) Tj -41.52 -7.2 TD (necessary, to prevent deformation of the fasteners and to) Tj 0 -7.2 TD (prevent distortion of the lath.) Tj 23.52 -14.4 TD (\(a\)) Tj 18 0 TD (Check to see that lath is applied with long edges at) Tj -41.52 -7.2 TD (right angles to supports and with lead linings placed next to) Tj 0 -7.2 TD (the supports.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (Check to see if lath end joints are placed over) Tj -41.52 -7.2 TD (supports, and staggered in alternate courses.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (Check to see that wall joints do not coincide with the) Tj -41.52 -7.2 TD (ceiling joints.) Tj 23.52 -14.4 TD (\(d\)) Tj 18 0 TD (Check over lap of the lead extensions on adjacent) Tj -41.52 -7.2 TD (sheets to provide an efficient lead lap.) Tj 23.52 -14.4 TD (\(e\)) Tj 18 0 TD (Check lath applied with long edges parallel to) Tj -41.52 -7.2 TD (supports to see if it has blocking to support end joints.) Tj 23.52 -14.4 TD (\(f\)) Tj 18 0 TD (Check external corners for reinforcing by use of) Tj -41.52 -7.2 TD (corner beads.) Tj 23.52 -14.4 TD (\(g\)) Tj 18 0 TD (Check securing of lath to wood supports with lead-) Tj -41.52 -7.2 TD (headed nails 7 inches on centers.) Tj 23.52 -14.4 TD (\(h\)) Tj 18 0 TD (Check to see if nail heads are driven up flush with) Tj -41.52 -7.2 TD (lath surface.) Tj 23.52 -11.52 TD (\(i\)) Tj 18 0 TD (For metal supports - check to see that lath is) Tj -41.52 -7.2 TD (attached to wood furring strips, which are screwed or bolted to) Tj 0 -7.2 TD (the metal supports at right angles.) Tj 23.52 -11.52 TD (\(8\)) Tj 18 0 TD (Lead-lined gypsum wallboard. Use drilled pilot holes) Tj -41.52 -7.2 TD (for fasteners. Install the wallboards vertically, parallel with) Tj 0 -7.2 TD (the supports and with the lead lining next to the supports.) Tj T* (Provide blocking at all end joints.) Tj ET endstream endobj 23 0 obj <>/ProcSet 373 0 R>>/Rotate 0/Type/Page>> endobj 24 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (13A-4) Tj -97.68 469.2 TD (\(a\)) Tj 18 0 TD (Check for use of 1-1/2 inch wide joint strips where) Tj -41.52 -7.2 TD (joints will occur.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (Check for 1-3/4 inch X 1-3/4 inch corner joint lead) Tj -41.52 -7.2 TD (strips.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (Check edges of wallboards for butt joints for) Tj -41.52 -7.2 TD (fastening with lead-headed nails at approximately 8 inches on) Tj 0 -7.2 TD (centers at joints, and 12 inches on centers at intermediate) Tj T* (supports.) Tj 23.52 -14.4 TD (\(d\)) Tj 18 0 TD (For metal studs - check for use of 1 inch long screws.) Tj -18 -14.4 TD (\(e\)) Tj 18 0 TD (Check screw heads for \275 inch diameter lead disc) Tj -41.52 -7.2 TD (covering, cemented to the surface of the wallboard, and made) Tj 0 -7.2 TD (flush with the surface of the wallboard.) Tj 23.52 -14.4 TD (\(f\)) Tj 18 0 TD (If plastic is not used - check for finish ply of) Tj -41.52 -7.2 TD (wallboard fastened with laminating adhesives. Nailing will not) Tj 0 -7.2 TD (be permitted on the finished ply.) Tj 23.52 -14.4 TD (\(9\)) Tj 18 0 TD (Suspended lead-lined plastered ceilings. See contract) Tj -41.52 -7.2 TD (drawings for erection details.) Tj 23.52 -14.4 TD (\(a\)) Tj 18 0 TD (Check insulated lath and continuous ceiling bars for) Tj -41.52 -7.2 TD (specified support by steel hangers from the overhead structure.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (Check to see that lead side of lath faces up.) Tj -18 -14.4 TD (\(c\)) Tj 18 0 TD (Check to see that lead in the ceiling will lap lead in) Tj -41.52 -7.2 TD (the wall by not less than 1-1/2 inches.) Tj 23.52 -14.4 TD (\(10\)) Tj 22.32 0 TD (Lead door thresholds. Install in accordance with) Tj -45.84 -7.2 TD (approved shop drawings, and constructed as detailed on the) Tj 0 -7.2 TD (contract drawings.) Tj 23.52 -14.4 TD (Check to see that lead surfaces in contact with concrete) Tj -23.52 -7.2 TD (is painted with a coat of asphalt paint or latex material.) Tj 23.52 -14.4 TD (\(11\)) Tj 22.32 0 TD (Operator) Tj 32.64 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s lead-lined protection screen. Locate and) Tj -82.56 -7.2 TD (construct the screen in accordance with the drawings.) Tj 23.52 -14.4 TD (Check to see that details are complied with both in) Tj -23.52 -7.2 TD (materials and installation methods.) Tj 23.52 -14.4 TD (\(12\)) Tj 22.32 0 TD (Lead-lined doors will have a clearance of 1/16 inch) Tj -45.84 -7.2 TD (at sides and top, a minimum adequate clearance at bottom, lock) Tj 0 -7.2 TD (edge beveled 1/8 inch, and hardware adjusted as required.) Tj 23.52 -14.4 TD (Check that warps or twist of lead door does not exceed 1/4) Tj -23.52 -7.2 TD (inch in any face dimension of door, including full diagonal,) Tj 0 -7.2 TD (after door has been hung and finished.) Tj 23.52 -14.4 TD (\(13\)) Tj 22.32 0 TD (Viewing windows installed in doors. Secure windows) Tj -45.84 -7.2 TD (with hardwood strips of same species as face veneer of door.) Tj 23.52 -14.4 TD (Check to see if stops are glued to the door on corridor) Tj -23.52 -7.2 TD (side and fastened with prescribed screws or finish nails on room) Tj 0 -7.2 TD (side.) Tj ET endstream endobj 25 0 obj <>/ProcSet 373 0 R>>/Rotate 0/Type/Page>> endobj 26 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (13A-5) Tj -97.68 469.2 TD (\(14\)) Tj 22.32 0 TD (Check that no line-of-sight through lead louvers) Tj -45.84 -7.2 TD (exists in installed doors. Fasten louvers with cadmium\227plated or) Tj 0 -7.2 TD (chromium-plated screws.) Tj 23.52 -14.4 TD (Check fastenings to insure that lead lining of door was) Tj -23.52 -7.2 TD (not penetrated. Use lead lined plugs on one side for through) Tj 0 -7.2 TD (bolting of door closer.) Tj 23.52 -14.4 TD (\(15\)) Tj 22.32 0 TD (Film cassette transfer cabinets in lead\227lined) Tj -45.84 -7.2 TD (partitions will have the entire cabinet, doors, and integral) Tj 0 -7.2 TD (wall flanges lined with sheet lead of the same thickness as the) Tj T* (partition.) Tj 0 -14.4 TD (13A-04 ) Tj 28.56 0 TD (VERIFICATION) Tj ET 50.16 412.08 48.96 0.72 re f BT 45.12 399.12 TD (a.) Tj 13.44 0 TD (Survey Test) Tj ET 58.56 397.68 44.88 0.72 re f BT 45.12 384.72 TD (The contractor is required to hire a qualified expert to) Tj -23.52 -7.2 TD (make the required radiation protection survey. Check for:) Tj 23.52 -14.4 TD (\(1\)) Tj 18 0 TD (Approved written survey procedures.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Qualification of the expert.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Defective areas which do not meet standard for which) Tj -41.52 -7.2 TD (the room is to be used.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (CE approval of corrective action proposed for) Tj -41.52 -7.2 TD (defective areas.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Resurvey of areas affected by corrective work.) Tj -18 -14.4 TD (\(6\)) Tj 18 0 TD (The written report of survey.) Tj -18 -14.4 TD (b.) Tj 13.44 0 TD (Certification) Tj ET 58.56 260.88 53.04 0.72 re f BT 45.12 247.92 TD (The acceptable report of survey for each room will certify) Tj -23.52 -7.2 TD (the protection provided to areas outside the room against) Tj 0 -7.2 TD (radiation exposure) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Designations) Tj ET 58.56 217.68 48.96 0.72 re f BT 45.12 204.72 TD (\(1\)) Tj 18 0 TD (Check for the permanently posted plague in each room) Tj -41.52 -7.2 TD (which will contain specific information on thickness of the lead) Tj 0 -7.2 TD (shielding.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Verify this information to be correct as built.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Information required may vary with the function of the) Tj -41.52 -7.2 TD (room; check your specifications.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Where the lead thickness within a room is different,) Tj -41.52 -7.2 TD (each surface area will require its separate plaque with the) Tj 0 -7.2 TD (as\227built thicknesses noted.) Tj ET endstream endobj 27 0 obj <>/ProcSet 29 0 R>>/Rotate 0/Type/Page>> endobj 28 0 obj <>stream q 234.48 525.12 53.28 7.68 re W n BT 239.04 527.04 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 517.44 36.96 7.68 re W n BT 255.36 519.36 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 150.96 45.12 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (i) Tj -20.4 454.8 TD (CHAPTER 13B) Tj ET 130.56 498.48 44.88 0.72 re f BT 104.16 485.52 TD (PRE-ENGINEERED BUILDINGS) Tj ET 104.16 484.08 97.92 0.72 re f BT 142.8 471.12 TD (INDEX) Tj -88.8 -14.4 TD (Para.) Tj ET 54 455.28 20.4 0.72 re f BT 144 456.72 TD (Title) Tj ET 144 455.28 20.4 0.72 re f BT 243.12 456.72 TD (Page) Tj ET 243.12 455.28 16.32 0.72 re f BT 54 442.32 TD (13B-01) Tj 49.44 0 TD (GENERAL) Tj 139.68 0 TD (13B-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Coordination of the Work) Tj 121.68 0 TD (13B-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Verification of Dimensions) Tj 121.68 0 TD (13B-1) Tj -189.12 -14.4 TD (13B-02) Tj 49.44 0 TD (MATERIALS) Tj 139.68 0 TD (13B-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Submittals) Tj 121.68 0 TD (13B-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Manufacturer) Tj 48.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s) Tj -53.04 -7.2 TD (Representative) Tj 121.68 0 TD (13B-2) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Delivery and Storage) Tj 121.68 0 TD (13B-2) Tj -189.12 -14.4 TD (13B-03) Tj 49.44 0 TD (ERECTION) Tj 0 -14.4 TD (a.) Tj 18 0 TD (Foundations and Services) Tj 121.68 0 TD (13B-2) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Electrical and Mechanical) Tj 121.68 0 TD (13B-2) Tj -189.12 -14.4 TD (13B-04) Tj 49.44 0 TD (TESTING AND CHECKOUT) Tj 9.12 -7.2 TD (PROCEDURES) Tj 130.56 0 TD (13B-3) Tj ET endstream endobj 29 0 obj [/PDF/Text] endobj 30 0 obj <>/ProcSet 374 0 R>>/Rotate 0/Type/Page>> endobj 31 0 obj <>stream q 234.48 525.12 53.28 7.68 re W n BT 239.04 527.04 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 517.44 36.96 7.68 re W n BT 255.36 519.36 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 45.12 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (13B-1) Tj -12.24 454.8 TD (CHAPTER 13B) Tj ET 130.56 498.48 44.88 0.72 re f BT 104.16 485.52 TD (PRE-ENGINEERED) Tj ET 104.16 484.08 57.12 0.72 re f BT 161.28 485.52 TD 0 Tc -0.096 Tw ( ) Tj 4.08 0 TD -0.096 Tc 0 Tw (BUILDINGS) Tj ET 165.36 484.08 36.72 0.72 re f BT 21.6 471.12 TD (13B-01) Tj 36.96 0 TD (GENERAL) Tj ET 58.56 469.68 28.56 0.72 re f BT 45.12 456.72 TD (a.) Tj 13.44 0 TD (Coordination of the Work) Tj ET 58.56 455.28 97.92 0.72 re f BT 45.12 442.32 TD (\(1\)) Tj 18 0 TD (This chapter covers the installation of pre\227engineered) Tj -41.52 -7.2 TD (buildings. Most such buildings require placement of foundations) Tj 0 -7.2 TD (and ground level slabs on grade. Some designs require basements) Tj T* (and/or crawl spaces.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (The placement of the foundations and slabs will) Tj -41.52 -7.2 TD (require close coordination between site grading, placement of) Tj 0 -7.2 TD (exterior and under the structure utilities, including vapor) Tj T* (barrier, and under the slab drainage if specified.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Testing of the water lines, drain lines, sewers, and) Tj -41.52 -7.2 TD (gas lines will have to be accomplished prior to being covered by) Tj 0 -7.2 TD (the foundation and slabs.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Electrical lines and communication lines will either) Tj -41.52 -7.2 TD (have to be coordinated with the placement of the foundation or) Tj 0 -7.2 TD (the slabs.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Seismic considerations required by a design and the) Tj -41.52 -7.2 TD (seismic zone will have to be incorporated in the foundations and) Tj 0 -7.2 TD (slabs. This will include seismic reinforcing steel in masonry) Tj T* (and concrete, flexible joints where branch lines leave main) Tj T* (drain lines under ground and seismic penetrations through) Tj T* (foundation walls.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Verification of Dimensions) Tj ET 58.56 260.88 106.08 0.72 re f BT 45.12 247.92 TD (It is of the utmost importance that the foundations and) Tj -23.52 -7.2 TD (slabs fit the pre-engineered building, and that such items) Tj 0 -7.2 TD (contain the required hold down bolts or fastening plates. The) Tj T* (contractor shall verify all dimensions and coordinate its) Tj T* (dimensions with the approved shop drawings and contract) Tj T* (drawings. The contracting officer will be advised of any) Tj T* (discrepancy before Contractor performs any work.) Tj 0 -14.4 TD (13B-02) Tj 36.96 0 TD (Materials) Tj ET 58.56 188.88 36.72 0.72 re f BT 45.12 175.92 TD (a.) Tj 13.44 0 TD (Submittals) Tj ET 58.56 174.48 40.8 0.72 re f BT 45.12 161.52 TD (\(1\)) Tj 18 0 TD (Shop drawings shall consist of the complete details) Tj -41.52 -7.2 TD (necessary to join together the foundations, slabs and pre-) Tj 0 -7.2 TD (engineered structure. The shop drawings will provide a complete) Tj T* (list of equipment and materials, including manufacturer) Tj 224.4 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s) Tj -228.48 -7.2 TD (descriptive and technical literature. The shop drawings will) Tj 0 -7.2 TD (provide the erection sequence, tie down arrangement, and joining) Tj T* (together details.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Shop drawings will show electrical, mechanical,) Tj -41.52 -7.2 TD (structural, and architectural features included in the factory) Tj 0 -7.2 TD (constructed units and how these units will be joined to the) Tj T* (field installed components.) Tj ET endstream endobj 32 0 obj <>/ProcSet 374 0 R>>/Rotate 0/Type/Page>> endobj 33 0 obj <>stream BT 18 527.04 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -474.24 TD (13B-2) Tj -97.68 454.8 TD (b.) Tj 13.44 0 TD (Manufacturer) Tj 48.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s Representative) Tj ET 58.56 498.48 118.32 0.72 re f BT 45.12 485.52 TD (Check requirements for manufacturer) Tj 142.8 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s representative) Tj -170.4 -7.2 TD (supervising the unloading, storage, and erection of the pre-) Tj 0 -7.2 TD (engineered structure. Metal building guide specification does) Tj T* (not require a manufacturer) Tj 106.08 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s representative.) Tj -86.64 -14.4 TD (c.) Tj 13.44 0 TD (Delivery and Storage) Tj ET 58.56 448.08 81.6 0.72 re f BT 45.12 435.12 TD (Equipment, parts, and units when delivered will be stored) Tj -23.52 -7.2 TD (with protection from the weather, humidity, temperature) Tj 0 -7.2 TD (variations, dirt, dust, or other contaminants Deliveries should) Tj T* (be scheduled to minimize job site storage whenever possible.) Tj 0 -14.4 TD (13B-03 ) Tj 28.56 0 TD (ERECTION) Tj ET 50.16 397.68 32.64 0.72 re f BT 45.12 384.72 TD (a.) Tj 13.44 0 TD (Foundations and Services) Tj ET 58.56 383.28 97.92 0.72 re f BT 45.12 370.32 TD (\(1\)) Tj 18 0 TD (Check Civil, Structural, Mechanical, and Electrical) Tj -41.52 -7.2 TD (plans against approved shop drawings to insure proper) Tj 0 -7.2 TD (orientation of building, that building will fit foundation and) Tj T* (prepared slabs, and that all utilities required to be concealed) Tj T* (are installed prior to foundation or slab placement.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check anchor bolt and other tie down location, size,) Tj -41.52 -7.2 TD (and projections. Protect such tie down devices from damage from) Tj 0 -7.2 TD (construction equipment.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Study erection procedures. Insure that manufactured) Tj -41.52 -7.2 TD (units and parts can be trucked to either erection location or to) Tj 0 -7.2 TD (storage as required. Coordinate underground work, deliveries,) Tj T* (and erection to avoid delay or unsafe working procedures.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Work closely with CQC representative and the) Tj -41.52 -7.2 TD (manufacturer) Tj 48.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s representative to insure that parts and portions) Tj -53.04 -7.2 TD (of the structure and utilities are fitted together without) Tj 0 -7.2 TD (bending or overstressing the parts or connections.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Check connection points for completeness of joining,) Tj -41.52 -7.2 TD (required method of joining, and to make sure that all components) Tj 0 -7.2 TD (are present at the joining.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Check exposed details of joined areas to insure that) Tj -41.52 -7.2 TD (required tolerances are met, that covers are provided as) Tj 0 -7.2 TD (specified, and that meeting planes are aligned, smooth and not) Tj T* (damaged as a result of shipping, storage, or erection.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Electrical and Mechanical) Tj ET 58.56 160.08 102 0.72 re f BT 45.12 147.12 TD (\(1\)) Tj 18 0 TD (Check shop drawings and contract drawings to insure) Tj -41.52 -7.2 TD (that all required services, utilities, and equipment are) Tj 0 -7.2 TD (provided and in the required location. Advise your supervisor if) Tj T* (errors or omissions are encountered.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Determine if field run electrical and mechanical runs) Tj -41.52 -7.2 TD (are required to be installed prior to or after the pre-) Tj 0 -7.2 TD (engineered units have been placed.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Coordinate mechanical and electrical work with) Tj -41.52 -7.2 TD (structural and architectural work to insure that such items are) Tj 0 -7.2 TD (concealed and supported as required.) Tj ET endstream endobj 34 0 obj <>/ProcSet 374 0 R>>/Rotate 0/Type/Page>> endobj 35 0 obj <>stream q 234.48 525.12 53.28 7.68 re W n BT 239.04 527.04 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 517.44 36.96 7.68 re W n BT 255.36 519.36 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 45.12 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (13B-3) Tj -97.68 454.8 TD (\(4\)) Tj 18 0 TD (Test utilities before concealment.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Provide seismic bracing for electrical and mechanical) Tj -41.52 -7.2 TD (equipment as required by the contract documents and the seismic) Tj 0 -7.2 TD (zone.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Check specified materials in exposed area to insure) Tj -41.52 -7.2 TD (proper finishes.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Check all outlets, conduits, pipes, and fixtures for) Tj -41.52 -7.2 TD (firm attachment, required height, slope, and insulation) Tj 0 -7.2 TD (required.) Tj 41.52 0 TD (height,) Tj 36.48 0 TD (slope, and insulation if) Tj -54.48 -14.4 TD (\(8\)) Tj 18 0 TD (Check all equipment and fixtures for ease of) Tj -41.52 -7.2 TD (operating.) Tj 0 -14.4 TD (13B-04) Tj 36.96 0 TD (TESTING AND CHECK OUT PROCEDURES) Tj ET 58.56 383.28 130.56 0.72 re f BT 45.12 370.32 TD (a.) Tj 13.44 0 TD (Check all joined together units for good fit, cover) Tj -36.96 -7.2 TD (plates, joining strips, or caulking as scarified. Check contract) Tj 0 -7.2 TD (requirements for wall end floor coverings such as wallpaper and) Tj T* (carpets.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Insure that using personnel are provided specified) Tj -36.96 -7.2 TD (training. Document the names and positions of user personnel) Tj 0 -7.2 TD (trained) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Insure posting of operating instructions and obtaining) Tj -36.96 -7.2 TD (maintenance manuals for furnished or installed equipment.) Tj 23.52 -14.4 TD (d.) Tj 13.44 0 TD (Conduct specified acceptance tests on electrical and) Tj -36.96 -7.2 TD (mechanical equipment. Obtain test results.) Tj 23.52 -14.4 TD (a.) Tj 13.44 0 TD (Operate all doors, windows, and movable partitions.) Tj -36.96 -7.2 TD (Check for ease of operation, full opening and adjustment of) Tj 0 -7.2 TD (hardware. Require correction or adjustment of all items not) Tj T* (performing correctly.) Tj ET endstream endobj 36 0 obj <>/ProcSet 38 0 R>>/Rotate 0/Type/Page>> endobj 37 0 obj <>stream q 234.48 525.12 53.28 7.68 re W n BT 239.04 527.04 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 517.44 36.96 7.68 re W n BT 255.36 519.36 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 150.96 45.12 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (i) Tj -20.4 454.8 TD (CHAPTER 13C) Tj ET 130.56 498.48 44.88 0.72 re f BT 112.32 485.52 TD (SOLAR ENERGY SYSTEMS) Tj ET 112.32 484.08 81.6 0.72 re f BT 142.8 471.12 TD (INDEX) Tj -88.8 -14.4 TD (Para.) Tj ET 54 455.28 20.4 0.72 re f BT 144 456.72 TD (Title) Tj ET 144 455.28 20.4 0.72 re f BT 243.12 456.72 TD (Page) Tj ET 243.12 455.28 16.32 0.72 re f BT 54 442.32 TD (13C-01) Tj 49.44 0 TD (GENERAL REQUIREMENTS) Tj 139.68 0 TD (13C-1) Tj -189.12 -14.4 TD (13C-02) Tj 49.44 0 TD (MATERIALS) Tj 139.68 0 TD (13C-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Submittals) Tj 121.68 0 TD (13C-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Delivery and Storage) Tj 121.68 0 TD (13C-2) Tj -189.12 -14.4 TD (13C-03) Tj 49.44 0 TD (ERECTION and TESTING) Tj 139.68 0 TD (13C-2) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Installation) Tj 121.68 0 TD (13C-2) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Cleaning of Pipe) Tj 121.68 0 TD (13C-4) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Testing) Tj 121.68 0 TD (13C-5) Tj -139.68 -7.2 TD (\(l\)) Tj 18 0 TD (Factory Tests) Tj 121.68 0 TD (13C-5) Tj -139.68 -7.2 TD (\(2\)) Tj 18 0 TD (Field Tests) Tj 121.68 0 TD (13C-5) Tj -139.68 -7.2 TD (\(3\)) Tj 18 0 TD (Balancing and Adjusting) Tj 121.68 0 TD (13C-5) Tj -139.68 -7.2 TD (\(4\)) Tj 18 0 TD (Performance) Tj 121.68 0 TD (13C-5) Tj ET endstream endobj 38 0 obj [/PDF/Text] endobj 39 0 obj <>/ProcSet 375 0 R>>/Rotate 0/Type/Page>> endobj 40 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (13C-1) Tj -12.24 469.2 TD (CHAPTER 13C) Tj ET 130.56 505.68 44.88 0.72 re f BT 112.32 492.72 TD (SOLAR ENERGY SYSTEMS) Tj ET 112.32 491.28 81.6 0.72 re f BT 21.6 478.32 TD (13C-01 ) Tj 32.64 0 TD (GENERAL REQUIREMENTS) Tj ET 54.24 476.88 81.6 0.72 re f BT 45.12 463.92 TD (a.) Tj 13.44 0 TD (This chapter rovers the installation and testing of) Tj -36.96 -7.2 TD (solar energy systems consisting of the following:) Tj 23.52 -14.4 TD (\(1\)) Tj 18 0 TD (Solar Energy System for Domestic Hot Water Heating) Tj -41.52 -7.2 TD (\(Liquid Collectors\)) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Solar Energy System. for Domestic Hot Water Heating) Tj -41.52 -7.2 TD (and Spate Healing \(Air Collectors\).) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Solar Energy System for Domestic Hot Water Heating and) Tj -41.52 -7.2 TD (Space Heating \(Liquid Collectors\).) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Solar assistant Heat Pump System for Domestic Hot) Tj -41.52 -7.2 TD (Water Heating and Space Heating \(Liquid Collectors\).) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Solar Energy System with absorption chiller cooling,) Tj -41.52 -7.2 TD (Domestic Hot Water Heating, and Spare Heating \(Liquid) Tj 0 -7.2 TD (Collectors\). ) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Heat Rejection System, Fan Coil.) Tj -18 -14.4 TD (\(7\)) Tj 18 0 TD (Heat Rejection System, Extended Surface Radiation.) Tj -18 -14.4 TD (\(8\)) Tj 18 0 TD (Heat Rejection System, Pipe immersed in open water) Tj -41.52 -7.2 TD (tank.) Tj 0 -14.4 TD (b. Work in this chapter will be coordinated with chapters 5A) Tj 0 -7.2 TD (for Structural, 5B for Welding, 15A-G for Mechanical, and 16A) Tj T* (and NEC-70 for Electrical.) Tj 0 -14.4 TD (c. The contract drawings indicate extent and general) Tj 0 -7.2 TD (arrangement of the solar energy system. Approved shop drawings) Tj T* (will provide necessary details for installation and erection of) Tj T* (the system. The contractor is responsible for coordination and) Tj T* (verification of dimensions. The contractor will inform the) Tj T* (Contracting Officer of any discrepancy prior to performing any) Tj T* (work.) Tj 0 -14.4 TD (d. Welders shall be performance qualified in accordance with) Tj 0 -7.2 TD (Section IX, ASME Boiler and Pressure Vessel Code. Each welder) Tj T* (shall place his identification symbol near each weld he makes,) Tj T* (as a permanent record. Structural members will be welded in) Tj T* (accordance with specification section: welding, Structural.) Tj T* (Welding and non destructive testing procedures are specified in) Tj T* (Specification Section: Welding Pressure Piping.) Tj 0 -14.4 TD (13C-02 ) Tj 32.64 0 TD (MATERIALS) Tj ET 54.24 131.28 36.72 0.72 re f BT 45.12 118.32 TD (a.) Tj 13.44 0 TD (Submittals) Tj ET 58.56 116.88 40.8 0.72 re f BT 45.12 103.92 TD (\(1\)) Tj 18 0 TD (All materials or equipment are specified to comply) Tj -41.52 -7.2 TD (with requirements of UL, ARI, or ASME. Proof of such compliance) Tj 0 -7.2 TD (shall be submitted.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Manufacturer) Tj 48.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s certificate of compliance shall be) Tj -94.56 -7.2 TD (submitted by contractor on construction of collector,) Tj 0 -7.2 TD (performance data for collector and 30 day degradation test data.) Tj ET endstream endobj 41 0 obj <>/ProcSet 375 0 R>>/Rotate 0/Type/Page>> endobj 42 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (13C-2) Tj -97.68 469.2 TD (\(3\)) Tj 18 0 TD (Shop drawings will consist of illustrations,) Tj -41.52 -7.2 TD (schedules, performance charts, instructions, brochures,) Tj 0 -7.2 TD (diagrams, and drawings necessary for the installation of solar) Tj T* (equipment, associated equipment, and for piping, wiring, and) Tj T* (related foundations. Shop drawings shall include details of) Tj T* (storage device, air handling equipment, heat transfer equipment,) Tj T* (liquid circulating equipment, and controls and instrumentation.) Tj T* (Drawings will indicate clearances required for maintenance and) Tj T* (operation.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Spare parts data will be provided for each different) Tj -41.52 -7.2 TD (item of materials and equipment specified.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Operating and Maintenance Instructions will be) Tj -41.52 -7.2 TD (provided for system start-up and operation and maintenance.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Performance Test reports in booklet form will be) Tj -41.52 -7.2 TD (provided. Each test report shall indicate the final position of) Tj 0 -7.2 TD (the controls.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Delivery and Storage) Tj ET 58.56 361.68 81.6 0.72 re f BT 45.12 348.72 TD (All equipment placed in storage will be protected from) Tj -23.52 -7.2 TD (weather, humidity, temperature variation, dirt, dust, or other) Tj 0 -7.2 TD (contaminants) Tj 0 -14.4 TD (13C-03 ) Tj 32.64 0 TD (ERECTION AND TESTING) Tj ET 54.24 318.48 81.6 0.72 re f BT 45.12 305.52 TD (a.) Tj 13.44 0 TD (Installation) Tj ET 58.56 304.08 48.96 0.72 re f BT 45.12 291.12 TD (\(1\)) Tj 18 0 TD (All work shall be installed as specified and indicated) Tj -41.52 -7.2 TD (and shall comply with the applicable sections of HUD 4930.2 and) Tj 0 -7.2 TD (NBSIR-76-1187 or NBSIR-78-1526, except as otherwise noted.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Absorption water chillers shall be installed in) Tj -41.52 -7.2 TD (accordance with Chapter 15G.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Air Supply Distribution System shall be installed in) Tj -41.52 -7.2 TD (accordance with Chapter 15B.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Ductwork shall be sealed in accordance with Table 1-1) Tj -41.52 -7.2 TD (in SMACNA Low Pressure Duct Construction Standards.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Automatic control equipment shall be installed at the) Tj -41.52 -7.2 TD (location shown under the supervision of the control manufacturer) Tj 0 -7.2 TD (and in accordance with the manufacturer) Tj 159.12 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s instructions.) Tj -139.68 -14.4 TD (\(6\)) Tj 18 0 TD (Thermal Insulation shall be installed in accordance) Tj -41.52 -7.2 TD (with Chapter 15C.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Vibration isolation shall be provided for fans and air) Tj -41.52 -7.2 TD (handling units in accordance with specification section: Air) Tj 0 -7.2 TD (Supply and Distribution System \(for A/C System\)) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (Check solar collector array for meeting approved shop) Tj -41.52 -7.2 TD (drawings. Check to see that each solar collector will withstand) Tj 0 -7.2 TD (the minimum indicated wind and snow load.) Tj 23.52 -14.4 TD (\(9\)) Tj 18 0 TD (Check piping for solar collector array for specified) Tj -41.52 -7.2 TD (size, type of material, use of fittings to make turns and) Tj 0 -7.2 TD (connections, specified support, automatic pressure and) Tj T* (temperature relief valve specified. Check adjustment of valve) Tj T* (for proper opening pressure and temperature.) Tj ET endstream endobj 43 0 obj <>/ProcSet 375 0 R>>/Rotate 0/Type/Page>> endobj 44 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (13C-3) Tj -97.68 469.2 TD (\(10\)) Tj 22.32 0 TD (Insulate unprotected fluid-carrying lines and) Tj -45.84 -7.2 TD (components in accordance with Chapter 15C.) Tj 23.52 -14.4 TD (\(11\)) Tj 22.32 0 TD (Cover plates for flat plate solar collectors shall be) Tj -45.84 -7.2 TD (completely replaceable from the front of the collector without) Tj 0 -7.2 TD (disturbing the piping or adjacent collectors.) Tj 23.52 -14.4 TD (\(12\)) Tj 22.32 0 TD (Protective cover plates shall be reinforced fiber) Tj -45.84 -7.2 TD (glass, reinforce safety glass, acrylic or polycarbonate and) Tj 0 -7.2 TD (shall withstand hail or similar impact loads.) Tj 23.52 -14.4 TD (\(13\)) Tj 22.32 0 TD (Check heating, air supply distribution and heat) Tj -45.84 -7.2 TD (transfer systems to see that they are in accordance with) Tj 0 -7.2 TD (approved shop drawings, plans and specifications. Advise) Tj T* (supervisor of any deviation in equipment or installation.) Tj 23.52 -14.4 TD (\(14\)) Tj 22.32 0 TD (Check piping, valves, and accessories for meeting) Tj -45.84 -7.2 TD (contract requirements and for type of service intended.) Tj 23.52 -14.4 TD (\(15\)) Tj 22.32 0 TD (Check expansion tank and liquid storage tanks for) Tj -45.84 -7.2 TD (size and arrangement against approved shop drawings, plans, and) Tj 0 -7.2 TD (specifications. Check for specified lining in liquid storage) Tj T* (tank.) Tj 23.52 -14.4 TD (\(16\)) Tj 22.32 0 TD (Check for specified insulation with smoothing coat of) Tj -45.84 -7.2 TD (finishing cement for tanks located inside of buildings.) Tj 23.52 -14.4 TD (\(17\)) Tj 22.32 0 TD (Check for specified insulation protective covering) Tj -45.84 -7.2 TD (for underground tanks.) Tj 23.52 -14.4 TD (\(18\)) Tj 22.32 0 TD (Check for specified cathodic protection system for) Tj -45.84 -7.2 TD (steel water tank. See Chapter 13D and 16B.) Tj 23.52 -14.4 TD (\(19\)) Tj 22.32 0 TD (Check hot water storage heater tank against approved) Tj -45.84 -7.2 TD (shop drawings and contract plans and specifications. Provide) Tj 0 -7.2 TD (insolation for interior tanks and insulation protective covering) Tj T* (for underground tanks with cathodic protection as indicated.) Tj 23.52 -14.4 TD (\(20\)) Tj 22.32 0 TD (Exact location of automatic control devices will be) Tj -45.84 -7.2 TD (as recommended by the control manufacture \227 see shop drawings.) Tj 23.52 -14.4 TD (\(21\)) Tj 22.32 0 TD (Dampers shall be sized and fabricated by the) Tj -45.84 -7.2 TD (automatic control manufacturer, compare with shop drawings.) Tj 23.52 -14.4 TD (\(22\)) Tj 22.32 0 TD (Instrumentation for monitoring solar system) Tj -45.84 -7.2 TD (performance shell be mounted so as to be easily readable.) Tj 23.52 -14.4 TD (\(23\)) Tj 22.32 0 TD (Check approved sequence of automatic controls,) Tj -45.84 -7.2 TD (including shut off controls on high and low limits.) Tj 23.52 -14.4 TD (\(24\)) Tj 22.32 0 TD (Solar system) Tj 48.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s automatic controls will be integrated) Tj -98.88 -7.2 TD (with building) Tj 53.04 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s automatic control system and the EVAC systems.) Tj -33.6 -14.4 TD (\(25\)) Tj 22.32 0 TD (Check specifications for painting and finishing) Tj -45.84 -7.2 TD (requirements. Repair factory finished coatings where possible.) Tj 0 -7.2 TD (Provide field painting of surfaces that were prime coated only) Tj T* (at the factory. See Section Painting, General, of the Contract) Tj T* (Specifications.) Tj 23.52 -14.4 TD (\(26\)) Tj 22.32 0 TD (Cutting or other weakening of the building structure) Tj -45.84 -7.2 TD (to facilitate pipe installation will not be permitted without) Tj 0 -7.2 TD (written approval.) Tj ET endstream endobj 45 0 obj <>/ProcSet 375 0 R>>/Rotate 0/Type/Page>> endobj 46 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (13C-4) Tj -97.68 469.2 TD (\(27\)) Tj 22.32 0 TD (Horizontal supply mains shall be pitched up or down) Tj -45.84 -7.2 TD (in the direction of flow as indicated. The grade shall be not) Tj 0 -7.2 TD (less than one \(1\) inch in 40 feet.) Tj 23.52 -14.4 TD (\(28\)) Tj 22.32 0 TD (Tin antimony solder \(95-5\) shall be used throughout) Tj -45.84 -7.2 TD (the collector loop and in the whole system when a silicone heat) Tj 0 -7.2 TD (transfer fluid is used.) Tj 23.52 -14.4 TD (\(29\)) Tj 22.32 0 TD (Welding electrodes shall be stored and dried in) Tj -45.84 -7.2 TD (accordance with AWS D1.1 or as recommended by the manufacturer.) Tj 0 -7.2 TD (Electrodes that have been wetted or that have lost any of their) Tj T* (coating shall not be used.) Tj 23.52 -14.4 TD (\(30\)) Tj 22.32 0 TD (Dielectric unions shall be provided between ferrous) Tj -45.84 -7.2 TD (and non ferrous piping to prevent galvanic corrosion.) Tj 23.52 -14.4 TD (\(31\)) Tj 22.32 0 TD (Swing joints or offsets shall be provided on all) Tj -45.84 -7.2 TD (branch connections, mains, and risers to provide for expansion) Tj 0 -7.2 TD (and contraction of the pipe.) Tj 23.52 -14.4 TD (\(32\)) Tj 22.32 0 TD (Check branch line for pitch, as indicated.) Tj -45.84 -7.2 TD (Connections shall be made to insure unrestricted circulation,) Tj 0 -7.2 TD (eliminate air pockets and permit drainage of the system.) Tj 23.52 -14.4 TD (\(33\)) Tj 22.32 0 TD (Supply and return lines shall provide for expansion) Tj -45.84 -7.2 TD (by changes in direction of run of pipe, by expansion loops, or) Tj 0 -7.2 TD (by expansion joints as indicated.) Tj 23.52 -14.4 TD (\(34\)) Tj 22.32 0 TD (Check for strainers at the inlet of each pump, heat) Tj -45.84 -7.2 TD (exchanger, heating coil, and cooling coil.) Tj 23.52 -14.4 TD (\(35\)) Tj 22.32 0 TD (Check that valves are installed where shown.) Tj -22.32 -14.4 TD (\(36\)) Tj 22.32 0 TD (Check valve stems to see that they have been) Tj -45.84 -7.2 TD (installed either horizontal or above.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Cleaning of Pipe) Tj ET 58.56 246.48 65.28 0.72 re f BT 45.12 233.52 TD (\(l\)) Tj 18 0 TD (Prior to flushing piping, all metering devices and) Tj -41.52 -7.2 TD (orifices shall be removed. Temporary by-passes shall be provided) Tj 0 -7.2 TD (for all solar collectors, coils, heat exchangers end equipment.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Pipes shall be cleaned free of scale and thoroughly) Tj -41.52 -7.2 TD (flushed of all foreign matter.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Strainers and valves shall be thoroughly cleaned.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (After the hydrostatic pressure tests have been made) Tj -41.52 -7.2 TD (and prior to operating tests, piping shall be cleaned again by) Tj 0 -7.2 TD (filling the system with clean water and an alkaline detergent.) Tj T* (The solution shall be circulated at the indicated flow rate for) Tj T* (a period of 48 hours. The system will be drained and flushed) Tj T* (thoroughly with fresh water.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (The system shall be drained and dried before filling) Tj -41.52 -7.2 TD (with silicone fluid.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Fill system with specified fluid and necessary) Tj -41.52 -7.2 TD (inhibitors added.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (The initial cleaning and final filling shall be) Tj -41.52 -7.2 TD (supervised by a technically qualified representative of a) Tj 0 -7.2 TD (reputable water treatment organization.) Tj ET endstream endobj 47 0 obj <>/ProcSet 375 0 R>>/Rotate 0/Type/Page>> endobj 48 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (13C-5) Tj -97.68 469.2 TD (c.) Tj 13.44 0 TD (Testing) Tj ET 58.56 505.68 28.56 0.72 re f BT 45.12 492.72 TD (\(1\)) Tj 18 0 TD (Factory Tests:) Tj -18 -14.4 TD (Check shop drawing submittals to determine if required) Tj -23.52 -7.2 TD (factory tests were made and recorded.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Field tests shall be as follows:) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Piping \227 after cleaning, water piping shall be) Tj -41.52 -7.2 TD (hydrostatically tested at a pressure equal to 1 \275 times the) Tj 0 -7.2 TD (total operating pressure for a period sufficient for inspection) Tj T* (of every joint in the system and in no case less than 2 hours.) Tj T* (No loss of pressure will be allowed.) Tj 23.52 -14.4 TD (Leaks found during testing shall be repaired by replacing) Tj -23.52 -7.2 TD (pipe or fittings. Caulking of joints will not be permitted.) Tj 23.52 -14.4 TD (Concealed pipes shall be tested in place before being) Tj -23.52 -7.2 TD (concealed.) Tj 23.52 -14.4 TD (The system will be drained and dried before filling with) Tj -23.52 -7.2 TD (silicone fluid.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Balancing and adjusting - shall be in accordance with) Tj -41.52 -7.2 TD (Specification Section: TESTING ADJUSTING AND BALANCING OF HVAC) Tj 0 -7.2 TD (SYSTEMS.) Tj 23.52 -14.4 TD (Adjust flow through each collector by measuring either the) Tj -23.52 -7.2 TD (pressure drop or the temperature rise across the collector.) Tj 23.52 -14.4 TD (Temperature measurement shall be made by means of platinum) Tj -23.52 -7.2 TD (resistance or thermocouple measuring devices.) Tj 23.52 -14.4 TD (Pressures shall be measured through inlet and outlet) Tj -23.52 -7.2 TD (pressure taps with U-tube manometers.) Tj 23.52 -14.4 TD (Balancing valves shall be adjusted and set for the) Tj -23.52 -7.2 TD (indicated flow through the collectors.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Performance) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (After completion of pressure testing, cleaning,) Tj -41.52 -7.2 TD (balancing and adjusting, and installation of all systems and) Tj 0 -7.2 TD (prior to acceptance, tests shall be conducted to demonstrate) Tj T* (that system and all components are operating in compliance with) Tj T* (contract performance requirements.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (The tests shall be conducted by a competent) Tj -41.52 -7.2 TD (experienced engineer and shall cover a period of not less than) Tj 0 -7.2 TD (the specified days for each system.) Tj ET endstream endobj 49 0 obj <>/ProcSet 51 0 R>>/Rotate 0/Type/Page>> endobj 50 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 150.96 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (i) Tj -20.4 469.2 TD (CHAPTER 13D) Tj ET 130.56 505.68 44.88 0.72 re f BT 96 492.72 TD (LIQUID AND GAS STORAGE TANKS) Tj ET 96 491.28 114.24 0.72 re f BT 142.8 478.32 TD (INDEX) Tj -88.8 -14.4 TD (Para.) Tj ET 54 462.48 20.4 0.72 re f BT 144 463.92 TD (Title) Tj ET 144 462.48 20.4 0.72 re f BT 243.12 463.92 TD (Page) Tj ET 243.12 462.48 16.32 0.72 re f BT 54 449.52 TD (13D-01) Tj 49.44 0 TD (GENERAL) Tj 139.68 0 TD (13D-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Definition) Tj 121.68 0 TD (13D-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Approvals) Tj 121.68 0 TD (13D-1) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Storage and Handling) Tj 121.68 0 TD (13D-1) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Coordination of Work) Tj 121.68 0 TD (13D-1) Tj -189.12 -14.4 TD (13D-02) Tj 49.44 0 TD (BULK STORAGE TANKS) Tj 139.68 0 TD (13D-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Above Ground Tanks) Tj 121.68 0 TD (13D-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Underground Tanks) Tj 121.68 0 TD (13D-3) Tj -189.12 -14.4 TD (13D-03) Tj 49.44 0 TD (PUMPS \(Excluding Water Pumps\)) Tj 139.68 0 TD (13D-4) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (General) Tj 121.68 0 TD (13D-4) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Positive Displacement Pumps) Tj 121.68 0 TD (13D-5) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Centrifugal Pumps) Tj 121.68 0 TD (13D-5) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Deep Well Turbine Pumps) Tj 121.68 0 TD (13D-5) Tj -189.12 -14.4 TD (13D-04) Tj 49.44 0 TD (AIRCRAFT FUELING SYSTEM) Tj 139.68 0 TD (13D-5) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (General) Tj 121.68 0 TD (13D-5) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Fuel Piping) Tj 121.68 0 TD (13D-6) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Valves) Tj 121.68 0 TD (13D-7) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Strainers) Tj 121.68 0 TD (13D-7) Tj -139.68 -7.2 TD (e.) Tj 18 0 TD (Gauges) Tj 121.68 0 TD (13D-7) Tj -139.68 -7.2 TD (f.) Tj 18 0 TD (Filter Separators) Tj 121.68 0 TD (13D-7) Tj -139.68 -7.2 TD (g.) Tj 18 0 TD (Mechanical Equipment) Tj 121.68 0 TD (13D-8) Tj -139.68 -7.2 TD (h.) Tj 18 0 TD (Operations and Testing) Tj 121.68 0 TD (13D-8) Tj -189.12 -14.4 TD (13D-05) Tj 49.44 0 TD (SEWAGE TREATMENT PLANTS) Tj 139.68 0 TD (13D-8) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Sewage Bar Screens) Tj 121.68 0 TD (13D-8) Tj -99.12 -7.2 TD (and Shredder) Tj -40.56 -7.2 TD (b.) Tj 18 0 TD (Grit Chamber) Tj 121.68 0 TD (13D-9) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Settling Chambers) Tj 0 -7.2 TD (\(Sedimentation Tanks;) Tj 121.68 0 TD (13D-9) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Dosing Chambers) Tj 121.68 0 TD (13D-10) Tj -139.68 -7.2 TD (e.) Tj 18 0 TD (Trickling Filter) Tj 121.68 0 TD (13D-10) Tj -139.68 -7.2 TD (f.) Tj 18 0 TD (Distributors) Tj 121.68 0 TD (13D-10) Tj -139.68 -7.2 TD (g.) Tj 18 0 TD (Sludge Digester) Tj 121.68 0 TD (13D-11) Tj -189.12 -14.4 TD (13D-06) Tj 49.44 0 TD (WATER DISTRIBUTION) Tj 139.68 0 TD (13D-12) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Pumps) Tj 121.68 0 TD (13D-12) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Water Tanks and Stand Pipes) Tj 121.68 0 TD (11D-13) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Chlorine and Nypochlorite) Tj 0 -7.2 TD (Feeding Machines) Tj 121.68 0 TD (13D-13) Tj -189.12 -14.4 TD (13D-07) Tj 49.44 0 TD (GENERATING UNITS) Tj 139.68 0 TD (13D-13) Tj -189.12 -14.4 TD (13D-08) Tj 49.44 0 TD (INCINERATORS) Tj 139.68 0 TD (13D-15) Tj -189.12 -14.4 TD (13D-09) Tj 49.44 0 TD (FOOD SERVICE AND HOSPITAL) Tj 9.12 -7.2 TD (EQUIPMENT) Tj 130.56 0 TD (13D-16) Tj ET endstream endobj 51 0 obj [/PDF/Text] endobj 52 0 obj <>/ProcSet 376 0 R>>/Rotate 0/Type/Page>> endobj 53 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (13D-1) Tj -12.24 469.2 TD (CHAPTER 13D) Tj ET 130.56 505.68 44.88 0.72 re f BT 96 492.72 TD (LIQUID AND GAS STORAGE TANKS) Tj ET 96 491.28 114.24 0.72 re f BT 21.6 478.32 TD (13D-01 ) Tj 32.64 0 TD (GENERAL) Tj ET 54.24 476.88 28.56 0.72 re f BT 45.12 463.92 TD (a.) Tj 13.44 0 TD (Definition) Tj ET 58.56 462.48 40.8 0.72 re f BT 45.12 449.52 TD (This chapter covers material, equipment, and good) Tj -23.52 -7.2 TD (workmanship practices for installation of liquid and gas storage) Tj 0 -7.2 TD (tanks.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Approvals) Tj ET 58.56 419.28 36.72 0.72 re f BT 45.12 406.32 TD (\(1\)) Tj 18 0 TD (Review ENG Form 4268, Submittal Register, and insure) Tj -41.52 -7.2 TD (that all material, equipment, and shop drawings are approved) Tj 0 -7.2 TD (prior to preparatory inspections and prior to either fabrication) Tj T* (or installation of foundation, tanks and associated equipment.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Obtain any helpful manufacturer) Tj 126.48 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s information.) Tj -148.56 -14.4 TD (c.) Tj 13.44 0 TD (Storage and Handling) Tj ET 58.56 354.48 81.6 0.72 re f BT 45.12 341.52 TD (\(1\)) Tj 18 0 TD (Insure that storage yard is placed in an area that) Tj -41.52 -7.2 TD (will not require movement of stored materials for Installation) Tj 0 -7.2 TD (of utility lines or other structures. Storage yard should be) Tj T* (adequate in size and location for both storing, sorting, and) Tj T* (retrieval of materials for erection.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Insure that all materials are safely and properly) Tj -41.52 -7.2 TD (stored to prevent damage.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Reject damaged materiel and equipment. Have such items) Tj -41.52 -7.2 TD (removed from the site.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (In handling heavy items use proper size construction) Tj -41.52 -7.2 TD (equipment to lift the loads being handled. Use proper size) Tj 0 -7.2 TD (slings, clamps, and chocking devices when lifting or moving) Tj T* (materials.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (provide necessary storage yard drainage, dunnage, and) Tj -41.52 -7.2 TD (working room for both equipment and personnel.) Tj 23.52 -14.4 TD (d.) Tj 13.44 0 TD (Coordination of Work) Tj ET 58.56 196.08 81.6 0.72 re f BT 45.12 183.12 TD (Continually check for interferences between structural,) Tj -23.52 -7.2 TD (electrical, and mechanical features, especially utilities in the) Tj 0 -7.2 TD (underground areas adjacent to the erection area.) Tj 0 -14.4 TD (13D-02) Tj 36.96 0 TD (BULK STORAGE TANKS) Tj ET 58.56 152.88 73.44 0.72 re f BT 45.12 139.92 TD (a.) Tj 13.44 0 TD (Above Ground Tanks) Tj ET 58.56 138.48 73.44 0.72 re f BT 45.12 125.52 TD (\(1\)) Tj 18 0 TD (Determine that fabrication is in accordance with API) Tj -41.52 -7.2 TD (standards \(for Petroleum Products\).) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Verify compliance with approved shop drawings.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Examine foundation details.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Observe installation of sand base \(oiled sand for Air) Tj -41.52 -7.2 TD (Force projects\)) Tj ET endstream endobj 54 0 obj <>/ProcSet 376 0 R>>/Rotate 0/Type/Page>> endobj 55 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (13D-2) Tj -97.68 469.2 TD (\(5\)) Tj 18 0 TD (Check thoroughly all welds for compliance with design) Tj -41.52 -7.2 TD (and workmanship. Check specifications for required weld) Tj 0 -7.2 TD (sampling. Reject welds not meeting these requirements. Check) Tj T* (specifications for destruct and non-destruct testing) Tj T* (requirements for welds.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Examine certified mill reports for steel.) Tj -18 -14.4 TD (\(7\)) Tj 18 0 TD (Inspect interior of tank, sump, and pipes for) Tj -41.52 -7.2 TD (cleanliness.) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (Refer to Chapter 5B for welding.) Tj -18 -14.4 TD (\(9\)) Tj 18 0 TD (Determine orientation of tanks.) Tj -18 -14.4 TD (\(10\)) Tj 22.32 0 TD (Measure plate thickness.) Tj -22.32 -14.4 TD (\(11\)) Tj 22.32 0 TD (Insure nameplates or stamps on tanks.) Tj -22.32 -14.4 TD (\(12\)) Tj 22.32 0 TD (Witness testing of the bottom and top plate welds.) Tj -45.84 -7.2 TD (Prior to testing, see that welded joint is well soaped.) Tj 23.52 -14.4 TD (\(13\)) Tj 22.32 0 TD (Insist that approved construction sequence is rigidly) Tj -45.84 -7.2 TD (followed.) Tj 23.52 -14.4 TD (\(14\)) Tj 22.32 0 TD (Note tank foundation prior to assembly and welding of) Tj -45.84 -7.2 TD (the bottom plates.) Tj 23.52 -14.4 TD (\(15\)) Tj 22.32 0 TD (Verify that tank foundation is not damaged during) Tj -45.84 -7.2 TD (erection of tank.) Tj 23.52 -14.4 TD (\(16\)) Tj 22.32 0 TD (Assure that radiographic inspection is made and) Tj -45.84 -7.2 TD (records substantiate the results.) Tj 23.52 -14.4 TD (\(17\)) Tj 22.32 0 TD (Inspect tank openings and fittings for location,) Tj -45.84 -7.2 TD (size, type, and reinforcement.) Tj 23.52 -14.4 TD (\(18\)) Tj 22.32 0 TD (Make sure that rim seals provide firm and continuous) Tj -45.84 -7.2 TD (contact between seal ring and tank shell at all times and under) Tj 0 -7.2 TD (all conditions, from partial to full tank capacity, without) Tj T* (binding or excessive wear.) Tj 23.52 -14.4 TD (\(19\)) Tj 22.32 0 TD (Insist that weatherhoods are provided over rim seals.) Tj -22.32 -14.4 TD (\(20\)) Tj 22.32 0 TD (Be certain that Zinc-coated or galvanized materials) Tj -45.84 -7.2 TD (are not permitted where there is a possibility of their coming) Tj 0 -7.2 TD (into contact with the fuels.) Tj 23.52 -14.4 TD (\(21\)) Tj 22.32 0 TD (Ensure that emergency venting requirements in API 650) Tj -45.84 -7.2 TD (are met.) Tj 23.52 -14.4 TD (\(22\)) Tj 22.32 0 TD (Electrical Grounding.) Tj -22.32 -14.4 TD (\(a\)) Tj 18 0 TD (Determine that electrical grounding has been) Tj -41.52 -7.2 TD (installed.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (Require testing by an electrical inspector after) Tj -41.52 -7.2 TD (grounding is complete.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (Check gasketed pipeline joint for electrical bonding) Tj -41.52 -7.2 TD (of adjacent pipe.) Tj ET endstream endobj 56 0 obj <>/ProcSet 376 0 R>>/Rotate 0/Type/Page>> endobj 57 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (13D-3) Tj -97.68 469.2 TD (\(d\)) Tj 18 0 TD (Check insulated pipe flanges to insure complete) Tj -41.52 -7.2 TD (electrical separation.) Tj 23.52 -14.4 TD (\(23\)) Tj 22.32 0 TD (Insure that gage pipe column is plumb from top of) Tj -45.84 -7.2 TD (tank to bottom.) Tj 23.52 -14.4 TD (\(24\)) Tj 22.32 0 TD (Float-operated liquid level guage should be checked) Tj -45.84 -7.2 TD (for easy and accurate operation from an empty to a full tank.) Tj 0 -7.2 TD (Cable and tape should be installed level and plumb to avoid) Tj T* (friction or binding in protective pipe, pulleys, and guage-well) Tj T* (cover ferrule.) Tj 23.52 -14.4 TD (\(25\)) Tj 22.32 0 TD (Tanks should be calibrated and a certified guage) Tj -45.84 -7.2 TD (table prepared, as specified. Witness the calibration) Tj 0 -7.2 TD (operations. In the industry, calibration and strapping are) Tj T* (synonymous.) Tj 23.52 -14.4 TD (\(26\)) Tj 22.32 0 TD (Stairways, platforms, ladders, and safety guages) Tj -45.84 -7.2 TD (should be examined for compliance with approved design and for) Tj 0 -7.2 TD (conformance to safety regulations.) Tj 23.52 -14.4 TD (\(27\)) Tj 22.32 0 TD (Provide adequate ventilation and lighting during) Tj -45.84 -7.2 TD (inside work.) Tj 23.52 -14.4 TD (\(28\)) Tj 22.32 0 TD (All required tests should be made as specified and) Tj -45.84 -7.2 TD (witnessed by the inspector. A complete record of each test) Tj 0 -7.2 TD (should be maintained.) Tj 23.52 -14.4 TD (\(29\)) Tj 22.32 0 TD (Check for requirement for dike to contain leaks and) Tj -45.84 -7.2 TD (spills. Insure that containment area is built to required) Tj 0 -7.2 TD (dimensions, and that joints of dike materials are constructed to) Tj T* (prevent leakage to adjacent areas.) Tj 23.52 -14.4 TD (\(30\)) Tj 22.32 0 TD (Check for access ramps or steps over dike wells for) Tj -45.84 -7.2 TD (access to storage tanks.) Tj 23.52 -14.4 TD (\(31\)) Tj 22.32 0 TD (Check for restoration work requirement to restore) Tj -45.84 -7.2 TD (area outside of dike area after construction is complete. The) Tj 0 -7.2 TD (work will be done in accordance with contract specifications.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Underground Tanks) Tj ET 58.56 217.68 69.36 0.72 re f BT 45.12 204.72 TD (\(1\)) Tj 18 0 TD (Check anchoring in locations subject to high ground) Tj -41.52 -7.2 TD (water.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check shop drawings. Verify foundation bolt layout) Tj -41.52 -7.2 TD (check bolts for proper length and diameter.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (See that tanks have been constructed in accordance) Tj -41.52 -7.2 TD (with applicable standards and approved shop drawings.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Ensure that pressure tests are performed. Check to see) Tj -41.52 -7.2 TD (if vacuum test on the interstitialspace is require to be) Tj 0 -7.2 TD (performed.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Examine tank openings and fittings for location, size,) Tj -41.52 -7.2 TD (type, and reinforcing.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Inspect shop applied coating on tanks. Witness holiday) Tj -41.52 -7.2 TD (test of coating. Repair coating and re-test to confirm quality) Tj 0 -7.2 TD (of repair. Check certified reports or inspection reports) Tj T* (provided by factory for compliance with contract specifications) Tj T* (and approved shop drawings.) Tj ET endstream endobj 58 0 obj <>/ProcSet 376 0 R>>/Rotate 0/Type/Page>> endobj 59 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (13D-4) Tj -97.68 469.2 TD (\(7\)) Tj 18 0 TD (Field-applied coatings on tanks.) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Observe removal of shop protective paint coating for) Tj -41.52 -7.2 TD (conformance with specification requirements.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (Observe preparation and cleaning of tank surfaces to) Tj -41.52 -7.2 TD (be coated.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (Require application of primer immediately after) Tj -41.52 -7.2 TD (cleaning.) Tj 23.52 -14.4 TD (\(d\)) Tj 18 0 TD (Check application of enamel while primer is still) Tj -41.52 -7.2 TD (\223live\224.) Tj 23.52 -14.4 TD (\(e\)) Tj 18 0 TD (Determine the needs for re-priming, or for primer) Tj -41.52 -7.2 TD (removal and reapplication.) Tj 23.52 -14.4 TD (\(f\)) Tj 18 0 TD (Check use of manufacturer) Tj 102 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s recommendations.) Tj -124.08 -14.4 TD (\(g\)) Tj 18 0 TD (Verify results of holiday testing and repairs to) Tj -41.52 -7.2 TD (coating.) Tj 23.52 -14.4 TD (\(h\)) Tj 18 0 TD (Witness handling of coated tank to avoid damage.) Tj -18 -14.4 TD (\(8\)) Tj 18 0 TD (Check type of fuel resistant gaskets{Buna-N or cork\).) Tj -18 -14.4 TD (\(9\)) Tj 18 0 TD (Examine coating of tie\227down straps.) Tj -18 -14.4 TD (\(10\)) Tj 22.32 0 TD (See that all appurtenances are installed inside of) Tj -45.84 -7.2 TD (tank. See that leak detection connections are installed on dual) Tj 0 -7.2 TD (wall tanks.) Tj 23.52 -14.4 TD (\(11\)) Tj 22.32 0 TD (Witness cleaning of interior of tank.) Tj -22.32 -14.4 TD (\(12\)) Tj 22.32 0 TD (Witness tank calibration.) Tj -22.32 -14.4 TD (\(13\)) Tj 22.32 0 TD (Observe the use of flexible connectors or piping to) Tj -45.84 -7.2 TD (tanks.) Tj 23.52 -14.4 TD (\(14\)) Tj 22.32 0 TD (See that tank slopes to low point or sump.) Tj -22.32 -14.4 TD (\(15\)) Tj 22.32 0 TD (Check specification requirements for installation of) Tj -45.84 -7.2 TD (cathodic protection for tank and piping to tank. See section on) Tj 0 -7.2 TD (cathodic protection.) Tj 23.52 -14.4 TD (\(16\)) Tj 22.32 0 TD (Check specification requirements for backfilling) Tj -45.84 -7.2 TD (around tank and piping. Check to see that tank manhole is to the) Tj 0 -7.2 TD (proper elevation. Clean out manhole after backfilling tank area.) Tj T* (Check for paved area or gravel area around manhole of tank and) Tj T* (tank area in general.) Tj 23.52 -14.4 TD (\(17\)) Tj 22.32 0 TD (Check to see that tank vent is installed to correct) Tj -45.84 -7.2 TD (height and installed as shown on drawings.) Tj 23.52 -14.4 TD (\(18\)) Tj 22.32 0 TD (Check to see that fill line to tank is to given grade) Tj -45.84 -7.2 TD (and protected from damage.) Tj 0 -14.4 TD (13D-03 ) Tj 28.56 0 TD (PUMPS) Tj ET 50.16 95.28 20.4 0.72 re f BT 70.56 96.72 TD ( \(Excluding water pumps\)) Tj -25.44 -14.4 TD (a.) Tj 13.44 0 TD (General) Tj ET 58.56 80.88 28.56 0.72 re f BT 45.12 67.92 TD (\(1\)) Tj 18 0 TD (Determine that certified test curves are furnished for) Tj -41.52 -7.2 TD (each type of pump. Determine that shop drawings are approved.) Tj ET endstream endobj 60 0 obj <>/ProcSet 376 0 R>>/Rotate 0/Type/Page>> endobj 61 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (13D-5) Tj -97.68 469.2 TD (\(2\)) Tj 18 0 TD (See that operation, maintenance, and installation) Tj -41.52 -7.2 TD (instructions are furnished.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Note type of bearings. Check type of seal. Determine) Tj -41.52 -7.2 TD (lubrication requirement and water cooling requirement.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Verify adjustment of stuffing box glands and leakage) Tj -41.52 -7.2 TD (of seals.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Observe the direction of rotation.) Tj -18 -14.4 TD (\(6\)) Tj 18 0 TD (Pumps to motor alignment can be thrown out of) Tj -41.52 -7.2 TD (allowable tolerance at couplings during bolting down of base) Tj 0 -7.2 TD (plate or attaching pipe to the pump. Check coupling alignment) Tj T* (after pump is set and piping is attached. If coupling is out of) Tj T* (tolerance, the motor should be reset to eliminate the out of) Tj T* (tolerance measurements at the coupling.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Examine guard device over couplings.) Tj -18 -14.4 TD (\(8\)) Tj 18 0 TD (Note electric motor drivers under operations.) Tj -18 -14.4 TD (b.) Tj 13.44 0 TD (Positive Displacement Pump) Tj ET 58.56 347.28 106.08 0.72 re f BT 45.12 334.32 TD (Check by\227pass or leak-off protection in the event of a) Tj -23.52 -7.2 TD (closed discharge.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Centrifugal Pump) Tj ET 58.56 311.28 65.28 0.72 re f BT 45.12 298.32 TD (\(1\)) Tj 18 0 TD (Check type of casing and material.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Check inherent self-priming features.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Check facilities on top of casings.) Tj -18 -14.4 TD (d.) Tj 13.44 0 TD (Deep Well Turbine Pump) Tj ET 58.56 253.68 89.76 0.72 re f BT 45.12 240.72 TD (\(1\)) Tj 18 0 TD (Obtain and record the impeller clearance settings as) Tj -41.52 -7.2 TD (made by the pump manufacturer) Tj 118.32 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s service engineer.) Tj -98.88 -14.4 TD (\(2\)) Tj 18 0 TD (Check pumps for non-reversing ratchet or restrictor.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Verify overhead clearance and openings in slab above) Tj -41.52 -7.2 TD (for removal of pumps.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Insure minimum submergence setting.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (See that vents are installed at the high point of all) Tj -41.52 -7.2 TD (pumps.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Note bowl serial number to assure correct assembly) Tj -41.52 -7.2 TD (when field assembled. Inspect bowl alignment.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Examine the check-valves installed between gate\227valve) Tj -41.52 -7.2 TD (and pump.) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (Determine that pump setting is level and plumb.) Tj -41.52 -14.4 TD (13D-04) Tj 36.96 0 TD (AIRCRAFT FUELING SYSTEM) Tj ET 58.56 88.08 93.84 0.72 re f BT 45.12 75.12 TD (a.) Tj 13.44 0 TD (General) Tj ET 58.56 73.68 28.56 0.72 re f endstream endobj 62 0 obj <>/ProcSet 376 0 R>>/Rotate 0/Type/Page>> endobj 63 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (13D-6) Tj -97.68 469.2 TD (\(1\)) Tj 18 0 TD (Insure provisions to avoid injury and damage to work) Tj -41.52 -7.2 TD (in the proximity of hangars, parking aprons, and runways.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Follow coordination between contractor and the air) Tj -41.52 -7.2 TD (base.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Avoid substitution for approved materials. Require all) Tj -41.52 -7.2 TD (materials be submitted for approval.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (See that every effort is made to furnish an) Tj -41.52 -7.2 TD (uncontaminated system.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Check cleanliness of existing system prior to) Tj -41.52 -7.2 TD (connecting a new installation.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Evaluate effect of welding operations on existing) Tj -41.52 -7.2 TD (system prior to commencement of work because of the extreme) Tj 0 -7.2 TD (hazard involved.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Inspect painted identification marking of fuel system.) Tj -18 -14.4 TD (b.) Tj 13.44 0 TD (Fuel piping) Tj ET 58.56 354.48 44.88 0.72 re f BT 45.12 341.52 TD (\(1\)) Tj 18 0 TD (Determine size, material, thickness, coating, and) Tj -41.52 -7.2 TD (painting of pipe.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Refer to chapter for Welding.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Examine storage of piping and materials to prevent) Tj -41.52 -7.2 TD (contamination.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Check blanking ends of piping.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Check for anchoring and expansion provisions.) Tj -18 -14.4 TD (\(6\)) Tj 18 0 TD (Require pneumatic testing with dry air.) Tj -18 -14.4 TD (\(7\)) Tj 18 0 TD (Inspect painted identification marking of fuel system.) Tj -18 -14.4 TD (\(8\)) Tj 18 0 TD (Note installation of valve numbering system.) Tj -18 -14.4 TD (\(9\)) Tj 18 0 TD (Require gasket material that is suitable for use with) Tj -41.52 -7.2 TD (petroleum products.) Tj 23.52 -14.4 TD (\(10\)) Tj 22.32 0 TD (Observe types of pipe sleeves for pipe passing) Tj -45.84 -7.2 TD (through concrete or masonry construction.) Tj 23.52 -14.4 TD (\(11\)) Tj 22.32 0 TD (Witness holiday tests of pipe coating.) Tj -22.32 -14.4 TD (\(12\)) Tj 22.32 0 TD (Compare pipe joint compound with type of product) Tj -45.84 -7.2 TD (approved.) Tj 23.52 -14.4 TD (\(13\)) Tj 22.32 0 TD (Check to make sure that there are pressure relief) Tj -45.84 -7.2 TD (valves or other means included to provide pressure relief) Tj 0 -7.2 TD (between closed valves.) Tj 23.52 -14.4 TD (\(14\)) Tj 22.32 0 TD (Examine encasement or protective sleeves where lines) Tj -45.84 -7.2 TD (pass under structures, railroad tracks and paved areas.) Tj 23.52 -14.4 TD (\(15\)) Tj 22.32 0 TD (Assure that the fittings and tools used for coupling) Tj -45.84 -7.2 TD (hose to track or railway cars are non-sparking materials.) Tj ET endstream endobj 64 0 obj <>/ProcSet 376 0 R>>/Rotate 0/Type/Page>> endobj 65 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (13D-7) Tj -97.68 469.2 TD (\(16\)) Tj 22.32 0 TD (Determine that fill connections are identified to) Tj -45.84 -7.2 TD (indicate the type of fuel handled.) Tj 23.52 -14.4 TD (\(17\)) Tj 22.32 0 TD (Inspect the slope or pitch of the pipe.) Tj -22.32 -14.4 TD (\(18\)) Tj 22.32 0 TD (Look at low spots for drains and at high points for) Tj -45.84 -7.2 TD (air releases.) Tj 23.52 -14.4 TD (\(19\)) Tj 22.32 0 TD (See that unloading couplings are below tank car or) Tj -45.84 -7.2 TD (truck unloading connections.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Valves) Tj ET 58.56 426.48 24.48 0.72 re f BT 45.12 413.52 TD (\(1\)) Tj 18 0 TD (Check to determine lubrication or non\227lubrication.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Check type of material and pressure rating.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Check valve boxes and extensions.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Check for special valves.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Check timing for POL Valves and sequence of operation.) Tj -18 -14.4 TD (d.) Tj 13.44 0 TD (Strainers) Tj ET 58.56 340.08 36.72 0.72 re f BT 45.12 327.12 TD (\(1\)) Tj 18 0 TD (Check for proper mesh size and non-corrosive basket) Tj -41.52 -7.2 TD (construction.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Strainers should not be placed in line before pig) Tj 199.92 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf ( is) Tj -245.52 -7.2 TD (blown through lines and line has been blown clean.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Strainers should be cleaned prior to acceptance from) Tj -41.52 -7.2 TD (the contractor.) Tj 23.52 -14.4 TD (e.) Tj 13.44 0 TD (Gauges) Tj ET 58.56 260.88 24.48 0.72 re f BT 45.12 247.92 TD (\(1\)) Tj 18 0 TD (Inspect to see that scale range is as per contract) Tj -41.52 -7.2 TD (requirement.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Inspect size and construction.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Inspect tank gauge and pump control.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Inspect to see that loss liquid level pump control is) Tj -41.52 -7.2 TD (set at same level as minimum submergence level of pump.) Tj 23.52 -14.4 TD (f.) Tj 13.44 0 TD (Filter Separators) Tj ET 58.56 174.48 69.36 0.72 re f BT 45.12 161.52 TD (\(1\)) Tj 18 0 TD (Check to see that filter separator has been approved.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Examine type of filtering media for approval.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Insure filtering media replacement after operations) Tj -41.52 -7.2 TD (and tests.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Insure that equipment is installed so that no) Tj -41.52 -7.2 TD (dismantling is necessary to replace filtering media cartridge or) Tj 0 -7.2 TD (strainers.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Check requirement for spare filter media cartridges.) Tj -41.52 -7.2 TD (Turn spares over to using agency at end of contract.) Tj ET endstream endobj 66 0 obj <>/ProcSet 376 0 R>>/Rotate 0/Type/Page>> endobj 67 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (13D-8) Tj -97.68 469.2 TD (\(6\)) Tj 18 0 TD (Check water dump valve operations by slugging the) Tj -41.52 -7.2 TD (filter with water.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Secure, review, and maintain custody of the results of) Tj -41.52 -7.2 TD (all tests performed.) Tj 23.52 -14.4 TD (g.) Tj 13.44 0 TD (Mechanical Equipment) Tj ET 58.56 462.48 81.6 0.72 re f BT 45.12 449.52 TD (\(1\)) Tj 18 0 TD (Check insulated joint on railroad track.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Check covers of hydrant outlet pits for good balance) Tj -41.52 -7.2 TD (and fit.) Tj 23.52 -14.4 TD (h.) Tj 13.44 0 TD (Operations and Testing) Tj ET 58.56 412.08 89.76 0.72 re f BT 45.12 399.12 TD (\(1\)) Tj 18 0 TD (Verify availability, in sufficient quantity of each) Tj -41.52 -7.2 TD (product.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check cleanliness of products delivered from existing) Tj -41.52 -7.2 TD (facilities for entry into the new system.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Check use of the Government furnished tank trucks,) Tj -41.52 -7.2 TD (meters, hoses, filter media, hose, cart, etc.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Do not permit intermixing of fuel, in a dual fuel) Tj -41.52 -7.2 TD (installation. Check requirement for a set of testing equipment) Tj 0 -7.2 TD (for each fuel system.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Require test reports and certification that system) Tj -41.52 -7.2 TD (cleanliness standards have been met prior to turn over of a) Tj 0 -7.2 TD (facility to the using agency.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Witness all testing and see that a test data log is) Tj -41.52 -7.2 TD (prepared by the contractor. A copy of this test data should be) Tj 0 -7.2 TD (included in the job files.) Tj 0 -14.4 TD (13D-05) Tj 36.96 0 TD (SEWAGE TREATMENT PLANTS) Tj ET 58.56 246.48 93.84 0.72 re f BT 45.12 233.52 TD (a.) Tj 13.44 0 TD (Sewage Bar Screens and Shredder) Tj ET 58.56 232.08 126.48 0.72 re f BT 45.12 219.12 TD (\(1\)) Tj 18 0 TD (See that bars are parallel to one another, equally) Tj -41.52 -7.2 TD (spaced, and in the same place of travel as the rakes.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Observe the adjustment of teeth on rakes for proper) Tj -41.52 -7.2 TD (mating with screen along entire travel. Reject rakes with) Tj 0 -7.2 TD (damaged teeth.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Determine that manufacturer) Tj 110.16 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s representative adjusts) Tj -155.76 -7.2 TD (tension of sprocket chains.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Notice rake wiper for efficient cleaning of rakes.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Examine shock absorber for elimination of excessive) Tj -41.52 -7.2 TD (wiper shock and smooth operation.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (See that complete assembly is set in concrete so that) Tj -41.52 -7.2 TD (no water is bypassed between concrete and equipment.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Require contractor to furnish competent engineer to) Tj -41.52 -7.2 TD (instruct government representatives in operations and) Tj 0 -7.2 TD (maintenance.) Tj ET endstream endobj 68 0 obj <>/ProcSet 376 0 R>>/Rotate 0/Type/Page>> endobj 69 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (13D-9) Tj -97.68 469.2 TD (\(8\)) Tj 18 0 TD (Witness operational tests for equipment performance) Tj -41.52 -7.2 TD (required by specifications.) Tj 23.52 -14.4 TD (\(9\)) Tj 18 0 TD (Obtain special tools, if required.) Tj -18 -14.4 TD (b.) Tj 13.44 0 TD (Grit Chamber) Tj ET 58.56 469.68 48.96 0.72 re f BT 45.12 456.72 TD (\(1\)) Tj 18 0 TD (Check elevator and level of proportional weir.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Check rake travel to see that it is parallel with) Tj -41.52 -7.2 TD (floor of chamber.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Check rake clearance for agreement with approved shop) Tj -41.52 -7.2 TD (drawings.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Check sprocket chain tension and adjusting mechanism.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Conduct operational test as required.) Tj -18 -14.4 TD (c.) Tj 13.44 0 TD (Settling Chambers \(Sedimentation Tanks) Tj ET 58.56 368.88 155.04 0.72 re f BT 213.6 370.32 TD (\)) Tj -168.48 -14.4 TD (\(1\)) Tj 18 0 TD (Rectangular and circular sedimentation tanks.) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Assure that all embedded items are installed and are) Tj -41.52 -7.2 TD (properly located.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (Examine elevation of concrete baffles and scum) Tj -41.52 -7.2 TD (troughs.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (Observe and record all recommendations and settings) Tj -41.52 -7.2 TD (made by manufacturer) Tj 81.6 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s representative supervising installation) Tj -85.68 -7.2 TD (of equipment.) Tj 23.52 -14.4 TD (\(d\)) Tj 18 0 TD (Evaluate adjustable weirs for elevation, level and) Tj -41.52 -7.2 TD (range of travel.) Tj 23.52 -14.4 TD (\(a\)) Tj 18 0 TD (Note adjusting mechanism of chain drive for easy) Tj -41.52 -7.2 TD (operation and for sufficient range to procure proper tension in) Tj 0 -7.2 TD (chain.) Tj 23.52 -14.4 TD (\(f\)) Tj 18 0 TD (Inspect scum pipes for level and elevation.) Tj -18 -14.4 TD (\(g\)) Tj 18 0 TD (Require lubrication with recommended lubricants prior) Tj -41.52 -7.2 TD (to initial start-up.) Tj 23.52 -14.4 TD (\(h\)) Tj 18 0 TD (View sprocket-wheel bearings for cleanliness, freedom) Tj -41.52 -7.2 TD (from binding, and smoothness of bearing surface.) Tj 23.52 -14.4 TD (\(i\)) Tj 18 0 TD (Check sprocket teeth for defects and for meshing) Tj -41.52 -7.2 TD (accurately with chain.) Tj 23.52 -14.4 TD (\(j\)) Tj 18 0 TD (See that shafting is level, plumb, and free from) Tj -41.52 -7.2 TD (rotation.) Tj 23.52 -14.4 TD (\(k\)) Tj 18 0 TD (Check chain for damaged links.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Rectangular Sedimentation Tanks.) Tj -18 -11.52 TD (\(a\)) Tj 18 0 TD (Examine skimming run supports for level.) Tj -18 -11.52 TD (\(b\)) Tj 18 0 TD (See that angle track is level and aligned with forward) Tj -41.52 -7.2 TD (sprocket.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Circular Sedimentation Tanks.) Tj ET endstream endobj 70 0 obj <>/ProcSet 376 0 R>>/Rotate 0/Type/Page>> endobj 71 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 122.88 -488.64 TD (13D-10) Tj -95.76 469.2 TD (\(a\)) Tj 18 0 TD (Observe whether top of tank is level.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Inspect skimmer arm, blade, and receptacle for rigid) Tj -41.52 -7.2 TD (support and assembly. Verify blade clearance.) Tj 23.52 -14.4 TD (d. ) Tj 12.24 0 TD (Dosing Chamber) Tj ET 57.36 469.68 57.12 0.72 re f BT 45.12 456.72 TD (\(1\)) Tj 18 0 TD (Check weirs for proper elevation.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Check all siphon placement dimensions and position.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Observe adjustment and operation of weir plates or) Tj -41.52 -7.2 TD (stop planks.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Verify location of trap opening pipe so that sewage) Tj -41.52 -7.2 TD (does not discharge directly into it.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Observe setting of bell with respect to top of main) Tj -41.52 -7.2 TD (trap pipe.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Assure that invert of vent and overflow pipe is above) Tj -41.52 -7.2 TD (the maximum discharge level of the siphon.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (During preliminary testing of tank, check maximum and) Tj -41.52 -7.2 TD (minimum discharge levels and the level at which the siphon stops) Tj 0 -7.2 TD (operating \(minimum drawdown level\)) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (Conduct operating tests as required.) Tj -18 -14.4 TD (\(9\)) Tj 18 0 TD (Contractor must furnish competent engineer, or) Tj -41.52 -7.2 TD (superintendent, as necessary, to provide proper installation and) Tj 0 -7.2 TD (adjustments, to conduct tests, and to instruct government) Tj T* (representatives in proper operation.) Tj 23.52 -14.4 TD (e.) Tj 13.44 0 TD (Trickling Filter) Tj ET 58.56 260.88 65.28 0.72 re f BT 45.12 247.92 TD (\(1\)) Tj 18 0 TD (Check filter media for size and specified material.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Insure that media material is protected from) Tj -41.52 -7.2 TD (contamination is stockpiled prior to placement in filter.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Reject filter media that has been contaminated with) Tj -41.52 -7.2 TD (nonremovable materials such as oils, grease, soil, etc.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Check placing of filter material.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Assure against contamination after finished placement) Tj -41.52 -7.2 TD (of filter media.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Check underdrains, for uniform bearing over the entire) Tj -41.52 -7.2 TD (bottom of each block. See that cross joints are staggered in) Tj 0 -7.2 TD (adjacent rows.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Check air ducts for blockages.) Tj -18 -14.4 TD (\(8\)) Tj 18 0 TD (Check that blocks in drainage channel are not moved by) Tj -41.52 -7.2 TD (placement of filter media.) Tj 23.52 -14.4 TD (f.) Tj 13.44 0 TD (Distributors) Tj ET 58.56 88.08 48.96 0.72 re f BT 45.12 78 TD (\(1\)) Tj 18 0 TD (Fixed Nozzle.) Tj -18 -11.52 TD (\(a\)) Tj 18 0 TD (Check stability and caulking in joint of piping laid) Tj -41.52 -7.2 TD (within filter.) Tj ET endstream endobj 72 0 obj <>/ProcSet 376 0 R>>/Rotate 0/Type/Page>> endobj 73 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 140.88 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (13D-11) Tj -95.76 469.2 TD (\(b\)) Tj 18 0 TD (Note spray nozzles for effective and uniform) Tj -41.52 -7.2 TD (distribution of sewage over entire filter bed.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (Assure furnishing of spare nozzles.) Tj -18 -14.4 TD (\(d\)) Tj 18 0 TD (Perform operating tests as required.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Rotary.) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Assure uniform distribution of sewage over entire) Tj -41.52 -7.2 TD (filter bed.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (Examine distribution arm flushing valve for tightness) Tj -41.52 -7.2 TD (and freedom of operation.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (Replace nozzles that do not show uniform flow) Tj -41.52 -7.2 TD (characteristics.) Tj 23.52 -14.4 TD (\(d\)) Tj 18 0 TD (Assure that distribution arms are level guyed.) Tj -18 -14.4 TD (\(e\)) Tj 18 0 TD (Inspect seal for operation and tightness.) Tj -18 -14.4 TD (\(f\)) Tj 18 0 TD (Witness operation of arms at minimum head for starting) Tj -41.52 -7.2 TD (and for operation. Complete cycle through all heads to maximum.) Tj 0 -7.2 TD (See that motion of arms is parallel to surface of media.) Tj 23.52 -14.4 TD (g.) Tj 13.44 0 TD (Sludge Digester) Tj ET 58.56 318.48 61.2 0.72 re f BT 45.12 305.52 TD (1\)) Tj 13.44 0 TD (Check all embedded items for proper location.) Tj -13.44 -14.4 TD (\(2\)) Tj 18 0 TD (Evaluate all cover seals for gas tightness.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Check overall inside diameter of tank of floating) Tj -41.52 -7.2 TD (cover digesters for roundness and clearances.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Examine cover rollers for clean bearings, ease of) Tj -41.52 -7.2 TD (greasing operations, and alignment of rollers and guides.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Inspect heating system piping for tightness,) Tj -41.52 -7.2 TD (materials, and secure fastening.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Assure that elevation of all cover rests are the same) Tj -41.52 -7.2 TD (on floating cover digesters.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Check sludge draw-off piping for location of rigid) Tj -41.52 -7.2 TD (support.) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (Assure that all heating system lines, gas lines, feed) Tj -41.52 -7.2 TD (pipes, and supernatant lines are flushed prior to operation.) Tj 23.52 -14.4 TD (\(9\)) Tj 18 0 TD (Assure that all debris is cleaned from interior of) Tj -41.52 -7.2 TD (structure.) Tj 23.52 -14.4 TD (\(10\)) Tj 22.32 0 TD (Check center post installation for plumbness and) Tj -45.84 -7.2 TD (rigidity.) Tj 23.52 -14.4 TD (\(11\)) Tj 22.32 0 TD (Examine sludge mixes and scum breaker for operating) Tj -45.84 -7.2 TD (ease and settings.) Tj 23.52 -14.4 TD (\(12\)) Tj 22.32 0 TD (Witness and record tests and adjustments made by) Tj -45.84 -7.2 TD (manufacturer) Tj 48.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s representatives.) Tj -29.52 -14.4 TD (\(13\)) Tj 22.32 0 TD (Refer to Chapter 5B for welding.) Tj ET endstream endobj 74 0 obj <>/ProcSet 376 0 R>>/Rotate 0/Type/Page>> endobj 75 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 122.88 -488.64 TD (13D-12) Tj -95.76 469.2 TD (\(14\)) Tj 22.32 0 TD (See that all manholes and openings through covers are) Tj -45.84 -7.2 TD (gas-tight.) Tj 23.52 -14.4 TD (\(15\)) Tj 22.32 0 TD (Note all sensing locations for thermometers and) Tj -45.84 -7.2 TD (controls.) Tj 23.52 -14.4 TD (\(16\)) Tj 22.32 0 TD (Verify that speed of mixer is set by manufacturer) Tj 199.92 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s) Tj -249.84 -7.2 TD (representative or contractor.) Tj 23.52 -14.4 TD (\(17\)) Tj 22.32 0 TD (Observe setting of gas pressure regulating valve.) Tj -22.32 -14.4 TD (\(18\)) Tj 22.32 0 TD (Check the use of flexible hose with double unions, in) Tj -45.84 -7.2 TD (cold water connection to heating system.) Tj 23.52 -14.4 TD (\(19\)) Tj 22.32 0 TD (Obtain any special tools required.) Tj -22.32 -14.4 TD (\(20\)) Tj 22.32 0 TD (Perform operating tests as required.) Tj -22.32 -14.4 TD (\(21\)) Tj 22.32 0 TD (Require contractor to furnish competent engineer for) Tj -45.84 -7.2 TD (instructional purposes.) Tj 0 -14.4 TD (13D-06 ) Tj 32.64 0 TD (WATER DISTRIBUTION) Tj ET 54.24 354.48 73.44 0.72 re f BT 45.12 341.52 TD (a.) Tj 13.44 0 TD (Pumps) Tj ET 58.56 340.08 20.4 0.72 re f BT 45.12 327.12 TD (\(1\)) Tj 18 0 TD (Be familiar with all pump manufacturer) Tj 155.04 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s) Tj -200.64 -7.2 TD (recommendations and with Hydraulic Institute) Tj 179.52 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s standards. Assure) Tj -183.6 -7.2 TD (that installation is in accordance with same.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Assure that adequate foundation is provided.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Verify the use of a direct drive pump when such is) Tj -41.52 -7.2 TD (specified.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (See that pump can be dismantled without disturbing) Tj -41.52 -7.2 TD (pipe connection or the alignment of pump.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Assure that bronze parts are used where specified.) Tj -18 -14.4 TD (\(6\)) Tj 18 0 TD (Check freedom of movement of impeller and shaft.) Tj -18 -14.4 TD (\(7\)) Tj 18 0 TD (Assure that water-seal is provided with proper type) Tj -41.52 -7.2 TD (and size of packing.) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (Inspect for necessary air cocks, drain plugs, guages,) Tj -41.52 -7.2 TD (and relief valves.) Tj 23.52 -14.4 TD (\(9\)) Tj 18 0 TD (Determine whether a gasoline engine is specified.) Tj -41.52 -7.2 TD (Check out same. \(Use check list for Generator Units, included in) Tj 0 -7.2 TD (this chapter\).) Tj 23.52 -14.4 TD (\(10\)) Tj 22.32 0 TD (Check controls to see that they function as) Tj -45.84 -7.2 TD (specified.) Tj 23.52 -14.4 TD (\(11\)) Tj 22.32 0 TD (Assure that all gears, couplings, projecting set) Tj -45.84 -7.2 TD (screws, keys, and other rotating or reciprocating parts are) Tj 0 -7.2 TD (fully enclosed or properly guarded.) Tj 23.52 -11.52 TD (\(12\)) Tj 22.32 0 TD (Assure that all instruction books, tools, and pumps) Tj -45.84 -7.2 TD (characteristic curves have been obtained from contractor.) Tj 23.52 -11.52 TD (\(13\)) Tj 22.32 0 TD (Examine Hydraulic Institute) Tj 110.16 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s standard and NEPA) Tj -160.08 -7.2 TD (Standard N5.20 or American Standard B58.1. See that tests are) Tj 0 -7.2 TD (made in accordance with these requirements.) Tj ET endstream endobj 76 0 obj <>/ProcSet 376 0 R>>/Rotate 0/Type/Page>> endobj 77 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 140.88 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (13D-13) Tj -95.76 469.2 TD (b.) Tj 13.44 0 TD (Water Tanks and Stand Pipes) Tj ET 58.56 505.68 110.16 0.72 re f BT 45.12 492.72 TD (\(1\)) Tj 18 0 TD (Check foundation construction against plans,) Tj -41.52 -7.2 TD (specifications, and shop drawings. Be sure to compare approved) Tj 0 -7.2 TD (shop drawings for foundation with fabricated column base plates) Tj T* (and anchor bolt layout.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Closely compare steel erection with approved shop) Tj -41.52 -7.2 TD (drawings. Check the erection of steel with Chapter 5A Structural) Tj 0 -7.2 TD (steel and Chapter 5B Welding.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Examine the layout of valve chamber to see that there) Tj -41.52 -7.2 TD (is adequate room for later maintenance of all parts.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Make sure all required checks, gates, altitude valves,) Tj -41.52 -7.2 TD (and pressure guages are installed.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Affirm that the results of the hydrostatic test are) Tj -41.52 -7.2 TD (satisfactory.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Check the installation of such items as cathodic) Tj -41.52 -7.2 TD (protection, lighting and grounding.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Determine whether there is a complete shop coat) Tj -41.52 -7.2 TD (coverage and that the tank receives the specified finish paint.) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (Determine the PPM of chlorine in the system during and) Tj -41.52 -7.2 TD (after the disinfection period. Prior to chlorination, internal) Tj 0 -7.2 TD (brass parts, such as those in altitude valves, should be removed) Tj T* (and later replaced after the chlorine has been flushed from the) Tj T* (line.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Chlorine and Hypochlorite Feeding Machines) Tj ET 58.56 275.28 171.36 0.72 re f BT 45.12 262.32 TD (\(1\)) Tj 18 0 TD (Work to be performed in accordance with the) Tj -41.52 -7.2 TD (manufacturer) Tj 48.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s recommendations, and to conform with plans and) Tj -53.04 -7.2 TD (specifications.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Assure the workmen are skilled in this type of work.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (See that controls, gauges, meters, valves, injectors,) Tj -41.52 -7.2 TD (and reliefs are installed as required.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Check for proper piping installation. Know where) Tj -41.52 -7.2 TD (emergency shut off valves are located on the chlorine supply) Tj 0 -7.2 TD (lines and tanks.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Make sure that all special tools, operating) Tj -41.52 -7.2 TD (instructions, and manuals are provided.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Perform operational tests as required.) Tj -41.52 -14.4 TD (13D-07 ) Tj 28.56 0 TD (GENERATING UNITS) Tj ET 50.16 131.28 65.28 0.72 re f BT 45.12 118.32 TD (a.) Tj 13.44 0 TD (See that contractor has verified all dimensions.) Tj -13.44 -14.4 TD (b.) Tj 13.44 0 TD (See Chapter 15A for checking pipe and fittings, Chapter) Tj -36.96 -7.2 TD (16A for electrical features, and Chapter 5B for welding.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Determine that skilled workmen are being employed.) Tj -13.44 -14.4 TD (d.) Tj 13.44 0 TD (Assure easy access to all parts of the engine.) Tj ET endstream endobj 78 0 obj <>/ProcSet 376 0 R>>/Rotate 0/Type/Page>> endobj 79 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 122.88 -488.64 TD (13D-14) Tj -95.76 469.2 TD (e.) Tj 13.44 0 TD (Examine fuel handling and storage facilities.) Tj -13.44 -14.4 TD (\(1\)) Tj 18 0 TD (Observe tank installation.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Check manhole construction; observe for water\227tight) Tj -41.52 -7.2 TD (cover, and for the height of manhole cover.) Tj 23.52 -14.4 TD (f.) Tj 13.44 0 TD (Assure necessary access doors in equipment.) Tj -13.44 -14.4 TD (g.) Tj 13.44 0 TD (Check the water level.) Tj -13.44 -14.4 TD (h.) Tj 13.44 0 TD (Check for excessive vibration.) Tj -13.44 -14.4 TD (i.) Tj 13.44 0 TD (Observe adjustment of V belt drives.) Tj -13.44 -14.4 TD (j.) Tj 13.44 0 TD (When operating the engine, check for excessive smoke,) Tj -36.96 -7.2 TD (overheating, etc. at this time also check to insure that) Tj 0 -7.2 TD (adequate ventilation is present in the test areas.) Tj 23.52 -14.4 TD (k.) Tj 13.44 0 TD (Check day tank installation.) Tj -13.44 -14.4 TD (\(1\)) Tj 18 0 TD (Check mounting and method of supporting.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Determine that high level cutoff switch is properly) Tj -41.52 -7.2 TD (installed.) Tj 23.52 -14.4 TD (l.) Tj 13.44 0 TD (Assure that approved tanks are installed as specified.) Tj -13.44 -14.4 TD (\(1\)) Tj 18 0 TD (Assure that tanks are kept clean during installation.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Check cleaning operation and its results.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Examine priming and painting applications.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Holiday test the tanks as necessary to assure a) Tj -41.52 -7.2 TD (complete prime and paint job.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Check voltage of holiday detector.) Tj -18 -14.4 TD (\(6\)) Tj 18 0 TD (Continually watch for abrasions.) Tj -18 -14.4 TD (\(7\)) Tj 18 0 TD (Carefully watch backfill operation, check compaction) Tj -41.52 -7.2 TD (and watch for any possible damage to tank or piping.) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (See that all bare places on exterior of tank are) Tj -41.52 -7.2 TD (repaired with hot enamel.) Tj 23.52 -14.4 TD (m.) Tj 13.44 0 TD (Check the installation, anchorage, and support of all) Tj -36.96 -7.2 TD (piping. This includes the exhaust piping and muffler.) Tj 23.52 -14.4 TD (n.) Tj 13.44 0 TD (Make sure that all pipes, valves, fittings, pumps,) Tj -36.96 -7.2 TD (etc., for the fuel and lubricant systems are shipped to the job) Tj 0 -7.2 TD (with ends closed. Check when installed to assure cleanliness,) Tj T* (and continue to guard against the entrance of dirt and foreign) Tj T* (matter into the equipment.) Tj 23.52 -14.4 TD (o.) Tj 13.44 0 TD (Assure the acid cleaning, the neutralization, and the) Tj -36.96 -7.2 TD (drying of the interior of the fuel piping systems.) Tj 23.52 -11.52 TD (p.) Tj 13.44 0 TD (Note the requirement for expansion joints.) Tj -13.44 -11.52 TD (\(1\)) Tj 18 0 TD (Check type furnished.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Check method of installation.) Tj ET endstream endobj 80 0 obj <>/ProcSet 376 0 R>>/Rotate 0/Type/Page>> endobj 81 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 140.88 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (13D-15) Tj -95.76 469.2 TD (\(3\)) Tj 18 0 TD (Check for misalignments.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Follow manufacturer) Tj 77.52 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s instructions to determine range) Tj -123.12 -7.2 TD (of movement for installing expansion joints.) Tj 23.52 -14.4 TD (q.) Tj 13.44 0 TD (Mufflers.) Tj -13.44 -14.4 TD (\(1\)) Tj 18 0 TD (Check type furnished and specified.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Check method of mounting.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Check treatment for rust resistance.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Check noise level.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Check drain hole.) Tj -18 -14.4 TD (r.) Tj 13.44 0 TD (Be alert for the requirements concerning auxiliary) Tj -36.96 -7.2 TD (equipment such as silencer, special controls, trickle charges,) Tj 0 -7.2 TD (filters, instrument board, static exciter, voltage regulator,) Tj T* (auxiliary compartment, special tools, operating instructions and) Tj T* (manuals.) Tj 23.52 -14.4 TD (s.) Tj 13.44 0 TD (See that required tests are made.) Tj -13.44 -14.4 TD (\(1\)) Tj 18 0 TD (Check safety circuit.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Check governor.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Check fly wheel.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Check accessibility of brush rigging.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Performance.) Tj -18 -14.4 TD (\(6\)) Tj 18 0 TD (Controls and interlocks.) Tj -41.52 -14.4 TD (13D-08 ) Tj 32.64 0 TD (INCINERATORS) Tj ET 54.24 239.28 48.96 0.72 re f BT 45.12 226.32 TD (a.) Tj 13.44 0 TD (Make sure that construction is in exact accordance with) Tj -36.96 -7.2 TD (approved shop drawings. Check dimensions very carefully.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Check construction and thickness of fire brick in) Tj -36.96 -7.2 TD (furnace and flue connections. Watch for:) Tj 23.52 -14.4 TD (\(1\)) Tj 18 0 TD (Width of joints.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Wall thickness.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Handle of arches and circular linings.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Size of baffle.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Bricks laid on edge in hearths and floors.) Tj -18 -14.4 TD (\(6\)) Tj 18 0 TD (Installation of expansion joints.) Tj -18 -14.4 TD (\(7\)) Tj 18 0 TD (Bracing.) Tj -18 -11.52 TD (c.) Tj 13.44 0 TD (Check casting and bonding of refractory casting when) Tj -36.96 -7.2 TD (same is used.) Tj 23.52 -11.52 TD (d.) Tj 13.44 0 TD (See that insulating brick is installed in specific) Tj -36.96 -7.2 TD (location.) Tj ET endstream endobj 82 0 obj <>/ProcSet 376 0 R>>/Rotate 0/Type/Page>> endobj 83 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 122.88 -488.64 TD (13D-16) Tj -95.76 469.2 TD (e.) Tj 13.44 0 TD (See Chapter 4 for Installation of exterior wall brick.) Tj -13.44 -14.4 TD (f.) Tj 13.44 0 TD (Assure that there is at least a 2" separation between) Tj -36.96 -7.2 TD (exterior walls and fire brick lining of chimney. Check plans and) Tj 0 -7.2 TD (specifications to see if different dimension is required for the) Tj T* (separation for your specific contract.) Tj 23.52 -14.4 TD (g.) Tj 13.44 0 TD (Check chimney for:) Tj -13.44 -14.4 TD (\(1\)) Tj 18 0 TD (Cleanout door and frame.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Concrete protective cap.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Spark screen.) Tj -18 -14.4 TD (h.) Tj 13.44 0 TD (Assure the installation of a safety rail around) Tj -36.96 -7.2 TD (charging throats and guillotine.) Tj 23.52 -14.4 TD (i.) Tj 13.44 0 TD (Check the installation for items such as:) Tj -13.44 -14.4 TD (\(1\)) Tj 18 0 TD (Dampers.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Auxiliary burners.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Test pipes.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Instruments.) Tj -18 -14.4 TD (j.) Tj 13.44 0 TD (Determine if other equipment such as can-wash or) Tj -36.96 -7.2 TD (forced-draft is specified and check same.) Tj 23.52 -14.4 TD (k.) Tj 13.44 0 TD (Require that all necessary operating tools; spare) Tj -36.96 -7.2 TD (parts, operating instructions, manuals, and training have been) Tj 0 -7.2 TD (provided.) Tj 23.52 -14.4 TD (l.) Tj 13.44 0 TD (See that unit is dried out in accordance with) Tj -36.96 -7.2 TD (requirements.) Tj 23.52 -14.4 TD (m.) Tj 13.44 0 TD (Assure that operating tests are conducted and that) Tj -36.96 -7.2 TD (results have been recorded. Obtain copies of all test records) Tj 0 -7.2 TD (and certification that unit was properly constructed and is) Tj T* (operating satisfactorily.) Tj 0 -14.4 TD (13D-09 ) Tj 32.64 0 TD (FOOD SERVICE AND HOSPITAL EQUIPMENT) Tj ET 54.24 196.08 142.8 0.72 re f BT 45.12 183.12 TD (a.) Tj 13.44 0 TD (Require an equipment layout if there is any question of) Tj -36.96 -7.2 TD (items fitting into place.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Require the installation of all trimmings, steam traps) Tj -36.96 -7.2 TD (and fittings necessary for proper operation.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (See that the equipment manufacturer) Tj 142.8 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s name plate is in) Tj -183.84 -7.2 TD (a conspicuous location.) Tj 23.52 -14.4 TD (d.) Tj 13.44 0 TD (Install back flow preventers when equipment has a water) Tj -36.96 -7.2 TD (supply.) Tj 23.52 -14.4 TD (e.) Tj 13.44 0 TD (Determine that motors of equipment are suitable for) Tj -36.96 -7.2 TD (voltage supplied.) Tj 23.52 -14.4 TD (f.) Tj 13.44 0 TD (Check the quality of workmanship in the fabricated) Tj -36.96 -7.2 TD (equipment.) Tj ET endstream endobj 84 0 obj <>/ProcSet 376 0 R>>/Rotate 0/Type/Page>> endobj 85 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 140.88 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (13D-17) Tj -95.76 469.2 TD (g.) Tj 13.44 0 TD (Check welds for smooth, ground off finish, and ensure) Tj -36.96 -7.2 TD (freedom from imperfections and color differences.) Tj 23.52 -14.4 TD (h.) Tj 13.44 0 TD (Check for the substitution of spot welds where full) Tj -36.96 -7.2 TD (welds are needed or specified.) Tj 23.52 -14.4 TD (i.) Tj 13.44 0 TD (Check the type of material used in fabrication and the) Tj -36.96 -7.2 TD (type and quality of finish.) Tj 23.52 -14.4 TD (j.) Tj 13.44 0 TD (Check for burrs, projections, and fins.) Tj -13.44 -14.4 TD (k.) Tj 13.44 0 TD (Inspect for exposed screws, rivets, or bolt heads.) Tj -13.44 -14.4 TD (l.) Tj 13.44 0 TD (Check for ferrous fastenings where stainless types are) Tj -36.96 -7.2 TD (specified.) Tj 23.52 -14.4 TD (m.) Tj 13.44 0 TD (All exposed piping is to be chromium-plated brass.) Tj -13.44 -14.4 TD (n.) Tj 13.44 0 TD (Completely check out the plumbing for equipment, using) Tj -36.96 -7.2 TD (Chapter 15.) Tj 23.52 -14.4 TD (o.) Tj 13.44 0 TD (Check all dimensions and capacities of equipment.) Tj -13.44 -14.4 TD (p.) Tj 13.44 0 TD (Check equipment for specified controls.) Tj -13.44 -14.4 TD (q.) Tj 13.44 0 TD (Input for any breaks in coated metal, and make sure the) Tj -36.96 -7.2 TD (metal is properly treated and protected against corrosion.) Tj 23.52 -14.4 TD (r.) Tj 13.44 0 TD (Determine that equipment with waste or drain surfaces) Tj -36.96 -7.2 TD (is pitched to drain,) Tj 23.52 -14.4 TD (a.) Tj 13.44 0 TD (Inspect counter tops for:) Tj -13.44 -14.4 TD (\(1\)) Tj 18 0 TD (Defects.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Corners being rounded, bullnosed, and equal in finish) Tj -41.52 -7.2 TD (of the counter top.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Closure at walls.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Bracing.) Tj -18 -14.4 TD (t.) Tj 13.44 0 TD (Compare all guages of metals with guages approved on) Tj -36.96 -7.2 TD (shop drawings.) Tj 23.52 -14.4 TD (u.) Tj 13.44 0 TD (Determine that all equipment is easy to clean.) Tj -13.44 -14.4 TD (v.) Tj 13.44 0 TD (Check equipment drawers for corrosion-resisting steel) Tj -36.96 -7.2 TD (sides, roller bearings, and the amount of play.) Tj 23.52 -14.4 TD (w.) Tj 13.44 0 TD (Check size of drawer to see that they have the) Tj -36.96 -7.2 TD (specified stop.) Tj 23.52 -14.4 TD (x.) Tj 13.44 0 TD (Check sliding doors for construction, size, type, and) Tj -36.96 -7.2 TD (ease of operation.) Tj 23.52 -14.4 TD (y.) Tj 13.44 0 TD (Check all hardware for type of material and finish.) Tj -13.44 -14.4 TD (z.) Tj 13.44 0 TD (Inspect sinks for:) Tj -13.44 -14.4 TD (\(1\)) Tj 18 0 TD (Specified fixtures and trim.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Overflow fittings.) Tj ET endstream endobj 86 0 obj <>/ProcSet 376 0 R>>/Rotate 0/Type/Page>> endobj 87 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 122.88 -488.64 TD (13D-18) Tj -95.76 469.2 TD (\(3\)) Tj 18 0 TD (Special features required.) Tj -18 -14.4 TD (aa.) Tj 18 0 TD (Examine all hoods for:) Tj -18 -14.4 TD (\(1\)) Tj 18 0 TD (Corrosion resisting steel construction.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Freedom from vibration.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Method of hanging.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Grease filters.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Method of connecting to duct.) Tj -18 -14.4 TD (ab.) Tj 18 0 TD (Determine that each piece of equipment is continually) Tj -41.52 -7.2 TD (protected and that it is cleaned prior to turn over to the using) Tj 0 -7.2 TD (agency.) Tj 23.52 -14.4 TD (ac.) Tj 18 0 TD (Require an instruction book with each piece of) Tj -41.52 -7.2 TD (equipment.) Tj 23.52 -14.4 TD (ad.) Tj 18 0 TD (Require special tools be furnished, if specified.) Tj -18 -14.4 TD (ae.) Tj 18 0 TD (Require operational tests for each piece of equipment.) Tj -41.52 -7.2 TD (Make a record of your findings.) Tj 23.52 -14.4 TD (af.) Tj 18 0 TD (When specified, assure that an experienced engineer) Tj -41.52 -7.2 TD (from the manufacturer) Tj 85.68 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s plant is present to supervise the) Tj -89.76 -7.2 TD (equipment installation and testing.) Tj ET endstream endobj 88 0 obj <>/ProcSet 90 0 R>>/Rotate 0/Type/Page>> endobj 89 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 150.96 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (i) Tj -20.4 469.2 TD (CHAPTER 14A) Tj ET 130.56 505.68 44.88 0.72 re f BT 134.64 492.72 TD (ELEVATORS) Tj ET 134.64 491.28 36.72 0.72 re f BT 142.8 478.32 TD (INDEX) Tj -88.8 -14.4 TD (Para.) Tj ET 54 462.48 20.4 0.72 re f BT 144 463.92 TD (Title) Tj ET 144 462.48 20.4 0.72 re f BT 243.12 463.92 TD (Page) Tj ET 243.12 462.48 16.32 0.72 re f BT 54 449.52 TD (14A-01) Tj 49.44 0 TD (GENERAL) Tj 139.68 0 TD (14A-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Coordination of Work) Tj 121.68 0 TD (14A-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Layout) Tj 121.68 0 TD (14A-l) Tj -189.12 -14.4 TD (14A-02) Tj 49.44 0 TD (MATERIAL) Tj 139.68 0 TD (14A-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Shop Drawings) Tj 121.68 0 TD (14A-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Spare Parts Data) Tj 121.68 0 TD (14A-2) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Operating and Maintenance) Tj 0 -7.2 TD (Instructions) Tj 121.68 0 TD (14A-2) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Storage and Handling) Tj 121.68 0 TD (14A-2) Tj -189.12 -14.4 TD (14A-03) Tj 49.44 0 TD (INSTALLATION AND TESTING OF ELECTRICAL) Tj 0 -7.2 TD (AND HYDRAULIC ELEVATORS) Tj 139.68 0 TD (14A-2) Tj ET endstream endobj 90 0 obj [/PDF/Text] endobj 91 0 obj <>/ProcSet 377 0 R>>/Rotate 0/Type/Page>> endobj 92 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (14A-1) Tj -12.24 469.2 TD (CHAPTER 14A) Tj ET 130.56 505.68 44.88 0.72 re f BT 134.64 492.72 TD (ELEVATORS) Tj ET 134.64 491.28 36.72 0.72 re f BT 21.6 478.32 TD (14A-01 ) Tj 32.64 0 TD (GENERAL) Tj ET 54.24 476.88 28.56 0.72 re f BT 45.12 463.92 TD (a.) Tj 13.44 0 TD (Coordination of Work) Tj ET 58.56 462.48 81.6 0.72 re f BT 45.12 449.52 TD (\(1\)) Tj 18 0 TD (This chapter covers the installation and testing of) Tj -41.52 -7.2 TD (Electric Elevators and Hydraulic Elevators. See Chapter 16A and) Tj 0 -7.2 TD (NEC 70\227ARTICLE-620, for Electrical; Chapter 5A for Structural) Tj T* (Steel; and Chapter 5B for Welding.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (The contract drawings indicate general layout and) Tj -41.52 -7.2 TD (components of the elevators. Approved shop drawings will provide) Tj 0 -7.2 TD (necessary information for installation of the particular) Tj T* (elevator selected for the project.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Elevator installation is a speciality trade. Elevator) Tj -41.52 -7.2 TD (installation mechanics must have a minimum of two years) Tj 0 -7.2 TD (experience on type of elevator specified. Close coordination is) Tj T* (required between contractor) Tj 110.16 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s CQC organization and the) Tj -114.24 -7.2 TD (supervisor installing the elevator.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Checks should be made to detect and avoid any conflict) Tj -41.52 -7.2 TD (between the elevator layout and the structure. Conduits and) Tj 0 -7.2 TD (pipes will not be run through the elevator shaft.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (In cases of hydraulic elevators, the installation must) Tj -41.52 -7.2 TD (be started early enough in the construction period so that) Tj 0 -7.2 TD (installation may be made of the hydraulic casing.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (3-Phase inspections and meetings will be held with CQC) Tj -41.52 -7.2 TD (representative and elevator installer representative to assure) Tj 0 -7.2 TD (that quality work designed into the project is being obtained.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (When structural or load bearing members are to be) Tj -41.52 -7.2 TD (field welded, welding and qualification of welders shall be as) Tj 0 -7.2 TD (specified in section: Welding, Structural.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Layout) Tj ET 58.56 217.68 24.48 0.72 re f BT 45.12 204.72 TD (\(1\)) Tj 18 0 TD (The contractor must provide elevator equipment room) Tj -41.52 -7.2 TD (layout drawings which must be reviewed and approved prior to) Tj 0 -7.2 TD (installation of equipment.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check layout of elevator equipment room for space to) Tj -41.52 -7.2 TD (maintain and repair the electrical and mechanical equipment.) Tj 0 -14.4 TD (14A-02 ) Tj 32.64 0 TD (MATERIALS) Tj ET 54.24 152.88 36.72 0.72 re f BT 45.12 139.92 TD (a.) Tj 13.44 0 TD (Shop Drawings) Tj ET 58.56 138.48 53.04 0.72 re f BT 45.12 125.52 TD (\(1\)) Tj 18 0 TD (Shop drawings will provide necessary erection details.) Tj -41.52 -7.2 TD (They will include a complete list of equipment and materials,) Tj 0 -7.2 TD (including illustrations, schedules, manufacturer) Tj 195.84 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s descriptive) Tj -199.92 -7.2 TD (literature, performance charts, catalog cuts, installation) Tj 0 -7.2 TD (instruction, brochures, diagrams, fabrication instructions,) Tj T* (dimensioned layouts in plan and elevation showing the) Tj T* (arrangement of the elevator equipment.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Compare the shop drawings closely with the contract) Tj -41.52 -7.2 TD (requirements contained in the plans and specifications.) Tj ET endstream endobj 93 0 obj <>/ProcSet 377 0 R>>/Rotate 0/Type/Page>> endobj 94 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (14A-2) Tj -97.68 469.2 TD (\(3\)) Tj 18 0 TD (Become familiar with the shop drawing and contract) Tj -41.52 -7.2 TD (requirements prior to each phase in particular for the) Tj 0 -7.2 TD (preparatory meeting and initial inspection. Refresh your memory) Tj T* (by referring to these documents as follow\227on inspections are) Tj T* (made.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Spare Parts Data) Tj ET 58.56 462.48 65.28 0.72 re f BT 45.12 449.52 TD (Prior to beneficial occupancy \(B.O.\) the contractor shall) Tj -23.52 -7.2 TD (provide a complete list of parts and supplies, with the current) Tj 0 -7.2 TD (unit prices and source of supply. This information will be) Tj T* (turned over at time of B.O.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Operating and Maintenance Instructions) Tj ET 58.56 412.08 155.04 0.72 re f BT 45.12 399.12 TD (The contractor will furnish complete copies of operating) Tj -23.52 -7.2 TD (instructions, maintenance instructions, operator training for) Tj 0 -7.2 TD (using agency personnel, and will post where directed, framed) Tj T* (instructions and wiring and control diagrams showing the) Tj T* (complete layout of the entire system. Upon completion of testing) Tj T* (he will provide test results in booklet form, showing all field) Tj T* (tests performed to adjust each component, and all field tests) Tj T* (performed to prove compliance with the specified performance) Tj T* (criteria.) Tj 23.52 -14.4 TD (d.) Tj 13.44 0 TD (Storage and Handling) Tj ET 58.56 325.68 81.6 0.72 re f BT 45.12 312.72 TD (\(1\)) Tj 18 0 TD (Insure that materials are new, handled safely and) Tj -41.52 -7.2 TD (carefully to prevent damages and are the source as approved.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Reject damaged and nonconforming materials. Have) Tj -41.52 -7.2 TD (damaged coatings repaired.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Check for storage off the ground. Assure weather tight) Tj -41.52 -7.2 TD (storage to protect finished materials, equipment, and panels.) Tj 0 -14.4 TD (14A-03 ) Tj 32.64 0 TD (INSTALLATION AND TESTING OF ELECTRICAL AND HYDRAULIC) Tj ET 54.24 246.48 212.16 0.72 re f BT 21.6 240.72 TD (ELEVATORS) Tj ET 21.6 239.28 36.72 0.72 re f BT 58.32 240.72 TD 0 Tc -0.096 Tw ( ) Tj -13.2 -14.4 TD -0.096 Tc 0 Tw (a.) Tj 13.44 0 TD (See that structural steel framing and guide rails are) Tj -36.96 -7.2 TD (plumb and secured as required.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (See that contractor has checked equipment dimensions) Tj -36.96 -7.2 TD (against the space available, and checked to see if shaft is) Tj 0 -7.2 TD (plumb.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Compare the features of the delivered equipment with) Tj -36.96 -7.2 TD (the approved shop drawings.) Tj 23.52 -11.52 TD (d.) Tj 13.44 0 TD (Check for required accessories such as fan, telephone,) Tj -36.96 -7.2 TD (light fixtures, convenience outlets, wrenches, direction-light) Tj 0 -7.2 TD (jewels, etc.) Tj 23.52 -11.52 TD (e.) Tj 13.44 0 TD (Provide steel casing larger than diameter of hydraulic) Tj -36.96 -7.2 TD (elevator) Tj 32.64 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s cylinder. The casing shall be accurately positioned,) Tj -36.72 -7.2 TD (plumbed, and set to accept the cylinder. Prior to setting) Tj 0 -7.2 TD (cylinder in casing, the entire outside surface of the cylinder) Tj T* (shall be protected from corrosion by the application) Tj T* (of double-wrapped layers of isolation material recommend by the) Tj T* (manufacturer. The area between the casing and the cylinder wall) Tj T* (shall be filled with dry sand after the cylinder has been) Tj T* (accurately located. Seal top of casing. The work of boring the) Tj T* (well and setting the cylinder shall be coordinated with) Tj T* (construction of concrete pit.) Tj ET endstream endobj 95 0 obj <>/ProcSet 377 0 R>>/Rotate 0/Type/Page>> endobj 96 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (14A-3) Tj -97.68 469.2 TD (f.) Tj 13.44 0 TD (Verify that ferrous metal meets salt-spray fog test,) Tj -36.96 -7.2 TD (and that stainless steel panels are used where specified.) Tj 23.52 -14.4 TD (g.) Tj 13.44 0 TD (Make sure that protection guards are provided for) Tj -36.96 -7.2 TD (moving parts, this includes shafts, keys, setscrews, belts,) Tj 0 -7.2 TD (sprockets, and chains.) Tj 23.52 -14.4 TD (h.) Tj 13.44 0 TD (Check contract installation requirements against the) Tj -36.96 -7.2 TD (manufacturer) Tj 48.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s recommendations. Call to your supervisor) Tj 171.36 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s) Tj -228.48 -7.2 TD (attention any differences.) Tj 23.52 -14.4 TD (i.) Tj 13.44 0 TD (Check anchor bolts and conduits for proper location.) Tj -13.44 -14.4 TD (j.) Tj 13.44 0 TD (Check elevator mechanics and welders qualifications.) Tj -13.44 -14.4 TD (k.) Tj 13.44 0 TD (Carefully check all installations for stability,) Tj -36.96 -7.2 TD (specified connections, anchorage, etc.) Tj 23.52 -14.4 TD (l.) Tj 13.44 0 TD (Determine the type of lubrication required, and examine) Tj -36.96 -7.2 TD (equipment for same.) Tj 23.52 -14.4 TD (m.) Tj 13.44 0 TD (See that spare parts data is provided for each item of) Tj -36.96 -7.2 TD (equipment.) Tj 23.52 -14.4 TD (n.) Tj 13.44 0 TD (Operate elevator to determine responsiveness. See that) Tj -36.96 -7.2 TD (manufacturer) Tj 48.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s name plate is in a conspicuous location. Check) Tj -53.04 -7.2 TD (all control lights, both inside the cab and at elevator) Tj 0 -7.2 TD (landings.) Tj 23.52 -14.4 TD (o.) Tj 13.44 0 TD (Check all safety features. Determine if contract) Tj -36.96 -7.2 TD (requires a break-in period, operated by the contractor.) Tj 23.52 -14.4 TD (p.) Tj 13.44 0 TD (Installation or hoisting or lifting machinery may) Tj -36.96 -7.2 TD (require that construction of certain floor and/or wall areas be) Tj 0 -7.2 TD (deferred until installation is completed.) Tj 23.52 -14.4 TD (q.) Tj 13.44 0 TD (Guard open shaftways until doors are provided.) Tj -13.44 -14.4 TD (r.) Tj 13.44 0 TD (Inspect hoisting cables after installation for possible) Tj -36.96 -7.2 TD (damage during the construction operation. For hydraulic) Tj 0 -7.2 TD (elevators also inspect the hydraulic lifting device after) Tj T* (installation.) Tj 23.52 -14.4 TD (s.) Tj 13.44 0 TD (Assure that required tests are performed in compliance) Tj -36.96 -7.2 TD (with ASME AID.1 and that all data is recorded. Obtain copies of) Tj 0 -7.2 TD (all tests with certification that the elevator are properly) Tj T* (installed and are in proper operating condition.) Tj 23.52 -14.4 TD (t.) Tj 13.44 0 TD (Check certification by elevator inspector per AR) Tj -36.96 -7.2 TD (420\22715.) Tj 36.96 0 TD (See that the safety certification is mounted in the cab) Tj -36.96 -7.2 TD (and under glass.) Tj 23.52 -14.4 TD (u.) Tj 13.44 0 TD (Check contract requirements for homing of elevator) Tj -36.96 -7.2 TD (after last call. Check specified door opening time. Check) Tj 0 -7.2 TD (sequence required when a multi-elevator installation is made.) Tj ET endstream endobj 97 0 obj <>/ProcSet 99 0 R>>/Rotate 0/Type/Page>> endobj 98 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 150.96 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (i) Tj -20.4 469.2 TD (CHAPTER 14B) Tj ET 130.56 505.68 44.88 0.72 re f BT 118.32 492.72 TD (HOISTS AND CRANES) Tj ET 118.32 491.28 69.36 0.72 re f BT 142.8 478.32 TD (INDEX) Tj -88.8 -14.4 TD (Para.) Tj ET 54 462.48 20.4 0.72 re f BT 144 463.92 TD (Title) Tj ET 144 462.48 20.4 0.72 re f BT 243.12 463.92 TD (Page) Tj ET 243.12 462.48 16.32 0.72 re f BT 54 449.52 TD (14B-01) Tj 49.44 0 TD (GENERAL) Tj 139.68 0 TD (14B-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Coordination of Work) Tj 121.68 0 TD (14B-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Verification of Dimensions) Tj 121.68 0 TD (14B-1) Tj -189.12 -14.4 TD (14B-02) Tj 49.44 0 TD (MATERIALS) Tj 139.68 0 TD (14B-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Submittals) Tj 121.68 0 TD (14B-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Manufacturer) Tj 48.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s) Tj -53.04 -7.2 TD (Representative) Tj 121.68 0 TD (14B-1) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Operator Training) Tj 0 -7.2 TD (Instructions) Tj 121.68 0 TD (14B-1) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Delivery and Storage) Tj 121.68 0 TD (14B-2) Tj -189.12 -14.4 TD (14B-03) Tj 49.44 0 TD (ERECTION AND TESTING) Tj 139.68 0 TD (14B-2) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Structural) Tj 121.68 0 TD (14B-2) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Mechanical Alignment) Tj 121.68 0 TD (14B-2) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Electrical Alignment) Tj 121.68 0 TD (14B-3) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Testing) Tj 121.68 0 TD (14B-3) Tj ET endstream endobj 99 0 obj [/PDF/Text] endobj 100 0 obj <>/ProcSet 378 0 R>>/Rotate 0/Type/Page>> endobj 101 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (14B-1) Tj -12.24 469.2 TD (CHAPTER 14B) Tj ET 130.56 505.68 44.88 0.72 re f BT 118.32 492.72 TD (HOISTS AND CRANES) Tj ET 118.32 491.28 69.36 0.72 re f BT 21.6 478.32 TD (14B-01 ) Tj 32.64 0 TD (GENERAL) Tj ET 54.24 476.88 28.56 0.72 re f BT 45.12 463.92 TD (a.) Tj 13.44 0 TD (Coordination of Work) Tj ET 58.56 462.48 81.6 0.72 re f BT 45.12 449.52 TD (\(1\)) Tj 18 0 TD (This chapter covers the installation and testing of) Tj -41.52 -7.2 TD (Hoists and Cranes. See Chapter 16A and NEC70-Article-620, for) Tj 0 -7.2 TD (Electrical; Chapter 5A for Structural Steel; and Chapter 5B for) Tj T* (Welding.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (The contract drawings indicate general layout and) Tj -41.52 -7.2 TD (components of the cranes and hoists. Approved shop drawings will) Tj 0 -7.2 TD (provide necessary information for installation of the particular) Tj T* (hoist or crane selected for the project.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Hoists and crane installation is a specialty trade.) Tj -41.52 -7.2 TD (Major assemblies of the crane shall be shop assembled as) Tj 0 -7.2 TD (completely as possible. Welders, welding operators and welding) Tj T* (procedures shall be qualified or prequalified in accordance with) Tj T* (AWSD1.1. Close coordination is required between the contractor) Tj 252.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s) Tj -257.04 -7.2 TD (QC representative, the crane and hoist contractor, and the) Tj 0 -7.2 TD (manufacturer.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Verification of Dimensions) Tj ET 58.56 318.48 106.08 0.72 re f BT 45.12 305.52 TD (The contractor shall verify all dimensions in the field) Tj -23.52 -7.2 TD (and shall advise the contracting officer of any discrepancy) Tj 0 -7.2 TD (before performing any work.) Tj 0 -14.4 TD (14B-02 ) Tj 32.64 0 TD (MATERIALS) Tj ET 54.24 275.28 36.72 0.72 re f BT 45.12 262.32 TD (a.) Tj 13.44 0 TD (Submittals) Tj ET 58.56 260.88 40.8 0.72 re f BT 45.12 247.92 TD (\(1\)) Tj 18 0 TD (Shop drawings shall consist of a complete list of) Tj -41.52 -7.2 TD (equipment and materials, including manufacturer) Tj 191.76 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s descriptive) Tj -195.84 -7.2 TD (and technical literature, performance charts and curves, catalog) Tj 0 -7.2 TD (cuts, and installation instructions. Shop drawings shall also) Tj T* (contain complete wiring and schematic diagrams and coordination) Tj T* (details for proper function of unit.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Spare parts data shall be furnished for each different) Tj -41.52 -7.2 TD (item of material and equipment specified.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Operations and Maintenance manuals and instructions) Tj -41.52 -7.2 TD (will be provided.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Performance Test Reports will be submitted, upon) Tj -41.52 -7.2 TD (completion and testing of the installed system, in booklet form) Tj 0 -7.2 TD (to prove compliance with the specified performance criteria.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Manufacturer) Tj 48.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s Representative) Tj ET 58.56 124.08 118.32 0.72 re f BT 45.12 111.12 TD (The manufacturer) Tj 65.28 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s representative shall supervise the) Tj -92.88 -7.2 TD (installation, adjusting, and testing of the cranes and hoists.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Operator Training Instructions) Tj ET 58.56 88.08 122.4 0.72 re f BT 45.12 75.12 TD (A field training course shall be provided for designated) Tj -23.52 -7.2 TD (operating staff members. The course will cover all items) Tj 0 -7.2 TD (contained in the Operations and Maintenance Instructions.) Tj ET endstream endobj 102 0 obj <>/ProcSet 378 0 R>>/Rotate 0/Type/Page>> endobj 103 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (14B-2) Tj -97.68 469.2 TD (d.) Tj 13.44 0 TD (Delivery and Storage) Tj ET 58.56 505.68 81.6 0.72 re f BT 45.12 492.72 TD (Equipment when delivered will be stored with protection) Tj -23.52 -7.2 TD (from the weather, humidity, temperature variations, dirt, dust,) Tj 0 -7.2 TD (or other contaminants) Tj 0 -14.4 TD (14B-03 ) Tj 32.64 0 TD (ERECTION AND TESTING) Tj ET 54.24 462.48 81.6 0.72 re f BT 45.12 449.52 TD (a.) Tj 13.44 0 TD (Structural) Tj ET 58.56 448.08 40.8 0.72 re f BT 45.12 435.12 TD (\(1\)) Tj 18 0 TD (Check TM 5-809-10 to determine seismic considerations) Tj -41.52 -7.2 TD (for your construction site. Review Chapter 13, Seismic Design of) Tj 0 -7.2 TD (Buildings. Tell your supervisor if lateral restraints or hold) Tj T* (down clamps are required but not provided for.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Structural bolted connections shall be made with ASTM) Tj -41.52 -7.2 TD (A325 bolts. A490 bolts or galvanized bolts shall not be used.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (The bridge rail shall be fastened to the top cover) Tj -41.52 -7.2 TD (plate with welded clips. Bridge rail joints shall be bolted) Tj 0 -7.2 TD (using standard joint bars. Rail joints shall be staggered. A) Tj T* (positive stop shall be provided at the bridge rail ends to) Tj T* (prevent creep.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Provide structural trolley stops on the bridge to) Tj -41.52 -7.2 TD (engage the trolley wheels, and locate to permit maximum trolley) Tj 0 -7.2 TD (travel. Bumpers shall be the spring or hydraulic type for the) Tj T* (bridge or trolley.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Compare the name plate capacity of equipment with) Tj -41.52 -7.2 TD (specified requirements.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Check track for:) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Size of members.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Method of supporting and anchoring.) Tj -18 -14.4 TD (\(c\)) Tj 18 0 TD (Stability and minimum sway.) Tj -18 -14.4 TD (\(d\)) Tj 18 0 TD (Being level and parallel.) Tj -18 -14.4 TD (\(e\)) Tj 18 0 TD (End-of-track stops or bumpers.) Tj -18 -14.4 TD (\(f\)) Tj 18 0 TD (The way wheels ride on track.) Tj -18 -14.4 TD (\(7\)) Tj 18 0 TD (Confirm that clearances are provided for required) Tj -41.52 -7.2 TD (operation.) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (Check welding and bolted connections of members.) Tj -18 -14.4 TD (\(9\)) Tj 18 0 TD (Insure that erection procedures for crane will not) Tj -41.52 -7.2 TD (cause internal stresses, forced or improvised fits,) Tj 0 -7.2 TD (misalignments, nicks of high strength structural steel) Tj T* (components, stress-raising welds, and rough burrs.) Tj 23.52 -14.4 TD (\(10\)) Tj 22.32 0 TD (After crane is erected any damaged paint surfaces) Tj -45.84 -7.2 TD (shall be cleaned and repainted.) Tj 23.52 -11.52 TD (b.) Tj 13.44 0 TD (Mechanical Alignment) Tj ET 58.56 83.76 81.6 0.72 re f BT 45.12 73.68 TD (All motors, couplings, brakes, gear boxes, and drive) Tj -23.52 -7.2 TD (components shall be aligned when reinstalled, in accordance with) Tj 0 -7.2 TD (the manufacturer) Tj 65.28 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s tolerances.) Tj ET endstream endobj 104 0 obj <>/ProcSet 378 0 R>>/Rotate 0/Type/Page>> endobj 105 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (14B-3) Tj -97.68 469.2 TD (c.) Tj 13.44 0 TD (Electrical Alignment) Tj ET 58.56 505.68 81.6 0.72 re f BT 45.12 492.72 TD (\(1\)) Tj 18 0 TD (The control system shall be aligned in accordance with) Tj -41.52 -7.2 TD (the manufacturer) Tj 65.28 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s instructions. Alignment data shall include) Tj -69.36 -7.2 TD (the following:) Tj 23.52 -14.4 TD (\(a\)) Tj 18 0 TD (Timer settings) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Resistor tap settings) Tj -18 -14.4 TD (\(c\)) Tj 18 0 TD (Pot settings) Tj -18 -14.4 TD (\(d\)) Tj 18 0 TD (Test point voltages) Tj -18 -14.4 TD (\(e\)) Tj 18 0 TD (Supply voltages) Tj -18 -14.4 TD (\(f\)) Tj 18 0 TD (Motor voltages) Tj -18 -14.4 TD (\(g\)) Tj 18 0 TD (Motor currents) Tj -18 -14.4 TD (\(h\)) Tj 18 0 TD (Test conditions, such as ambient temperature, motor) Tj -41.52 -7.2 TD (load, date performed, and person performing the alignment.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (A copy of the final alignment data shall be stored in) Tj -41.52 -7.2 TD (control panel door.) Tj 23.52 -14.4 TD (d.) Tj 13.44 0 TD (Testing) Tj ET 58.56 318.48 28.56 0.72 re f BT 45.12 305.52 TD (\(1\)) Tj 18 0 TD (Check ease of operating equipment.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Determine that all the various speeds can he obtained.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Check if all safety devices such as lift switches,) Tj -41.52 -7.2 TD (brakes, etc., have been furnished, connected, and function as) Tj 0 -7.2 TD (designed.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (See that specified tests are performed and recorded.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (The contractor shall provide all personnel necessary) Tj -41.52 -7.2 TD (to conduct the tests including but not limited to crane) Tj 0 -7.2 TD (operators, riggers, rigging gear, and test weights. Tests will) Tj T* (be performed in the presence of the Government representatives.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Test sequence shall be in accordance to specified) Tj -41.52 -7.2 TD (procedure.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Test data shall be recorded on appropriate test record) Tj -41.52 -7.2 TD (forms for retention for the life of the crane. Recorded values) Tj 0 -7.2 TD (shall be compared with design specifications or manufacturer) Tj 244.8 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s) Tj -248.88 -7.2 TD (recommended values.) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (Equipment monitoring. During load test, check for) Tj -41.52 -7.2 TD (improper operation or poor condition of safety devices,) Tj 0 -7.2 TD (electrical components, mechanical equipment and structural) Tj T* (assemblies. Report all defects to test supervisor immediately.) Tj 23.52 -14.4 TD (\(9\)) Tj 18 0 TD (Check specifications for specific tests to be) Tj -41.52 -7.2 TD (conducted.) Tj ET endstream endobj 106 0 obj <>/ProcSet 108 0 R>>/Rotate 0/Type/Page>> endobj 107 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 150.96 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (i) Tj -20.4 469.2 TD (CHAPTER 14C) Tj ET 130.56 505.68 44.88 0.72 re f BT 104.16 492.72 TD (MATERIAL HANDLING SYSTEM) Tj ET 104.16 491.28 97.92 0.72 re f BT 142.8 478.32 TD (INDEX) Tj -88.8 -14.4 TD (Para.) Tj ET 54 462.48 20.4 0.72 re f BT 144 463.92 TD (Title) Tj ET 144 462.48 20.4 0.72 re f BT 243.12 463.92 TD (Page) Tj ET 243.12 462.48 16.32 0.72 re f BT 54 449.52 TD (14C-01) Tj 49.44 0 TD (GENERAL) Tj 139.68 0 TD (14C-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Coordination of Work) Tj 121.68 0 TD (14C-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Verification of Dimensions) Tj 121.68 0 TD (14C-1) Tj -189.12 -14.4 TD (14C-02) Tj 49.44 0 TD (MATERIALS) Tj 139.68 0 TD (14C-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Submittals) Tj -18 -7.2 TD (b.) Tj 18 0 TD (Manufacturer) Tj 48.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s) Tj 68.64 0 TD (14C-1) Tj -121.68 -7.2 TD (Representative) Tj 121.68 0 TD (14C-2) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Delivery and Storage) Tj 121.68 0 TD (14C-2) Tj -189.12 -14.4 TD (14C-03) Tj 49.44 0 TD (ERECTION AND TESTING) Tj 139.68 0 TD (14C-2) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Erection) Tj 121.68 0 TD (14C-2) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Testing) Tj 121.68 0 TD (14C-3) Tj ET endstream endobj 108 0 obj [/PDF/Text] endobj 109 0 obj <>/ProcSet 379 0 R>>/Rotate 0/Type/Page>> endobj 110 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 45.12 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (14C-1) Tj -12.24 462 TD (CHAPTER 14C) Tj ET 130.56 505.68 44.88 0.72 re f BT 104.16 492.72 TD (MATERIAL HANDLING SYSTEM) Tj ET 104.16 491.28 97.92 0.72 re f BT 21.6 478.32 TD (14C-01 ) Tj 32.64 0 TD (GENERAL) Tj ET 54.24 476.88 28.56 0.72 re f BT 45.12 463.92 TD (a.) Tj 13.44 0 TD (Coordination of the Work) Tj ET 58.56 462.48 97.92 0.72 re f BT 45.12 449.52 TD (\(1\)) Tj 18 0 TD (This chapter covers the installation and testing of) Tj -41.52 -7.2 TD (freight handling equipment, prefabricated chutes, conveyors,) Tj 0 -7.2 TD (gravity rollers, power belts, and other devices for transfer of) Tj T* (bulk or package materials. System includes associated) Tj T* (components, hardware, control, and safety equipment.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (The installation of a material handling system) Tj -41.52 -7.2 TD (requires close coordination between structural, mechanical, and) Tj 0 -7.2 TD (electrical work. The CQC representative must insure that the) Tj T* (material handling equipment is designed to fit into the space) Tj T* (available; that it is delivered in time so as not to hold up the) Tj T* (construction work, and that the necessary walls, columns, or) Tj T* (roof areas are left open to allow entry into the structure of) Tj T* (the material handling equipment.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Shop drawing reviews must include determination if) Tj -41.52 -7.2 TD (space is available for future maintenance, operation, and) Tj 0 -7.2 TD (subsequent replacement of worn equipment. Location of anchor) Tj T* (bolts, and connections for utilities must be checked and assured) Tj T* (prior to placement.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Seismic considerations required by the design and the) Tj -41.52 -7.2 TD (seismic zone must be incorporated into the work. Carefully check) Tj 0 -7.2 TD (contract requirements and shop drawings for the requirement for) Tj T* (seismic bracing, supports, snubbers, and springs.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Verification of Dimensions) Tj ET 58.56 260.88 106.08 0.72 re f BT 45.12 247.92 TD (\(1\)) Tj 18 0 TD (Verify opening sizes and locations, anchor bolt size) Tj -41.52 -7.2 TD (and location, foundation pads, equipment isolation and vibration) Tj 0 -7.2 TD (elimination means. Check shop drawing requirements against) Tj T* (contract drawings. Advise your supervisor if errors are) Tj T* (detected.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Verify structural clearances such as overhead beams) Tj -41.52 -7.2 TD (and girders, clear span between columns, and wall spacing.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Coordinate electrical and mechanical work to insure) Tj -41.52 -7.2 TD (needed equipment clearances.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Some automated material handling equipment will) Tj -41.52 -7.2 TD (require close tolerance of concrete floors, so that the) Tj 0 -7.2 TD (equipment can service the storage bins without tilting or) Tj T* (leaning of the automated material handling equipment.) Tj 0 -14.4 TD (14C-02 ) Tj 32.64 0 TD (Materials) Tj ET 54.24 124.08 36.72 0.72 re f BT 45.12 111.12 TD (a.) Tj 13.44 0 TD (Submittals) Tj ET 58.56 109.68 40.8 0.72 re f BT 45.12 96.72 TD (\(1\)) Tj 18 0 TD (Shop drawings shall consist of a complete list of) Tj -41.52 -7.2 TD (equipment and materials, including manufacturer) Tj 191.76 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s descriptive) Tj -195.84 -7.2 TD (and technical literature, performance charts and curves, catalog) Tj 0 -7.2 TD (cuts, and installation instructions. Shop drawings shall also) Tj T* (contain complete structural, electrical, and mechanical layouts,) Tj ET endstream endobj 111 0 obj <>/ProcSet 379 0 R>>/Rotate 0/Type/Page>> endobj 112 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -481.44 TD (14C-2) Tj -121.2 462 TD (schematic diagrams, and coordination details for installation of) Tj 0 -7.2 TD (the components and system.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Spare parts data shall be furnished for each different) Tj -41.52 -7.2 TD (item of material and equipment specified.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Systems operating and maintenance manuals and) Tj -41.52 -7.2 TD (instructions will be provided.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Performance test reports will be submitted, upon) Tj -41.52 -7.2 TD (completion and testing of the installed system, in booklet form,) Tj 0 -7.2 TD (to prove compliance with the specified performance criteria.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Manufacturer) Tj 48.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s representative) Tj ET 58.56 412.08 118.32 0.72 re f BT 45.12 399.12 TD (Check requirements for manufacturer) Tj 142.8 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s representative to) Tj -170.4 -7.2 TD (supervise installation, adjusting, and testing of the material) Tj 0 -7.2 TD (handling system.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Delivery and Storage) Tj ET 58.56 368.88 81.6 0.72 re f BT 45.12 355.92 TD (Equipment, plates, and units when delivered will be stored) Tj -23.52 -7.2 TD (with protection from the weather, humidity, temperature) Tj 0 -7.2 TD (variations, dirt, dust, or other contaminants. Deliveries should) Tj T* (be scheduled to minimize job site storage whenever possible.) Tj 0 -14.4 TD (14C-03 ) Tj 32.64 0 TD (Erection and Testing) Tj ET 54.24 318.48 81.6 0.72 re f BT 45.12 305.52 TD (a.) Tj 13.44 0 TD (Erection) Tj ET 58.56 304.08 32.64 0.72 re f BT 45.12 291.12 TD (\(1\)) Tj 18 0 TD (Check TM 5-809-10 to determine seismic considerations) Tj -41.52 -7.2 TD (for your construction site, Tell your supervisor if required) Tj 0 -7.2 TD (reinforcing or restraints are not provided for in the contract) Tj T* (for the structure and the material handling system.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check shop drawings and contract drawings to insure) Tj -41.52 -7.2 TD (proper orientation of the equipment and utilities servicing the) Tj 0 -7.2 TD (equipment.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Check anchor bolt layout, foundations, vibration) Tj -41.52 -7.2 TD (eliminator and restraints.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Install equipment in accordance with installation) Tj -41.52 -7.2 TD (sequence shown in shop drawings and contract drawings.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Compare the name plate capacity of the equipment with) Tj -41.52 -7.2 TD (the specified equipment capacity. Inform your supervisor if) Tj 0 -7.2 TD (variation in capacity is found.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Insure that erection procedures for material handling) Tj -41.52 -7.2 TD (equipment will not cause internal stresses, forced or improvised) Tj 0 -7.2 TD (fits, misalignment, or damage to either the building or the) Tj T* (equipment.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (After equipment is erected any damaged paint surfaces) Tj -41.52 -7.2 TD (shall be cleaned and repainted.) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (All motors, couplings, brakes, gear boxes, and drive) Tj -41.52 -7.2 TD (components shall be aligned when installed at the site, in) Tj 0 -7.2 TD (accordance with the manufacturer) Tj 130.56 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s tolerances, for mechanical) Tj -134.64 -7.2 TD (alignment.) Tj ET endstream endobj 113 0 obj <>/ProcSet 379 0 R>>/Rotate 0/Type/Page>> endobj 114 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 45.12 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (14C-3) Tj -97.68 462 TD (\(9\)) Tj 18 0 TD (The material handling system shall be electrically) Tj -41.52 -7.2 TD (aligned in accordance with the manufacturer) Tj 175.44 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s instructions.) Tj -179.52 -7.2 TD (Alignment data shall include all timer settings, test point) Tj 0 -7.2 TD (voltages, supply voltages, motor voltages, motor currents, and) Tj T* (test conditions such as ambient temperature, motor load, date) Tj T* (performed, and person performing the alignment. Obtain a copy of) Tj T* (the final alignment data.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Testing) Tj ET 58.56 448.08 28.56 0.72 re f BT 45.12 435.12 TD (\(l\)) Tj 18 0 TD (Check ease of operating equipment.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Determine that all the various speeds can be obtained.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Check if all safety devices have been furnished,) Tj -41.52 -7.2 TD (installed, and are operating properly.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (See that specified tests are performed and recorded.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (The contractor shall provide all personnel necessary) Tj -41.52 -7.2 TD (to conduct the tests. Tests will be held in the presence of the) Tj 0 -7.2 TD (Government representative.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Test data shall be recorded and evaluated by) Tj -41.52 -7.2 TD (manufacturer) Tj 48.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s representative. Verification will be given that) Tj -53.04 -7.2 TD (units are installed and operate in the manner designed. Obtain) Tj 0 -7.2 TD (copies of all test reports and data.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Recorded values shall be compared with design) Tj -41.52 -7.2 TD (specification or manufacturer) Tj 118.32 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s recommended values. Inform your) Tj -122.4 -7.2 TD (supervisor any improper values obtained during testing.) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (During operating and load tests check for improper) Tj -41.52 -7.2 TD (operation or poor condition of safety devices, electrical) Tj 0 -7.2 TD (components, mechanical equipment, and structural assemblies.) Tj T* (Report all defects to test supervisor immediately.) Tj 23.52 -14.4 TD (\(9\)) Tj 18 0 TD (Check specifications for specific tests to be) Tj -41.52 -7.2 TD (conducted.) Tj ET endstream endobj 115 0 obj <>/ProcSet 117 0 R>>/Rotate 0/Type/Page>> endobj 116 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 150.96 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (i) Tj -20.4 469.2 TD (CHAPTER 15A) Tj ET 130.56 505.68 44.88 0.72 re f BT 124.56 499.92 TD (PIPING SYSTEMS) Tj ET 124.56 498.48 57.12 0.72 re f BT 142.8 485.52 TD (INDEX) Tj -88.8 -14.4 TD (Para.) Tj ET 54 469.68 20.4 0.72 re f BT 144 471.12 TD (Title) Tj ET 144 469.68 20.4 0.72 re f BT 243.12 471.12 TD (Page) Tj ET 243.12 469.68 16.32 0.72 re f BT 54 456.72 TD (15A-01) Tj 49.44 0 TD (GENERAL) Tj 139.68 0 TD (15A-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Coordination of Work) Tj 121.68 0 TD (15A-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Layout) Tj 121.68 0 TD (15A-1) Tj -189.12 -14.4 TD (15A-02) Tj 49.44 0 TD (MATERIALS) Tj 139.68 0 TD (15A-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Submittals) Tj 121.68 0 TD (15A-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Storage and Handling) Tj 121.68 0 TD (15A-2) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Water Pipe and Fittings) Tj 121.68 0 TD (15A-2) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Fuel Gas Pipe and Fittings) Tj 121.68 0 TD (15A-2) Tj -139.68 -7.2 TD (e.) Tj 18 0 TD (Drainage Pipe and Fittings) Tj 121.68 0 TD (15A-3) Tj -139.68 -7.2 TD (f.) Tj 18 0 TD (Heating Pipe and Fittings) Tj 121.68 0 TD (15A-3) Tj -139.68 -7.2 TD (g.) Tj 18 0 TD (Refrigeration and Air) Tj 0 -7.2 TD (Conditioning Pipe and) Tj T* (Fittings) Tj 121.68 0 TD (15A-3) Tj -139.68 -7.2 TD (h.) Tj 18 0 TD (Fire Sprinkler Pipe and) Tj 0 -7.2 TD (Fittings) Tj 121.68 0 TD (15A-3) Tj -189.12 -14.4 TD (15A-03) Tj 49.44 0 TD (INSTALLATION) Tj 139.68 0 TD (15A-4) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (General) Tj 121.68 0 TD (15A-4) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Pipe Connections - Screwed) Tj 121.68 0 TD (15A-5) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Pipe Connections) Tj 0 -7.2 TD (Mechanical) Tj 121.68 0 TD (15A-6) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Pipe Connections Hub &) Tj 0 -7.2 TD (Hubless Types) Tj 121.68 0 TD (15A-6) Tj -139.68 -7.2 TD (e.) Tj 18 0 TD (Pipe Connections) Tj 0 -7.2 TD (Soldered) Tj 121.68 0 TD (15A-7) Tj -139.68 -7.2 TD (f.) Tj 18 0 TD (Pipe Connections - Solvent) Tj 0 -7.2 TD (Cement \(Adhesive\)) Tj 121.68 0 TD (15A-7) Tj -139.68 -7.2 TD (g.) Tj 18 0 TD (Pipe Connections - Welded) Tj 121.68 0 TD (15A-7) Tj -139.68 -7.2 TD (h.) Tj 18 0 TD (Fittings and Valves) Tj 121.68 0 TD (15A-8) Tj -139.68 -7.2 TD (i.) Tj 18 0 TD (Pipelines) Tj 121.68 0 TD (15A-8) Tj -189.12 -14.4 TD (15A-04) Tj 49.44 0 TD (TESTING) Tj 139.68 0 TD (15A-10) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Preparation) Tj 121.68 0 TD (15A-10) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Performing Tests) Tj 121.68 0 TD (15A-11) Tj -189.12 -14.4 TD (15A-05) Tj 49.44 0 TD (CLEANING ADJUSTING) Tj 9.12 -7.2 TD (AND OPERATION) Tj 130.56 0 TD (15A-12) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Cleaning) Tj 121.68 0 TD (15A-12) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Adjusting) Tj 121.68 0 TD (15A-12) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Operations) Tj 121.68 0 TD (15A-13) Tj ET endstream endobj 117 0 obj [/PDF/Text] endobj 118 0 obj <>/ProcSet 380 0 R>>/Rotate 0/Type/Page>> endobj 119 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15A-1) Tj -12.24 469.2 TD (CHAPTER 15A) Tj ET 130.56 505.68 44.88 0.72 re f BT 124.56 492.72 TD (PIPING SYSTEMS) Tj ET 124.56 491.28 57.12 0.72 re f BT 21.6 478.32 TD (15A-01 ) Tj 32.64 0 TD (General) Tj ET 54.24 476.88 28.56 0.72 re f BT 45.12 463.92 TD (a.) Tj 13.44 0 TD (Coordination of Work) Tj ET 58.56 462.48 81.6 0.72 re f BT 45.12 449.52 TD (\(1\)) Tj 18 0 TD (This chapter covers piping for the water, gas,) Tj -41.52 -7.2 TD (drainage, heating, fire sprinkler and refrigeration/air) Tj 0 -7.2 TD (conditioning systems, and condensate \(drainage\) pipelines.) Tj T* (Refrigerator/air conditioning piping includes refrigerant,) Tj T* (condenser and chilled water pipelines.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Drawings indicate general layout. Pipe and equipment) Tj -41.52 -7.2 TD (space and schedule for installation must be coordinated between) Tj 0 -7.2 TD (the various subcontractors doing the work.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Check and eliminate interferences between electrical,) Tj -41.52 -7.2 TD (mechanical, architectural and structural features, especially in) Tj 0 -7.2 TD (equipment rooms, and above ceilings.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Layout) Tj ET 58.56 347.28 24.48 0.72 re f BT 45.12 334.32 TD (\(1\)) Tj 18 0 TD (The contractor will provide equipment and mechanical) Tj -41.52 -7.2 TD (room layout drawings which must be reviewed and approved.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Pipe sleeve layout drawings will be useful. Check for) Tj -41.52 -7.2 TD (clearances and proper sleeve sizes to include the pipe) Tj 0 -7.2 TD (insulation thicknesses.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Check layout for space to operate valves.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Check layout for space to maintain and repair piping,) Tj -41.52 -7.2 TD (especially at equipment spaces.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Check for sufficient space for required swing joints) Tj -41.52 -7.2 TD (at branch connections.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Check space for anchors and expansion loops.) Tj -18 -14.4 TD (\(7\)) Tj 18 0 TD (Check space for support of hangers for piping.) Tj -18 -14.4 TD (\(8\)) Tj 18 0 TD (Check space for slope in pipe lines. Remember that all) Tj -41.52 -7.2 TD (piping systems carrying liquids must be drainable.) Tj 23.52 -14.4 TD (\(9\)) Tj 18 0 TD (Pipe lines should not pass thru footings; locate) Tj -41.52 -7.2 TD (beneath footings before the footings are placed.) Tj 23.52 -14.4 TD (\(10\)) Tj 22.32 0 TD (Check equipment dimension to assure all equipment can) Tj -45.84 -7.2 TD (be removed and replaced thru the doorways provided, once) Tj 0 -7.2 TD (ceiling/roof is installed.) Tj 0 -14.4 TD (15A-02 ) Tj 32.64 0 TD (Materials) Tj ET 54.24 124.08 36.72 0.72 re f BT 45.12 111.12 TD (a.) Tj 13.44 0 TD (Submittals) Tj ET 58.56 109.68 40.8 0.72 re f BT 45.12 96.72 TD (\(1\)) Tj 18 0 TD (These usually include information on compliance with) Tj -41.52 -7.2 TD (specifications using labels, listings or certificates. Shop) Tj 0 -7.2 TD (drawings are required for layout of mechanical rooms and should) Tj T* (include the special support for heavy piping and fittings.) Tj ET endstream endobj 120 0 obj <>/ProcSet 380 0 R>>/Rotate 0/Type/Page>> endobj 121 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (15A-2) Tj -97.68 469.2 TD (\(2\)) Tj 18 0 TD (The mechanical specialist will check submittals for) Tj -41.52 -7.2 TD (compliance with requirements.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (After determining that the submittal is in compliance,) Tj -41.52 -7.2 TD (use its descriptive information to check the material at) Tj 0 -7.2 TD (delivery. You will use the layout drawings to check actual) Tj T* (installation.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Storage and Handling) Tj ET 58.56 448.08 81.6 0.72 re f BT 45.12 435.12 TD (\(l\) Insure that materials are handled safely and carefully) Tj -23.52 -7.2 TD (to prevent damage.) Tj 23.52 -14.4 TD (\(a\)) Tj 18 0 TD (Reject damaged materials.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Have damaged coatings repaired.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Insure proper handling for coated pipe; use wide belt) Tj -41.52 -7.2 TD (slings.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Check for storage off of the ground and weather tight) Tj -41.52 -7.2 TD (storage when required.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Store pipe and fittings to eliminate entry of dirt,) Tj -41.52 -7.2 TD (etc.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Refrigerant pipe is cleaned and capped at the factory.) Tj -41.52 -7.2 TD (The pipe must remain capped in storage.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Check for piping that is factory cleaned and purged) Tj -41.52 -7.2 TD (with inert gas and capped. Check for gas tight capping.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Water Pipe and Fittings) Tj ET 58.56 275.28 93.84 0.72 re f BT 45.12 262.32 TD (\(1\)) Tj 18 0 TD (There are about 23 different pipe materials which can) Tj -41.52 -7.2 TD (be selected for above ground cold water pipelines. Many are) Tj 0 -7.2 TD (plastic materials. Plastic pipes cannot be used in water systems) Tj T* (for buildings greater than two stories in height.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Plastic type pipe cannot extend through the roof or) Tj -41.52 -7.2 TD (through fire rated walls or floors.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (There are almost as many selections for above ground) Tj -41.52 -7.2 TD (hot water pipelines. Check your specifications.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Seamless copper water tube must be hard drawn: Type M) Tj -41.52 -7.2 TD (above ground and Type L below ground.) Tj 23.52 -14.4 TD (d.) Tj 13.44 0 TD (Fuel Gas Pine and Fittings) Tj ET 58.56 160.08 106.08 0.72 re f BT 21.6 154.32 TD (comply with the Fuel Gas Code as given in National Fire) Tj 0 -7.2 TD (Protection Association \(NFPA\) Standard No. V54.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check for permitted pipe options; either all or only) Tj -41.52 -7.2 TD (steel, aluminum alloy, metal tubing and plastic materials may be) Tj 0 -7.2 TD (specified.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Check for specific materials required in insulating) Tj -41.52 -7.2 TD (couplings.) Tj 23.52 -11.52 TD (\(4\)) Tj 18 0 TD (Aluminum alloy tubing and pipe is not permitted) Tj -41.52 -7.2 TD (underground or at exterior locations.) Tj 23.52 -11.52 TD (\(5\)) Tj 18 0 TD (Plastic pipe is not permitted in or under the building) Tj -41.52 -7.2 TD (and is permitted only underground outside of the building.) Tj ET endstream endobj 122 0 obj <>/ProcSet 380 0 R>>/Rotate 0/Type/Page>> endobj 123 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15A-3) Tj -97.68 469.2 TD (\(6\)) Tj 18 0 TD (Check the specifications for ambient temperature) Tj -41.52 -7.2 TD (limitations to the use of plastic pipe.) Tj 23.52 -14.4 TD (e.) Tj 13.44 0 TD (Drainage Pipe and Fittings) Tj ET 58.56 484.08 106.08 0.72 re f BT 45.12 471.12 TD (These consist of the waste system, the stormdrains and) Tj -23.52 -7.2 TD (rainwater conductors and the condensate drainage pipelines from) Tj 0 -7.2 TD (air conditioning and refrigeration units.) Tj 23.52 -14.4 TD (\(1\)) Tj 18 0 TD (There are many optional pipe materials and use is) Tj -41.52 -7.2 TD (dependent on locations in the building and in the drainage) Tj 0 -7.2 TD (system.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Suggest you use the pipe material submittal for) Tj -41.52 -7.2 TD (identification or the pipe material table in the specifications.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Check for drainage pattern type fittings as they are) Tj -41.52 -7.2 TD (required in the wet pipe portion of the waste system.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Hubless cast iron pipe cannot be used underground and) Tj -41.52 -7.2 TD (may not be permitted in crawl spaces.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Check for use of proper pipe and fittings in corrosive) Tj -41.52 -7.2 TD (waste and vent systems.) Tj 23.52 -14.4 TD (f.) Tj 13.44 0 TD (Heating Pipe and Fittings) Tj ET 58.56 325.68 102 0.72 re f BT 45.12 312.72 TD (\(1\)) Tj 18 0 TD (Check for use of black steel pipe or copper tubing for) Tj -41.52 -7.2 TD (low temperature hot water pipelines.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Steam piping must be black steel: vent piping must be) Tj -41.52 -7.2 TD (the same type.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Check for use ) Tj 57.12 0 TD /F1 7.92 Tf -0.1787 Tc 0.1187 Tw (of ) Tj 8.16 0 TD /F0 6.96 Tf -0.096 Tc 0 Tw (Schedule 40, black steel, in high) Tj -106.8 -7.2 TD (temperature pipelines of 2 inches and larger.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Use welded joints for high temperature water pipelines) Tj -41.52 -7.2 TD (over 3/4 inch diameter.) Tj 23.52 -14.4 TD (g.) Tj 13.44 0 TD (Refrigeration and Air Conditioning Pipe and Fittings) Tj ET 58.56 224.88 212.16 0.72 re f BT 45.12 211.92 TD (\(1\)) Tj 18 0 TD (Check the steel pipe or the copper or steel tubing and) Tj -41.52 -7.2 TD (fittings for intended service. Refrigerant service rating is) Tj 0 -7.2 TD (required for lines carrying a refrigerant.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check for galvanized steel pipe or hard drawn copper) Tj -41.52 -7.2 TD (tubing for condenser water lines, except lines 4\227inches and) Tj 0 -7.2 TD (larger require black steel which must be coated and wrapped for) Tj T* (underground use.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Chilled water. Check the type of piping specified for) Tj -41.52 -7.2 TD (chilled water lines.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (The drainage lines for condensate water are usually) Tj -41.52 -7.2 TD (given in the plumbing section of the specifications.) Tj 23.52 -14.4 TD (h.) Tj 13.44 0 TD (Fire Sprinkler Pipe and Fittings) Tj ET 58.56 102.48 130.56 0.72 re f BT 45.12 89.52 TD (\(1\)) Tj 18 0 TD (Insure that materials are in accordance with approved) Tj -41.52 -7.2 TD (submittals.) Tj ET endstream endobj 124 0 obj <>/ProcSet 380 0 R>>/Rotate 0/Type/Page>> endobj 125 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (15A-4) Tj -97.68 469.2 TD (\(2\)) Tj 18 0 TD (The type system is designed to use a specific water) Tj -41.52 -7.2 TD (supply and distribution for specific occupancy. More information) Tj 0 -7.2 TD (can be found in National Fire Protection Association \(NFPA\)) Tj T* (Standard No. 13.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Contractor) Tj 40.8 0 TD /F2 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s working plans shall be approved and shall) Tj -86.4 -7.2 TD (be used when installing the system.) Tj 0 -14.4 TD (15A-03 ) Tj 32.64 0 TD (INSTALLATION) Tj ET 54.24 448.08 48.96 0.72 re f BT 45.12 435.12 TD (a.) Tj 13.44 0 TD (General) Tj ET 58.56 433.68 28.56 0.72 re f BT 45.12 420.72 TD (\(1\)) Tj 18 0 TD (Laying underground pipe lines is covered in Chapter) Tj -41.52 -7.2 TD (2C, Volume 1 of the Construction Inspector) Tj 171.36 0 TD /F2 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s Guide.) Tj -151.92 -14.4 TD (\(2\)) Tj 18 0 TD (Installation of exposed pipelines inside the building) Tj -41.52 -7.2 TD (should follow building lines. The building structure cannot be) Tj 0 -7.2 TD (cut or otherwise weakened for pipelines without written) Tj T* (approval.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Check for required slope in horizontal runs; liquid) Tj -41.52 -7.2 TD (systems must be drainable.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Check for drains at low points.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Check for air cocks at high points.) Tj -18 -14.4 TD (\(6\)) Tj 18 0 TD (Check for required access to drains, air cocks and) Tj -41.52 -7.2 TD (valves.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Check for contact between dissimilar metals such as) Tj -41.52 -7.2 TD (copper to iron or steel. Isolation \(separation\) will be) Tj 0 -7.2 TD (required. Dissimilar pipe must be coupled with a dielectric) Tj T* (connection.) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (Are hangers proper style, size and at required) Tj -41.52 -7.2 TD (intervals? Are ferrous hangers coated where used against copper) Tj 0 -7.2 TD (pipe? Size hangers to encompass the pipe insulation.) Tj 23.52 -14.4 TD (\(9\)) Tj 18 0 TD (Are pipelines restrained from lateral movement at) Tj -41.52 -7.2 TD (trapeze.) Tj 23.52 -14.4 TD (\(10\)) Tj 22.32 0 TD (Wall or floor supports must also restrain the) Tj -45.84 -7.2 TD (pipeline from lateral movement.) Tj 23.52 -14.4 TD (\(11\)) Tj 22.32 0 TD (Check for support needs at each floor but not more) Tj -45.84 -7.2 TD (than 15 foot intervals. Support is not necessary at the floor) Tj 0 -7.2 TD (slab on grade hangers with \223U\224 bolts or other type clips.) Tj 23.52 -14.4 TD (\(12\)) Tj 22.32 0 TD (Check for extra hangers or supports required at) Tj -45.84 -7.2 TD (fittings and devices. A hanger is usually required within one) Tj 0 -7.2 TD (foot of each change of direction.) Tj 23.52 -14.4 TD (\(13\)) Tj 22.32 0 TD (Suspended heavy pipelines must have proper support) Tj -45.84 -7.2 TD (without overloading support points. This should be covered in) Tj 0 -7.2 TD (the preparatory inspection by the contractor) Tj 179.52 0 TD /F2 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s quality control) Tj -183.6 -7.2 TD (representative. Be aware of:) Tj 23.52 -14.4 TD (\(a\)) Tj 18 0 TD (Excess loads on steel bar joints or beams.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (A hanger load or multiple hangers at the same location) Tj -41.52 -7.2 TD (with more than 100 pounds of load.) Tj ET endstream endobj 126 0 obj <>/ProcSet 380 0 R>>/Rotate 0/Type/Page>> endobj 127 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15A-5) Tj -97.68 469.2 TD (\(c\)) Tj 18 0 TD (Check with your supervisor where you have a suspicious) Tj -41.52 -7.2 TD (condition and he will request a structural evaluation.) Tj 23.52 -14.4 TD (\(14\)) Tj 22.32 0 TD (Check for required anchors and expansion loops or) Tj -45.84 -7.2 TD (joints, especially on long pipelines. Also check for guides at) Tj 0 -7.2 TD (the expansion points.) Tj 23.52 -14.4 TD (\(15\)) Tj 22.32 0 TD (Check for union or flanged connections at equipment) Tj -45.84 -7.2 TD (and elsewhere in order to break and repair or replace piping,) Tj 0 -7.2 TD (etc.) Tj 23.52 -14.4 TD (\(16\)) Tj 22.32 0 TD (Check for proper size pipe sleeves. Sleeves shall be) Tj -45.84 -7.2 TD (large enough for the pipe insulation thickness when required.) Tj 23.52 -14.4 TD (\(17\)) Tj 22.32 0 TD (Pipe sleeves through waterproofing must have a) Tj -45.84 -7.2 TD (clamping device to hold the flashing.) Tj 23.52 -14.4 TD (\(18\)) Tj 22.32 0 TD (Sleeves must protrude above finished floor surfaces) Tj -45.84 -7.2 TD (in wet areas. Space between pipe and sleeve must be sealed.) Tj 23.52 -14.4 TD (\(19\)) Tj 22.32 0 TD (Check for proper fireproofing of openings between) Tj -45.84 -7.2 TD (pipes and fire-rated construction.) Tj 23.52 -14.4 TD (\(20\)) Tj 22.32 0 TD (Check that escutcheons are used around pipes) Tj -45.84 -7.2 TD (penetrating finished surfaces.) Tj 23.52 -14.4 TD (\(21\)) Tj 22.32 0 TD (Use soft drawn copper tubing, as permitted, when not) Tj -45.84 -7.2 TD (using fittings.) Tj 23.52 -14.4 TD (\(22\)) Tj 22.32 0 TD (Steel pipe bending with proper equipment is permitted) Tj -45.84 -7.2 TD (in sizes to 4-inch diameter. Bend radius must be at least 6) Tj 0 -7.2 TD (times pipe diameter.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Pipe Connections \227 Screwed) Tj ET 58.56 268.08 106.08 0.72 re f BT 45.12 255.12 TD (\(1\)) Tj 18 0 TD (Examine the threading operation for:) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Square cut pipe) Tj -18 -14.4 TD (\(b\) Proper reaming before threading) Tj 0 -14.4 TD (\(c\)) Tj 18 0 TD (Sharp cutters so that threads are not shaved) Tj -18 -14.4 TD (\(d\)) Tj 18 0 TD (Tapered threads - not running threads) Tj -18 -14.4 TD (\(e\)) Tj 18 0 TD (Thread run - not more than three threads should be) Tj -41.52 -7.2 TD (exposed after connection is tight. The specifications may have a) Tj 0 -7.2 TD (threading table you can refer to.) Tj 23.52 -14.4 TD (\(f\)) Tj 18 0 TD (Use of cutting oil - pipe shall be cleaned of oil and) Tj -41.52 -7.2 TD (metal \223filings\224. This is critical for refrigerant lines.) Tj 23.52 -14.4 TD (\(g\)) Tj 18 0 TD (Protect floor surfaces \227 Use a sand box or other) Tj -41.52 -7.2 TD (adequate protection under the threading/cutting operation.) Tj 23.52 -14.4 TD (\(h\)) Tj 18 0 TD (Plastic pipe and metallic tubing will not be threaded.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Examine screwed pipe connections for:) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Use of approved thread lubricant or tape applied to) Tj -41.52 -7.2 TD (male threads only. Some piping may not permit use of tape at) Tj 0 -7.2 TD (screwed joints check for requirements) Tj ET endstream endobj 128 0 obj <>/ProcSet 380 0 R>>/Rotate 0/Type/Page>> endobj 129 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (15A-6) Tj -97.68 469.2 TD (\(b\)) Tj 18 0 TD (Tighten connection, but do not overtighten to strain) Tj -41.52 -7.2 TD (the fittings.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Be alert for distorted valves. See that wrenches are) Tj -41.52 -7.2 TD (used on the end of valves being screwed onto the pipes in order) Tj 0 -7.2 TD (to prevent damage to the valve bore. If it is necessary to put) Tj T* (wrench on the opposite end of valve from the end being screwed) Tj T* (onto pipe, use a nipple that has been screwed into the valve.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Do not screw pipes against the web of globe valves, or) Tj -41.52 -7.2 TD (against the underside of seat rings of gate valves.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Use threaded connections to angle stops at plumbing) Tj -41.52 -7.2 TD (fixtures.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Pipe Connections \227 Mechanical) Tj ET 58.56 397.68 118.32 0.72 re f BT 45.12 384.72 TD (\(1\)) Tj 18 0 TD (Check proper alignment of flanges, couplings and) Tj -41.52 -7.2 TD (gaskets.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check the gasket material, it must be compatible with) Tj -41.52 -7.2 TD (the liquid or gas in the pipeline.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Gaskets with high temperature water shall be metallic) Tj -41.52 -7.2 TD (asbestos type.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Do not use the drift pin or spud wrench handle to) Tj -41.52 -7.2 TD (align flanges.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Mechanical couplings and fittings must be compatible) Tj -41.52 -7.2 TD (and manufactured by the same concern.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Mechanical couplings are usually permitted on ferrous) Tj -41.52 -7.2 TD (metal pipelines in the building for domestic hot and cold water) Tj 0 -7.2 TD (systems.) Tj 23.52 -14.4 TD (d.) Tj 13.44 0 TD (Pipe Connections - Hub and Hubless Types) Tj ET 58.56 246.48 163.2 0.72 re f BT 45.12 233.52 TD (\(1\)) Tj 18 0 TD (Check for proper rubber gasket installation in the hub) Tj -41.52 -7.2 TD (or bell. Spigot end must be pushed \223home into the hub.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (When molten lead is used to make the joint, check for:) Tj -18 -14.4 TD (- Jute compacted into base of joint to seal the end, and) Tj -23.52 -7.2 TD (center the spigot end in the hub.) Tj 23.52 -14.4 TD (- Depth of joint.) Tj 0 -14.4 TD (- Pouring the molten lead joint in a continuous operation.) Tj T* (- Caulking the lead with proper size irons.) Tj T* (- Caulking each joint at least three times around.) Tj T* (\(3\)) Tj 18 0 TD (Hubless joint uses a rubber sleeve with stainless) Tj -41.52 -7.2 TD (steel band; the assembly must be approved by the Cast Iron Soil) Tj 0 -7.2 TD (Pipe Institute \(CISPI\).) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Check for proper torque wrench set to 5 foot\227pounds) Tj -41.52 -7.2 TD (for tightening the stainless steel band in hubless joints.) Tj ET endstream endobj 130 0 obj <>/ProcSet 380 0 R>>/Rotate 0/Type/Page>> endobj 131 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15A-7) Tj -97.68 469.2 TD (e.) Tj 13.44 0 TD (Pipe Connections \227 Soldered) Tj ET 58.56 505.68 110.16 0.72 re f BT 45.12 492.72 TD (\(1\)) Tj 18 0 TD (Surfaces of the fitting and pipe must be cleaned to) Tj -41.52 -7.2 TD (bright metal with an abrasive material before the joint is made.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (The 50/50 solder is half tin/half lead and can be used) Tj -41.52 -7.2 TD (in drainage, waste and vent \(DWV\) pipelines. It is also known as) Tj 0 -7.2 TD (soft solder.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Silver solder is 95/5, 95 percent tin \227 5 percent) Tj -41.52 -7.2 TD (antimony, and must be used in all other pipelines.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Core solder is not permitted.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Joint must be well heated before solder is applied.) Tj -41.52 -7.2 TD (Approximately 400F for soft solder and 1150F for silver solder.) Tj 23.52 -14.4 TD (\(6\) Check for use of a multiflame torch for uniformly) Tj -23.52 -7.2 TD (heating joints where 2 \275 inch diameter and larger pipe are) Tj 0 -7.2 TD (soldered.) Tj 23.52 -14.4 TD (f.) Tj 13.44 0 TD (Pipe Connections \227 Solvent Cement) Tj ET 58.56 354.48 134.64 0.72 re f BT 193.2 355.92 TD 0 Tc -0.096 Tw ( ) Tj 4.08 0 TD -0.096 Tc 0 Tw (\(Adhesive\)) Tj ET 197.28 354.48 40.8 0.72 re f BT 45.12 341.52 TD (\(1\)) Tj 18 0 TD (For plastic pipe connections use compatible materials.) Tj -18 -14.4 TD (\(2\) Use in accordance with the pipe manufacturer) Tj 195.84 0 TD /F2 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s) Tj -223.44 -7.2 TD (instructions.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Do not join different kinds of plastic pipe together.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Only heat\227fusion connection is used to join) Tj -41.52 -7.2 TD (polyethylene pipe, tubing or fittings.) Tj 23.52 -14.4 TD (g.) Tj 13.44 0 TD (Pipe Connections - Welded) Tj ET 58.56 268.08 102 0.72 re f BT 45.12 255.12 TD (\(1\)) Tj 18 0 TD (Check for use of welding fittings.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Making fittings by notching or mitering pipe is not) Tj -41.52 -7.2 TD (permitted.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Check for the approved welding procedures before) Tj -41.52 -7.2 TD (welding begins.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Check for the individual welder certification in the) Tj -41.52 -7.2 TD (type welding each welder must perform.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Welders must stamp each weld with an assigned symbol) Tj -41.52 -7.2 TD (so that the individual) Tj 89.76 0 TD /F2 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s weld can always be identified. Painted) Tj -93.84 -7.2 TD (stamps are not permanent and may not be used to identify welds.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Check welding of refrigerant pipe as the fittings and) Tj -41.52 -7.2 TD (pipe must be filled with inert gas such as nitrogen, during) Tj 0 -7.2 TD (welding. This prevents the formation of scale inside the pipe.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (welding for fire sprinkler systems must be performed) Tj -41.52 -7.2 TD (in a shop and in accordance with NFPA 13 requirements. Jobsite) Tj 0 -7.2 TD (welding is not permitted.) Tj ET endstream endobj 132 0 obj <>/ProcSet 380 0 R>>/Rotate 0/Type/Page>> endobj 133 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (15A-8) Tj -97.68 469.2 TD (\(8\)) Tj 18 0 TD (Check Chapter 5B, Volume 3 of the \223Construction) Tj -41.52 -7.2 TD (Inspector) Tj 36.72 0 TD /F2 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s Guide\224 for additional information on welding.) Tj -17.28 -14.4 TD (h.) Tj 13.44 0 TD (Fittings and Valves) Tj ET 58.56 484.08 77.52 0.72 re f BT 45.12 471.12 TD (\(1\)) Tj 18 0 TD (Check riser diagrams and floor plans on drawings for) Tj -41.52 -7.2 TD (proper valve locations.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Are valves proper type?) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Valves must be oriented with stems in horizontal) Tj -41.52 -7.2 TD (position or above. Only the horizontal position is allowed for) Tj 0 -7.2 TD (refrigerant pipelines.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Check and globe valves have an arrow cast in housing) Tj -41.52 -7.2 TD (to indicate direction of flow. Check these valves for proper) Tj 0 -7.2 TD (orientation in the pipeline flow.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Check for access to all valves. Are access locations) Tj -41.52 -7.2 TD (marked on ceiling panels.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Use dielectric connectors where required at locations) Tj -41.52 -7.2 TD (where different metals connect together in the pipeline.) Tj 23.52 -14.4 TD (i.) Tj 13.44 0 TD (Pipelines) Tj ET 58.56 332.88 36.72 0.72 re f BT 45.12 319.92 TD (\(1\)) Tj 18 0 TD (Water pipelines.) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Are air chambers installed at fixtures?) Tj -18 -14.4 TD (\(b\) Are water hammer arrestors shown instead of air) Tj -23.52 -7.2 TD (chambers? Check your riser diagrams on the drawings for) Tj 0 -7.2 TD (locations and sizes of these arrestors.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (Are valves located as shown?) Tj -18 -14.4 TD (\(d\)) Tj 18 0 TD (Does the water service have a gate valve and drain at) Tj -41.52 -7.2 TD (its point of building entry?) Tj 23.52 -14.4 TD (\(e\)) Tj 18 0 TD (Check for use of a backflow prevention device in each) Tj -41.52 -7.2 TD (branch waterline connected to another system. Also check for the) Tj 0 -7.2 TD (correct type device, especially where toxic fluids are involved.) Tj 23.52 -14.4 TD (\(f\)) Tj 18 0 TD (Check for a vacuum breaker at each fitting or fixture) Tj -41.52 -7.2 TD (with hose connection. The vacuum breaker will prevent back-) Tj 0 -7.2 TD (siphonage.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Fuel gas pipelines.) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Avoid installation under buildings. Fuel gas service) Tj -41.52 -7.2 TD (should be installed above grade on the outside. Do not install) Tj 0 -7.2 TD (service pipeline in the trench with other utilities.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (Do not permit soldered joints. Use pressure- threaded) Tj -41.52 -7.2 TD (joints for copper pipe.) Tj 23.52 -14.4 TD (\(c\) When piping is to be embedded in concrete, check for) Tj -23.52 -7.2 TD (special requirements such as:) Tj 23.52 -14.4 TD (- Should be acceptable to the gas service company) Tj 0 -14.4 TD (- Check concrete mix for compatibility with pipe material.) Tj -23.52 -7.2 TD (Certain additives and aggregates may not be compatible.) Tj ET endstream endobj 134 0 obj <>/ProcSet 380 0 R>>/Rotate 0/Type/Page>> endobj 135 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15A-9) Tj -97.68 469.2 TD (\(d\)) Tj 18 0 TD (Don) Tj 12.24 0 TD /F2 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (t embed gas pipelines in solid walls and) Tj -57.84 -7.2 TD (partitions.) Tj 23.52 -14.4 TD (\(e\)) Tj 18 0 TD (Check for protective coating on underground metallic) Tj -41.52 -7.2 TD (pipelines.) Tj 23.52 -14.4 TD (\(f\)) Tj 18 0 TD (Where piping must be buried under the building it) Tj -41.52 -7.2 TD (should be encased in a gas tight conduit for its full length of) Tj 0 -7.2 TD (run. Space between the pipe and conduit must be safely vented to) Tj T* (the atmosphere. Check your details.) Tj 23.52 -14.4 TD (\(g\)) Tj 18 0 TD (Check for pipe slope and drains at low points.) Tj -18 -14.4 TD (\(h\)) Tj 18 0 TD (Check for required pipeline bonding and grounding in) Tj -41.52 -7.2 TD (accordance with the National Electric Code.) Tj 23.52 -14.4 TD (\(i\)) Tj 18 0 TD (Check for shutoff valves as required.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Drainage lines.) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Hubless cast-iron pipelines require support next to) Tj -41.52 -7.2 TD (each joint.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (Hub type pipelines require support at 10 feet) Tj -41.52 -7.2 TD (intervals and within 3 feet of each fitting.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (Check for required expansion joint at floors in) Tj -41.52 -7.2 TD (plastic pipeline risers.) Tj 23.52 -14.4 TD (\(d\)) Tj 18 0 TD (Install cleanouts so they are flush with finish) Tj -41.52 -7.2 TD (surfaces. Close each cleanout with a brass plug installed with) Tj 0 -7.2 TD (graphite thread lubricant.) Tj 23.52 -14.4 TD (\(e\)) Tj 18 0 TD (Check the elevation of each floor drain before) Tj -41.52 -7.2 TD (finished floor is placed to assure drainage slope.) Tj 23.52 -14.4 TD (\(f\) Check floor drain for type specified. Does it require) Tj -23.52 -7.2 TD (a special item such as a sediment basket, a backwater valve or a) Tj 0 -7.2 TD (self-priming valve?) Tj 23.52 -14.4 TD (\(g\)) Tj 18 0 TD (On roof drains check for the clamping ring to hold the) Tj -41.52 -7.2 TD (metal flashing and for the cast iron strainer.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Heating pipelines.) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Check for slope of at least 1 inch in 10 feet.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Reducing fittings on horizontal lines must be) Tj -41.52 -7.2 TD (eccentric type with bottom of pipelines flat for positive) Tj 0 -7.2 TD (drainage flow.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (Check for proper branch line take off from the high) Tj -41.52 -7.2 TD (temperature pipeline supply and return. Should be from the upper) Tj 0 -7.2 TD (half of pipeline, at a 45 degree angle in direction of flow.) Tj 23.52 -14.4 TD (\(d\)) Tj 18 0 TD (Check for special piping from high temperature) Tj -41.52 -7.2 TD (waterline air vents to funnel drain.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Refrigeration and air conditioning pipelines.) Tj -18 -11.52 TD (\(a\)) Tj 18 0 TD (Refrigerant steel pipeline joints shall be welded.) Tj -18 -11.52 TD (\(b\)) Tj 18 0 TD (Refrigerant tubing of copper or steel shall have) Tj -41.52 -7.2 TD (brazed joints.) Tj ET endstream endobj 136 0 obj <>/ProcSet 380 0 R>>/Rotate 0/Type/Page>> endobj 137 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 122.88 -488.64 TD (15A-10) Tj -95.76 469.2 TD (\(6\)) Tj 18 0 TD (Fire sprinkler pipelines.) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (The approved shop drawings will be your guide in) Tj -41.52 -7.2 TD (checking the fire sprinkler system layout and pipe sizes.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (Check for possible conflict between final sprinkler) Tj -41.52 -7.2 TD (head location and user items which would interrupt flow coverage) Tj 0 -7.2 TD (or cause damage to the system.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (Review Chapter 3 of the National Fire Protection) Tj -41.52 -7.2 TD (Association Standard 13 for supports, hangers, slope and) Tj 0 -7.2 TD (drainage.) Tj 23.52 -14.4 TD (\(d\)) Tj 18 0 TD (Do not allow paint on sprinkler heads. Check heads for) Tj -41.52 -7.2 TD (proper temperature rating indicated by color code or stamped) Tj 0 -7.2 TD (numbers.) Tj 23.52 -14.4 TD (\(a\)) Tj 18 0 TD (Where required, outside connection shall be the size) Tj -41.52 -7.2 TD (indicated and shall mate with fire department hose.) Tj 23.52 -14.4 TD (\(f\) Check for required sprinklers in concealed spaces.) Tj 0 -14.4 TD (\(g\)) Tj 18 0 TD (Check for special protection against freezing,) Tj -41.52 -7.2 TD (corrosion and earthquakes, and for sprinkler head clearance from) Tj 0 -7.2 TD (heat sources.) Tj 23.52 -14.4 TD (\(h\) Check electric power and alarm for:) Tj 0 -14.4 TD (- Electric power correction ahead of the main switch.) Tj T* (- Alarm tie-in with fire department, as required.) Tj T* (- Effective location of the local alarm.) Tj -23.52 -14.4 TD (15A-04 ) Tj 32.64 0 TD (TESTING) Tj ET 54.24 260.88 28.56 0.72 re f BT 45.12 247.92 TD (a.) Tj 13.44 0 TD (Preparation) Tj ET 58.56 246.48 44.88 0.72 re f BT 45.12 233.52 TD (Testing is the responsibility of the contractor unless) Tj -23.52 -7.2 TD (stated as a Government responsibility in the specifications.) Tj 0 -7.2 TD (Check with supervisor for recommended presence of user personnel) Tj T* (during certain testing such as sprinkler, etc. The system or) Tj T* (portion of the system will be prepared for testing by the) Tj T* (craftsman who installed the pipeline. The contractor) Tj 212.16 0 TD /F2 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s quality) Tj -216.24 -7.2 TD (control representative will be responsible for verifying the) Tj 0 -7.2 TD (extent of test, the method and results which will be reported.) Tj T* (The following items must be checked:) Tj 23.52 -14.4 TD (\(1\)) Tj 18 0 TD (Determine extent of test.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Is pipeline isolated at limits of the test with valves) Tj -41.52 -7.2 TD (closed and the plugs and caps tightly in place?) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Are pipeline valves open within the test area?) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Are pipelines adequately blocked and anchored for) Tj -41.52 -7.2 TD (pressure tests? Pipelines should be in the permanent, fixed) Tj 0 -7.2 TD (position before the test is permitted.) Tj 23.52 -11.52 TD (\(5\)) Tj 18 0 TD (Will joints be exposed for the visual or soap test) Tj -41.52 -7.2 TD (requirements?) Tj 23.52 -11.52 TD (\(6\)) Tj 18 0 TD (When testing pipeline to be concealed, does extent of) Tj -41.52 -7.2 TD (test include all of the affected pipeline.) Tj ET endstream endobj 138 0 obj <>/ProcSet 380 0 R>>/Rotate 0/Type/Page>> endobj 139 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 140.88 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15A-11) Tj -95.76 469.2 TD (\(7\)) Tj 18 0 TD (For a pressure test, have diaphrams or other internal) Tj -41.52 -7.2 TD (parts of valves, regulations, etc. which may be damaged by the) Tj 0 -7.2 TD (pressure been removed?) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (Review the test method to be used.) Tj -18 -14.4 TD (\(9\)) Tj 18 0 TD (Inspect the test instruments and apparatus for proper) Tj -41.52 -7.2 TD (type, calibration and operation.) Tj 23.52 -14.4 TD (\(10\)) Tj 22.32 0 TD (When flushing to clean the pipeline, check to) Tj -45.84 -7.2 TD (determine that coils for heating, air conditioning and) Tj 0 -7.2 TD (refrigerant lines are bypassed to prevent flushing\227water from) Tj T* (passing through coils.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (performing Tests) Tj ET 58.56 404.88 65.28 0.72 re f BT 45.12 391.92 TD (\(1\)) Tj 18 0 TD (Water pipelines.) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Pneumatic or hydrostatic test shall be used.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Check ambient temperature at beginning and end of test) Tj -41.52 -7.2 TD (period for temperature differential and the correction factor) Tj 0 -7.2 TD (for the final gauge reading.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (For the hydrostatic test, was the tested segment) Tj -41.52 -7.2 TD (vented to ensure it was completely filled with water?) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Fuel gas pipelines.) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (An air pressure test, similar to the waterline test,) Tj -41.52 -7.2 TD (is usually made. Do not use oxygen.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (Refer to National Fire Protection Association \(NFPA\)) Tj -41.52 -7.2 TD (Bulletin 565 test requirements for nitrous oxide and oxygen) Tj 0 -7.2 TD (system test requirements.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (Check the gas system for leakage immediately when) Tj -41.52 -7.2 TD (beginning the test using fuel gas.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Gravity drainage lines.) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Is the test stack high enough to provide the 10 foot) Tj -41.52 -7.2 TD (head for all of the tested line.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (Check each joint for leakage.) Tj -18 -14.4 TD (\(c\)) Tj 18 0 TD (The final smoke or peppermint test is made with all) Tj -41.52 -7.2 TD (fixtures attached.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Heating pipelines.) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Hydrostatic pressure testing is required. Usually 45) Tj -41.52 -7.2 TD (psig for four hours for low temperature waterlines.) Tj 23.52 -11.52 TD (\(b\)) Tj 18 0 TD (High pressure waterlines are tested at 1 \275 times) Tj -41.52 -7.2 TD (design pressure.) Tj 23.52 -11.52 TD (\(5\)) Tj 18 0 TD (Refrigeration and Air Conditioning pipelines.) Tj -18 -11.52 TD (\(a\)) Tj 18 0 TD (Pneumatic pressure test used on refrigerant pipelines) Tj -41.52 -7.2 TD (using dry nitrogen. Check each joint with soap solution.) Tj 23.52 -11.52 TD (\(b\)) Tj 18 0 TD (Refrigerant pipelines also are charged with) Tj -41.52 -7.2 TD (refrigerant gas and joints checked for leaks with a halide) Tj 0 -7.2 TD (torch.) Tj ET endstream endobj 140 0 obj <>/ProcSet 380 0 R>>/Rotate 0/Type/Page>> endobj 141 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 122.88 -488.64 TD (15A-12) Tj -95.76 469.2 TD (\(c\)) Tj 18 0 TD (Refrigerant pipelines also require an evacuation test.) Tj -41.52 -7.2 TD (Check the specifications for details.) Tj 23.52 -14.4 TD (\(d\)) Tj 18 0 TD (Check the hydrostatic pressure test on water pipelines) Tj -41.52 -7.2 TD (for use of appropriate pressure and time requirements.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Fire Sprinkler pipelines.) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Refer to Chapter 1, NEPA 13 for specific test) Tj -41.52 -7.2 TD (requirements.) Tj 23.52 -14.4 TD (\(b\) Assure that feeder piping has been flushed before) Tj -23.52 -7.2 TD (testing.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (Check for approved contractor) Tj 118.32 0 TD /F2 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s test procedure and) Tj -163.92 -7.2 TD (adequate monitoring of the tests by contractor) Tj 187.68 0 TD /F2 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s quality control) Tj -191.76 -7.2 TD (person.) Tj 23.52 -14.4 TD (\(d\)) Tj 18 0 TD (Check the adequacy of contractor) Tj 130.56 0 TD /F2 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s required material) Tj -176.16 -7.2 TD (and test certificates to be submitted after completion of tests.) Tj 23.52 -14.4 TD (\(e\) Test blanks used in the system during testing shall be) Tj -23.52 -7.2 TD (approved type and each blank shall be numbered and accounted for) Tj 0 -7.2 TD (at activation of the system.) Tj 0 -14.4 TD (15A-05 ) Tj 32.64 0 TD (CLEANING ADJUSTING AND OPERATION) Tj ET 54.24 325.68 130.56 0.72 re f BT 45.12 312.72 TD (a.) Tj 13.44 0 TD (Cleaning) Tj ET 58.56 311.28 32.64 0.72 re f BT 45.12 298.32 TD (\(1\)) Tj 18 0 TD (Pipelines constructed with properly stored and) Tj -41.52 -7.2 TD (protected pipe should need very little cleaning.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Close ends of unfinished lines during work stoppages.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (On occassion, craftsmen temporarily place tools or) Tj -41.52 -7.2 TD (other items in the end of pipes. This habit must be stopped.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Check the specification for flushing requirements.) Tj -41.52 -7.2 TD (Flushing may be ordered for dirty pipelines.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (The completed potable water system must be sterilized) Tj -41.52 -7.2 TD (by chlorination. This process, as given in the specification, is) Tj 0 -7.2 TD (required reading.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Heating pipelines must be cleaned with a chemical) Tj -41.52 -7.2 TD (solution after successful completion of the pressure tests.) Tj 0 -7.2 TD (Check for proper solution, temperature and time.) Tj 23.52 -14.4 TD (\(7\) Fire sprinkler systems must be flushed and disinfected) Tj -23.52 -7.2 TD (after testing.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Adjusting) Tj ET 58.56 138.48 36.72 0.72 re f BT 45.12 125.52 TD (\(l\)) Tj 18 0 TD (When beginning the operating phase each piping system) Tj -41.52 -7.2 TD (must be closely inspected for necessary adjustment and proper) Tj 0 -7.2 TD (operation.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Adjust flow and flush valves.) Tj -18 -14.4 TD (\(3\) Check air cocks for leakage, clean and adjust as) Tj -23.52 -7.2 TD (required.) Tj ET endstream endobj 142 0 obj <>/ProcSet 380 0 R>>/Rotate 0/Type/Page>> endobj 143 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 140.88 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15A-13) Tj -95.76 469.2 TD (\(4\)) Tj 18 0 TD (Condenser and chilled water pipelines must be balanced) Tj -41.52 -7.2 TD (after testing.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Check for heating system approved balancing procedure.) Tj -41.52 -7.2 TD (This must be performed by a qualified engineer.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Operation) Tj ET 58.56 462.48 36.72 0.72 re f BT 45.12 449.52 TD (\(1\)) Tj 18 0 TD (Specifications require that user personnel be) Tj -41.52 -7.2 TD (instructed in proper system operation. Make a note of the) Tj 0 -7.2 TD (identification of these personnel for the record.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check the posted operating instructions. Are posting) Tj -41.52 -7.2 TD (requirements met? Do they include the required diagrams, layouts) Tj 0 -7.2 TD (end specific written instructions?) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Are pipelines coded as required?) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Check for required spare parts.) Tj ET endstream endobj 144 0 obj <>/ProcSet 146 0 R>>/Rotate 0/Type/Page>> endobj 145 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 150.96 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (i) Tj -20.4 469.2 TD (CHAPTER 15B) Tj ET 130.56 505.68 44.88 0.72 re f BT 136.8 492.72 TD (DUCTWORK) Tj ET 136.8 491.28 32.64 0.72 re f BT 142.8 478.32 TD (INDEX) Tj -88.8 -14.4 TD (Para.) Tj ET 54 462.48 20.4 0.72 re f BT 144 463.92 TD (Title) Tj ET 144 462.48 20.4 0.72 re f BT 243.12 463.92 TD (Page) Tj ET 243.12 462.48 16.32 0.72 re f BT 54 449.52 TD (15B-01) Tj 49.44 0 TD (GENERAL) Tj 139.68 0 TD (15B-1) Tj -189.12 -14.4 TD (15B-02) Tj 49.44 0 TD (SHOP DRAWINGS) Tj 139.68 0 TD (15B-1) Tj -189.12 -14.4 TD (15B-03) Tj 49.44 0 TD (DUCTWORK) Tj 139.68 0 TD (15B-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Fabrication) Tj 121.68 0 TD (15B-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Erection) Tj 121.68 0 TD (15B-2) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Diffusers, Registers,) Tj 0 -7.2 TD (and Grilles) Tj 121.68 0 TD (15B-2) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Insulation) Tj 121.68 0 TD (15B-3) Tj -139.68 -7.2 TD (e.) Tj 18 0 TD (Balancing and Testing) Tj 121.68 0 TD (15B-3) Tj ET endstream endobj 146 0 obj [/PDF/Text] endobj 147 0 obj <>/ProcSet 381 0 R>>/Rotate 0/Type/Page>> endobj 148 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15B-1) Tj -12.24 469.2 TD (CHAPTER 15B) Tj ET 130.56 505.68 44.88 0.72 re f BT 136.8 492.72 TD (DUCTWORK) Tj ET 136.8 491.28 32.64 0.72 re f BT 21.6 478.32 TD (15B-01 ) Tj 32.64 0 TD (GENERAL) Tj ET 54.24 476.88 28.56 0.72 re f BT 45.12 463.92 TD (This chapter covers ductwork for air conditioning,) Tj -23.52 -7.2 TD (heating, ventilating, and exhaust systems. The QA Rep must) Tj 0 -7.2 TD (closely coordinate this chapter with chapter 15C, 15E, 15F, and) Tj T* (15G. It is important that the QA Rep have a thorough knowledge) Tj T* (of the job plans, specifications, and potential obstructions in) Tj T* (the area in which the ductwork is to be installed, including) Tj T* (locations of fire rated walls that the duct must penetrate.) Tj 0 -14.4 TD (15B-02 ) Tj 32.64 0 TD (SHOP DRAWINGS) Tj ET 54.24 404.88 53.04 0.72 re f BT 45.12 391.92 TD (a.) Tj 13.44 0 TD (It is the QAR) Tj 53.04 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s responsibility to determine that all) Tj -94.08 -7.2 TD (ductwork is approved well in advance of its actual need on the) Tj 0 -7.2 TD (job.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Check all ductwork delivered to the site for) Tj -36.96 -7.2 TD (conformance with approved shop drawings.) Tj 0 -14.4 TD (15B-03 ) Tj 32.64 0 TD (DUCTWORK) Tj ET 54.24 340.08 32.64 0.72 re f BT 45.12 327.12 TD (a.) Tj 13.44 0 TD (Fabrication) Tj ET 58.56 325.68 44.88 0.72 re f BT 103.44 327.12 TD ( \(See SMACNA Duct Manual appropriate to) Tj -81.84 -7.2 TD (material and service requirements\)) Tj 23.52 -14.4 TD (\(1\)) Tj 18 0 TD (Inspect for type, thickness and shape of sheet) Tj -41.52 -7.2 TD (material, and fiber glass boards used for ductwork.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check workmanship and observe lock seams and breaks in) Tj -41.52 -7.2 TD (ductwork for cracks of sheet metal ducts. Check fiber glass) Tj 0 -7.2 TD (ducts for broken, or damaged edges, joints, and seams.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Inspect all joint connections for correct type and) Tj -41.52 -7.2 TD (adequately sealed to prevent movement and air loss.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Make sure that the joints are neatly finished and that) Tj -41.52 -7.2 TD (the duct is smooth on the inside. Any laps should be made in the) Tj 0 -7.2 TD (directions of the flow of air. Internal insulation will be) Tj T* (securely fastened and coated as specified.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Provide adequate bracing and reinforcement of the) Tj -41.52 -7.2 TD (larger ducts.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Compare the radius of curved duct with the) Tj -41.52 -7.2 TD (specification requirements.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Slope ratio of transitions should be \) Provide turning) Tj -41.52 -7.2 TD (vanes and extractors to eliminate abrupt turns of air which) Tj 0 -7.2 TD (cause appreciable turbulence.) Tj 23.52 -14.4 TD (\(9\)) Tj 18 0 TD (Check the need for and construction of splitter) Tj -41.52 -7.2 TD (dampers. Make sure the operating mechanism is accessible; and if) Tj 0 -7.2 TD (exposed in a finished room, the mechanism is to be chromium) Tj T* (plated.) Tj 23.52 -14.4 TD (\(10\)) Tj 22.32 0 TD (Make sure that fire and/or smoke dampers are provided) Tj -45.84 -7.2 TD (in ducts as required in accord with NEPA, and SMACNA fire damper) Tj 0 -7.2 TD (guide. Check for fire-safety switch on return air ducts of) Tj T* (circulation system.) Tj ET endstream endobj 149 0 obj <>/ProcSet 381 0 R>>/Rotate 0/Type/Page>> endobj 150 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (15B-2) Tj -97.68 469.2 TD (\(11\)) Tj 22.32 0 TD (Check duct for the required test holes and covers.) Tj -22.32 -14.4 TD (\(12\)) Tj 22.32 0 TD (Check the fabrication of flexible connections.) Tj -22.32 -14.4 TD (\(13\)) Tj 22.32 0 TD (Make sure that equipment serviced by the ductwork is) Tj -45.84 -7.2 TD (fully accessible for maintenance, repairs, oiling, cleaning, and) Tj 0 -7.2 TD (for filter changing.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Erection) Tj ET 58.56 448.08 32.64 0.72 re f BT 45.12 435.12 TD (\(1\)) Tj 18 0 TD (Examine all fabricated ducts, rejecting any which are) Tj -41.52 -7.2 TD (not smooth or any which are damaged.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Examine duct hangers for specified material,) Tj -41.52 -7.2 TD (thickness, and spacing.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Check specification requirements for the need for) Tj -41.52 -7.2 TD (stiffeners for wide ducts. Also check for need of trapeze) Tj 0 -7.2 TD (hangers under wide ducts.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Provide approved flexible connections between ducts) Tj -41.52 -7.2 TD (and for fan units.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Check rigidity and tightness of such field installed) Tj -41.52 -7.2 TD (items as dampers and defectors.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Provide access doors at all fire dampers, automatic) Tj -41.52 -7.2 TD (dampers, coils, filters, heaters, thermostats, or at any item) Tj 0 -7.2 TD (that requires servicing. Doors are to be airtight, securely) Tj T* (fastened and accessible, and able to be fully opened. Refer to) Tj T* (SMACNA and Specifications for size of access doors required.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Inspect goose necks and rain hoods for method of) Tj -41.52 -7.2 TD (fastening, flashing and bracing. Goose necks are to be turned) Tj 0 -7.2 TD (away from the prevailing wind. Check specifications for screens) Tj T* (on open end of goose necks.) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (Provide proper size sleeves where insulated duct) Tj -41.52 -7.2 TD (passes through wall openings.) Tj 23.52 -14.4 TD (\(9\)) Tj 18 0 TD (When obstructions cannot be avoided, the duct area) Tj -41.52 -7.2 TD (should never be decreased more than 10 percent, and then a) Tj 0 -7.2 TD (streamlined collar should be used. Larger obstructions require) Tj T* (an increase in the duct size in order to maintain as nearly) Tj T* (uniform velocity as possible.) Tj 23.52 -14.4 TD (\(10\)) Tj 22.32 0 TD (Before insulating metal duct, test duct for air) Tj -45.84 -7.2 TD (tightness.) Tj 23.52 -14.4 TD (\(11\)) Tj 22.32 0 TD (All ducts, plenums and casings must be thoroughly) Tj -45.84 -7.2 TD (cleaned of debris and blown free of small particles and dust) Tj 0 -7.2 TD (before supply outlets are installed.) Tj 23.52 -14.4 TD (\(12\)) Tj 22.32 0 TD (Inspect duct break away collar at fire dampers for) Tj -45.84 -7.2 TD (meeting SMACNA requirements.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Diffusers. Registers, and Grilles) Tj ET 58.56 102.48 134.64 0.72 re f BT 45.12 89.52 TD (\(1\)) Tj 18 0 TD (Insure that the contractor furnishes a schedule) Tj -41.52 -7.2 TD (showing all air inlets and outlets.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Inspect diffusers and registers for accessible volume) Tj -41.52 -7.2 TD (control operator.) Tj ET endstream endobj 151 0 obj <>/ProcSet 381 0 R>>/Rotate 0/Type/Page>> endobj 152 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15B-3) Tj -97.68 469.2 TD (\(3\)) Tj 18 0 TD (Examine specification and installation for integral) Tj -41.52 -7.2 TD (anti-smudge rings for diffusers.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Check for loose or bent vanes.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Inspect each item for fit, and see that gaskets are) Tj -41.52 -7.2 TD (provided when required.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Inspect for the proper operation of registers,) Tj -41.52 -7.2 TD (dampers, and grille directional-controls.) Tj 23.52 -14.4 TD (d.) Tj 13.44 0 TD (Insulation) Tj ET 58.56 426.48 40.8 0.72 re f BT 45.12 413.52 TD (Insulation for metal ductwork is covered in Chapter 15C) Tj -23.52 -7.2 TD (entitled, Mechanical Insulation. Chapter 15C covers pipe) Tj 0 -7.2 TD (insulation, equipment insulation, and ductwork insulation.) Tj 23.52 -14.4 TD (e.) Tj 13.44 0 TD (Balancing and Testing) Tj ET 58.56 383.28 85.68 0.72 re f BT 45.12 370.32 TD (Balancing and Testing of air supplies is covered in) Tj -23.52 -7.2 TD (Chapter 15F entitled, Ventilating, Air Supply and Distribution) Tj 0 -7.2 TD (Systems.) Tj ET endstream endobj 153 0 obj <>/ProcSet 155 0 R>>/Rotate 0/Type/Page>> endobj 154 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 150.96 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (i) Tj -20.4 469.2 TD (CHAPTER 15C) Tj ET 130.56 505.68 44.88 0.72 re f BT 110.16 492.72 TD (MECHANICAL INSULATION) Tj ET 110.16 491.28 85.68 0.72 re f BT 142.8 478.32 TD (INDEX) Tj -88.8 -14.4 TD (Para.) Tj ET 54 462.48 20.4 0.72 re f BT 144 463.92 TD (Title) Tj ET 144 462.48 20.4 0.72 re f BT 243.12 463.92 TD (Page) Tj ET 243.12 462.48 16.32 0.72 re f BT 54 449.52 TD (15C-01) Tj 49.44 0 TD (GENERAL) Tj 139.68 0 TD (15C-1) Tj -189.12 -14.4 TD (15C-02) Tj 49.44 0 TD (IDENTIFICATION OF MATERIAL) Tj 139.68 0 TD (15C-1) Tj -189.12 -14.4 TD (15C-03) Tj 49.44 0 TD (SHOP DRAWINGS) Tj 139.68 0 TD (15C-1) Tj -189.12 -14.4 TD (15C-04) Tj 49.44 0 TD (SURFACE BURNING) Tj 0 -7.2 TD (CHARACTERISTICS) Tj 139.68 0 TD (15C-1) Tj -189.12 -14.4 TD (15C-05) Tj 49.44 0 TD (MECHANICAL INSULATION) Tj 139.68 0 TD (15C-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Ductwork Insulation) Tj 121.68 0 TD (15C-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Pipe Insulation) Tj 121.68 0 TD (15C-2) Tj -189.12 -14.4 TD (15C-06) Tj 49.44 0 TD (DUCTS NOT REQUIRING INSULATION) Tj 139.68 0 TD (15C-3) Tj -189.12 -14.4 TD (15C-07) Tj 49.44 0 TD (INSULATION FOR RECTANGULAR AND) Tj 0 -7.2 TD (ROUND DUCTS) Tj 139.68 0 TD (15C-3) Tj -189.12 -14.4 TD (15C-08) Tj 49.44 0 TD (INSULATION FOR HOT EQUIPMENT) Tj 139.68 0 TD (15C-3) Tj -189.12 -14.4 TD (15C-09) Tj 49.44 0 TD (INSULATION FOR COLD EQUIPMENT) Tj 139.68 0 TD (15C-4) Tj -189.12 -14.4 TD (15C-10) Tj 49.44 0 TD (ABOVE GROUND PIPE INSULATION) Tj 139.68 0 TD (15C-4) Tj -189.12 -14.4 TD (15C-11) Tj 49.44 0 TD (PIPING EXPOSED TO WEATHER) Tj 139.68 0 TD (15C-4) Tj -189.12 -14.4 TD (15C-12) Tj 49.44 0 TD (BELOW GROUND PIPE INSULATION) Tj 139.68 0 TD (15C-5) Tj ET endstream endobj 155 0 obj [/PDF/Text] endobj 156 0 obj <>/ProcSet 382 0 R>>/Rotate 0/Type/Page>> endobj 157 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15C-1) Tj -12.24 469.2 TD (CHAPTER 15C) Tj ET 130.56 505.68 44.88 0.72 re f BT 110.16 492.72 TD (MECHANICAL INSULATION) Tj ET 110.16 491.28 85.68 0.72 re f BT 21.6 478.32 TD (15C-01 ) Tj 32.64 0 TD (GENERAL) Tj ET 54.24 476.88 28.56 0.72 re f BT 45.12 463.92 TD (This chapter covers field-applied insulation. Factory) Tj -23.52 -7.2 TD (applied insulation is specified under the equipment, duct, or) Tj 0 -7.2 TD (piping to be installed, as detailed in the specification.) Tj 0 -14.4 TD (15C-02 ) Tj 32.64 0 TD (IDENTIFICATION OF MATERIAL) Tj ET 54.24 433.68 106.08 0.72 re f BT 45.12 420.72 TD (All packages or standard container of insulation, jacket) Tj -23.52 -7.2 TD (material, cements, adhesives, and coatings delivered for use,) Tj 0 -7.2 TD (and all samples shall have a manufacturer) Tj 167.28 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s stamp or label) Tj -171.36 -7.2 TD (attached giving the name of the manufacturer, brand, and a) Tj 0 -7.2 TD (description of the material.) Tj 0 -14.4 TD (15C-03 ) Tj 32.64 0 TD (SHOP DRAWINGS) Tj ET 54.24 376.08 53.04 0.72 re f BT 45.12 363.12 TD (a.) Tj 13.44 0 TD (It is the inspector) Tj 77.52 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s responsibility to determine that) Tj -118.56 -7.2 TD (all insulation related materials are approved well in advance of) Tj 0 -7.2 TD (their actual need on the job.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (After approval of materials and prior to insulating any) Tj -36.96 -7.2 TD (pipe the contractor will submit for approval sample insulation) Tj 0 -7.2 TD (boards, or approved standards, showing his proposed methods of) Tj T* (mechanical insulation, including cut-a\227way sections, insulation,) Tj T* (coverings, and finish of completed work. Approved sample boards) Tj T* (will be maintained by the contractor at the jobsite for the) Tj T* (duration of the work.) Tj 0 -14.4 TD (15C-04 ) Tj 32.64 0 TD (SURFACE BURNING CHARACTERISTICS) Tj ET 54.24 275.28 126.48 0.72 re f BT 45.12 262.32 TD (a.) Tj 13.44 0 TD (Check underwriters labels and test certificate of all) Tj -36.96 -7.2 TD (insulating materials and accessories for not exceeding a flame) Tj 0 -7.2 TD (spread rating of 25 or a smoke developed rating of 50, as) Tj T* (determined by ASTM E 84.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Check specification for limitations on surface burning) Tj -36.96 -7.2 TD (characteristic.) Tj 0 -14.4 TD (15C-05 ) Tj 32.64 0 TD (MECHANICAL INSULATION) Tj ET 54.24 203.28 85.68 0.72 re f BT 45.12 190.32 TD (a.) Tj 13.44 0 TD (Ductwork insulation) Tj ET 58.56 188.88 77.52 0.72 re f BT 45.12 175.92 TD (\(1\)) Tj 18 0 TD (Distinguish between areas requiring flexible type) Tj -41.52 -7.2 TD (insulation and those requiring rigid or semi-rigid type) Tj 0 -7.2 TD (insulation.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check the type and thickness of insulation and) Tj -41.52 -7.2 TD (requirements for vapor barrier.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Check the method of fastening insulation to exterior) Tj -41.52 -7.2 TD (or interior of duct.) Tj 23.52 -14.4 TD (\(a\)) Tj 18 0 TD (If metal pins are used, check the type and spacing.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (If wire is used, see that corners of insulation are) Tj -41.52 -7.2 TD (protected from possible damage.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (Verify adhesive materials are correct, and area) Tj -41.52 -7.2 TD (specified receives proper coverage.) Tj ET endstream endobj 158 0 obj <>/ProcSet 382 0 R>>/Rotate 0/Type/Page>> endobj 159 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (15C-2) Tj -97.68 469.2 TD (\(4\)) Tj 18 0 TD (Make a careful check for breaks in insulation and) Tj -41.52 -7.2 TD (vapor barriers.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (See that materials are fire\227retardant or) Tj -41.52 -7.2 TD (noncombustible as required by the specifications.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (When equipment casings are required to be insulated,) Tj -41.52 -7.2 TD (check for proper application. See that application is firm.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Where insulation is subject to mechanical damage,) Tj -41.52 -7.2 TD (check for protection requirements.) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (Check for continuity of insulation through walls and) Tj -41.52 -7.2 TD (floor, if required.) Tj 23.52 -14.4 TD (\(9\)) Tj 18 0 TD (Check for proper sealing of insulation to diffusers,) Tj -41.52 -7.2 TD (grills, and fire dampers.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Pipe Insulation) Tj ET 58.56 376.08 61.2 0.72 re f BT 45.12 363.12 TD (\(1\)) Tj 18 0 TD (Determine whether the material on the job has been) Tj -41.52 -7.2 TD (approved for the particular piping being installed. Make sure) Tj 0 -7.2 TD (insulations, vapor barriers, adhesives and sealers are) Tj T* (noncombustible or fire retardant as specified.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Note that heated water piping is insulated differently) Tj -41.52 -7.2 TD (from chilled water piping and from combination chilled and) Tj 0 -7.2 TD (heated water piping.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Check thickness of insulation and of vapor barrier.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Determine that insulation jackets which are exposed to) Tj -41.52 -7.2 TD (view are paintable.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Examine the requirements for the insulation of) Tj -41.52 -7.2 TD (flangers, fittings, and valves, and assure compliance with the) Tj 0 -7.2 TD (requirements.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Check the lap and the sealing at joints.) Tj -18 -14.4 TD (\(7\)) Tj 18 0 TD (Be very careful to see that there are no breaks in the) Tj -41.52 -7.2 TD (vapor barrier. Watch for later damages during construction.) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (Check specification requirements for extending through) Tj -41.52 -7.2 TD (sleeves in walls, floors, and ceilings; chilled water lines) Tj 0 -7.2 TD (inside cabinets of fan coil units should be covered as required) Tj T* (to prevent condensate dripping on floor.) Tj 23.52 -14.4 TD (\(9\)) Tj 18 0 TD (Make sure that pipe hangers are installed over) Tj -41.52 -7.2 TD (insulation. Metal shields to be provided between hanger ring and) Tj 0 -7.2 TD (insulation. High density insulation inserts shall be installed) Tj T* (with a length equal to length of metal shield.) Tj 23.52 -14.4 TD (\(10\) Check for the neat termination and seal of insulation) Tj -23.52 -7.2 TD (at the end of insulation.) Tj 23.52 -14.4 TD (\(11\)) Tj 22.32 0 TD (Know the special requirements for insulation and) Tj -45.84 -7.2 TD (jacketing of piping exposed to weather.) Tj 23.52 -11.52 TD (\(12\)) Tj 22.32 0 TD (Check the installation, the width, and the spacing of) Tj -45.84 -7.2 TD (the bands used on pipe jacketing.) Tj 23.52 -11.52 TD (\(13\)) Tj 22.32 0 TD (In chilled-water and hot\227water combination piping) Tj -45.84 -7.2 TD (check for vapor seal requirement on boiler piping.) Tj ET endstream endobj 160 0 obj <>/ProcSet 382 0 R>>/Rotate 0/Type/Page>> endobj 161 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15C-3) Tj -121.2 469.2 TD (15C-06 ) Tj 32.64 0 TD (DUCTS NOT REQUIRING INSULATION) Tj ET 54.24 505.68 122.4 0.72 re f BT 45.12 492.72 TD (a.) Tj 13.44 0 TD (Site\227erected casings and plenums constructed of factory) Tj -36.96 -7.2 TD (insulated sheet metal panels.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Ducts shown to be acoustically lined, provided) Tj -36.96 -7.2 TD (sufficient thickness of liner is specified.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Supply and return ducts in air conditioned or heated) Tj -36.96 -7.2 TD (spaces, unless otherwise shown.) Tj 23.52 -14.4 TD (d.) Tj 13.44 0 TD (Return ducts in ceiling spaces when roofing is) Tj -36.96 -7.2 TD (insulated. Ceiling space shall be defined as those spaces) Tj 0 -7.2 TD (between the ceiling and bottom of floor deck or roof deck inside) Tj T* (the heated space insulated envelope.) Tj 23.52 -14.4 TD (e.) Tj 13.44 0 TD (Supply and Return Ducts made out of faced fiber glass) Tj -36.96 -7.2 TD (insulating board. Check on sealing joints between individual) Tj 0 -7.2 TD (duct sections, thickness, and connections.) Tj 0 -14.4 TD (15C-07 ) Tj 32.64 0 TD (INSULATION FOR RECTANGULAR AND ROUND DUCTS) Tj ET 54.24 361.68 171.36 0.72 re f BT 45.12 348.72 TD (a.) Tj 13.44 0 TD (Check flexible type insulation used on concealed ducts) Tj -36.96 -7.2 TD (for specified minimum density, usually 3/4 pcf for rectangular) Tj 0 -7.2 TD (ducts.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Check rigid type insulations used on exposed ducts for) Tj -36.96 -7.2 TD (specified minimum density, usually 3 pcf for rectangular ducts.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Check for flexible type insulation specified for round) Tj -36.96 -7.2 TD (duct, usually a minimum density 3/4 pcf.) Tj 23.52 -14.4 TD (d.) Tj 13.44 0 TD (Check for specified vapor barrier jacket on exposed) Tj -36.96 -7.2 TD (insulation, either factory applied or field applied.) Tj 23.52 -14.4 TD (e.) Tj 13.44 0 TD (Check specification for requirement for factory applied) Tj -36.96 -7.2 TD (or field applied vapor barrier on insulation on concealed duct.) Tj 23.52 -14.4 TD (f.) Tj 13.44 0 TD (Check rigid fiber glass duct installation method to) Tj -36.96 -7.2 TD (insure accessibility for maintenance of coils, vanes, and fan) Tj 0 -7.2 TD (motors used in the HVAC duct system.) Tj 0 -14.4 TD (15C-08 ) Tj 32.64 0 TD (INSULATION FOR HOT EQUIPMENT) Tj ET 54.24 203.28 114.24 0.72 re f BT 45.12 190.32 TD (a.) Tj 13.44 0 TD (Check specification to determine if insulation is) Tj -36.96 -7.2 TD (required to be rigid block or semi-rigid board.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Check for specified type of material and thickness of) Tj -36.96 -7.2 TD (insulation being installed.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Form or fabricate insulation to fit equipment.) Tj -13.44 -14.4 TD (d.) Tj 13.44 0 TD (On round equipment insulation edges will be beveled to) Tj -36.96 -7.2 TD (insure tight joints.) Tj 23.52 -14.4 TD (e.) Tj 13.44 0 TD (Check joints for being tightly butted, being filled) Tj -36.96 -7.2 TD (with mineral fiber, or insulation cement.) Tj 23.52 -14.4 TD (f.) Tj 13.44 0 TD (Check specifications and manufacturers recommendation) Tj -36.96 -7.2 TD (on spacing of bands. Spacing will not be less than 12 inches on) Tj 0 -7.2 TD (centers.) Tj ET endstream endobj 162 0 obj <>/ProcSet 382 0 R>>/Rotate 0/Type/Page>> endobj 163 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (15C-4) Tj -97.68 469.2 TD (g.) Tj 13.44 0 TD (Check for excessive use of wires in lieu of bands.) Tj -36.96 -7.2 TD (Check for insulation corner protectors under wires.) Tj 23.52 -14.4 TD (h.) Tj 13.44 0 TD (Check hot ducts and equipment for specified finish) Tj -13.44 -14.4 TD (i.) Tj 13.44 0 TD (Check for continuity of insulation thru walls and) Tj -36.96 -7.2 TD (floors.) Tj 0 -14.4 TD (15C-09 ) Tj 32.64 0 TD (INSULATION FOR COLD EQUIPMENT) Tj ET 54.24 448.08 118.32 0.72 re f BT 45.12 435.12 TD (a.) Tj 13.44 0 TD (Check dual temperature equipment, which operates at 60F) Tj -36.96 -7.2 TD (or below at any time, for insulation as specified for cold) Tj 0 -7.2 TD (equipment. Check specification for pump insulation. It may vary) Tj T* (from flexible, rigid, or semi-rigid type insulation. Check all) Tj T* (other equipment for specified insulation..) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Check insulation for thickness specified.) Tj -13.44 -14.4 TD (c.) Tj 13.44 0 TD (Check installation of vapor barrier.) Tj -13.44 -14.4 TD (d.) Tj 13.44 0 TD (Check drain pans under pumps for insulation underneath.) Tj -13.44 -14.4 TD (a.) Tj 13.44 0 TD (Check cold duct and equipment insulation. finish, in) Tj -36.96 -7.2 TD (accordance with specifications.) Tj 0 -14.4 TD (15C-10 ) Tj 32.64 0 TD (ABOVE GROUND PIPE INSULATION) Tj ET 54.24 325.68 114.24 0.72 re f BT 45.12 312.72 TD (a.) Tj 13.44 0 TD (Check contract specifications to determine type of) Tj -36.96 -7.2 TD (insulation required on pipelines within the structure.) Tj 23.52 -14.4 TD (\(1\)) Tj 18 0 TD (Normally, domestic hot water, steam, condensate, hot) Tj -41.52 -7.2 TD (water heating, heated oil, and water defrost lines are insulated) Tj 0 -7.2 TD (as hot pipelines.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Normally domestic cold water, interior roof drains,) Tj -41.52 -7.2 TD (refrigerant suction lines, chilled water and dual temperature) Tj 0 -7.2 TD (water line, air-conditioner condensate drain pipelines, exposed) Tj T* (to weather drainage piping, and piping which operates at 60F or) Tj T* (below at any time, are insulated as cold pipelines.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Check exterior piping for being insulated as required) Tj -36.96 -7.2 TD (by specifications for piping exposed to weather.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Check specifications for areas which are to receive) Tj -36.96 -7.2 TD (factory-applied vapor barrier jackets, field applied aluminum) Tj 0 -7.2 TD (jackets, and field applied vapor barrier.) Tj 0 -14.4 TD (15C-ll ) Tj 32.64 0 TD (PIPING EXPOSED TO WEATHER) Tj ET 54.24 167.28 102 0.72 re f BT 45.12 154.32 TD (a.) Tj 13.44 0 TD (Check to see that pipe is insulated and jacketed for) Tj -36.96 -7.2 TD (applicable service. Note that vapor barrier is not normally) Tj 0 -7.2 TD (specified for hot pipelines.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Check to see if specified jacket is aluminum.) Tj -13.44 -14.4 TD (c.) Tj 13.44 0 TD (Check to see if jacket is required to be factory) Tj -36.96 -7.2 TD (applied or field applied.) Tj 23.52 -14.4 TD (\(1\)) Tj 18 0 TD (Check to see if aluminum jacket laps not less than 2) Tj -41.52 -7.2 TD (inches at all joints.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check banding requirements for the jacket.) Tj ET endstream endobj 164 0 obj <>/ProcSet 382 0 R>>/Rotate 0/Type/Page>> endobj 165 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15C-5) Tj -97.68 469.2 TD (\(3\)) Tj 18 0 TD (Check to see that horizontal joints are lapped) Tj -41.52 -7.2 TD (downward to shed water, and that vertical joints are sealed with) Tj 0 -7.2 TD (a water proof coating.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Check specifications for special treatment of flanges,) Tj -41.52 -7.2 TD (couplings, unions, valves, fittings and anchors.) Tj 0 -14.4 TD (15C-12 ) Tj 32.64 0 TD (BELOW GROUND PIPE INSULATION) Tj ET 54.24 455.28 114.24 0.72 re f BT 45.12 442.32 TD (a.) Tj 13.44 0 TD (Check all below ground domestic hot water heating,) Tj -36.96 -7.2 TD (heating hot water to 200F, dual temperature water, and chilled) Tj 0 -7.2 TD (water piping for specified insulation. Generally the insulation) Tj T* (is 1 1/2\227inch thick cellular glass.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Cellular glass insulation.) Tj -13.44 -14.4 TD (\(1\)) Tj 18 0 TD (Check to see that bore surfaces of insulation are) Tj -41.52 -7.2 TD (coated with a thin application of high strength gypsum cement,) Tj 0 -7.2 TD (as recommended by manufacturer.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check to see that insulation joints are) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Staggered, one-half overlapping the next opposite half) Tj -41.52 -7.2 TD (section.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (All joints are tightly butted and seated with bedding) Tj -41.52 -7.2 TD (compound.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (Insulation secured with 2 stainless steel bands per) Tj -41.52 -7.2 TD (section of insulation.) Tj 23.52 -14.4 TD (\(d\)) Tj 18 0 TD (Insulation termites at anchor blocks.) Tj -18 -14.4 TD (\(e\)) Tj 18 0 TD (Insulation is continuous thru sleeves and manhole.) Tj -18 -14.4 TD (\(f\)) Tj 18 0 TD (Backfill around and three inches above the insulation) Tj -41.52 -7.2 TD (to be free of stones larger than 1/4 in any dimension.) Tj 23.52 -14.4 TD (\(g\)) Tj 18 0 TD (Insulation extends two inches inside of building) Tj 195.84 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s) Tj -241.44 -7.2 TD (interior and tightly butted, scaled, and vapor barrier coated to) Tj 0 -7.2 TD (interior piping.) Tj 23.52 -14.4 TD (\(h\)) Tj 18 0 TD (Check for special insulation requirements for flanges,) Tj -41.52 -7.2 TD (couplings, unions, valves and fittings.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Check finish of insulation for 2 coats of mastic with) Tj -36.96 -7.2 TD (glass cloth or tape embedded between coats. Check for proper) Tj 0 -7.2 TD (overlap at all joints.) Tj 23.52 -14.4 TD (\(1\)) Tj 18 0 TD (Check wet film thickness of both coats of mastic to) Tj -41.52 -7.2 TD (meet specifications requirements.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check termination points to see that mastic and cloth) Tj -41.52 -7.2 TD (or tape covers the end of of the insulation and extends along) Tj 0 -7.2 TD (the base pipe as required by the specifications.) Tj ET endstream endobj 166 0 obj <>/ProcSet 168 0 R>>/Rotate 0/Type/Page>> endobj 167 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 150.96 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (i) Tj -20.4 469.2 TD (CHAPTER 15D) Tj ET 130.56 505.68 44.88 0.72 re f BT 120.48 492.72 TD (PLUMBING SYSTEMS) Tj ET 120.48 491.28 65.28 0.72 re f BT 142.8 478.32 TD (INDEX) Tj -88.8 -14.4 TD (Para.) Tj ET 54 462.48 20.4 0.72 re f BT 144 463.92 TD (Title) Tj ET 144 462.48 20.4 0.72 re f BT 243.12 463.92 TD (Page) Tj ET 243.12 462.48 16.32 0.72 re f BT 54 449.52 TD (15D-01) Tj 49.44 0 TD (GENERAL) Tj 139.68 0 TD (15D-1) Tj -189.12 -14.4 TD (15D-02) Tj 49.44 0 TD (FIXTURES AND MATERIALS) Tj 139.68 0 TD (15D-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Three Phase Inspections) Tj 121.68 0 TD (15D-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Storage and Handling) Tj 121.68 0 TD (15D-1) Tj -189.12 -14.4 TD (15D-03) Tj 49.44 0 TD (COORDINATION OF WORK) Tj 139.68 0 TD (15D-l) Tj -189.12 -14.4 TD (15D-04) Tj 49.44 0 TD (INSTALLATION) Tj 139.68 0 TD (15D-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (General) Tj 121.68 0 TD (15D-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Protection) Tj 121.68 0 TD (15D-2) Tj -189.12 -14.4 TD (15D-05) Tj 49.44 0 TD (PIPELINES, DRAINS, VENT STACKS) Tj 0 -7.2 TD (AND INSULATION) Tj 139.68 0 TD (15D-2) Tj -189.12 -14.4 TD (15D-06) Tj 49.44 0 TD (CLEANING, ADJUSTING,) Tj 0 -7.2 TD (AND OPERATING) Tj 139.68 0 TD (15D-2) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Cleaning) Tj 121.68 0 TD (15D-2) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Adjusting and Operating) Tj 121.68 0 TD (15D-2) Tj ET endstream endobj 168 0 obj [/PDF/Text] endobj 169 0 obj <>/ProcSet 383 0 R>>/Rotate 0/Type/Page>> endobj 170 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15D-1) Tj -12.24 469.2 TD (CHAPTER 15D) Tj ET 130.56 505.68 44.88 0.72 re f BT 120.48 492.72 TD (PLUMBING SYSTEMS) Tj ET 120.48 491.28 65.28 0.72 re f BT 21.6 478.32 TD (15D-01 ) Tj 32.64 0 TD (GENERAL) Tj ET 54.24 476.88 28.56 0.72 re f BT 45.12 463.92 TD (Definition) Tj ET 45.12 462.48 40.8 0.72 re f BT 85.92 463.92 TD (. This chapter covers plumbing fixtures,) Tj -64.32 -7.2 TD (materials, and good workmanship practices for plumbing systems.) Tj 0 -14.4 TD (15D-02 ) Tj 32.64 0 TD (FIXTURES AND MATERIALS) Tj ET 54.24 440.88 89.76 0.72 re f BT 45.12 427.92 TD (a.) Tj 13.44 0 TD (Three Phase Inspections) Tj ET 58.56 426.48 93.84 0.72 re f BT 45.12 413.52 TD (Insure that all plumbing fixtures and materials have been) Tj -23.52 -7.2 TD (submitted and approved prior to the Preparatory Inspections,) Tj 0 -7.2 TD (fabrication, and installation. Obtain and review manufacturer s) Tj T* (installation information. During subsequent Initial Inspections) Tj T* (with contractor) Tj 61.2 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s CQC representative, check to see that contract) Tj -65.28 -7.2 TD (requirements and manufacturer) Tj 118.32 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s recommendations were complied) Tj -122.4 -7.2 TD (with during installation. Follow-up Inspections will be made as) Tj 0 -7.2 TD (the installation of the plumbing systems progress throughout the) Tj T* (facility under construction or renovation.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Storage and Handling) Tj ET 58.56 340.08 81.6 0.72 re f BT 45.12 327.12 TD (Insure that all materials and equipment are handled) Tj -23.52 -7.2 TD (carefully, properly stored and protected to prevent damage.) Tj 23.52 -14.4 TD (\(1\) Reject damaged materials and equipment. Have them) Tj -23.52 -7.2 TD (removed from the site.) Tj 23.52 -14.4 TD (\(2\) Inspect the plumbing fixtures upon arrival at the job) Tj -23.52 -7.2 TD (site for conformance with contract requirements. Require) Tj 0 -7.2 TD (adequate storage and protection from damage before and after) Tj T* (installation. Insure that fixtures are installed in compliance) Tj T* (with contract requirements and good plumbing practice.) Tj 23.52 -14.4 TD (\(3\) Withhold inventory payment for improperly stored and) Tj -23.52 -7.2 TD (protected materials.) Tj 0 -14.4 TD (15D-03 ) Tj 32.64 0 TD (COORDINATION OF WORK) Tj ET 54.24 217.68 81.6 0.72 re f BT 45.12 204.72 TD (Continually check for interferences between electrical,) Tj -23.52 -7.2 TD (mechanical, architectural, and structural features especially in) Tj 0 -7.2 TD (toilet and shower room walls, floors, and pipe chases.) Tj 0 -14.4 TD (15D-04 ) Tj 32.64 0 TD (INSTALLATION) Tj ET 54.24 174.48 48.96 0.72 re f BT 45.12 161.52 TD (a. ) Tj 12.24 0 TD (General) Tj ET 57.36 160.08 28.56 0.72 re f BT 45.12 147.12 TD (\(1\) Know how the plumbing system fits into the total job) Tj -23.52 -7.2 TD (and where the specific items are to be installed. Prior to) Tj 0 -7.2 TD (installing plumbing fixtures check to insure that all testing of) Tj T* (water supply lines, vents, and drains have been completed.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check size, spacing, elevation, and location of wall) Tj -41.52 -7.2 TD (and floor stub outs to receive plumbing equipment. Do not allow) Tj 0 -7.2 TD (plumbing fixtures to be stained, or supply lines to be) Tj T* (undersized. Insure that the stub outs are corrected as necessary) Tj T* (prior to setting plumbing fixtures.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Check location and firmness of the installation of) Tj -41.52 -7.2 TD (specified equipment supports, holders, and tie down flanges.) Tj ET endstream endobj 171 0 obj <>/ProcSet 383 0 R>>/Rotate 0/Type/Page>> endobj 172 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (15D-2) Tj -97.68 469.2 TD (\(4\)) Tj 18 0 TD (Check setting or attaching plumbing fixtures, for) Tj -41.52 -7.2 TD (required seals, traps, grouting, and caulking. Check each) Tj 0 -7.2 TD (fixture for alignment, height, anchorage and for plumbness.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Check for use of chrome plating on exposed piping,) Tj -41.52 -7.2 TD (valves, escutcheons, cover plates, and drains.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Check for surge arrestors on lines having quick) Tj -41.52 -7.2 TD (closing valves. Check for positioning of access opening to allow) Tj 0 -7.2 TD (maintenance of surge arrestors and operation of control and shut) Tj T* (off valves. Check for individual shut off valves at each piece) Tj T* (of plumbing equipment.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Check for connection of cold water piping to the right) Tj -41.52 -7.2 TD (hand side of showers, lavatories, and sinks. Also make sure cold) Tj 0 -7.2 TD (water is provided to toilets and urinals.) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (Check for specified trim, materials, screws, and) Tj -41.52 -7.2 TD (bolts.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Protection) Tj ET 58.56 361.68 40.8 0.72 re f BT 45.12 348.72 TD (\(1\)) Tj 18 0 TD (Keep trash and debris out of fixtures and drains.) Tj -41.52 -7.2 TD (Check fixtures for damage during installation.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Cover and protect fixtures after installation to) Tj -41.52 -7.2 TD (prevent future breakage, staining, or other damage.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Check workmanship on all bolting, grouting, caulking,) Tj -41.52 -7.2 TD (shimming, and leveling after work in toilet and bath area after) Tj 0 -7.2 TD (the work has been completed. All fixtures, whether wall or floor) Tj T* (mounted, must be firmly attached in place to prevent damage to) Tj T* (the fixtures and to the seals of the fixtures. Check to see that) Tj T* (all materials and fixtures are sanitary anti-siphon units.) Tj 0 -14.4 TD (15D-05 ) Tj 32.64 0 TD (PIPELINES. DRAINS. VENT STACKS, AND INSULATION) Tj ET 54.24 253.68 187.68 0.72 re f BT 45.12 240.72 TD (See Section 15A for water pipelines, fittings, valves,) Tj -23.52 -7.2 TD (vents and drain lines. See Section 15C for insulation of pipe) Tj 0 -7.2 TD (lines.) Tj 0 -14.4 TD (15D-06 ) Tj 32.64 0 TD (CLEANING, ADJUSTING, AND OPERATING) Tj ET 54.24 210.48 138.72 0.72 re f BT 45.12 197.52 TD (a.) Tj 13.44 0 TD (Cleaning) Tj ET 58.56 196.08 32.64 0.72 re f BT 45.12 183.12 TD (\(1\)) Tj 18 0 TD (Inspect all surfaces for damage or stains. Replace or) Tj -41.52 -7.2 TD (clean as necessary. Clean equipment before running water thru) Tj 0 -7.2 TD (it.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (See that all grease, paint, plaster, spackle, spots) Tj -41.52 -7.2 TD (and debris are removed. See that anchorage and seals are firm.) Tj 0 -7.2 TD (See that equipment is still undamaged. Accept only properly) Tj T* (working, and undamaged equipment.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Adjusting and Operating) Tj ET 58.56 116.88 93.84 0.72 re f BT 45.12 103.92 TD (\(1\)) Tj 18 0 TD (Flush, turn on, or otherwise run water thru system.) Tj -41.52 -7.2 TD (Check flow, water levels, quietness of operation, and shut off) Tj 0 -7.2 TD (capability. Check flow thru both fixtures and drains. Correct as) Tj T* (necessary.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Reject equipment that is damaged, does not properly) Tj -41.52 -7.2 TD (operate, is not properly installed, and is not in new condition.) Tj ET endstream endobj 173 0 obj <>/ProcSet 175 0 R>>/Rotate 0/Type/Page>> endobj 174 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 150.96 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (i) Tj -20.4 469.2 TD (CHAPTER 15E) Tj ET 130.56 505.68 44.88 0.72 re f BT 122.4 492.72 TD (HEATING SYSTEMS) Tj ET 122.4 491.28 61.2 0.72 re f BT 142.8 478.32 TD (INDEX) Tj -88.8 -14.4 TD (Para.) Tj ET 54 462.48 20.4 0.72 re f BT 144 463.92 TD (Title) Tj ET 144 462.48 20.4 0.72 re f BT 243.12 463.92 TD (Page) Tj ET 243.12 462.48 16.32 0.72 re f BT 54 449.52 TD (15E-01) Tj 49.44 0 TD (GENERAL) Tj 139.68 0 TD (15E-1) Tj -189.12 -14.4 TD (15E-02) Tj 49.44 0 TD (MATERIALS AND EQUIPMENT) Tj 139.68 0 TD (15E-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (General) Tj 121.68 0 TD (15E-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Boilers, Furnaces, and) Tj 0 -7.2 TD (Accessory Equipment) Tj 121.68 0 TD (15E-2) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Fuel Burning Equipment) Tj 121.68 0 TD (15E-2) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Draft Fans) Tj 121.68 0 TD (15E-3) Tj -139.68 -7.2 TD (e.) Tj 18 0 TD (Oil Storage Tank) Tj 121.68 0 TD (15E-3) Tj -139.68 -7.2 TD (f.) Tj 18 0 TD (Circulating, Condensate and) Tj 0 -7.2 TD (Vacuum Return Pumps) Tj 121.68 0 TD (15E-3) Tj -139.68 -7.2 TD (g.) Tj 18 0 TD (Miscellaneous Fittings and) Tj 0 -7.2 TD (Equipment) Tj 121.68 0 TD (15E-3) Tj -189.12 -14.4 TD (15E-03) Tj 49.44 0 TD (INSPECTION) Tj 139.68 0 TD (15E-4) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Planning) Tj 121.68 0 TD (15E-4) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Piping) Tj 121.68 0 TD (15E-4) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Pipe Insulation) Tj 121.68 0 TD (15E-5) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Hot-Water Systems) Tj 121.68 0 TD (15E-6) Tj -139.68 -7.2 TD (e.) Tj 18 0 TD (High-Temperature) Tj 0 -7.2 TD (Hot Water) Tj 121.68 0 TD (15E-6) Tj -139.68 -7.2 TD (f.) Tj 18 0 TD (Steam Systems) Tj 121.68 0 TD (15E-6) Tj -139.68 -7.2 TD (g.) Tj 18 0 TD (Hot Air Heating) Tj 121.68 0 TD (15E-6) Tj -139.68 -7.2 TD (h.) Tj 18 0 TD (Heating and Ventilating) Tj 0 -7.2 TD (Units) Tj 121.68 0 TD (15E-7) Tj -139.68 -7.2 TD (i.) Tj 18 0 TD (Unit Heaters) Tj 121.68 0 TD (15E-7) Tj -139.68 -7.2 TD (j.) Tj 18 0 TD (Controls) Tj 121.68 0 TD (15E-7) Tj -139.68 -7.2 TD (k.) Tj 18 0 TD (Boilers and Boiler Plants) Tj 121.68 0 TD (15E-7) Tj -139.68 -7.2 TD (l.) Tj 18 0 TD (Smoke Connections) Tj 121.68 0 TD (15E-13) Tj -139.68 -7.2 TD (m.) Tj 18 0 TD (Fuel Storage and Conveying) Tj 121.68 0 TD (15E-13) Tj -139.68 -7.2 TD (n.) Tj 18 0 TD (Painting) Tj 121.68 0 TD (15E-14) Tj -139.68 -7.2 TD (o.) Tj 18 0 TD (Testing) Tj 121.68 0 TD (15E-14) Tj -139.68 -7.2 TD (p.) Tj 18 0 TD (Operating Instructions and) Tj 0 -7.2 TD (Guaranties) Tj 121.68 0 TD (15E-14) Tj ET endstream endobj 175 0 obj [/PDF/Text] endobj 176 0 obj <>/ProcSet 384 0 R>>/Rotate 0/Type/Page>> endobj 177 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15E-1) Tj -12.24 469.2 TD (CHAPTER 15E) Tj ET 130.56 505.68 44.88 0.72 re f BT 122.4 492.72 TD (HEATING SYSTEMS) Tj ET 122.4 491.28 61.2 0.72 re f BT 21.6 485.52 TD (15E-01 ) Tj 32.64 0 TD (GENERAL) Tj ET 54.24 484.08 28.56 0.72 re f BT 45.12 471.12 TD (a.) Tj 13.44 0 TD (This chapter covers material, equipment, and good) Tj -36.96 -7.2 TD (workmanship practices for the installation of heating systems.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (The QA Rep should strive to obtain systems in) Tj -36.96 -7.2 TD (accordance with the contract requirements that are safe,) Tj 0 -7.2 TD (adequate, and neat, and which function properly with a minimum) Tj T* (of routine maintenance.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (In combination heating-cooling systems designed for) Tj -36.96 -7.2 TD (year- round automatic air conditioning, coordinate material of) Tj 0 -7.2 TD (this section with Section 15F, VENTILATING, AIR SUPPLY AND) Tj T* (DISTRIBUTION SYSTEMS, 15G REFRIGERATION AND AIR CONDITIONING,) Tj T* (AND SECTION 15C MECHANICAL INSULATION.) Tj 0 -14.4 TD (15E-02 ) Tj 32.64 0 TD (MATERIALS AND EQUIPMENT) Tj ET 54.24 368.88 93.84 0.72 re f BT 45.12 355.92 TD (a.) Tj 13.44 0 TD (General) Tj ET 58.56 354.48 28.56 0.72 re f BT 45.12 341.52 TD (\(1\)) Tj 18 0 TD (Make sure that each piece of material and each item of) Tj -41.52 -7.2 TD (equipment has been approved well in advance of its need. When) Tj 0 -7.2 TD (the material and equipment arrive on the job, inspect them very) Tj T* (carefully, comparing them with the approved shop drawing and) Tj T* (samples. Check and record nameplate data on all equipment.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Determine that there is adequate space in the room for) Tj -41.52 -7.2 TD (proper functioning and maintenance of all the equipment.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Reject all damaged materials and equipment and have) Tj -41.52 -7.2 TD (them removed from the site.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Check the electrical features of equipment and) Tj -41.52 -7.2 TD (coordinate with the mechanical features.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Determine that provisions have been made for access) Tj -41.52 -7.2 TD (panels.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Check the required controls and valves for compliance) Tj -41.52 -7.2 TD (with contract requirements.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Check specification provisions for necessary spare) Tj -41.52 -7.2 TD (parts and tools for all of the equipment.) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (See that operations and maintenance instructions are) Tj -41.52 -7.2 TD (with equipment and are posted on the wall upon completion of) Tj 0 -7.2 TD (installation.) Tj 23.52 -14.4 TD (\(9\)) Tj 18 0 TD (Require proper storage and protection of all materials) Tj -41.52 -7.2 TD (and equipment.) Tj 23.52 -14.4 TD (\(10\)) Tj 22.32 0 TD (Check the noise level of all equipment.) Tj -22.32 -14.4 TD (\(11\)) Tj 22.32 0 TD (Verify requirements for the installation of flexible) Tj -45.84 -7.2 TD (pipe connections and vibration eliminators for equipment.) Tj 23.52 -14.4 TD (\(12\)) Tj 22.32 0 TD (Check the installation of all equipment for) Tj -45.84 -7.2 TD (compliance with manufacturer) Tj 114.24 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s recommendations.) Tj ET endstream endobj 178 0 obj <>/ProcSet 384 0 R>>/Rotate 0/Type/Page>> endobj 179 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (15E-2) Tj -97.68 469.2 TD (b.) Tj 13.44 0 TD (Boilers, Furnaces, and Accessory Equipment) Tj ET 58.56 505.68 171.36 0.72 re f BT 45.12 492.72 TD (\(1\)) Tj 18 0 TD (Examine pressure boilers for conformance with the ASME) Tj -41.52 -7.2 TD (Code.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check for all necessary connections on the boiler.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Check cast iron boilers, if field assembled, for) Tj -41.52 -7.2 TD (tightness of joints.) Tj 23.52 -14.4 TD (\(a\)) Tj 18 0 TD (All joints shall be sealed.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Reject cracked section.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Inspect refractory furnaces built up on the job for) Tj -41.52 -7.2 TD (materials and workmanship.) Tj 23.52 -14.4 TD (\(a\)) Tj 18 0 TD (Require expansion joints to be provided. Piping on) Tj -41.52 -7.2 TD (both sides of expansion joints should be properly guided.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (Insure packing to prevent gas or air leakage.) Tj -18 -14.4 TD (\(c\)) Tj 18 0 TD (Reject all cracked, chipped or otherwise damaged brick) Tj -41.52 -7.2 TD (and tile.) Tj 23.52 -14.4 TD (\(d\) Check plastic refractories for placement, thorough) Tj -23.52 -7.2 TD (ramming, and consistency.) Tj 23.52 -14.4 TD (\(a\)) Tj 18 0 TD (Require refractories to be kept dry.) Tj -18 -14.4 TD (\(f\)) Tj 18 0 TD (Inspect for use of refractory mortar in construction) Tj -41.52 -7.2 TD (of combustion chamber.) Tj 23.52 -14.4 TD (\(g\)) Tj 18 0 TD (Check for air circulation under the combustion chamber) Tj -41.52 -7.2 TD (floors.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Inspect the application of insulation after all joints) Tj -41.52 -7.2 TD (are tightly sealed. Check material, thickness, and finish.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Observe accessory equipment operation such as) Tj -41.52 -7.2 TD (feedwater controllers, dampers, pressure and draft gages, flow) Tj 0 -7.2 TD (and pressure recorders, soot blowers, water columns and boiler) Tj T* (blowdown. Check the pressurestat differential.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Check requirement for expansion joint in floor around) Tj -41.52 -7.2 TD (boiler.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Fuel Burning Equipment) Tj ET 58.56 167.28 89.76 0.72 re f BT 45.12 154.32 TD (\(1\)) Tj 18 0 TD (Coal, Hand-Fired. Verify installation of grates and) Tj -41.52 -7.2 TD (operation of dumping mechanism.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Coal, Stoker-Fired. Confirm capacity and operation of) Tj -41.52 -7.2 TD (feeder, grates, and ash removal.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Oil burners. Check:) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Size and type of burner tips) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Location of electrodes to insure spark in oil spray) Tj -41.52 -7.2 TD (cone) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (Position of gas or oil pilot) Tj ET endstream endobj 180 0 obj <>/ProcSet 384 0 R>>/Rotate 0/Type/Page>> endobj 181 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15E-3) Tj -97.68 469.2 TD (\(d\)) Tj 18 0 TD (Clearances for removal of burner from furnace.) Tj -18 -14.4 TD (\(e\)) Tj 18 0 TD (Burner adjustments.) Tj -18 -14.4 TD (\(f\)) Tj 18 0 TD (Carbon dioxide in flue gas.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Inspect gas burners for cleanliness, adjustments,) Tj -41.52 -7.2 TD (position of pilot flame, and sensing element. Check regulator) Tj 0 -7.2 TD (and controls.) Tj 23.52 -14.4 TD (\(a\)) Tj 18 0 TD (Blow out gas line before connecting to burner or) Tj -41.52 -7.2 TD (regulator.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (Install regulator in vertical position.) Tj -18 -14.4 TD (\(c\)) Tj 18 0 TD (Pipe gas vents to the outdoors.) Tj -18 -14.4 TD (d.) Tj 13.44 0 TD (Draft Fans) Tj ET 58.56 383.28 40.8 0.72 re f BT 45.12 370.32 TD (\(1\)) Tj 18 0 TD (Check fans and drivers for anchorage, alignment, and) Tj -41.52 -7.2 TD (rotation.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check accessibility of lubrication fittings.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Inspect dampers for operation in compliance with) Tj -41.52 -7.2 TD (contract requirements.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Inspect bearings for smoothness and overheating.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Check vibration and vibration absorbing mounts.) Tj -18 -14.4 TD (\(6\)) Tj 18 0 TD (Inspect insulation application to induced draft fan.) Tj -18 -14.4 TD (\(7\)) Tj 18 0 TD (Examine safety control interlocks and sic-flow) Tj -41.52 -7.2 TD (switches.) Tj 23.52 -14.4 TD (e.) Tj 13.44 0 TD (Oil Storage Tank) Tj ET 58.56 246.48 65.28 0.72 re f BT 45.12 233.52 TD (\(1\)) Tj 18 0 TD (Check for Underwriter) Tj 85.68 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s approval.) Tj -107.76 -14.4 TD (\(2\)) Tj 18 0 TD (Check tank capacity and calibration.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (See that tanks have the required openings and the) Tj -41.52 -7.2 TD (means for proper anchorage.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Check for tank heaters, when required.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Examine paint coating and examine holiday testing.) Tj -18 -14.4 TD (\(6\)) Tj 18 0 TD (Check manufacturers instructions for proper) Tj -41.52 -7.2 TD (installation.) Tj 23.52 -14.4 TD (f.) Tj 13.44 0 TD (Circulating, Condensate and Vacuum Return Pumps) Tj ET 58.56 131.28 191.76 0.72 re f BT 45.12 118.32 TD (Inspect for capacity and for method of mounting.) Tj 0 -14.4 TD (g.) Tj 13.44 0 TD (Miscellaneous Fittings and Equipment) Tj ET 58.56 102.48 146.88 0.72 re f BT 45.12 89.52 TD (Inspect drips, traps, valves, coils, elements, convectors,) Tj -23.52 -7.2 TD (radiators, etc., as they are brought on the job, to make sure) Tj 0 -7.2 TD (that they are of the correct capacity and that they have been) Tj T* (approved.) Tj ET endstream endobj 182 0 obj <>/ProcSet 384 0 R>>/Rotate 0/Type/Page>> endobj 183 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (15E-4) Tj -121.2 469.2 TD (15E-03 ) Tj 32.64 0 TD (INSPECTION) Tj ET 54.24 505.68 40.8 0.72 re f BT 45.12 492.72 TD (a.) Tj 13.44 0 TD (Planning) Tj ET 58.56 491.28 32.64 0.72 re f BT 45.12 478.32 TD (\(1\)) Tj 18 0 TD (Check the availability of codes, reference data and) Tj -41.52 -7.2 TD (manufacturer) Tj 48.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s recommendations.) Tj -29.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check with contractor for his detail layouts of) Tj -41.52 -7.2 TD (equipment and piping which are normally made to coordinate work) Tj 0 -7.2 TD (of the various trades.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Compare nameplate data, piping markings, etc., with) Tj -41.52 -7.2 TD (requirements.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (provide the proper spacing of equipment to make sure) Tj -41.52 -7.2 TD (that there is adequate room fur piping, ductwork, accessibility) Tj 0 -7.2 TD (for maintenance and that walls behind ductwork can be finished) Tj T* (without duct removal. Check for adequate clearance for removal) Tj T* (of air filters and strainers.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (verify how the heating system fits into the total job.) Tj -18 -14.4 TD (\(6\)) Tj 18 0 TD (Be sure that sleeves of the correct size and material) Tj -41.52 -7.2 TD (are properly located in floors and walls before they are built.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (In spite of all attempts to insure that sleeves,) Tj -41.52 -7.2 TD (inserts, boxes, and so on, are all in place before concrete is) Tj 0 -7.2 TD (placed, oversights occur, and it becomes necessary to cut) Tj T* (concrete. Any such operation should be approved by the) Tj T* (supervisor before it is begun. A cut in concrete wall should be) Tj T* (made from both sides of the wall to avoid spalling of the far) Tj T* (surface.) Tj 23.52 -14.4 TD (h.) Tj 13.44 0 TD (Piping) Tj ET 58.56 268.08 24.48 0.72 re f BT 45.12 255.12 TD (\(1\)) Tj 18 0 TD (Compare piping workmanship with the check list of) Tj -41.52 -7.2 TD (paragraph 15A-03.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check storage and handling against paragraph 15A-02b.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Inspect for the required type and size of pipe.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Examine the cutting of construction to install piping.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Require provisions for expansion and contraction, and) Tj -41.52 -7.2 TD (proper anchorage of pipe.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Check the installation of mechanical expansion joints.) Tj -41.52 -7.2 TD (Do not remove spacers until expansion joints are ready to be) Tj 0 -7.2 TD (installed.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Verify that the pitch of the horizontal runs are) Tj -41.52 -7.2 TD (correct.) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (Check the position of branch connections.) Tj -18 -14.4 TD (\(9\)) Tj 18 0 TD (Be sure that required valves are installed in the) Tj -41.52 -7.2 TD (correct positions.) Tj 23.52 -14.4 TD (\(10\)) Tj 22.32 0 TD (Check the method and procedure of jointing pipes.) Tj ET endstream endobj 184 0 obj <>/ProcSet 384 0 R>>/Rotate 0/Type/Page>> endobj 185 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15E-5) Tj -97.68 469.2 TD (\(a\)) Tj 18 0 TD (On threaded joints, check for the use of tapered) Tj -41.52 -7.2 TD (threads. See that graphite and oil, or an equivalent, are) Tj 0 -7.2 TD (applied to the threads.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (On welded joints, check for compliance with approved) Tj -41.52 -7.2 TD (welding procedures, inspect for defective welds; check type of) Tj 0 -7.2 TD (material of the welding rod; make sure welders have been) Tj T* (qualified and are stamping their welds. See Chapter 5 and) Tj T* (Chapter 15A for welding inspection guidance.) Tj 23.52 -14.4 TD (\(11\)) Tj 22.32 0 TD (See that piping is properly aligned and that there is) Tj -45.84 -7.2 TD (no strain on joints or on adjacent equipment.) Tj 23.52 -14.4 TD (\(12\)) Tj 22.32 0 TD (See that proper grade and alignment are maintained) Tj -45.84 -7.2 TD (and that proper fittings are provided to eliminate air pockets) Tj 0 -7.2 TD (and restrictions.) Tj 23.52 -14.4 TD (\(13\)) Tj 22.32 0 TD (Check for air valves at all high points and at the) Tj -45.84 -7.2 TD (ends of mains. Check for drips and traps at low points. Examine) Tj 0 -7.2 TD (the lines to make sure that condensate cannot accumulate in the) Tj T* (lines.) Tj 23.52 -14.4 TD (\(14\)) Tj 22.32 0 TD (Inspect for required floor, wall, and ceiling plates.) Tj -45.84 -7.2 TD (Check for type, size, material, and finish.) Tj 23.52 -14.4 TD (\(15\)) Tj 22.32 0 TD (Watch for the use and proper installation of) Tj -45.84 -7.2 TD (eccentric fittings.) Tj 23.52 -14.4 TD (\(16\)) Tj 22.32 0 TD (See that interconnecting piping between boilers) Tj -45.84 -7.2 TD (conforms to shop drawings and ASME Code. Watch for adequate) Tj 0 -7.2 TD (valves and other special fittings. Cutoff valves shall be) Tj T* (provided to isolate each boiler from the steam header.) Tj 23.52 -14.4 TD (\(17\)) Tj 22.32 0 TD (Be sure that lift fittings are provided where the) Tj -45.84 -7.2 TD (gravity flow of vacuum returns is interrupted by a change to a) Tj 0 -7.2 TD (higher elevation.) Tj 23.52 -14.4 TD (\(18\)) Tj 22.32 0 TD (Clean all supply and return lines before putting them) Tj -45.84 -7.2 TD (into operation. Check whether contractor has cleaned all traps) Tj 0 -7.2 TD (and strainers after pipe cleaning and before system operation.) Tj 23.52 -14.4 TD (\(19\)) Tj 22.32 0 TD (Check safety valve discharge pipe for number of ells) Tj -45.84 -7.2 TD (\(restriction\).) Tj 23.52 -14.4 TD (\(20\)) Tj 22.32 0 TD (Check bent pipe for kinks, wrinkles or other) Tj -45.84 -7.2 TD (malformations.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Pipe Insulation) Tj ET 58.56 167.28 61.2 0.72 re f BT 45.12 154.32 TD (\(1\)) Tj 18 0 TD (Know locations of pipes required to be insulated.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (See that insulation has been approved.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Check width and type of material and the spacing of) Tj -41.52 -7.2 TD (bands.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Be sure that all fittings except unions and flanges) Tj -41.52 -7.2 TD (are insulated.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Be sure that insulation is being correctly installed.) Tj -41.52 -7.2 TD (See section 15C Mechanical Insulation.) Tj ET endstream endobj 186 0 obj <>/ProcSet 384 0 R>>/Rotate 0/Type/Page>> endobj 187 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (15E-6) Tj -97.68 469.2 TD (\(6\)) Tj 18 0 TD (Check for continuity of insulation through walls and) Tj -41.52 -7.2 TD (floors.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Check that proper thickness of insulation is being) Tj -41.52 -7.2 TD (applied.) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (On chilled-water and hot-water combination piping and) Tj -41.52 -7.2 TD (boiler piping check for vapor seal requirement.) Tj 23.52 -14.4 TD (d.) Tj 13.44 0 TD (Hot Water Systems) Tj ET 58.56 440.88 69.36 0.72 re f BT 45.12 427.92 TD (\(1\)) Tj 18 0 TD (Note the installation of balancing valves or orifices) Tj -41.52 -7.2 TD (in the return connection of each radiator or heating device.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (See that contractor balances system as required by) Tj -41.52 -7.2 TD (plans or specifications.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Insure that threaded openings are provided on) Tj -41.52 -7.2 TD (converters. See that safety devices and temperature controls are) Tj 0 -7.2 TD (furnished and are in working order. Check coil for tightness and) Tj T* (clearance for its removal. Note drain pipe to outside atmosphere) Tj T* (or floor drain from blow\227off safety valves.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Check for automatic and manual vents.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Examine expansion tanks for size, conformance to code,) Tj -41.52 -7.2 TD (protective paint coating, insulation, water level gage, drain) Tj 0 -7.2 TD (and air charging valves.) Tj 23.52 -14.4 TD (a.) Tj 13.44 0 TD (High Temperature Not Water) Tj ET 58.56 296.88 106.08 0.72 re f BT 45.12 283.92 TD (\(1\)) Tj 18 0 TD (Check pumps for:) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Leveling, alignment, and stability on foundation) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Lubrication) Tj -18 -14.4 TD (\(c\)) Tj 18 0 TD (Seals for leaks) Tj -18 -14.4 TD (\(d\)) Tj 18 0 TD (Packing adjustment and type) Tj -18 -14.4 TD (\(e\)) Tj 18 0 TD (Pressure retention) Tj -18 -14.4 TD (\(f\)) Tj 18 0 TD (Correct rotation) Tj -18 -14.4 TD (\(g\) Seal coolant service installed.) Tj 0 -14.4 TD (\(2\)) Tj 18 0 TD (Insure that radiant heating coils are accurately) Tj -41.52 -7.2 TD (placed, firmly secured, and absolutely tight under a hydrostatic) Tj 0 -7.2 TD (test pressure of one and one-half times the operating pressure) Tj T* (prior to encasement in construction.) Tj 23.52 -14.4 TD (f.) Tj 13.44 0 TD (Steam Systems) Tj ET 58.56 131.28 53.04 0.72 re f BT 45.12 121.2 TD (\(1\)) Tj 18 0 TD (Know details of the type of system required.) Tj -18 -11.52 TD (\(2\)) Tj 18 0 TD (Check the operation of supply valves to radiator and) Tj -41.52 -7.2 TD (convector.) Tj 23.52 -11.52 TD (\(3\)) Tj 18 0 TD (Check radiator run-out for pitch.) Tj -18 -11.52 TD (g.) Tj 13.44 0 TD (Hot Air Heating) Tj ET 58.56 78 61.2 0.72 re f BT 45.12 65.04 TD (\(1\)) Tj 18 0 TD (Insure that contractor follows NFPA criteria for) Tj -41.52 -7.2 TD (installation of oil or gas equipment.) Tj ET endstream endobj 188 0 obj <>/ProcSet 384 0 R>>/Rotate 0/Type/Page>> endobj 189 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15E-7) Tj -97.68 469.2 TD (\(2\)) Tj 18 0 TD (Be sure that return air has free passage to heater) Tj -41.52 -7.2 TD (unit.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Note damper setting balance of the flow of air.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Check that flexible connections have been installed) Tj -41.52 -7.2 TD (between furnace and duct system.) Tj 23.52 -14.4 TD (h.) Tj 13.44 0 TD (Heating and Ventilating Units) Tj ET 58.56 448.08 118.32 0.72 re f BT 45.12 435.12 TD (\(1\)) Tj 18 0 TD (Require that all component parts operate) Tj -41.52 -7.2 TD (satisfactorily.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Note access doors for tightness and clearance.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Determine that noise level is within acceptable) Tj -41.52 -7.2 TD (limits.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Check flexible pipe connections and/or vibration) Tj -41.52 -7.2 TD (eliminators.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Check rotation.) Tj -18 -14.4 TD (i.) Tj 13.44 0 TD (Unit Heaters) Tj ET 58.56 340.08 48.96 0.72 re f BT 45.12 327.12 TD (Check:) Tj 0 -14.4 TD (\(1\)) Tj 18 0 TD (Air distribution) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Noise level) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Controls) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Clearances) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Rotation) Tj -18 -14.4 TD (j.) Tj 13.44 0 TD (Controls) Tj ET 58.56 239.28 32.64 0.72 re f BT 45.12 226.32 TD (Be sure that the controls are provided, as specified, that) Tj -23.52 -7.2 TD (they are properly hooked up, and that they will perform the) Tj 0 -7.2 TD (required operation.) Tj 23.52 -14.4 TD (k.) Tj 13.44 0 TD (Boilers and Boiler Plants) Tj ET 58.56 196.08 102 0.72 re f BT 45.12 183.12 TD (\(1\)) Tj 18 0 TD (General Requirements:) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Before rolling in, check the cleaning of ends of tubes) Tj -41.52 -7.2 TD (and the surfaces of tube holes in drums and headers. Check to) Tj 0 -7.2 TD (assure that new boilers exposed to weather are covered to) Tj T* (prevent corrosion.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (See that tube-rolling is done by experienced workmen) Tj -41.52 -7.2 TD (and that all precautions are taken to prevent either under or) Tj 0 -7.2 TD (over rolling. ) Tj 57.12 0 TD (At this stage of erection request technical) Tj ET 78.72 116.88 175.44 0.72 re f BT 21.6 111.12 TD (assistance) Tj ET 21.6 109.68 40.8 0.72 re f BT 62.4 111.12 TD (.) Tj -17.28 -14.4 TD (\(c\)) Tj 18 0 TD (Insure that the boiler inspector is notified when it) Tj -41.52 -7.2 TD (is time for the hydrostatic test. Obtain Certificate of) Tj 0 -7.2 TD (Inspection. Do not permit the installation of any baffles or the) Tj T* (setting of refractories until after the boiler has passed) Tj T* (inspection.) Tj ET endstream endobj 190 0 obj <>/ProcSet 384 0 R>>/Rotate 0/Type/Page>> endobj 191 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (15E-8) Tj -97.68 469.2 TD (\(d\)) Tj 18 0 TD (Affirm that baffles of steel, refractory tile, or) Tj -41.52 -7.2 TD (monolithic construction are installed gas-tight but with) Tj 0 -7.2 TD (provision for expansion, and that they will resist dislodgment) Tj T* (by "puffs".) Tj 23.52 -14.4 TD (\(e\)) Tj 18 0 TD (Insure that boiling-out operations for the removal of) Tj -41.52 -7.2 TD (grease, oil, and other foreign matter are performed before) Tj 0 -7.2 TD (boiler is placed on-the-line.) Tj 23.52 -14.4 TD (\(f\)) Tj 18 0 TD (Insure that space is provided for tube removal and) Tj -41.52 -7.2 TD (cleaning and for general maintenance of all equipment.) Tj 23.52 -14.4 TD (\(g\)) Tj 18 0 TD (Check to assure that during periods of operation by) Tj -41.52 -7.2 TD (contractor chemical treatment and blowdown are provided to) Tj 0 -7.2 TD (prevent scale deposits and corrosion.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Settings) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Be sure that all settings are constructed with) Tj -41.52 -7.2 TD (provision for expansion and contraction of both the refractories) Tj 0 -7.2 TD (and the pressure parts. See that expansion joints are sealed to) Tj T* (prevent passage of air or gases but are flexible enough to) Tj T* (maintain their seal under movement of the structure. Check the) Tj T* (entire setting for leaks.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (Check solid refractory walls for plumb, level courses) Tj -41.52 -7.2 TD (and dipped joints. Check grades of refractories used. Chipped,) Tj 0 -7.2 TD (cracked, wet or broken refractory materials will be rejected.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (Insure that refractory tile and setting casings are) Tj -41.52 -7.2 TD (constructed to prevent the escape of gases or the infiltration) Tj 0 -7.2 TD (of air, and that they are installed in accordance with the) Tj T* (recommendations of the manufacturer.) Tj 23.52 -14.4 TD (\(d\)) Tj 18 0 TD (Insist that all openings through setting walls are) Tj -41.52 -7.2 TD (accurately located and of proper size. Check temperature of) Tj 0 -7.2 TD (boiler setting surface against room temperature.) Tj 23.52 -14.4 TD (\(a\)) Tj 18 0 TD (Verify that pipe sleeves for draft gages are clean and) Tj -41.52 -7.2 TD (flush with interior face of wall.) Tj 23.52 -14.4 TD (\(f\)) Tj 18 0 TD (Inspect uptake damper for correct location, bearing) Tj -41.52 -7.2 TD (material, and freedom of operation when hot.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Fuel Burning Equipment) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Correlate coal stokers with stationary grates for) Tj -41.52 -7.2 TD (accurate placement and support of the grate bars. See that) Tj 0 -7.2 TD (shaking and dumping mechanism will work freely under operating) Tj T* (temperatures.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (Evaluate traveling and moving grates for alignment of) Tj -41.52 -7.2 TD (running parts and guides, tightness of seals, and provision for) Tj 0 -7.2 TD (expansion and contraction.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (Note lubrication and protection of motors, gears, and) Tj -41.52 -7.2 TD (bearings.) Tj 23.52 -14.4 TD (\(d\)) Tj 18 0 TD (Examine all moving parts for operation under) Tj -41.52 -7.2 TD (temperatures encountered and for loads specified.) Tj 23.52 -14.4 TD (\(e\)) Tj 18 0 TD (Insure that grate design and coal sizing are suitable) Tj -41.52 -7.2 TD (for each other.) Tj ET endstream endobj 192 0 obj <>/ProcSet 384 0 R>>/Rotate 0/Type/Page>> endobj 193 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15E-9) Tj -97.68 469.2 TD (\(f\)) Tj 18 0 TD (See that stoker feeding mechanism is adjusted to) Tj -41.52 -7.2 TD (distribute the coat evenly over the grates.) Tj 23.52 -14.4 TD (\(g\)) Tj 18 0 TD (Verify that pulverizers are constructed and installed) Tj -41.52 -7.2 TD (as nearly dust-tight as possible. Be sure the equipment is) Tj 0 -7.2 TD (firmly secured to foundation. Check units for proper balance and) Tj T* (quiet operation at normal operating speeds.) Tj 23.52 -14.4 TD (\(h\)) Tj 18 0 TD (See if pulverizers are adjusted for proper coal) Tj -41.52 -7.2 TD (fineness. Notice whether heat is applied to the coal in the) Tj 0 -7.2 TD (pulverizer, or that temperatures are obtained prior to entrance) Tj T* (of coal to assure satisfactory dryness of coal.) Tj 23.52 -14.4 TD (\(i\)) Tj 18 0 TD (Insure that burners are adjusted for efficient) Tj -41.52 -7.2 TD (operation, minimum excess air, stable ignition at low rating,) Tj 0 -7.2 TD (and no impingement on furnace walls. Use a boiler test kit when) Tj T* (required.) Tj 23.52 -14.4 TD (\(j\)) Tj 18 0 TD (Evaluate the coal feeder for accurate and even) Tj -41.52 -7.2 TD (operation.) Tj 23.52 -14.4 TD (\(k\)) Tj 18 0 TD (Examine the installation of access and inspection) Tj -41.52 -7.2 TD (doors.) Tj 23.52 -14.4 TD (\(l\)) Tj 18 0 TD (View magnetic separators for location ahead of) Tj -41.52 -7.2 TD (pulverizers.) Tj 23.52 -14.4 TD (\(m\)) Tj 18 0 TD (All safety precautions are to be observed in the) Tj -41.52 -7.2 TD (installation of gas burners and piping. Arrangement of gas) Tj 0 -7.2 TD (valves should be in accordance with ASA Standard Z 21.33.) Tj 23.52 -14.4 TD (\(n\)) Tj 18 0 TD (Burners should be arranged to permit ready inspection) Tj -41.52 -7.2 TD (and servicing.) Tj 23.52 -14.4 TD (\(o\)) Tj 18 0 TD (Note location of pilot flame. Provision shall be made) Tj -41.52 -7.2 TD (to facilitate manual lighting of pilot flame. Hand torch and) Tj 0 -7.2 TD (receptacle should be provided for each boiler.) Tj 23.52 -14.4 TD (\(p\)) Tj 18 0 TD (See that mixing dampers or valves are adjusted to) Tj -41.52 -7.2 TD (proportion air and fuel for the most efficient combustion with) Tj 0 -7.2 TD (minimum excess air and stable operation of low rating, with no) Tj T* (impingement on furnace walls.) Tj 23.52 -14.4 TD (\(q\)) Tj 18 0 TD (Compare all dimensions of the combustion chamber) Tj -41.52 -7.2 TD (during construction for agreement with manufacturer) Tj 208.08 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s approved) Tj -212.16 -7.2 TD (shop drawings. Check all materials of construction for) Tj 0 -7.2 TD (compliance with specifications and approved shop drawing. Take) Tj T* (physical samples of all tile, insulating plastic, firebrick,) Tj T* (etc., for future reference.) Tj 23.52 -14.4 TD (\(r\)) Tj 18 0 TD (Check type and capacity of heaters for grade of oil.) Tj -18 -14.4 TD (\(s\)) Tj 18 0 TD (Check relief of excess pressure in pumps.) Tj -18 -14.4 TD (\(t\)) Tj 18 0 TD (Test oil piping for leaks.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Draft Fans and Ductwork) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (See that induced draft fans are provided with cleanout) Tj -41.52 -7.2 TD (doors.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (Verify the operation of dampers at high flue gas) Tj -41.52 -7.2 TD (temperatures.) Tj ET endstream endobj 194 0 obj <>/ProcSet 384 0 R>>/Rotate 0/Type/Page>> endobj 195 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 122.88 -488.64 TD (15E-10) Tj -95.76 469.2 TD (\(5\) Blow Down System) Tj 0 -14.4 TD (\(a\)) Tj 18 0 TD (Insist that work conforms to applicable codes.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Observe location of vent and discharge lines.) Tj -18 -14.4 TD (\(c\)) Tj 18 0 TD (Require that piping provides for expansion and) Tj -41.52 -7.2 TD (contraction.) Tj 23.52 -14.4 TD (\(6\) Combustion Controls) Tj 0 -14.4 TD (\(a\)) Tj 18 0 TD (Inspect equipment for type, capacity, installation,) Tj -41.52 -7.2 TD (and operation.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (Be sure that operating devices are firmly secured to) Tj -41.52 -7.2 TD (floor, foundations, or other supports and that they operate) Tj 0 -7.2 TD (freely. They should have sufficient power to easily perform) Tj T* (their duties.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (Check the location and stability of sleeves in setting) Tj -41.52 -7.2 TD (walls, ducts or breechings for draft piping, thermometers and) Tj 0 -7.2 TD (gages.) Tj 23.52 -14.4 TD (\(d\)) Tj 18 0 TD (Pipe, tubing, and wiring should run neatly and) Tj -41.52 -7.2 TD (Parallel to the lines of building or structure. They should be) Tj 0 -7.2 TD (firmly secured and have proper pitch. See that draft piping is) Tj T* (provided with means for removing accumulations of ash and soot.) Tj 23.52 -14.4 TD (\(e\)) Tj 18 0 TD (Verify the operation of safety controls.) Tj -18 -14.4 TD (\(f\)) Tj 18 0 TD (Check that flame-sensing device is installed in) Tj -41.52 -7.2 TD (position to sense both pilot and main flame.) Tj 23.52 -14.4 TD (\(g\)) Tj 18 0 TD (Determine that instrument panels are firmly anchored) Tj -41.52 -7.2 TD (and set plumb. Be sure that wiring, tubing, and piping are) Tj 0 -7.2 TD (neatly arranged in rear of panel. See that nameplates,) Tj T* (indicating the function of each instrument, are mounted on the) Tj T* (face of the pane.) Tj 23.52 -14.4 TD (\(h\)) Tj 18 0 TD (Secure a written statement from manufacturer) Tj 179.52 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s) Tj -225.12 -7.2 TD (representative to the effect that all equipment of the control) Tj 0 -7.2 TD (system is properly installed and in perfect operating condition) Tj T* (before acceptance.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Economizers and Air Heaters) Tj -18 -14.4 TD (Check for tightness of tubes or plates and for evidence of) Tj -23.52 -7.2 TD (erosion or corrosion whether integral with the boiler or) Tj 0 -7.2 TD (separate units. Observe performance.) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (Fly Ash Collectors) Tj -18 -14.4 TD (Check:) Tj 0 -14.4 TD (\(a\)) Tj 18 0 TD (Inspection and cleanout doors for location and) Tj -41.52 -7.2 TD (adequacy) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (Dampers for free operation under all temperature) Tj -41.52 -7.2 TD (conditions.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (Discharge grates for leakage of either ash or air.) Tj ET endstream endobj 196 0 obj <>/ProcSet 384 0 R>>/Rotate 0/Type/Page>> endobj 197 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 140.88 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15E-11) Tj -95.76 469.2 TD (\(9\)) Tj 18 0 TD (Boiler specialties) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Verify all trimmings such as water column, steam gage,) Tj -41.52 -7.2 TD (safety valves, blowoff valves, nonreturn valves, stop and check) Tj 0 -7.2 TD (feed valves and vent valves for type and size. Inspect for) Tj T* (installation and setting.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (Check that safety valve discharge piping is anchored) Tj -41.52 -7.2 TD (so that it does not impose a strain on valve.) Tj 23.52 -14.4 TD (\(10\)) Tj 22.32 0 TD (Soot Blowers) Tj -22.32 -14.4 TD (\(a\)) Tj 18 0 TD (Determine operating pressure of steam operated unite.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Note materials of elements and bearings.) Tj -18 -14.4 TD (\(c\)) Tj 18 0 TD (See that wall boxes are accurately and firmly set and) Tj -41.52 -7.2 TD (that the operating heads are securely fastened. Insure that each) Tj 0 -7.2 TD (element operates freely and that it may be removed without) Tj T* (disturbing tubes or setting.) Tj 23.52 -14.4 TD (\(d\)) Tj 18 0 TD (Check clearance for the removal of soot blowers.) Tj -18 -14.4 TD (\(e\)) Tj 18 0 TD (Insure that drainage is provided to prevent moisture) Tj -41.52 -7.2 TD (from being blown into the furnace.) Tj 23.52 -14.4 TD (\(11\)) Tj 22.32 0 TD (Check for correct location and installation of test) Tj -45.84 -7.2 TD (holes in breechings and stacks to allow for periodic measurement) Tj 0 -7.2 TD (of fly ash and other particulate matter for air pollution) Tj T* (control.) Tj 23.52 -14.4 TD (\(a\)) Tj 18 0 TD (Inspect breechings for gage \(thickness\) of metal,) Tj -41.52 -7.2 TD (supports, and insulation.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (Examine cleanout doors for tightness, location, and) Tj -41.52 -7.2 TD (size.) Tj 23.52 -14.4 TD (\(c\) Check expansion joints for tightness and location.) Tj 0 -14.4 TD (\(d\)) Tj 18 0 TD (Check caulked joint at opening around breaching) Tj -41.52 -7.2 TD (entering masonry chimneys.) Tj 23.52 -14.4 TD (\(e\)) Tj 18 0 TD (Check guys, bracing or other supports.) Tj -18 -14.4 TD (\(f\)) Tj 18 0 TD (Reject damaged or unsuitable brick and radial block.) Tj -41.52 -7.2 TD (See that all courses are brought up together and bonded.) Tj 23.52 -14.4 TD (\(g\)) Tj 18 0 TD (In reinforcement operation inspect materials and) Tj -41.52 -7.2 TD (accuracy of placement. Observe especially the lapping of bars.) Tj 23.52 -14.4 TD (\(h\)) Tj 18 0 TD (Evaluate the material and the setting of embedded) Tj -41.52 -7.2 TD (items for securing ladders, platforms, cables, lights, doors, or) Tj 0 -7.2 TD (other equipment.) Tj 23.52 -14.4 TD (\(i\)) Tj 18 0 TD (Check openings and locations of test holes in) Tj -41.52 -7.2 TD (breaching. Check cleanout door for size and location.) Tj 23.52 -14.4 TD (\(j\)) Tj 18 0 TD (Check closing and latching of cleanout doors.) Tj -18 -11.52 TD (\(k\)) Tj 18 0 TD (See that firebrick lining covers the chimney area and) Tj -41.52 -7.2 TD (that weep holes are provided at bottom.) Tj 23.52 -11.52 TD (\(l\)) Tj 18 0 TD (Check continuous-pour type concrete chimneys for a) Tj -41.52 -7.2 TD (smooth, jointless exterior finish.) Tj ET endstream endobj 198 0 obj <>/ProcSet 384 0 R>>/Rotate 0/Type/Page>> endobj 199 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 122.88 -488.64 TD (15E-12) Tj -95.76 469.2 TD (\(m\)) Tj 18 0 TD (Determine if ladders are sturdy, securely anchored,) Tj -41.52 -7.2 TD (and provided with safety cages where required.) Tj 23.52 -14.4 TD (\(n\)) Tj 18 0 TD (Verify that metal vent cap, when required, is firmly) Tj -41.52 -7.2 TD (secured and coated for prevention of corrosion.) Tj 23.52 -14.4 TD (\(o\)) Tj 18 0 TD (Identify requirement for obstruction lights and) Tj -41.52 -7.2 TD (lightning protection. Check access to them for servicing.) Tj 23.52 -14.4 TD (\(p\)) Tj 18 0 TD (Insure that chimney is plumb, concentric, and has) Tj -41.52 -7.2 TD (uniform taper from top to bottom.) Tj 23.52 -14.4 TD (\(12\)) Tj 22.32 0 TD (Boiler Feedwater) Tj -22.32 -14.4 TD (Check:) Tj 0 -14.4 TD (\(a\)) Tj 18 0 TD (Type of water treatment for:) Tj -18 -14.4 TD (- Water available.) Tj 0 -14.4 TD (- Pressures and temperatures to be obtained in boiler.) Tj T* (- Materials and installation.) Tj T* (\(b\)) Tj 18 0 TD (Scales, proportioning devices, and mixing valves for) Tj -41.52 -7.2 TD (accuracy and operation.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (Installation of tanks and piping for types of material) Tj -41.52 -7.2 TD (and supports, workmanship, and conformance with contract) Tj 0 -7.2 TD (requirements.) Tj 23.52 -14.4 TD (\(d\)) Tj 18 0 TD (Pressure tanks for conformance with the applicable) Tj -41.52 -7.2 TD (codes and ASME stamp.) Tj 23.52 -14.4 TD (\(e\)) Tj 18 0 TD (Control apparatus for the installation and operation) Tj -41.52 -7.2 TD (of all components. Check should be done by the manufacturer) Tj 240.72 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s) Tj -244.8 -7.2 TD (service engineer. Refer to job specifications for necessary) Tj 0 -7.2 TD (tests and reports required, and determine from service engineer) Tj T* (the sequence of testing.) Tj 23.52 -14.4 TD (\(f\)) Tj 18 0 TD (Open heaters for the installation of pans, trays,) Tj -41.52 -7.2 TD (plates, sprays, and other internal parts, as well as for the) Tj 0 -7.2 TD (setting of the control for water level in storage compartment.) Tj T* (Be sure that heater vent operates and that the heater reduces) Tj T* (the oxygen content in the water to the specified amounts before) Tj T* (acceptance. Checking should be done by manufacturer) Tj 208.08 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s service) Tj -212.16 -7.2 TD (engineer.) Tj 23.52 -14.4 TD (\(g\)) Tj 18 0 TD (Closed heaters for compliance with code governing) Tj -41.52 -7.2 TD (unfired pressure vessels. Assure that clearance is provided for) Tj 0 -7.2 TD (the removal of tubes. Evaluate performance.) Tj 23.52 -14.4 TD (\(h\)) Tj 18 0 TD (Thermometers and gages for accuracy and operation.) Tj -18 -11.52 TD (\(13\)) Tj 22.32 0 TD (Turbines.) Tj -22.32 -11.52 TD (\(a\)) Tj 18 0 TD (Inspect equipment for the pressures and temperatures) Tj -41.52 -7.2 TD (to he applied. Compare with approved shop drawings.) Tj 23.52 -11.52 TD (\(b\)) Tj 18 0 TD (Examine all drains, drips, leakoffs, relief valves,) Tj -41.52 -7.2 TD (and other required safety devices for operation.) Tj 23.52 -11.52 TD (\(c\)) Tj 18 0 TD (Insure that turbines are firmly secured to foundation,) Tj -41.52 -7.2 TD (are accurately aligned with driven equipment, and operate) Tj 0 -7.2 TD (without vibration.) Tj ET endstream endobj 200 0 obj <>/ProcSet 384 0 R>>/Rotate 0/Type/Page>> endobj 201 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 140.88 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15E-13) Tj -95.76 469.2 TD (\(d\)) Tj 18 0 TD (Check that piping is installed to impose no strain on) Tj -41.52 -7.2 TD (turbine connections.) Tj 23.52 -14.4 TD (\(e\)) Tj 18 0 TD (Verify that provision is made for expansion when) Tj -41.52 -7.2 TD (aligning couplings.) Tj 23.52 -14.4 TD (\(f\)) Tj 18 0 TD (Be certain that field\227assembled turbines are installed) Tj -41.52 -7.2 TD (by the manufacturer) Tj 77.52 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s erectors only) Tj -58.08 -14.4 TD (\(g\)) Tj 18 0 TD (Reduction gears must mesh perfectly and operate) Tj -41.52 -7.2 TD (smoothly and without noise or vibration. Check dwelling after) Tj 0 -7.2 TD (turbines and gears are in perfect alignment.) Tj 23.52 -14.4 TD (\(h\)) Tj 18 0 TD (Evaluate the operation of governors.) Tj -18 -14.4 TD (\(i\)) Tj 18 0 TD (Check capacity and steam consumption under various) Tj -41.52 -7.2 TD (load conditions.) Tj 23.52 -14.4 TD (1.) Tj 13.44 0 TD (Smoke Connections) Tj ET 58.56 376.08 69.36 0.72 re f BT 45.12 363.12 TD (\(1\)) Tj 18 0 TD (Examine the size and construction of stacks and flues.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Check the clearance space between stacks, flues, and) Tj -41.52 -7.2 TD (adjacent building materials.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Inspect the method of supporting and anchoring all) Tj -41.52 -7.2 TD (smoke connections.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (See that cleanout is provided which will allow) Tj -41.52 -7.2 TD (cleaning of the entire smoke connection without dismantling.) Tj 23.52 -14.4 TD (m.) Tj 13.44 0 TD (Fuel Storage and Conveying) Tj ET 58.56 282.48 106.08 0.72 re f BT 45.12 269.52 TD (\(1\)) Tj 18 0 TD (Inspect overhead bunkers for capacity in conformance) Tj -41.52 -7.2 TD (with specifications. See that all gates are installed dust\227) Tj 0 -7.2 TD (tight and that they operate freely. Note the sealing of spaces) Tj T* (around top of bunkers and elevators.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Be sure that silos are erected plumb and concentric.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (See that courses in tile, brick or block silos are) Tj -41.52 -7.2 TD (carried up evenly, that horizontal joints are level, and that) Tj 0 -7.2 TD (reinforcement is welded and thoroughly embedded.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Tight joints and reinforcement bands for concrete) Tj -41.52 -7.2 TD (stave silos must be pulled up tightly.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Check continuous-pour type concrete silo for a smooth,) Tj -41.52 -7.2 TD (jointless exterior finish.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Determine whether pneumatic conveyers are installed) Tj -41.52 -7.2 TD (with air and dust\227tight joints.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Examine materials and installation of mechanical coal) Tj -41.52 -7.2 TD (conveyers.) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (Insure that screw flights do not ride on bottom of) Tj -41.52 -7.2 TD (trough.) Tj 23.52 -14.4 TD (\(9\)) Tj 18 0 TD (See that bucket, chain, and belt conveyor guides and) Tj -41.52 -7.2 TD (bearings are carefully aligned.) Tj ET endstream endobj 202 0 obj <>/ProcSet 384 0 R>>/Rotate 0/Type/Page>> endobj 203 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 122.88 -488.64 TD (15E-14) Tj -95.76 469.2 TD (\(10\)) Tj 22.32 0 TD (Evaluate skip hoists for capacity and proper) Tj -45.84 -7.2 TD (installation, with particular attention to operation of the top) Tj 0 -7.2 TD (and bottom limit stops.) Tj 23.52 -14.4 TD (\(11\)) Tj 22.32 0 TD (Make sure that housings for all conveyors and) Tj -45.84 -7.2 TD (elevators are installed with dust-tight joints.) Tj 23.52 -14.4 TD (\(12\)) Tj 22.32 0 TD (Access doors and connections with chutes and) Tj -45.84 -7.2 TD (discharge gates should be tightly fitted.) Tj 23.52 -14.4 TD (\(13\)) Tj 22.32 0 TD (Observe that chutes are installed with sufficient) Tj -45.84 -7.2 TD (slope to insure free, gravity flow of coal.) Tj 23.52 -14.4 TD (\(14\)) Tj 22.32 0 TD (Check weighing lorries for capacity, accuracy of) Tj -45.84 -7.2 TD (weight, and ease of operation.) Tj 23.52 -14.4 TD (\(15\)) Tj 22.32 0 TD (Verify that vibrating feeders are accurately) Tj -45.84 -7.2 TD (positioned and adjusted for specified flow of coal.) Tj 23.52 -14.4 TD (\(16\)) Tj 22.32 0 TD (Be sure that coal crushers are securely anchored to) Tj -45.84 -7.2 TD (foundation or supports and that grids are adjusted to proper) Tj 0 -7.2 TD (coal size. Ascertain the direction of rotation.) Tj 23.52 -14.4 TD (\(17\)) Tj 22.32 0 TD (Check coal scales for accuracy of weight and for) Tj -45.84 -7.2 TD (operation of component parts.) Tj 23.52 -14.4 TD (\(18\)) Tj 22.32 0 TD (Track and Truck Hoppers \227 Insure provision for) Tj -45.84 -7.2 TD (removing water from pita. Inspect hopper grids for size opening) Tj 0 -7.2 TD (and materials.) Tj 23.52 -14.4 TD (\(19\)) Tj 22.32 0 TD (Note flow of coal of entire conveying system, from) Tj -45.84 -7.2 TD (unloading hoppers to boilers.) Tj 23.52 -14.4 TD (n.) Tj 13.44 0 TD (Painting) Tj ET 58.56 268.08 32.64 0.72 re f BT 45.12 255.12 TD (\(1\)) Tj 18 0 TD (See that equipment contains the correct finish. Watch) Tj -41.52 -7.2 TD (for abrasions.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Watch for miscellaneous ferrous metal items that are) Tj -41.52 -7.2 TD (not primed.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Require finish painting as specified.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Identify all pipe runs as specified.) Tj -18 -14.4 TD (o.) Tj 13.44 0 TD (Testing) Tj ET 58.56 181.68 28.56 0.72 re f BT 45.12 168.72 TD (Witness that all required tests of heating equipment are) Tj -23.52 -7.2 TD (accurately recorded. See that tests are performed by) Tj 0 -7.2 TD (manufacturer) Tj 48.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s representatives where required. Check tests and) Tj -53.04 -7.2 TD (verify that tests meet all requirements before acceptance.) Tj 0 -7.2 TD (Report unsatisfactory test results to the supervisor.) Tj 23.52 -14.4 TD (p.) Tj 13.44 0 TD (Operating Instructions and Guaranties) Tj ET 58.56 124.08 150.96 0.72 re f BT 45.12 111.12 TD (\(1\)) Tj 18 0 TD (See that equipment guaranties and instructions for the) Tj -41.52 -7.2 TD (operation of equipment are furnished.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Notify supervisor of the readiness of the construction) Tj -41.52 -7.2 TD (for test and subsequent operation for instructing personnel.) Tj ET endstream endobj 204 0 obj <>/ProcSet 206 0 R>>/Rotate 0/Type/Page>> endobj 205 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 150.96 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (i) Tj -20.4 469.2 TD (CHAPTER 15F) Tj ET 130.56 505.68 44.88 0.72 re f BT 57.12 492.72 TD (VENTILATING, AIR SUPPLY AND DISTRIBUTION SYSTEM) Tj ET 57.12 491.28 191.76 0.72 re f BT 142.8 478.32 TD (INDEX) Tj -88.8 -14.4 TD (Para.) Tj ET 54 462.48 20.4 0.72 re f BT 144 463.92 TD (Title) Tj ET 144 462.48 20.4 0.72 re f BT 243.12 463.92 TD (Page) Tj ET 243.12 462.48 16.32 0.72 re f BT 54 449.52 TD (15F-01) Tj 49.44 0 TD (GENERAL) Tj 139.68 0 TD (15F-1) Tj -189.12 -14.4 TD (15F-02) Tj 49.44 0 TD (EQUIPMENT) Tj 139.68 0 TD (15F-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (General) Tj 121.68 0 TD (15F-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Fans and Air Handling) Tj 0 -7.2 TD (Units) Tj 121.68 0 TD (15F-1) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Power Roof Ventilators) Tj 121.68 0 TD (15F-2) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Gravity Ventilators) Tj 121.68 0 TD (15F-2) Tj -139.68 -7.2 TD (e.) Tj 18 0 TD (Dampers) Tj 121.68 0 TD (15F-2) Tj -139.68 -7.2 TD (f.) Tj 18 0 TD (Filters) Tj 121.68 0 TD (15F-2) Tj -139.68 -7.2 TD (g.) Tj 18 0 TD (Screens) Tj 121.68 0 TD (15F-3) Tj -189.12 -14.4 TD (15F-03) Tj 49.44 0 TD (DUCTWORK AND MECHANICAL) Tj 9.12 -7.2 TD (INSULATION) Tj 130.56 0 TD (15F-3) Tj -189.12 -14.4 TD (15F-04) Tj 49.44 0 TD (DIFFUSERS, REGISTERS,) Tj 9.12 -7.2 TD (AND GRILLES) Tj 130.56 0 TD (15F-3) Tj -189.12 -14.4 TD (15F-05) Tj 49.44 0 TD (BALANCING AND TESTING) Tj 139.68 0 TD (15F-3) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Cleaning and Adjusting) Tj 121.68 0 TD (15F-3) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Testing) Tj 121.68 0 TD (15F-4) Tj ET endstream endobj 206 0 obj [/PDF/Text] endobj 207 0 obj <>/ProcSet 385 0 R>>/Rotate 0/Type/Page>> endobj 208 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15F-1) Tj -12.24 469.2 TD (CHAPTER 15F) Tj ET 130.56 505.68 44.88 0.72 re f BT 106.08 492.72 TD (VENTILATING, AIR SUPPLY) Tj ET 106.08 491.28 93.84 0.72 re f BT 104.16 485.52 TD (AND DISTRIBUTION SYSTEMS) Tj ET 104.16 484.08 97.92 0.72 re f BT 21.6 471.12 TD (15F-01 ) Tj 32.64 0 TD (GENERAL) Tj ET 54.24 469.68 28.56 0.72 re f BT 45.12 456.72 TD (Since the ventilating system is largely dependent upon) Tj -23.52 -7.2 TD (associated equipment, the QAR must closely coordinate this) Tj 0 -7.2 TD (chapter with Chapters 15B, 15C, 15E, and 15G. The same) Tj T* (importance of a thorough knowledge of job plans and) Tj T* (specifications applies.) Tj 0 -14.4 TD (15F-02 ) Tj 32.64 0 TD (EQUIPMENT) Tj ET 54.24 412.08 36.72 0.72 re f BT 45.12 399.12 TD (a.) Tj 13.44 0 TD (General) Tj ET 58.56 397.68 28.56 0.72 re f BT 45.12 384.72 TD (\(1\)) Tj 18 0 TD (It is the QAR) Tj 53.04 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s responsibility, in concert with the) Tj -98.64 -7.2 TD (quality control man, to determine that all equipment is approved) Tj 0 -7.2 TD (well in advance of its actual need on the job.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check all equipment delivered to the site for) Tj -41.52 -7.2 TD (conformance with approved shop drawings. Make sure the necessary) Tj 0 -7.2 TD (rating and test certificates have been furnished.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Closely examine material for any damages. Minor) Tj -41.52 -7.2 TD (abrasions or rust spots must be cleaned and repainted to match) Tj 0 -7.2 TD (original paint in appearance and in quality. Reject other) Tj T* (damages.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Be certain that approved vibration-isolators and) Tj -41.52 -7.2 TD (flexible connections will be furnished as specified.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Examine the mounting of each piece of equipment for) Tj -41.52 -7.2 TD (secure installation.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Check equipment for excess noise and vibration.) Tj -18 -14.4 TD (\(7\)) Tj 18 0 TD (Do not use dissimilar materials, especially screws,) Tj -41.52 -7.2 TD (fasteners and flashings with different equipment bases and) Tj 0 -7.2 TD (housing materials.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Fans and Air Handling Units) Tj ET 58.56 203.28 110.16 0.72 re f BT 45.12 190.32 TD (\(1\)) Tj 18 0 TD (Check rotation of fan before permanent power) Tj -41.52 -7.2 TD (connection is made.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check method of drive. If belt driven, check means) Tj -41.52 -7.2 TD (provided to adjust the motor.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Check the type of motor enclosure.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (See that specified seals, sleeves and bearings are) Tj -41.52 -7.2 TD (provided, and when lubricating type bearings are allowed provide) Tj 0 -7.2 TD (accessibility for lubricating without dismantling fan or) Tj T* (disconnecting duct.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Provide a fire-safety switch on return air ducts of) Tj -41.52 -7.2 TD (circulation systems.) Tj 23.52 -11.52 TD (\(6\)) Tj 18 0 TD (Check for pulley and belt alignment.) Tj -18 -11.52 TD (\(7\)) Tj 18 0 TD (See that adequate guards are provided for rotating) Tj -41.52 -7.2 TD (equipment and belts.) Tj ET endstream endobj 209 0 obj <>/ProcSet 385 0 R>>/Rotate 0/Type/Page>> endobj 210 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (15F-2) Tj -97.68 469.2 TD (\(8\)) Tj 18 0 TD (Check for installation of smoke detectors when) Tj -41.52 -7.2 TD (required.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Power Roof Ventilators) Tj ET 58.56 484.08 89.76 0.72 re f BT 45.12 471.12 TD (\(l\)) Tj 18 0 TD (Provide service accessibility.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Flashing at curbs must be water-tight.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Discharged air is not to be directed toward air) Tj -41.52 -7.2 TD (intakes.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Check for required local disconnect switch.) Tj -18 -14.4 TD (d.) Tj 13.44 0 TD (Gravity Ventilators) Tj ET 58.56 404.88 77.52 0.72 re f BT 45.12 391.92 TD (\(1\)) Tj 18 0 TD (Examine installation for rigidity and) Tj -41.52 -7.2 TD (weathertightness.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Make sure units are oiled and properly adjusted.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Check the actual freedom of rotation of the blades.) Tj -18 -14.4 TD (e.) Tj 13.44 0 TD (Dampers) Tj ET 58.56 340.08 28.56 0.72 re f BT 45.12 327.12 TD (\(1\)) Tj 18 0 TD (Backdraft dampers should be installed for each exhaust) Tj -41.52 -7.2 TD (fan.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check the actual operation of the dampers. See that) Tj -41.52 -7.2 TD (dampers do not rattle and that felt strips are provided for) Tj 0 -7.2 TD (backdraft dampers.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Assure that a separate frame is provided in openings) Tj -41.52 -7.2 TD (on which the dampers will be mounted.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Check for correct installation of fire dampers in) Tj -41.52 -7.2 TD (accordance with SMACNA Fire Damper Guide.) Tj 23.52 -14.4 TD (f.) Tj 13.44 0 TD (Filters) Tj ET 58.56 232.08 28.56 0.72 re f BT 45.12 219.12 TD (\(1\)) Tj 18 0 TD (Make sure the proper type of filter is furnished and) Tj -41.52 -7.2 TD (installed.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check thickness and method of mounting and supporting.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Provide proper amount of adhesive and washing tank for) Tj -41.52 -7.2 TD (viscous medium type filters.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Inspect sealing strips.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Provide accessibility for removal and replacement of) Tj -41.52 -7.2 TD (filters.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Assure that air stream is distributed uniformly over) Tj -41.52 -7.2 TD (all filter areas.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Observe electrostatic-type filters for operation of) Tj -41.52 -7.2 TD (warning lights and door interlocks. Check ionizers for loose) Tj 0 -7.2 TD (wires, sparking, and free access.) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (Inspect automatic sprays for complete washing and) Tj -41.52 -7.2 TD (spray coverage.) Tj ET endstream endobj 211 0 obj <>/ProcSet 385 0 R>>/Rotate 0/Type/Page>> endobj 212 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15F-3) Tj -97.68 469.2 TD (\(9\)) Tj 18 0 TD (On traveling screen type filters note the operation of) Tj -41.52 -7.2 TD (screen and oil charge.) Tj 23.52 -14.4 TD (\(10\)) Tj 22.32 0 TD (On renewable roll media type filters inspect:) Tj -22.32 -14.4 TD (\(a\)) Tj 18 0 TD (Tracking of roll) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Media runout switch \(c\) Timer setting \(d\) Static) Tj -41.52 -7.2 TD (pressure control) Tj 23.52 -14.4 TD (\(a\)) Tj 18 0 TD (Tension on media) Tj -18 -14.4 TD (\(11\)) Tj 22.32 0 TD (See that clean filters are installed upon completion) Tj -45.84 -7.2 TD (of final tests.) Tj 23.52 -14.4 TD (\(12\)) Tj 22.32 0 TD (Check specifications regarding requirements for spare) Tj -45.84 -7.2 TD (filters. This requirement is sometimes expressed as a percentage) Tj 0 -7.2 TD (of the total of each kind required. Check on the transfer of the) Tj T* (spares to the operating agency.) Tj 23.52 -14.4 TD (g.) Tj 13.44 0 TD (Screens) Tj ET 58.56 361.68 28.56 0.72 re f BT 45.12 348.72 TD (\(1\)) Tj 18 0 TD (Provide bird or insect screens if required.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Check fabric material and installation of dissimilar) Tj -41.52 -7.2 TD (materials.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Check mesh size.) Tj -41.52 -14.4 TD (15F-03 ) Tj 32.64 0 TD (DUCTWORK AND MECHANICAL INSULATION) Tj ET 54.24 296.88 138.72 0.72 re f BT 45.12 283.92 TD (See Section 15D for Ductwork. See Section 15C for) Tj -23.52 -7.2 TD (Mechanical Insulation.) Tj 0 -14.4 TD (15F-04 ) Tj 32.64 0 TD (DIFFUSERS. REGISTERS. AND GRILLES) Tj ET 54.24 260.88 134.64 0.72 re f BT 45.12 247.92 TD (\(a\)) Tj 18 0 TD (See that the contractor furnishes a schedule showing) Tj -41.52 -7.2 TD (all air inlets and outlets.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (Inspect diffusers and registers for accessible volume) Tj -41.52 -7.2 TD (control operator.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (Examine specification and installation for integral) Tj -41.52 -7.2 TD (anti-smudge rings for diffusers.) Tj 23.52 -14.4 TD (\(d\)) Tj 18 0 TD (Check for loose or bent vanes.) Tj -18 -14.4 TD (\(e\)) Tj 18 0 TD (Inspect each item for fit, and see that sponge-rubber) Tj -41.52 -7.2 TD (gaskets are provided when required.) Tj 23.52 -14.4 TD (\(f\)) Tj 18 0 TD (Inspect for the proper operation of registers,) Tj -41.52 -7.2 TD (dampers, and grille directional-controls.) Tj 0 -14.4 TD (15F-05 ) Tj 32.64 0 TD (BALANCING AND TESTING) Tj ET 54.24 124.08 85.68 0.72 re f BT 45.12 111.12 TD (General Check for any required certification of HVAC test) Tj -23.52 -7.2 TD (and balance subcontractor/agent, prior to their arrival at site.) Tj 23.52 -14.4 TD (a.) Tj 13.44 0 TD (Cleaning and Adjusting) Tj ET 58.56 88.08 89.76 0.72 re f endstream endobj 213 0 obj <>/ProcSet 385 0 R>>/Rotate 0/Type/Page>> endobj 214 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (15F-4) Tj -97.68 469.2 TD (\(1\)) Tj 18 0 TD (All ducts, plenums and casings must be thoroughly) Tj -41.52 -7.2 TD (cleaned of debris and blown free of small particles and dust) Tj 0 -7.2 TD (before supply outlets are installed.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Clean equipment of oil, dust, dirt, and paint spots.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Replace sectional throwaway filters after ductwork is) Tj -41.52 -7.2 TD (blown out and cleaned.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Lubricate all bearings.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Check tension on all belts and the adjustment of fan) Tj -41.52 -7.2 TD (pulleys.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Check that all fan and belt guards are in place.) Tj -18 -14.4 TD (\(7\)) Tj 18 0 TD (Install temporary filters for tasting purposes.) Tj -18 -14.4 TD (b.) Tj 13.44 0 TD (Testing) Tj ET 58.56 376.08 28.56 0.72 re f BT 45.12 363.12 TD (\(1\)) Tj 18 0 TD (Before insulating duct test it for air tightness.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Contractor must provide necessary equipment for) Tj -41.52 -7.2 TD (airflow measurements and coefficients for registers and) Tj 0 -7.2 TD (diffusers.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Review contractor) Tj 69.36 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s method for recording test data,) Tj -114.96 -7.2 TD (including comparison to the design air-flows.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Test each outlet for the amount of air quantities) Tj -41.52 -7.2 TD (required.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Final air-flows must be recorded after all adjustments) Tj -41.52 -7.2 TD (are made.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (If actual air flows result in objectional velocities) Tj -41.52 -7.2 TD (or distribution, notify your supervisor.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Check all dampers for proper operation.) Tj ET endstream endobj 215 0 obj <>/ProcSet 217 0 R>>/Rotate 0/Type/Page>> endobj 216 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 150.96 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (i) Tj -20.4 469.2 TD (CHAPTER 15G) Tj ET 130.56 505.68 44.88 0.72 re f BT 83.76 492.72 TD (REFRIGERATION AND AIR CONDITIONING) Tj ET 83.76 491.28 138.72 0.72 re f BT 142.8 478.32 TD (INDEX) Tj -88.8 -14.4 TD (Para.) Tj ET 54 462.48 20.4 0.72 re f BT 144 463.92 TD (Title) Tj ET 144 462.48 20.4 0.72 re f BT 243.12 463.92 TD (Page) Tj ET 243.12 462.48 16.32 0.72 re f BT 54 449.52 TD (15G-01) Tj 49.44 0 TD (GENERAL) Tj 139.68 0 TD (15G-01) Tj -189.12 -14.4 TD (15G-02) Tj 49.44 0 TD (PIPING) Tj 139.68 0 TD (15G-01) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Refrigerator Piping) Tj 121.68 0 TD (15G-01) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Water Piping) Tj 121.68 0 TD (15G-01) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Installation) Tj 121.68 0 TD (15G-01) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Insulation) Tj 121.68 0 TD (15G-02) Tj -189.12 -14.4 TD (15G-03) Tj 49.44 0 TD (EQUIPMENT) Tj 139.68 0 TD (15G-03) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (General) Tj 121.68 0 TD (15G-03) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Condensers) Tj 121.68 0 TD (15G-04) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Reciprocating Compressors) Tj 121.68 0 TD (150-04) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Centrifugal Compressors) Tj 121.68 0 TD (15G-05) Tj -139.68 -7.2 TD (e.) Tj 18 0 TD (Receivers) Tj 121.68 0 TD (15G-05) Tj -139.68 -7.2 TD (f.) Tj 18 0 TD (Water Chillers) Tj 121.68 0 TD (15G-06) Tj -139.68 -7.2 TD (g.) Tj 18 0 TD (Evaporative Coolers) Tj 121.68 0 TD (15G-06) Tj -139.68 -7.2 TD (h.) Tj 18 0 TD (Unit Coolers) Tj 121.68 0 TD (15G-06) Tj -139.68 -7.2 TD (i.) Tj 18 0 TD (Refrigeration Specialties) Tj 121.68 0 TD (15G-06) Tj -139.68 -7.2 TD (j.) Tj 18 0 TD (Package-Type) Tj 0 -7.2 TD (Air Conditioners) Tj 121.68 0 TD (15G-07) Tj -139.68 -7.2 TD (k.) Tj 18 0 TD (Washers) Tj 121.68 0 TD (15G-07) Tj -139.68 -7.2 TD (l.) Tj 18 0 TD (Humidifiers and) Tj 0 -7.2 TD (Dehumidifiers) Tj 121.68 0 TD (15G-08) Tj -139.68 -7.2 TD (m.) Tj 18 0 TD (Absorption Refrigeration) Tj 0 -7.2 TD (Machine) Tj 121.68 0 TD (15G-08) Tj -139.68 -7.2 TD (n.) Tj 18 0 TD (Cooling Towers and Ponds) Tj 121.68 0 TD (15G-08) Tj -139.68 -7.2 TD (o.) Tj 18 0 TD (Pumps) Tj 121.68 0 TD (15G-09) Tj -139.68 -7.2 TD (p.) Tj 18 0 TD (Insulation) Tj 121.68 0 TD (15G-09) Tj -189.12 -14.4 TD (15G-04) Tj 49.44 0 TD (CONTROLS) Tj 139.68 0 TD (15G-10) Tj -189.12 -14.4 TD (15G-05) Tj 49.44 0 TD (TESTING) Tj 139.68 0 TD (15G-10) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Submittals) Tj 121.68 0 TD (15G-10) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Procedures) Tj 121.68 0 TD (15G-11) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Types) Tj 121.68 0 TD (15G-11) Tj -189.12 -14.4 TD (15G-06) Tj 49.44 0 TD (PAINTING) Tj 139.68 0 TD (15G-11) Tj -189.12 -14.4 TD (15G-07) Tj 49.44 0 TD (OPERATING INSTRUCTIONS AND) Tj 0 -7.2 TD (GUARANTIES) Tj 139.68 0 TD (15G-11) Tj ET endstream endobj 217 0 obj [/PDF/Text] endobj 218 0 obj <>/ProcSet 386 0 R>>/Rotate 0/Type/Page>> endobj 219 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15G-1) Tj -12.24 469.2 TD (CHAPTER) Tj ET 130.56 505.68 28.56 0.72 re f BT 159.12 507.12 TD 0 Tc -0.096 Tw ( ) Tj 4.08 0 TD -0.096 Tc 0 Tw (15G) Tj ET 163.2 505.68 12.24 0.72 re f BT 83.76 492.72 TD (REFRIGERATION AND AIR CONDITIONING) Tj ET 83.76 491.28 138.72 0.72 re f BT 21.6 478.32 TD (15G-01 ) Tj 32.64 0 TD (GENERAL) Tj ET 54.24 476.88 28.56 0.72 re f BT 45.12 463.92 TD (This chapter covers Refrigeration and Air Conditioning for) Tj -23.52 -7.2 TD (both the central and unitary type systems.) Tj 23.52 -14.4 TD (Since there is generally a duplication in the requirements) Tj -23.52 -7.2 TD (for piping and ductwork for this subject and for plumbing and) Tj 0 -7.2 TD (air handling, and since those areas have been covered in) Tj T* (previous chapters, it will be necessary for the inspector to be) Tj T* (very familiar with the piping area of Chapter 15A and the) Tj T* (ductwork section of Chapter 15C.) Tj 23.52 -14.4 TD (When the work appears to be beyond the scope of the) Tj -23.52 -7.2 TD (inspector, technical assistance should be requested promptly.) Tj 0 -14.4 TD (15G-02 ) Tj 32.64 0 TD (PIPING) Tj ET 54.24 368.88 24.48 0.72 re f BT 45.12 355.92 TD (a.) Tj 13.44 0 TD (Refrigerator Piping) Tj ET 58.56 354.48 77.52 0.72 re f BT 45.12 341.52 TD (\(1\)) Tj 18 0 TD (Determine where copper or black steel will be used,) Tj -41.52 -7.2 TD (and the type required.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Make sure the piping and fittings have been approved.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Check the method of installing piping. See Section) Tj -41.52 -7.2 TD (15A.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Make sure piping is stored as prescribed in) Tj -41.52 -7.2 TD (specifications.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Water Piping) Tj ET 58.56 260.88 48.96 0.72 re f BT 45.12 247.92 TD (\(1\)) Tj 18 0 TD (Check the type of piping required for chilled water) Tj -41.52 -7.2 TD (and condenser water systems. See Section 15A.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Determine weight and class of piping.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Make sure the specified and approved piping, fittings) Tj -41.52 -7.2 TD (and jointing materials are being used.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Installation) Tj ET 58.56 188.88 48.96 0.72 re f BT 45.12 175.92 TD (\(1\)) Tj 18 0 TD (Utilize paragraphs 15A-02 and 15A-03 as a check list) Tj -41.52 -7.2 TD (for fabricating and installing piping. Watch specifically for) Tj 0 -7.2 TD (workmanship, supports, and sleeves.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Be especially careful to:) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Make sure the specified solder is used. Check) Tj -41.52 -7.2 TD (soldering of joints.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (See that internal valve parts are removed from valves,) Tj -41.52 -7.2 TD (and that valves are wet wrapped before soldering.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (See that joints are thoroughly cleaned before) Tj -41.52 -7.2 TD (soldering.) Tj 23.52 -14.4 TD (\(d\)) Tj 18 0 TD (Check on the removal of excess flux and acid after) Tj -41.52 -7.2 TD (joints are made.) Tj ET endstream endobj 220 0 obj <>/ProcSet 386 0 R>>/Rotate 0/Type/Page>> endobj 221 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (15G-2) Tj -97.68 469.2 TD (\(3\)) Tj 18 0 TD (Make sure the proper type flexible connections are) Tj -41.52 -7.2 TD (installed in the required locations.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (See that unions or flanges are installed at all) Tj -41.52 -7.2 TD (equipment, at control valves, and at other points that will) Tj 0 -7.2 TD (facilitate maintenance.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Check carefully for the proper slope of all lines.) Tj -41.52 -7.2 TD (Assure slope of refrigerant lines to provide movement of oil) Tj 0 -7.2 TD (through the system.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Check installation for improper configuration of) Tj -41.52 -7.2 TD (piping. Make sure the installation conforms with the approved) Tj 0 -7.2 TD (drawing. If there is any question about the requirement for the) Tj T* (arrangement of piping and if there is no approved drawing,) Tj T* (obtain the drawing before allowing the contractor to proceed.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Make sure air vents are installed at high points in) Tj -41.52 -7.2 TD (water lines and that drains are installed at low points.) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (Do not allow gate valves to be installed where globe) Tj -41.52 -7.2 TD (valves are required.) Tj 23.52 -14.4 TD (\(9\)) Tj 18 0 TD (Be sure balancing cocks are installed as required to) Tj -41.52 -7.2 TD (permit proper balancing.) Tj 23.52 -14.4 TD (\(10\)) Tj 22.32 0 TD (Do not install swing check valves in vertical lines) Tj -45.84 -7.2 TD (with a downward flow of water.) Tj 23.52 -14.4 TD (\(11\)) Tj 22.32 0 TD (Check for the installation of such required items as) Tj -45.84 -7.2 TD (pressure gages, thermal elements, thermometer wells, etc.) Tj 23.52 -14.4 TD (\(12\)) Tj 22.32 0 TD (Provide adequate number and type of hangers. Hangers) Tj -45.84 -7.2 TD (on uninsulated copper pipe must be electrolytically coated or) Tj 0 -7.2 TD (made of solid compatible non ferrous metals.) Tj 23.52 -14.4 TD (\(13\)) Tj 22.32 0 TD (Check for the proper installation of oil traps and) Tj -45.84 -7.2 TD (double risers in refrigerant lines.) Tj 23.52 -14.4 TD (\(14\)) Tj 22.32 0 TD (Check valves for pressure setting and discharge) Tj -45.84 -7.2 TD (locations.) Tj 23.52 -14.4 TD (\(15\)) Tj 22.32 0 TD (Be sure that refrigerant system is evacuated prior to) Tj -45.84 -7.2 TD (charging and accomplished according to job specifications.) Tj 23.52 -14.4 TD (\(16\)) Tj 22.32 0 TD (Make sure the system is charged with the required) Tj -45.84 -7.2 TD (type and amount of refrigerant.) Tj 23.52 -14.4 TD (\(17\)) Tj 22.32 0 TD (See that the system is completely checked for leaks.) Tj -45.84 -7.2 TD (Dry nitrogen must be used for pressure tests.) Tj 23.52 -14.4 TD (\(18\)) Tj 22.32 0 TD (Double check to see that there are no unnecessary oil) Tj -45.84 -7.2 TD (traps.) Tj 23.52 -14.4 TD (\(19\)) Tj 22.32 0 TD (Vacuum should be broken by charging the system with) Tj -45.84 -7.2 TD (dry refrigerant for which the system is designed.) Tj 23.52 -11.52 TD (d.) Tj 13.44 0 TD (Insulation) Tj ET 58.56 98.16 40.8 0.72 re f BT 45.12 88.08 TD (\(1\)) Tj 18 0 TD (Determine whether the material on the job has been) Tj -41.52 -7.2 TD (approved for the particular piping being installed. Make sure) Tj 0 -7.2 TD (insulations, vapor barriers, adhesives and sealers are) Tj T* (noncombustible or fire retardant as specified. See Section 15C) Tj T* (Mechanical Insulation.) Tj ET endstream endobj 222 0 obj <>/ProcSet 386 0 R>>/Rotate 0/Type/Page>> endobj 223 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15G-3) Tj -97.68 469.2 TD (\(2\)) Tj 18 0 TD (Note that heating water piping is insulated) Tj -41.52 -7.2 TD (differently from both chilled water piping and combination) Tj 0 -7.2 TD (chilled and heated water piping.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Check thickness of insulation and of vapor barrier) Tj -41.52 -7.2 TD (finish.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Determine that insulation jackets which are exposed to) Tj -41.52 -7.2 TD (view are paintable.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Examine the requirements for the insulation of) Tj -41.52 -7.2 TD (flanges, fittings, and valves, and assure compliance with the) Tj 0 -7.2 TD (specifications.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Check the lap and the sealing at joints.) Tj -18 -14.4 TD (\(7\)) Tj 18 0 TD (Be very careful to see that there are no breaks in the) Tj -41.52 -7.2 TD (vapor barrier. Watch for later damages during construction.) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (Check specification requirements for extending) Tj -41.52 -7.2 TD (insulation through sleeves in walls, floors, and ceilings;) Tj 0 -7.2 TD (chilled water lines inside cabinets of fan coil units should be) Tj T* (insulated as required to prevent condensate dripping on floor.) Tj 23.52 -14.4 TD (\(9\)) Tj 18 0 TD (Make sure that pipe hangers are installed over) Tj -41.52 -7.2 TD (insulation. Metal Shields to be provided between hanger ring and) Tj 0 -7.2 TD (insulation. High density insulation insert shall be installed) Tj T* (with a length equal to length of metal shield.) Tj 23.52 -14.4 TD (\(10\)) Tj 22.32 0 TD (Check for the neat termination and seal of insulation) Tj -45.84 -7.2 TD (at the end of insulation.) Tj 23.52 -14.4 TD (\(11\)) Tj 22.32 0 TD (Know the special requirements for insulation and) Tj -45.84 -7.2 TD (jacketing of piping exposed to weather.) Tj 23.52 -14.4 TD (\(12\)) Tj 22.32 0 TD (Check the installation, the width, and the spacing of) Tj -45.84 -7.2 TD (the bands used on pipe jacketing.) Tj 0 -14.4 TD (15G-03 ) Tj 32.64 0 TD (EQUIPMENT) Tj ET 54.24 232.08 36.72 0.72 re f BT 45.12 219.12 TD (a.) Tj 13.44 0 TD (General) Tj ET 58.56 217.68 28.56 0.72 re f BT 45.12 204.72 TD (\(1\)) Tj 18 0 TD (All equipment should be checked to see that it is) Tj -41.52 -7.2 TD (approved before it is needed on the job. When equipment arrives) Tj 0 -7.2 TD (on the job, it should be checked against shop drawing. During) Tj T* (installation, the contractor) Tj 114.24 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s work should be checked against) Tj -118.32 -7.2 TD (the contract plans and specifications, the approved shop) Tj 0 -7.2 TD (drawing, and the manufacturer) Tj 118.32 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s recommendations.) Tj -98.88 -14.4 TD (\(2\)) Tj 18 0 TD (Be sure that no damaged equipment is installed.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (See that equipment is stored in a manner that will) Tj -41.52 -7.2 TD (insure that the equipment be like new when installed.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Be sure that all refrigeration equipment is installed) Tj -41.52 -7.2 TD (strictly in accordance with the safety code for mechanical) Tj 0 -7.2 TD (refrigeration.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Check on space requirements for equipment. Obtain an) Tj -41.52 -7.2 TD (equipment room layout drawing and make sure that adequate) Tj 0 -7.2 TD (clearances are provided for maintenance and operation.) Tj ET endstream endobj 224 0 obj <>/ProcSet 386 0 R>>/Rotate 0/Type/Page>> endobj 225 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (15G-4) Tj -97.68 469.2 TD (\(6\)) Tj 18 0 TD (Determine the need for access panels. A common error) Tj -41.52 -7.2 TD (is the failure to provide the means for pulling condenser and) Tj 0 -7.2 TD (chiller tubes.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Make sure that all rotating parts, such as belts,) Tj -41.52 -7.2 TD (chains, sheaves, shaft couplings, etc. are covered to protect) Tj 0 -7.2 TD (personnel.) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (Check the type of motors on equipment, the type of) Tj -41.52 -7.2 TD (motor starter, heaters in the motor starters, and voltage of) Tj 0 -7.2 TD (motor.) Tj 23.52 -14.4 TD (\(9\)) Tj 18 0 TD (Make sure all equipment is lubricated according to) Tj -41.52 -7.2 TD (manufacturer) Tj 48.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s recommendations. This includes motor bearings.) Tj -29.52 -14.4 TD (b.) Tj 13.44 0 TD (Condensers) Tj ET 58.56 397.68 40.8 0.72 re f BT 45.12 384.72 TD (\(1\)) Tj 18 0 TD (See that air flow is not obstructed and that wind) Tj -41.52 -7.2 TD (deflectors are installed, if required, in air cooled condensers.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Inspect water cooled condensers for leaks and proper) Tj -41.52 -7.2 TD (flow.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Check evaporative condensers for:) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Spray coverage.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Float valve operation without chatter.) Tj -18 -14.4 TD (\(c\)) Tj 18 0 TD (Water level.) Tj -18 -14.4 TD (\(d\)) Tj 18 0 TD (Fan rotation and speed.) Tj -18 -14.4 TD (\(e\)) Tj 18 0 TD (Pump suction strainer.) Tj -18 -14.4 TD (\(f\)) Tj 18 0 TD (Liquid discharge line carried full size to first) Tj -41.52 -7.2 TD (elbow, with a 12-inch to 18-inch drop to receiver.) Tj 23.52 -14.4 TD (\(g\)) Tj 18 0 TD (Mesh size of inlet screens.) Tj -18 -14.4 TD (\(h\)) Tj 18 0 TD (Pan, casing, eliminators, fan corrosion protection,) Tj -41.52 -7.2 TD (and complete drainage.) Tj 23.52 -14.4 TD (\(i\)) Tj 18 0 TD (Provision for and adjustment of constant bleeding.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (For all season air cooled condensers manufacturers) Tj -41.52 -7.2 TD (recommended installation should be adhered to. Check project) Tj 0 -7.2 TD (plans, specifications, and manufacturers recommended) Tj T* (installation to see if condenser flooding or air volume control) Tj T* (is required.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Reciprocating Compressors) Tj ET 58.56 138.48 102 0.72 re f BT 45.12 125.52 TD (Check for:) Tj 0 -14.4 TD (\(1\)) Tj 18 0 TD (Oil, suction, and discharge pressures.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Shaft alignment on direct-driven machines.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Operation of high pressurestat, low pressurestat, and) Tj -41.52 -7.2 TD (oil pressure failure switch.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Proper level viscosity of oil.) Tj ET endstream endobj 226 0 obj <>/ProcSet 386 0 R>>/Rotate 0/Type/Page>> endobj 227 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15G-5) Tj -97.68 469.2 TD (\(5\)) Tj 18 0 TD (Installation of required gages.) Tj -18 -14.4 TD (\(6\)) Tj 18 0 TD (Amount, correct type, and dryness of refrigerant) Tj -41.52 -7.2 TD (charge.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Pressure holding ability upon pump-down.) Tj -18 -14.4 TD (\(8\)) Tj 18 0 TD (Isolator deflection and compressor vibration.) Tj -18 -14.4 TD (\(9\)) Tj 18 0 TD (Suction strainer screen mesh, and removal of startup) Tj -41.52 -7.2 TD (belts.) Tj 23.52 -14.4 TD (\(10\)) Tj 22.32 0 TD (Unloader action.) Tj -22.32 -14.4 TD (\(11\)) Tj 22.32 0 TD (Compressor speed.) Tj -22.32 -14.4 TD (\(12\)) Tj 22.32 0 TD (Belt tension and alignment.) Tj -22.32 -14.4 TD (\(13\)) Tj 22.32 0 TD (Motor amperage under maximum load.) Tj -22.32 -14.4 TD (\(14\)) Tj 22.32 0 TD (Refrigerant flood back and oil foaming.) Tj -22.32 -14.4 TD (\(15\)) Tj 22.32 0 TD (Cylinder head overheating.) Tj -22.32 -14.4 TD (\(16\)) Tj 22.32 0 TD (Rotation.) Tj -22.32 -14.4 TD (\(17\)) Tj 22.32 0 TD (Automatic oil heater in crank case. Heater should) Tj -45.84 -7.2 TD (work during shutdown.) Tj 23.52 -14.4 TD (\(18\)) Tj 22.32 0 TD (Loops in refrigerant piping as loops will permit oil) Tj -45.84 -7.2 TD (to be trapped.) Tj 23.52 -14.4 TD (\(19\)) Tj 22.32 0 TD (Damage of equipment compressor \227 should not be run) Tj -45.84 -7.2 TD (during vacuum tests.) Tj 23.52 -14.4 TD (d.) Tj 13.44 0 TD (Centrifugal Compressors) Tj ET 58.56 253.68 93.84 0.72 re f BT 45.12 240.72 TD (Check for:) Tj 0 -14.4 TD (\(1\)) Tj 18 0 TD (Alignment of compressor, drive and gear box.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Suction damper or inlet vane operation.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Safety control circuit operation.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Purge compressor operation.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Float valve operation, if furnished.) Tj -18 -14.4 TD (\(6\)) Tj 18 0 TD (Oil pump and cooler operation.) Tj -18 -14.4 TD (\(7\)) Tj 18 0 TD (Noise and vibration.) Tj -18 -14.4 TD (\(8\)) Tj 18 0 TD (Required gages.) Tj -18 -14.4 TD (e.) Tj 13.44 0 TD (Receivers) Tj ET 58.56 109.68 36.72 0.72 re f BT 45.12 96.72 TD (Check for:) Tj 0 -14.4 TD (\(1\)) Tj 18 0 TD (Location, if installed on the outside of the building.) Tj -41.52 -7.2 TD (Do not place in direct rays of sun.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Relief valves are adequate size.) Tj ET endstream endobj 228 0 obj <>/ProcSet 386 0 R>>/Rotate 0/Type/Page>> endobj 229 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (15G-6) Tj -97.68 469.2 TD (\(3\)) Tj 18 0 TD (ASME Stamp.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Drain, purge valve, liquid level indication, and shut-) Tj -41.52 -7.2 TD (off valves.) Tj 23.52 -14.4 TD (f.) Tj 13.44 0 TD (Water Chillers) Tj ET 58.56 469.68 57.12 0.72 re f BT 45.12 456.72 TD (\(1\)) Tj 18 0 TD (Examine water drains, vents, and correct pass) Tj -41.52 -7.2 TD (arrangement in direct expansion type chillers.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Inspect for freeze protection safety devices.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Check strength of liquid bleed-off at bottom of) Tj -41.52 -7.2 TD (flooded chillers. Check adjustment of level control.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Check tubes and shell in brine chiller for type of) Tj -41.52 -7.2 TD (material.) Tj 23.52 -14.4 TD (g.) Tj 13.44 0 TD (Evaporative Coolers) Tj ET 58.56 376.08 77.52 0.72 re f BT 45.12 363.12 TD (Inspect for adequate spray coverage, non sagging media,) Tj -23.52 -7.2 TD (water carry-through, correct water level in sump, and lack of) Tj 0 -7.2 TD (float valve \223chatter.) Tj 23.52 -14.4 TD (h.) Tj 13.44 0 TD (Unit Coolers) Tj ET 58.56 332.88 48.96 0.72 re f BT 45.12 319.92 TD (Check:) Tj 0 -14.4 TD (\(1\)) Tj 18 0 TD (For corrosion\227protected pan and casing.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Water defrost units for spray coverage with no) Tj -41.52 -7.2 TD (carryover.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Electric defrost units, for cycle timing in accordance) Tj -41.52 -7.2 TD (with the job conditions.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Hot gas defrost, for suction pressures and refrigerant) Tj -41.52 -7.2 TD (charge in accordance with manufacturer) Tj 155.04 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s recommendations.) Tj -135.6 -14.4 TD (\(5\)) Tj 18 0 TD (Drainage during defrost cycle.) Tj -18 -14.4 TD (\(6\)) Tj 18 0 TD (Cycle timing.) Tj -18 -14.4 TD (\(7\)) Tj 18 0 TD (That drain lines are properly trapped on the warm end.) Tj -18 -14.4 TD (i.) Tj 13.44 0 TD (Refrigeration Specialties) Tj ET 58.56 181.68 102 0.72 re f BT 45.12 168.72 TD (Check:) Tj 0 -14.4 TD (\(1\)) Tj 18 0 TD (Superheat setting of expansion valves and that bulb) Tj -41.52 -7.2 TD (and equalizer position is in accordance with the manufacturer) Tj 248.88 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s) Tj -252.96 -7.2 TD (recommendations.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Solenoid valve for vertical stem, correct direction of) Tj -41.52 -7.2 TD (refrigerant flow, and manual opener disengaged.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Unobstructed view of sight glass.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Operation of evaporator pressure regulator under light) Tj -41.52 -7.2 TD (load.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Operation of hold-back value upon start-up.) Tj ET endstream endobj 230 0 obj <>/ProcSet 386 0 R>>/Rotate 0/Type/Page>> endobj 231 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15G-7) Tj -97.68 469.2 TD (\(6\)) Tj 18 0 TD (Float valves or switches mounted level and at a height) Tj -41.52 -7.2 TD (which will insure correct liquid level in the evapoess before) Tj 0 -7.2 TD (opening of refrigerant drier canisters.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Airtightness before opening of refrigerant drier) Tj -41.52 -7.2 TD (canisters.) Tj 23.52 -14.4 TD (\(8\)) Tj 18 0 TD (Drier; if it is the replaceable type, piping will be) Tj -41.52 -7.2 TD (arranged to facilitate replacement \227 3 valve bypass.) Tj 23.52 -14.4 TD (\(9\)) Tj 18 0 TD (Piping connections of liquid-suction heat exchanger.) Tj -18 -14.4 TD (\(10\)) Tj 22.32 0 TD (That direct expansion coils are installed as) Tj -45.84 -7.2 TD (recommended by manufacturer.) Tj 23.52 -14.4 TD (\(11\)) Tj 22.32 0 TD (That pans of fan-coil units are protected against) Tj -45.84 -7.2 TD (corrosion.) Tj 23.52 -14.4 TD (\(12\)) Tj 22.32 0 TD (That drain pans are installed under all units, or as) Tj -45.84 -7.2 TD (needed, to collect condensate.) Tj 23.52 -14.4 TD (j.) Tj 13.44 0 TD (Package-Type Air Conditioners) Tj ET 58.56 354.48 118.32 0.72 re f BT 45.12 341.52 TD (Check the following:) Tj 0 -14.4 TD (\(1\)) Tj 18 0 TD (High-pressure cutout setting.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Compressor hold-down bolts \(for shipping\) removed.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Drip pan should be watertight and connected to open) Tj -41.52 -7.2 TD (drain.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Water regulator valve operation, if used.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Installation of air filters and strainers.) Tj -18 -14.4 TD (\(6\)) Tj 18 0 TD (Operation of thermostat.) Tj -18 -14.4 TD (\(7\)) Tj 18 0 TD (Suction and discharge pressures of refrigeration) Tj -41.52 -7.2 TD (compressors.) Tj 23.52 -14.4 TD (k.) Tj 13.44 0 TD (Washers) Tj ET 58.56 210.48 28.56 0.72 re f BT 45.12 197.52 TD (\(1\)) Tj 18 0 TD (Check the following features of the spray-type air) Tj -41.52 -7.2 TD (washers:) Tj 23.52 -14.4 TD (\(a\)) Tj 18 0 TD (All nozzles discharging water spray.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (No water should carry over from eliminators.) Tj -18 -14.4 TD (\(c\)) Tj 18 0 TD (Eliminators must not rattle, and they must be) Tj -41.52 -7.2 TD (removable for maintenance.) Tj 23.52 -14.4 TD (\(d\)) Tj 18 0 TD (Float valve should not \223chatter\224 on opening or) Tj -41.52 -7.2 TD (closing.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check the following features of the capillary\227type) Tj -41.52 -7.2 TD (washers:) Tj 23.52 -11.52 TD (\(a\)) Tj 18 0 TD (Media should not sag in frames.) Tj -18 -11.52 TD (\(b\)) Tj 18 0 TD (Wetting of all media.) Tj -18 -11.52 TD (\(c\)) Tj 18 0 TD (Water level is at correct height.) Tj ET endstream endobj 232 0 obj <>/ProcSet 386 0 R>>/Rotate 0/Type/Page>> endobj 233 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (15G-8) Tj -97.68 469.2 TD (l.) Tj 13.44 0 TD (Humidifiers and Dehumidifiers) Tj ET 58.56 505.68 118.32 0.72 re f BT 45.12 492.72 TD (\(1\)) Tj 18 0 TD (Examine the humidifiers for supported coil and) Tj -41.52 -7.2 TD (corrosion-protected pan.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check refrigeration type dehumidifiers for frosting of) Tj -41.52 -7.2 TD (cooling coil and for water carry-over.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Check absorption type dehumidifiers for the following:) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Solution level and temperature controls.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (No solution should carry over from eliminators.) Tj -18 -14.4 TD (\(c\)) Tj 18 0 TD (Regenerator duct must be drained of specified) Tj -41.52 -7.2 TD (material, and correctly sealed.) Tj 23.52 -14.4 TD (\(d\)) Tj 18 0 TD (Damper operation, cycle timing, evidence of \223dusting\224) Tj -41.52 -7.2 TD (of the desiccant, and regenerative temperatures.) Tj 23.52 -14.4 TD (m.) Tj 13.44 0 TD (Absorption Refrigeration Machine) Tj ET 58.56 361.68 130.56 0.72 re f BT 45.12 348.72 TD (Check the following:) Tj 0 -14.4 TD (\(1\)) Tj 18 0 TD (Cleanliness of all parts during erection.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Proper materials.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Access for removing tubes from absorber-evaporator and) Tj -41.52 -7.2 TD (generator-condenser.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Control operation, especially high and low-limit) Tj -41.52 -7.2 TD (temperature cutouts or condenser water pump interlock.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Operation of purge system.) Tj -18 -14.4 TD (\(6\)) Tj 18 0 TD (Unit to be fully charged with water and a nontoxic) Tj -41.52 -7.2 TD (absorber after installation.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Services of a factory representative for charging,) Tj -41.52 -7.2 TD (testing, starting the plant, and providing instruction.) Tj 23.52 -14.4 TD (n.) Tj 13.44 0 TD (Cooling Towers and Ponds) Tj ET 58.56 203.28 97.92 0.72 re f BT 45.12 190.32 TD (\(1\)) Tj 18 0 TD (Check mechanical-draft cooling towers for unobstructed) Tj -41.52 -7.2 TD (air intake, fan rotation and speed, belt tension, stacked fill,) Tj 0 -7.2 TD (and weather protection of motor. \(Do not allow open fan motors) Tj T* (when totally enclosed motors are specified.\) Insure that) Tj T* (water\227flow through outlet does not form a vortex which draws air) Tj T* (in with the water. Check operation of water temperature control) Tj T* (and drainage devices.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Observe spray ponds for evenness of sprays and for) Tj -41.52 -7.2 TD (water drift.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Insure provision for an adjustment of constant bleed.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (See that mist eliminators are installed when) Tj -41.52 -7.2 TD (specified.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Insure the installation of over-flow and drain piping.) Tj ET endstream endobj 234 0 obj <>/ProcSet 386 0 R>>/Rotate 0/Type/Page>> endobj 235 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15G-9) Tj -97.68 469.2 TD (\(6\)) Tj 18 0 TD (See that the water is at adequate level after) Tj -41.52 -7.2 TD (operation, and that spray-pump operates.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Check belt alignment and tension.) Tj -18 -14.4 TD (o.) Tj 13.44 0 TD (Pumps) Tj ET 58.56 469.68 20.4 0.72 re f BT 45.12 456.72 TD (\(1\)) Tj 18 0 TD (Assure that manufacturer) Tj 97.92 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s name-plates, equipment,) Tj -143.52 -7.2 TD (serial numbers, or code stamps are not covered or hidden from) Tj 0 -7.2 TD (view after installation.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check for anchorage of pump in compliance with) Tj -41.52 -7.2 TD (contract.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Check alignment of pump with motor and piping.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Make sure that all gages and meters are provided.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (See that eccentric reducers, in lieu of concentric) Tj -41.52 -7.2 TD (reducers, are used in suction piping, and that the flat side is) Tj 0 -7.2 TD (turned up.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Check for adequate support of piping around pump.) Tj -18 -14.4 TD (\(7\)) Tj 18 0 TD (Be sure check valve is installed in discharge piping.) Tj -18 -14.4 TD (\(8\)) Tj 18 0 TD (Check pump packing. Make sure adequate packing is) Tj -41.52 -7.2 TD (installed to allow gland take-up.) Tj 23.52 -14.4 TD (\(9\)) Tj 18 0 TD (Check for excess vibration and flexible piping) Tj -41.52 -7.2 TD (connections if required.) Tj 23.52 -14.4 TD (\(10\)) Tj 22.32 0 TD (Make sure that the pump motor is weatherproof when) Tj -45.84 -7.2 TD (specified, and that it is connected to rotate correctly.) Tj 23.52 -14.4 TD (\(11\)) Tj 22.32 0 TD (Recheck oil sumps after operation, if applicable.) Tj -22.32 -14.4 TD (p.) Tj 13.44 0 TD (Insulation) Tj ET 58.56 239.28 40.8 0.72 re f BT 45.12 226.32 TD (\(1\)) Tj 18 0 TD (Check for:) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Proper insulation of chilled water pumps.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Insulated converters and expansion tanks.) Tj -18 -14.4 TD (\(c\)) Tj 18 0 TD (Insulated condensate drain pans of air handling units.) Tj -18 -14.4 TD (\(d\)) Tj 18 0 TD (Protective finish over such items as pumps, converters) Tj -41.52 -7.2 TD (tanks, fans, etc.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Insure that all insulating materials have been) Tj -41.52 -7.2 TD (approved and that they are of the specified thickness.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Check the method of attaching insulation to equipment.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Make sure that specified reinforcing is provided in) Tj -41.52 -7.2 TD (adhesive plaster finish.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (See that corner angle beads are installed at the) Tj -41.52 -7.2 TD (specified corners.) Tj ET endstream endobj 236 0 obj <>/ProcSet 386 0 R>>/Rotate 0/Type/Page>> endobj 237 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 122.88 -488.64 TD (15G-10) Tj -95.76 469.2 TD (\(6\)) Tj 18 0 TD (See that the adhesive finish coat has smooth, pleasing) Tj -41.52 -7.2 TD (finish.) Tj 23.52 -14.4 TD (\(7\)) Tj 18 0 TD (Check on the application of vapor barriers to see that) Tj -41.52 -7.2 TD (they effectively seal out all moisture.) Tj 0 -14.4 TD (15G-04 ) Tj 32.64 0 TD (CONTROLS) Tj ET 54.24 462.48 32.64 0.72 re f BT 45.12 449.52 TD (a.) Tj 13.44 0 TD (Review all control installations with approved control) Tj -36.96 -7.2 TD (shop drawings, to assure that they are being installed in strict) Tj 0 -7.2 TD (conformance with the drawings.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (See that dampers are mounted securely on rigid) Tj -36.96 -7.2 TD (supports, and that the correct bearings are provided on the) Tj 0 -7.2 TD (blade axles.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Note damper motors while fan is on, and check linkage) Tj -36.96 -7.2 TD (between damper and motor.) Tj 23.52 -14.4 TD (d.) Tj 13.44 0 TD (Examine valve operations for tight closing.) Tj -13.44 -14.4 TD (e.) Tj 13.44 0 TD (Examine electrical equipment for interlocking.) Tj -13.44 -14.4 TD (f.) Tj 13.44 0 TD (Check on the installation of all required alarm bells.) Tj -13.44 -14.4 TD (g.) Tj 13.44 0 TD (See that freeze\227stats are installed as specified.) Tj -13.44 -14.4 TD (h.) Tj 13.44 0 TD (Check for proper electrical current and voltage in the) Tj -36.96 -7.2 TD (control system. Carefully check the operation of solenoid) Tj 0 -7.2 TD (valves.) Tj 23.52 -14.4 TD (i.) Tj 13.44 0 TD (Check that air compressor location will permit tank) Tj -36.96 -7.2 TD (drain operation, and check for cycle time with all operating) Tj 0 -7.2 TD (controls.) Tj 23.52 -14.4 TD (j.) Tj 13.44 0 TD (Verify clean elements in humidistats when the system is) Tj -36.96 -7.2 TD (started.) Tj 23.52 -14.4 TD (k.) Tj 13.44 0 TD (Evaluate pneumatic systems for air\227tightness,) Tj -36.96 -7.2 TD (restrictions caused by flattening of the tubing, and cleanliness) Tj 0 -7.2 TD (of the system.) Tj 23.52 -14.4 TD (l.) Tj 13.44 0 TD (Inspect electronic systems for grounded shielded cable,) Tj -36.96 -7.2 TD (and location of amplifiers with respect to magnetic fields, such) Tj 0 -7.2 TD (as large transformers.) Tj 23.52 -14.4 TD (m.) Tj 13.44 0 TD (View graphic panels for damaged plastic, dirt between) Tj -36.96 -7.2 TD (plastic and back plate, lacing of control wires and access for) Tj 0 -7.2 TD (service to all controls.) Tj 23.52 -14.4 TD (n.) Tj 13.44 0 TD (Verify control instructions, including sequence of) Tj -36.96 -7.2 TD (operations, and control drawing furnished by the contractor when) Tj 0 -7.2 TD (conducting final acceptance test. Check each function of the) Tj T* (controls.) Tj 0 -14.4 TD (15G-05 ) Tj 32.64 0 TD (TESTING) Tj ET 54.24 109.68 28.56 0.72 re f BT 45.12 96.72 TD (a.) Tj 13.44 0 TD (Submittals) Tj ET 58.56 95.28 40.8 0.72 re f BT 45.12 82.32 TD (Be sure the contractor obtains approval of test procedures) Tj -23.52 -7.2 TD (and other pertinent information prior to testing.) Tj ET endstream endobj 238 0 obj <>/ProcSet 386 0 R>>/Rotate 0/Type/Page>> endobj 239 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 140.88 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15G-11) Tj -95.76 469.2 TD (b.) Tj 13.44 0 TD (Procedures) Tj ET 58.56 505.68 40.8 0.72 re f BT 45.12 492.72 TD (\(1\)) Tj 18 0 TD (Make a record of all tests, including such information) Tj -41.52 -7.2 TD (as who attended, methods and procedures of test, results, and) Tj 0 -7.2 TD (conclusions. Check specifications to determine that contractor) Tj T* (is recording sufficient data to comply with requirements.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Before tests are scheduled, see that contractor has) Tj -41.52 -7.2 TD (proper tools, equipment, and instruments, and gages should be) Tj 0 -7.2 TD (certified and pretested.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (See that equipment is thoroughly checked and prepared) Tj -41.52 -7.2 TD (for tests.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Make sure strainers and filters are clean immediately) Tj -41.52 -7.2 TD (prior to test.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Types) Tj ET 58.56 383.28 20.4 0.72 re f BT 45.12 370.32 TD (\(1\)) Tj 18 0 TD (Check the testing of refrigerant piping. See that) Tj -41.52 -7.2 TD (specified pressure is put on the lines. Make sure all joints are) Tj 0 -7.2 TD (checked, and that leaks are detected, repaired, and retested) Tj T* (until found satisfactory. Isolate all items which may be damaged) Tj T* (by high pressure.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (See that hydrostatic test is performed on all water) Tj -41.52 -7.2 TD (piping. Carefully check to see if there is a loss in pressure) Tj 0 -7.2 TD (during the test.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (See that a performance test on the system is run for) Tj -41.52 -7.2 TD (the duration specified. Make sure needed corrections and) Tj 0 -7.2 TD (adjustments are made as determined during test. See that the) Tj T* (contractor records all data required for the performance test.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (After successful tests, install a new oil charge in) Tj -41.52 -7.2 TD (compressor. Change oil filters and socks, and provide new) Tj 0 -7.2 TD (cartridge in refrigerant drier. \(Oil charge is not required for) Tj T* (factory sealed units\)) Tj 0 -14.4 TD (15G-06 ) Tj 32.64 0 TD (PAINTING) Tj ET 54.24 224.88 32.64 0.72 re f BT 45.12 211.92 TD (a.) Tj 13.44 0 TD (See that equipment is furnished with the correct) Tj -36.96 -7.2 TD (finish. Watch for abrasions.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Watch for miscellaneous ferrous metal items that are) Tj -36.96 -7.2 TD (not primed.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Require touching up, priming, and finish painting as) Tj -36.96 -7.2 TD (specified.) Tj 23.52 -14.4 TD (d.) Tj 13.44 0 TD (Apply asphaltic varnish on all hangers and other items) Tj -36.96 -7.2 TD (not to be painted.) Tj 23.52 -11.52 TD (e.) Tj 13.44 0 TD (Require piping identification on coding as specified.) Tj -36.96 -11.52 TD (15G-07 ) Tj 32.64 0 TD (OPERATING INSTRUCTIONS AND GUARANTIES) Tj ET 54.24 115.44 150.96 0.72 re f BT 45.12 105.36 TD (a.) Tj 13.44 0 TD (See that equipment guaranties, schematic flow diagrams,) Tj -36.96 -7.2 TD (and instructions for the operation of equipment are furnished) Tj 0 -7.2 TD (and posted.) Tj 23.52 -11.52 TD (b.) Tj 13.44 0 TD (Arrange for future operating personnel to be instructed) Tj -36.96 -7.2 TD (on the operation of equipment. Make a record of instruction) Tj 0 -7.2 TD (periods, including any complications, instructing personnel, and) Tj T* (personnel instructed.) Tj ET endstream endobj 240 0 obj <>/ProcSet 242 0 R>>/Rotate 0/Type/Page>> endobj 241 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 150.96 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (i) Tj -20.4 469.2 TD (CHAPTER 15H) Tj ET 130.56 505.68 44.88 0.72 re f BT 106.08 492.72 TD (FIRE PROTECTION SYSTEMS) Tj ET 106.08 491.28 93.84 0.72 re f BT 142.8 478.32 TD (INDEX) Tj -88.8 -14.4 TD (Para.) Tj ET 54 462.48 20.4 0.72 re f BT 144 463.92 TD (Title) Tj ET 144 462.48 20.4 0.72 re f BT 243.12 463.92 TD (Page) Tj ET 243.12 462.48 16.32 0.72 re f BT 54 449.52 TD (15H-01) Tj 49.44 0 TD (GENERAL) Tj 139.68 0 TD (15H-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Definition) Tj 121.68 0 TD (15H-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Approvals) Tj 121.68 0 TD (15H-1) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Storage and Handling) Tj 121.68 0 TD (15H-1) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Coordination of Work) Tj 121.68 0 TD (15H-1) Tj -189.12 -14.4 TD (15H-02) Tj 49.44 0 TD (SPRINKLER SYSTEMS) Tj 139.68 0 TD (15H-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (General) Tj 121.68 0 TD (15H-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Materials) Tj 121.68 0 TD (15H-2) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Water Supply) Tj 121.68 0 TD (15H-2) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Aboveground Piping) Tj 121.68 0 TD (15H-2) Tj -139.68 -7.2 TD (e.) Tj 18 0 TD (Sprinkler Heads) Tj 121.68 0 TD (15H-2) Tj -139.68 -7.2 TD (f.) Tj 18 0 TD (Drains) Tj 121.68 0 TD (15H-3) Tj -139.68 -7.2 TD (g.) Tj 18 0 TD (Wet Pipe Systems) Tj 121.68 0 TD (15H-3) Tj -139.68 -7.2 TD (h.) Tj 18 0 TD (Dry Pipe Systems) Tj 121.68 0 TD (15H-3) Tj -139.68 -7.2 TD (i.) Tj 18 0 TD (Deluge Systems) Tj 121.68 0 TD (15H-4) Tj -139.68 -7.2 TD (j.) Tj 18 0 TD (Sterilization) Tj 121.68 0 TD (15H-4) Tj -139.68 -7.2 TD (k.) Tj 18 0 TD (Alarm Facilities) Tj 121.68 0 TD (15H-4) Tj -139.68 -7.2 TD (l.) Tj 18 0 TD (Testing) Tj 121.68 0 TD (15H-4) Tj -189.12 -14.4 TD (15H-03) Tj 49.44 0 TD (PIPING, INSULATION,) Tj 0 -7.2 TD ( AND INTERIOR ELECTRICAL) Tj 139.68 0 TD (15H-4) Tj ET endstream endobj 242 0 obj [/PDF/Text] endobj 243 0 obj <>/ProcSet 387 0 R>>/Rotate 0/Type/Page>> endobj 244 0 obj <>stream q 234.48 546.72 53.28 7.68 re W n BT 239.04 548.64 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 539.04 36.96 7.68 re W n BT 255.36 540.96 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 23.52 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15H-1) Tj -12.24 498 TD (CHAPTER 15H) Tj ET 130.56 520.08 44.88 0.72 re f BT 106.08 506.88 TD (FIRE PROTECTION SYSTEMS) Tj ET 106.08 505.44 93.84 0.72 re f BT 18 491.52 TD (15H-01 ) Tj 32.64 0 TD (GENERAL) Tj ET 50.64 490.08 28.56 0.72 re f BT 45.12 476.16 TD (a.) Tj 13.44 0 TD (Definition) Tj ET 58.56 474.72 40.8 0.72 re f BT 45.12 460.8 TD (This chapter covers materials, equipment, and good) Tj -27.12 -7.68 TD (workmanship practices for Fire Protection Systems.) Tj 27.12 -15.36 TD (b.) Tj 13.44 0 TD (Approvals) Tj ET 58.56 436.32 36.72 0.72 re f BT 45.12 422.4 TD (\(1\)) Tj 18 0 TD (Review Eng Form 4288, Submittal Register, and insure) Tj -45.12 -7.68 TD (that all material equipment, and shop drawings are approved prior) Tj 0 -7.68 TD (to preparatory inspection, and prior to either fabrication or) Tj T* (installation. Obtain any helpful manufacturer) Tj 183.6 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s installation) Tj -187.68 -7.68 TD (information.) Tj 27.12 -15.36 TD (\(2\)) Tj 18 0 TD (Insure that seismic restraints are shown on shop) Tj -45.12 -7.68 TD (drawings.) Tj 27.12 -15.36 TD (c.) Tj 13.44 0 TD (Storage and Handling) Tj ET 58.56 351.84 81.6 0.72 re f BT 45.12 337.92 TD (\(1\)) Tj 18 0 TD (Insure that all materials and equipment are handled) Tj -45.12 -7.68 TD (carefully to prevent damage.) Tj 27.12 -15.36 TD (\(a\)) Tj 18 0 TD (Reject damaged material and equipment. Have such items) Tj -45.12 -7.68 TD (removed from the site.) Tj 27.12 -15.36 TD (\(b\)) Tj 18 0 TD (Have damaged coatings repaired.) Tj -18 -15.36 TD (\(2\)) Tj 18 0 TD (In handling heavy pipe use wide belt slings to avoid) Tj -45.12 -7.68 TD (damage to pipe coatings.) Tj 27.12 -15.36 TD (\(3\)) Tj 18 0 TD (Check storage facilities for adequate weather) Tj -45.12 -7.68 TD (protection, possible damage, and safety hazard.) Tj 27.12 -15.36 TD (\(4\)) Tj 18 0 TD (When outside storage is necessary, store materials and) Tj -45.12 -7.68 TD (equipment above ground.) Tj 27.12 -15.36 TD (d.) Tj 13.44 0 TD (Coordination of Work) Tj ET 58.56 205.92 81.6 0.72 re f BT 45.12 192 TD (Continually check for interferences between electrical,) Tj -27.12 -7.68 TD (mechanical, architectural, and structural features especially in) Tj 0 -7.68 TD (ceiling area and along walls where fire protection system is to be) Tj T* (installed.) Tj 0 -15.36 TD (15H-02 ) Tj 32.64 0 TD (SPRINKLER SYSTEMS) Tj ET 50.64 152.16 69.36 0.72 re f BT 45.12 138.24 TD (a.) Tj 13.44 0 TD (General) Tj ET 58.56 136.8 28.56 0.72 re f BT 45.12 122.88 TD (\(1\)) Tj 18 0 TD (Assure that fire protection systems serving occupied) Tj -45.12 -7.68 TD (buildings are not shut off for repairs without advance notice) Tj 0 -7.68 TD (being given to proper authorities.) Tj 27.12 -15.36 TD (\(2\)) Tj 18 0 TD (Note valves and equipment proposed for location within) Tj -45.12 -7.68 TD (reach of flood waters. Call to the attention of your supervisor.) Tj 27.12 -15.36 TD (\(3\)) Tj 18 0 TD (Do not take water from fire mains for domestic use.) Tj -18 -15.36 TD (\(4\)) Tj 18 0 TD (Identify painting and coding requirements.) Tj ET endstream endobj 245 0 obj <>/ProcSet 387 0 R>>/Rotate 0/Type/Page>> endobj 246 0 obj <>stream BT 18 548.64 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -517.44 TD (15H-2) Tj -97.68 497.76 TD (\(5\)) Tj 18 0 TD (Check that sprinkler heads are not painted.) Tj -18 -15.36 TD (b.) Tj 13.44 0 TD (Materials) Tj ET 58.56 504.48 36.72 0.72 re f BT 45.12 490.56 TD (\(1\)) Tj 18 0 TD (Coordinate fire department hose connections for use) Tj -45.12 -7.68 TD (with local fire department hose.) Tj 27.12 -15.36 TD (\(2\)) Tj 18 0 TD (Inspect pipe, fittings, and valves. Pipe that is) Tj -45.12 -7.68 TD (properly reamed is free from burrs and fins.) Tj 27.12 -15.36 TD (c.) Tj 13.44 0 TD (Water Supply) Tj ET 58.56 443.04 48.96 0.72 re f BT 45.12 429.12 TD (\(1\)) Tj 18 0 TD (Evaluate plan of work to minimize interruption of water) Tj -45.12 -7.68 TD (service.) Tj 27.12 -15.36 TD (\(2\)) Tj 18 0 TD (Insure that water line is located below local frost) Tj -45.12 -7.68 TD (line.) Tj 27.12 -15.36 TD (\(3\)) Tj 18 0 TD (Block off ends of supply lines terminating in building) Tj -45.12 -7.68 TD (or valve house.) Tj 27.12 -15.36 TD (\(4\)) Tj 18 0 TD (Be certain that pipe joints are left exposed until) Tj -45.12 -7.68 TD (final inspection and tests are made.) Tj 27.12 -15.36 TD (\(5\)) Tj 18 0 TD (See that turns in supply line are braced, blocked or) Tj -45.12 -7.68 TD (clamped.) Tj 27.12 -15.36 TD (d.) Tj 13.44 0 TD (Aboveground Piping) Tj ET 58.56 312.48 73.44 0.72 re f BT 45.12 298.56 TD (\(1\)) Tj 18 0 TD (Notice size of pipe. Check to insure all hangers are) Tj -45.12 -7.68 TD (tight.) Tj 27.12 -15.36 TD (\(a\)) Tj 18 0 TD (Run parallel to building lines, with slope to drain.) Tj -18 -15.36 TD (\(b\)) Tj 18 0 TD (See that branch piping is off top of main.) Tj -18 -15.36 TD (\(c\)) Tj 18 0 TD (Where impossible to obtain an even slope, plugs should) Tj -45.12 -7.68 TD (be provided at low points so that the entire system may be) Tj 0 -7.68 TD (drained. Check for inspection test connections required by NFPA.) Tj 27.12 -15.36 TD (\(2\)) Tj 18 0 TD (See that no cutting of structural members for support) Tj -45.12 -7.68 TD (or passage of pipe is allowed.) Tj 27.12 -15.36 TD (\(3\)) Tj 18 0 TD (Insure that holes through fire walls are provided with) Tj -45.12 -7.68 TD (sleeves and plates. Sleeves will be provided where pipe passes) Tj 0 -7.68 TD (through walls and floors.) Tj 27.12 -15.36 TD (\(4\)) Tj 18 0 TD (Check that installation of seismic restraints are) Tj -45.12 -7.68 TD (installed as approved.) Tj 27.12 -15.36 TD (e.) Tj 13.44 0 TD (Sprinkler Heads) Tj ET 58.56 135.84 61.2 0.72 re f BT 45.12 121.92 TD (\(1\)) Tj 18 0 TD (Be sure that heads in accordance with NFPA 13 are) Tj -45.12 -7.68 TD (installed in upright position with recommended clearance to roof) Tj 0 -7.68 TD (or ceiling surfaces.) Tj 27.12 -15.36 TD (\(a\)) Tj 18 0 TD (When in pendant position return bends will be used if) Tj -45.12 -7.68 TD (water is subject to sedimentation.) Tj 27.12 -15.36 TD (\(b\)) Tj 18 0 TD (Where subject to mechanical injury heads will be) Tj -45.12 -7.68 TD (provided with approved guards.) Tj 27.12 -15.36 TD (\(c\)) Tj 18 0 TD (All heads will be new and should not be painted.) Tj ET endstream endobj 247 0 obj <>/ProcSet 387 0 R>>/Rotate 0/Type/Page>> endobj 248 0 obj <>stream q 234.48 546.72 53.28 7.68 re W n BT 239.04 548.64 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 539.04 36.96 7.68 re W n BT 255.36 540.96 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 23.52 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (15H-3) Tj -97.68 497.76 TD (\(2\)) Tj 18 0 TD (Determine sprinkler head temperature ratings as proper) Tj -45.12 -7.68 TD (for ambient temperatures anticipated in the area; e.g., near) Tj 0 -7.68 TD (heaters, skylights, etc.) Tj 27.12 -15.36 TD (Notify your supervisor in instances where sprinkler head) Tj -27.12 -7.68 TD (temperature ratings appear to be inconsistent with anticipated) Tj 0 -7.68 TD (ambient temperatures.) Tj 27.12 -15.36 TD (\(3\)) Tj 18 0 TD (Spare heads should be provided and arrangements made to) Tj -45.12 -7.68 TD (transfer them to the using service.) Tj 27.12 -15.36 TD (\(4\)) Tj 18 0 TD (Where sprinkler heads are shown to be installed in) Tj -45.12 -7.68 TD (special hazard areas, such as electronic shops, confirm that) Tj 0 -7.68 TD (installation will be in conformance with area usage.) Tj 27.12 -15.36 TD (f.) Tj 13.44 0 TD (Drains) Tj ET 58.56 404.64 24.48 0.72 re f BT 45.12 390.72 TD (See that valves or plugs are provided to insure drainage of) Tj -27.12 -7.68 TD (the entire system. Assure that discharger from all drain valves is) Tj 0 -7.68 TD (visible. They should be arranged so that wide open valve position) Tj T* (under normal pressure will not cause any water damage.) Tj 27.12 -15.36 TD (g.) Tj 13.44 0 TD (Wet Pipe Systems) Tj ET 58.56 350.88 65.28 0.72 re f BT 45.12 336.96 TD (\(l\)) Tj 18 0 TD (Insist that piping layout is in strict accordance with) Tj -45.12 -7.68 TD (approved drawings.) Tj 27.12 -15.36 TD (\(2\)) Tj 18 0 TD (Alarm check-valve assembly must conform with connection) Tj -45.12 -7.68 TD (diagram.) Tj 27.12 -15.36 TD (\(3\)) Tj 18 0 TD (Observe installation of water\227flow indicators for) Tj -45.12 -7.68 TD (conformance with connection diagram.) Tj 27.12 -15.36 TD (\(4\)) Tj 18 0 TD (Confirm insulation and painting requirements.) Tj -18 -15.36 TD (\(5\)) Tj 18 0 TD (Check water flow alarm signal by using wet pipe type of) Tj -45.12 -7.68 TD (inspector) Tj 36.72 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s test connection.) Tj -13.68 -15.36 TD (h.) Tj 13.44 0 TD (Dry Pipe Systems) Tj ET 58.56 228 65.28 0.72 re f BT 45.12 214.08 TD (\(1\)) Tj 18 0 TD (Determine that piping layout is in strict accordance) Tj -45.12 -7.68 TD (with approved drawings.) Tj 27.12 -15.36 TD (\(2\)) Tj 18 0 TD (Note dry pipe valve installation for conformance with) Tj -45.12 -7.68 TD (connection diagram.) Tj 27.12 -15.36 TD (\(3\)) Tj 18 0 TD (Inspect installation of air compressors. Air supply) Tj -45.12 -7.68 TD (line should include flexible connection and orifice plate. Check) Tj 0 -7.68 TD (motor controller operation. If compressor is equipped with an air) Tj T* (storage tank, assure that condensate water drain is provided at) Tj T* (bottom of tank.) Tj 27.12 -15.36 TD (\(4\)) Tj 18 0 TD (Examine locations and operation of condensate chambers;) Tj -45.12 -7.68 TD (i.e., drum drips.) Tj 27.12 -15.36 TD (\(5\)) Tj 18 0 TD (Check water flow alarm signal time and dry valve trip) Tj -45.12 -7.68 TD (test time by using the dry pipe type of inspector) Tj 199.92 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s test) Tj -204 -7.68 TD (connection.) Tj 27.12 -15.36 TD (\(6\)) Tj 18 0 TD (Where dry pipe valve accelerators are provided, check) Tj -45.12 -7.68 TD (for proper operation.) Tj 27.12 -15.36 TD (i.) Tj 13.44 0 TD (Deluge Systems) Tj ET 58.56 43.68 57.12 0.72 re f endstream endobj 249 0 obj <>/ProcSet 387 0 R>>/Rotate 0/Type/Page>> endobj 250 0 obj <>stream BT 18 548.64 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -517.44 TD (15H-4) Tj -97.68 497.76 TD (\(1\)) Tj 18 0 TD (Confirm that piping layout is in strict accordance with) Tj -45.12 -7.68 TD (approved drawings.) Tj 27.12 -15.36 TD (\(2\)) Tj 18 0 TD (Examine installation of deluge valve assembly.) Tj -18 -15.36 TD (\(3\)) Tj 18 0 TD (Inspect and test releasing devices.) Tj -18 -15.36 TD (\(4\)) Tj 18 0 TD (Check tripping devices both manual and automatic. Check) Tj -45.12 -7.68 TD (provisions to insure against accidental water damage.) Tj 27.12 -15.36 TD (\(5\)) Tj 18 0 TD (Insure that contractor provided portable test units in) Tj -45.12 -7.68 TD (good working order.) Tj 27.12 -15.36 TD (j.) Tj 13.44 0 TD (Sterilization) Tj ET 58.56 420 53.04 0.72 re f BT 45.12 406.08 TD (Witness dosage, distribution, retention, and final flush-) Tj -27.12 -7.68 TD (out.) Tj 27.12 -15.36 TD (k.) Tj 13.44 0 TD (Alarm Facilities) Tj ET 58.56 381.6 65.28 0.72 re f BT 45.12 367.68 TD (\(1\)) Tj 18 0 TD (Check installations to insure that all alarm devices) Tj -45.12 -7.68 TD (have been provided and are in operating condition.) Tj 27.12 -15.36 TD (\(2\)) Tj 18 0 TD (Be sure that electric power for alarm signals is taken) Tj -45.12 -7.68 TD (from the house current supply line ahead of the main switch.) Tj 27.12 -15.36 TD (\(3\)) Tj 18 0 TD (Examine alarm system for tie-in with local fire) Tj -45.12 -7.68 TD (department.) Tj 27.12 -15.36 TD (\(4\)) Tj 18 0 TD (Check alarm to insure that it can be heard above normal) Tj -45.12 -7.68 TD (noise levels.) Tj 27.12 -15.36 TD (l.) Tj 13.44 0 TD (Testing) Tj ET 58.56 274.08 28.56 0.72 re f BT 45.12 260.16 TD (\(1\)) Tj 18 0 TD (Review test procedure for adequacy, and witness all) Tj -45.12 -7.68 TD (tests.) Tj 27.12 -15.36 TD (\(2\)) Tj 18 0 TD (Protect dry pipe valves against damage during the) Tj -45.12 -7.68 TD (tests.) Tj 27.12 -15.36 TD (\(3\)) Tj 18 0 TD (In testing extensions to existing system, insure that) Tj -45.12 -7.68 TD (self-indicating blanks are used. Remove upon completion of tests.) Tj 27.12 -15.36 TD (\(4\)) Tj 18 0 TD (Insure that all sprinkler contractor) Tj 146.88 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s certificates) Tj -196.08 -7.68 TD (covering materials and tests are properly executed.) Tj 27.12 -15.36 TD (\(5\)) Tj 18 0 TD (Insure that flushing and hydrostatic tests are made in) Tj -45.12 -7.68 TD (accordance with the accepted tests specified in Standard 13 of the) Tj 0 -7.68 TD (National Fire Protection Association.) Tj 27.12 -15.36 TD (\(6\)) Tj 18 0 TD (Insure that all lines and controls are properly) Tj -45.12 -7.68 TD (painted, color coded, indentified, tagged, and with directional) Tj 0 -7.68 TD (flow markings.) Tj 27.12 -15.36 TD (\(7\)) Tj 18 0 TD (Check with supervisor to assure user/fire marshall is) Tj -45.12 -7.68 TD (present as needed durin the test.) Tj 0 -15.36 TD (15H-03 ) Tj 32.64 0 TD (PIPING. INSULATION. AND INTERIOR ELECTRICAL) Tj ET 50.64 82.08 175.44 0.72 re f BT 45.12 68.16 TD (See Section 15A PIPING SYSTEMS, Section 15C MECHANICAL) Tj -27.12 -7.68 TD (INSULATION, and Section 16A INTERIOR ELECTRICAL.) Tj ET endstream endobj 251 0 obj <>/ProcSet 388 0 R>>/Rotate 0/Type/Page>> endobj 252 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 150.96 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (i) Tj -20.4 469.2 TD (CHAPTER 16A) Tj ET 130.56 505.68 44.88 0.72 re f BT 114.24 492.72 TD (INTERIOR ELECTRICAL) Tj ET 114.24 491.28 77.52 0.72 re f BT 142.8 478.32 TD (INDEX) Tj -88.8 -14.4 TD (Para.) Tj ET 54 462.48 20.4 0.72 re f BT 144 463.92 TD (Title) Tj ET 144 462.48 20.4 0.72 re f BT 243.12 463.92 TD (Page) Tj ET 243.12 462.48 16.32 0.72 re f BT 54 449.52 TD (16A-01) Tj 49.44 0 TD (GENERAL) Tj 139.68 0 TD (16A-1) Tj -189.12 -14.4 TD (16A-02) Tj 49.44 0 TD (GENERAL REQUIREMENTS) Tj 139.68 0 TD (16A-1) Tj -189.12 -14.4 TD (16A-03) Tj 49.44 0 TD (GROUNDING) Tj 139.68 0 TD (16A-4) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Drawings and) Tj 0 -7.2 TD (Specifications) Tj 121.68 0 TD (16A-4) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Visual Inspection) Tj 121.68 0 TD (16A-4) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Grounds to Metallic) Tj 0 -7.2 TD (Water-Piping System) Tj 121.68 0 TD (16A-4) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Bolted Connections) Tj 121.68 0 TD (16A-4) Tj -139.68 -7.2 TD (e.) Tj 18 0 TD (Exothermic Welding) Tj 0 -7.2 TD (Connections) Tj 121.68 0 TD (16A-4) Tj -139.68 -7.2 TD (f.) Tj 18 0 TD (Metallic Enclosures) Tj 121.68 0 TD (16A-4) Tj -139.68 -7.2 TD (g.) Tj 18 0 TD (Incoming Service Conduit) Tj 121.68 0 TD (16A-5) Tj -139.68 -7.2 TD (h.) Tj 18 0 TD (Grounding Connection) Tj 121.68 0 TD (16A-5) Tj -139.68 -7.2 TD (i.) Tj 18 0 TD (Ground Rods) Tj 121.68 0 TD (16A-5) Tj -139.68 -7.2 TD (j.) Tj 18 0 TD (System Neutral and) Tj 0 -7.2 TD (Equipment Grounds) Tj 121.68 0 TD (16A-5) Tj -139.68 -7.2 TD (k.) Tj 18 0 TD (System Neutral) Tj 121.68 0 TD (16A-5) Tj -139.68 -7.2 TD (l.) Tj 18 0 TD (Multiple Connections) Tj 121.68 0 TD (16A-5) Tj -139.68 -7.2 TD (m.) Tj 18 0 TD (Grounding Resistance) Tj 121.68 0 TD (16A-5) Tj -139.68 -7.2 TD (n.) Tj 18 0 TD (Electrical Continuity) Tj 121.68 0 TD (16A-5) Tj -189.12 -14.4 TD (16A-04) Tj 49.44 0 TD (WIRING METHODS) Tj 139.68 0 TD (16A-5) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Rigid Metal Conduit,) Tj 0 -7.2 TD (Intermediate Metal Conduit) Tj T* (\(IMC\), and Electrical) Tj T* (Metallic Tubing \(EMT\)) Tj 121.68 0 TD (16A-5) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Cable Systems) Tj 121.68 0 TD (16A-9) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Busway Systems) Tj 121.68 0 TD (16A-9) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Continuous Rigid Cable) Tj 0 -7.2 TD (Supports or Cable Trays) Tj 121.68 0 TD (16A-10) Tj -139.68 -7.2 TD (e.) Tj 18 0 TD (Wireways) Tj 121.68 0 TD (16A-10) Tj -139.68 -7.2 TD (f.) Tj 18 0 TD (Auxiliary Gutters) Tj 121.68 0 TD (16A-10) Tj -139.68 -7.2 TD (g.) Tj 18 0 TD (Underfloor Duct Systems) Tj 121.68 0 TD (16A-10) Tj -139.68 -7.2 TD (h.) Tj 18 0 TD (Movable Partitions) Tj 121.68 0 TD (16A-11) Tj -139.68 -7.2 TD (i.) Tj 18 0 TD (Conductors) Tj 121.68 0 TD (16A-11) Tj -189.12 -14.4 TD (16A-05) Tj 49.44 0 TD (OUTLETS) Tj 139.68 0 TD (16A-11) Tj -189.12 -14.4 TD (16A-06) Tj 49.44 0 TD (DEVICE PLATES) Tj 139.68 0 TD (16A-13) Tj -189.12 -14.4 TD (16A-07) Tj 49.44 0 TD (RECEPTACLES) Tj 139.68 0 TD (16A-13) Tj -189.12 -14.4 TD (16A-08) Tj 49.44 0 TD (WALL SWITCHES) Tj 139.68 0 TD (16A-13) Tj -189.12 -14.4 TD (16A-09) Tj 49.44 0 TD (SERVICE EQUIPMENT) Tj 139.68 0 TD (16A-13) Tj -189.12 -14.4 TD (16A-10) Tj 49.44 0 TD (LOAD CENTER TYPE PANEL BOARDS) Tj 139.68 0 TD (16A-14) Tj -189.12 -14.4 TD (16A-11) Tj 49.44 0 TD (PANELBOARDS) Tj 139.68 0 TD (16A-14) Tj ET endstream endobj 253 0 obj <>/ProcSet 388 0 R>>/Rotate 0/Type/Page>> endobj 254 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 131.04 -488.64 TD (ii) Tj -12.24 469.2 TD (\(con) Tj 16.32 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (t\) ) Tj -103.2 -14.4 TD (16A-12) Tj 49.44 0 TD (CABINETS) Tj 139.68 0 TD (16A-15) Tj -189.12 -14.4 TD (16A-13) Tj 49.44 0 TD (FUSES) Tj 139.68 0 TD (16A-15) Tj -189.12 -14.4 TD (16A-14) Tj 49.44 0 TD (UNDERGROUND SERVICE CONDUITS) Tj 139.68 0 TD (16A-14) Tj -189.12 -14.4 TD (16A-15) Tj 49.44 0 TD (AERIAL SERVICE) Tj 139.68 0 TD (16A-16) Tj -189.12 -14.4 TD (16A-16) Tj 49.44 0 TD (MOTORS) Tj 139.68 0 TD (16A-16) Tj -189.12 -14.4 TD (16A-17) Tj 49.44 0 TD (MOTOR CONTROL) Tj 139.68 0 TD (16A-17) Tj -189.12 -14.4 TD (16A-18) Tj 49.44 0 TD (MOTOR DISCONNECT MEANS) Tj 139.68 0 TD (16A-18) Tj -189.12 -14.4 TD (16A-19) Tj 49.44 0 TD (LAMPS AND LIGHTING FIXTURES) Tj 139.68 0 TD (16A-18) Tj -189.12 -14.4 TD (16A-20) Tj 49.44 0 TD (EQUIPMENT CONNECTIONS) Tj 139.68 0 TD (16A-19) Tj -189.12 -14.4 TD (16A-21) Tj 49.44 0 TD (TRANSFORMER STATIONS) Tj 139.68 0 TD (16A-19) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Dry Type Transformers) Tj 121.68 0 TD (16A-19) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Transformer Taps) Tj 121.68 0 TD (16A-19) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Liquid\227Filled Transformers) Tj 121.68 0 TD (16A-19) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Nameplate Data) Tj 121.68 0 TD (16A-19) Tj -139.68 -7.2 TD (e.) Tj 18 0 TD (Accessories) Tj 121.68 0 TD (16A-20) Tj -139.68 -7.2 TD (f.) Tj 18 0 TD (Bushings) Tj 121.68 0 TD (16A-20) Tj -139.68 -7.2 TD (g.) Tj 18 0 TD (Insulating Liquid) Tj 121.68 0 TD (16A-20) Tj -139.68 -7.2 TD (h.) Tj 18 0 TD (Grounding) Tj 121.68 0 TD (16A-20) Tj -139.68 -7.2 TD (i.) Tj 18 0 TD (Ventilation) Tj 121.68 0 TD (16A-20) Tj -189.12 -14.4 TD (16A-22) Tj 49.44 0 TD (SWITCHGEAR) Tj 139.68 0 TD (16A-20) Tj -189.12 -14.4 TD (16A-23) Tj 49.44 0 TD (ENGINE GENERATOR SETS) Tj 139.68 0 TD (16A-21) Tj -189.12 -14.4 TD (16A-24) Tj 49.44 0 TD (ELEVATOR INSTALLATIONS) Tj 139.68 0 TD (16A-22) Tj -189.12 -14.4 TD (16A-25) Tj 49.44 0 TD (MISCELLANEOUS SYSTEMS) Tj 139.68 0 TD (16A-22) Tj -189.12 -14.4 TD (16A-26) Tj 49.44 0 TD (TESTS) Tj 139.68 0 TD (16A-22) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (All Testing) Tj 121.68 0 TD (16A-22) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (precautions) Tj 121.68 0 TD (16A-23) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Electrical Tests) Tj 121.68 0 TD (16A-23) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Records of Tests) Tj 121.68 0 TD (16A-23) Tj -139.68 -7.2 TD (e.) Tj 18 0 TD (Description of Tests) Tj 121.68 0 TD (16A-23) Tj -139.68 -7.2 TD (f.) Tj 18 0 TD (Megger Tests) Tj 121.68 0 TD (16A-24) Tj -139.68 -7.2 TD (g.) Tj 18 0 TD (Method of Testing) Tj 121.68 0 TD (16A-24) Tj ET endstream endobj 255 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 256 0 obj <>stream 0 0 0 rg 18 89.28 90.24 1.2 re f q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 30.72 TD /F0 6.96 Tf -0.096 Tc 0 Tw (16A-1) Tj -12.24 476.4 TD (CHAPTER 16A) Tj ET 130.56 505.68 44.88 0.72 re f BT 114.24 492.72 TD (INTERIOR ELECTRICAL) Tj ET 114.24 491.28 77.52 0.72 re f BT 18 478.32 TD (16A-01 ) Tj 32.64 0 TD (GENERAL) Tj ET 50.64 476.88 28.56 0.72 re f BT 45.12 463.92 TD (This guide has been prepared to assist the quality) Tj -27.12 -7.2 TD (assurance representative in obtaining the quality assurance of) Tj 0 -7.2 TD (interior electrical installation required by the contract) Tj T* (specifications. It is recognized that specialized technical) Tj T* (aspects of this subject may require the services of an electrical) Tj T* (engineer or technician. When the work appears to be beyond the) Tj T* (scope of the QAR, assistance should be requested promptly from the) Tj T* (immediate supervisor.) Tj 27.12 -14.4 TD (During the Preliminary Inspection of each phase of work,) Tj -27.12 -7.2 TD (make an inspection of materials prior to installation for) Tj 0 -7.2 TD (conformance with specification, plans, and approved shop drawings.) Tj T* (ENG Form 4288, Submittal Register, which lists approved materials) Tj T* (is essential to this inspection. Components for interior) Tj T* (electrical work will be inspected before they are installed and) Tj T* (energized. Initial Inspection and followup Inspections will follow) Tj T* (work as required by ER 1180-1-6.) Tj 0 -14.4 TD (16A-02 ) Tj 32.64 0 TD (GENERAL REQUIREMENTS) Tj ET 50.64 332.88 81.6 0.72 re f BT 45.12 319.92 TD (a.) Tj 13.44 0 TD (It is the intent that the electrical installation shall) Tj -40.56 -7.2 TD (conform to the applicable rules of the current National Electrical) Tj 0 -7.2 TD (Code \)NEC\)*, except where expressly modified by the plans and) Tj T* (specifications. This requirement can be found in the general) Tj T* (section of the project specification for INTERIOR ELECTRICAL. The) Tj T* (appropriate edition of the code will be listed in APPLICABLE) Tj T* (PUBLICATIONS. A copy of the applicable NEC should be readily) Tj T* (available to the general inspector, and he should be readily) Tj T* (available to the QAR, and he should be prepared to use it as a) Tj T* (reference and an authority. However, the NEC is a minimum standard) Tj T* (intended to assure a safe installation. Frequently, Corps of) Tj T* (Engineers project specifications require a higher quality) Tj T* (installation than that which is required by the minimum standards) Tj T* (of the NEC. A substitution or change to the requirements of the) Tj T* (project specification proposed on the basis of being \223Okay under) Tj T* (the Code\224 should not be casually accepted. NEC paragraph) Tj T* (references in the text of this guide are to assist the QAR in) Tj T* (using the Code and to lend authority to his demands for features) Tj T* (not spelled out in the project specification.) Tj 27.12 -14.4 TD (b.) Tj 13.44 0 TD (Watch job conditions at all times to assure that the) Tj -40.56 -7.2 TD (electrical work is done at the proper time in relation to other) Tj 0 -7.2 TD (parts of the building construction.) Tj 27.12 -14.4 TD (c.) Tj 13.44 0 TD (Determine the existence, extent, and classification of) Tj -40.56 -7.2 TD (hazardous locations as noted in the contract documentation. If) Tj 0 -7.2 TD (such locations exist, the installation therein should be strictly) Tj T* (in accord with appropriate sections of the NEC. Do not approve any) Tj T* (doubtful material or workmanship \(NEC 500 - 503\). Do not fail to) Tj T* (seek advice if needed.) Tj 27.12 -28.8 TD (*National Electrical Code \(NFPA No. 70-84\). Text references) Tj -27.12 -7.2 TD (are to the 1984 edition. Copies can be obtained from the national) Tj 0 -7.2 TD (Fire Protection Association at Batterymarch Park, Quincy, MA 02269) Tj T* (for $15.00.) Tj ET endstream endobj 257 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 258 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -495.84 TD (16A-2) Tj -97.68 476.4 TD (d.) Tj 13.44 0 TD (Inspect materials and equipment and approved shop) Tj -40.56 -7.2 TD (drawings. If materials are in accord with approved shop drawing) Tj 0 -7.2 TD (but appear to be contrary to specifications, inform your) Tj T* (supervisor.) Tj 27.12 -14.4 TD (e.) Tj 13.44 0 TD (Examine both contractor and government\227furnished) Tj -40.56 -7.2 TD (equipment for damage in shipment. Promptly report defective) Tj 0 -7.2 TD (equipment to your supervisor and accept or reject such equipment,) Tj T* (as directed.) Tj 27.12 -14.4 TD (f.) Tj 13.44 0 TD (Shop inspection by a Government representative may have) Tj -40.56 -7.2 TD (been required for some equipment and material. Copies of reports) Tj 0 -7.2 TD (of such shop inspections should be on hand before acceptance of) Tj T* (material or equipment.) Tj 27.12 -14.4 TD (g.) Tj 13.44 0 TD (Storage of electrical equipment will be done per) Tj -40.56 -7.2 TD (manufacturers requirement and in dry locations, free of dirt,) Tj 0 -7.2 TD (dust, and corrosive fumes, with protection from physical damage.) Tj T* (Storage of switchgear, engine generator units, and) Tj T* (government\227furnished equipment will usually require indoor) Tj T* (storage. Temporary heaters may be required or specified to keep) Tj T* (equipment free from effects of condensation. Equipment installed) Tj T* (during construction phases should be protected from dirt and) Tj T* (moisture. A requirement for this protection may be found in) Tj T* (special conditions of the contract \(ALSO NEC 110\22711.\)) Tj 27.12 -14.4 TD (h.) Tj 13.44 0 TD (Require the contractor to furnish all layout drawings) Tj -40.56 -7.2 TD (required by the specifications. Electrical contract drawings) Tj 0 -7.2 TD (should be reviewed and compared with architectural, structural and) Tj T* (mechanical drawings for possible interferences. Examples of this) Tj T* (are:) Tj 27.12 -14.4 TD (\(1\)) Tj 18 0 TD (Are the wall switches located with proper respect to) Tj -45.12 -7.2 TD (door swing?) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Does location of wall outlets conflict with) Tj -45.12 -7.2 TD (installation of baseboard heating units, casework, cabinets or) Tj 0 -7.2 TD (lockers?) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (Are there interferences with other building) Tj -45.12 -7.2 TD (construction, such as pipes, ducts, overhead doors, sliding doors,) Tj 0 -7.2 TD (accessibility, etc.? Especially check equipment room layout.) Tj 27.12 -14.4 TD (\(4\)) Tj 18 0 TD (Is relocation of ceiling lighting outlets required,) Tj -45.12 -7.2 TD (especially in utility and boiler rooms, to avoid interference with) Tj 0 -7.2 TD (mechanical equipment?) Tj 27.12 -14.4 TD (\(5\)) Tj 18 0 TD (Will transformers, bus duct or switchgear be subjected) Tj -45.12 -7.2 TD (to moisture from overhead floor inadequate?) Tj 27.12 -14.4 TD (\(6\)) Tj 18 0 TD (Have suspended ceilings been lowered, making lighting) Tj -45.12 -7.2 TD (fixture clearance from floor inadequate?) Tj 27.12 -14.4 TD (i.) Tj 13.44 0 TD (Temporary electric service will generally be required) Tj -40.56 -7.2 TD (during the construction period for lighting, power, and sometimes) Tj 0 -7.2 TD (heat. The contractor should make early arrangements for such) Tj T* (service to prevent construction delays; and temporary) Tj T* (installations will be located so as not to interfere with) Tj T* (operation of existing facilities or permanent construction.) Tj 27.12 -14.4 TD (The contractor should arrange for frequent inspection and) Tj -27.12 -7.2 TD (rehabilitation of temporary installation during the course of the) Tj 0 -7.2 TD (contract to keep it in good repair \(NEC-305\).) Tj ET endstream endobj 259 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 260 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 30.72 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (16A-3) Tj -97.68 476.4 TD (j.) Tj 13.44 0 TD (Adherence to the requirements of Corps of Engineers) Tj -40.56 -7.2 TD (Safety Manual, *EN 385-1-1, is a general provision requirement for) Tj 0 -7.2 TD (all Corps of Engineers administered projects.) Tj 27.12 -14.4 TD (\(1\) Temporary open wiring should be guarded or isolated by) Tj -27.12 -7.2 TD (elevation. Types NM in dry locations and/or NMC in damp locations) Tj 0 -7.2 TD (\(Romex\) are suitable for temporary wiring when guarded or isolated) Tj T* (by elevation \(EM 385-1-1, paragraph 15D-01 and NEC 320, 336\)) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Portable and extension cords shall be an Underwriter) Tj 212.16 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s) Tj -261.36 -7.2 TD (Laboratory \(UL\) listed type for the usage. Hard service cords Type) Tj 0 -7.2 TD (S, SJ, SJO, SJT, SJTO, STO or ST are recommended for this service.) Tj T* (Types NM or NMC are not approved as portable cables or covers \(NEC) Tj T* (400\).) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (Ground fault circuit protection for construction sites) Tj -45.12 -7.2 TD (is required on all 120 volt, single phase, 15 and 20 Amp) Tj 0 -7.2 TD (receptacles per NEC 305-4.) Tj 27.12 -14.4 TD (k.) Tj 13.44 0 TD (Use by the contractor of equipment and facilities) Tj -40.56 -7.2 TD (permanently incorporated in the structure should be carefully) Tj 0 -7.2 TD (watched to see that circuits and equipment are not overloaded and) Tj T* (that all work is left in essentially new condition. All protected) Tj T* (safety and working lamps used for temporary lighting shall be) Tj T* (removed when construction is completed, and new lamps shall be) Tj T* (installed in permanent light fixtures \(Project Specification:) Tj T* (Lamps.\)) Tj 27.12 -14.4 TD (l.) Tj 13.44 0 TD (ENG Form 4288, Submittal Register was prepared and) Tj -40.56 -7.2 TD (included in the contract specifications prior to bidding the work.) Tj 0 -7.2 TD (This list of required equipment will insure timely approval and) Tj T* (will alert the QAR if the contractor has not procured all) Tj T* (equipment. Generally, electrical construction materials and) Tj T* (equipment must be built and tested according to UL requirements.) Tj T* (Listed materials and equipment will bear the UL label. The) Tj T* (Electrical Constructions Materials Directory is available form UL) Tj T* (Inc., Publications Stock, 333 Pfingsten Road, Northbrook, IL) Tj T* (60062.) Tj 27.12 -14.4 TD (m.) Tj 13.44 0 TD (Check shop drawings for all equipment having electrical) Tj -40.56 -7.2 TD (connections to be sure that rough-in conduits and circuits are) Tj 0 -7.2 TD (correctly sized and located.) Tj 27.12 -14.4 TD (n.) Tj 13.44 0 TD (Manufacturer) Tj 48.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s representatives are sometimes required to) Tj -93.6 -7.2 TD (assist field and contractor personnel in the installation,) Tj 0 -7.2 TD (assembly, testing and/or initial operation of electrical) Tj T* (equipment. When Government Furnished Equipment is involved, be) Tj T* (sure advance arrangements for such services are coordinated by) Tj T* (Resident Engineer and contractor so that the representative is on) Tj T* (hand when needed because usually the number of days are designated) Tj T* (in the contract and an overrun will result in an additional cost) Tj T* (to the Government. Maintain complete record of all adjustments and) Tj T* (tests made during installation and startup, and of any) Tj T* (peculiarities of the equipment which may be of use to those) Tj T* (responsible for its operation and maintenance. Turn copy of record) Tj T* (over to your supervisor for delivery to the using agency. Retain a) Tj T* (copy of all records for the job file.) Tj 27.12 -14.4 TD (o.) Tj 13.44 0 TD (The using agency should be required to witness tests.) Tj -40.56 -7.2 TD (The presence or absence of the using service personnel should be) Tj 0 -7.2 TD (noted on the test report.) Tj ET endstream endobj 261 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 262 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -495.84 TD (16A-4) Tj -97.68 476.4 TD (p.) Tj 13.44 0 TD (Fire ratings of structures shall not be compromised by) Tj -40.56 -7.2 TD (electrical installations \(NEC 300-21\).) Tj 0 -14.4 TD (16A-03 ) Tj 32.64 0 TD (GROUNDING) Tj ET 50.64 484.08 36.72 0.72 re f BT 87.36 485.52 TD ( \(NEC 250 and Project Specifications: Grounding\)) Tj -42.24 -14.4 TD (a.) Tj 13.44 0 TD (Drawings and Specifications) Tj ET 58.56 469.68 110.16 0.72 re f BT 45.12 456.72 TD (Drawings and Specifications should be examined carefully to) Tj -27.12 -7.2 TD (determine the nature and extent of the grounding system and the) Tj 0 -7.2 TD (requirements for separate grounding of equipment and structures.) Tj T* (Automatic Data Processing \(ADP\) , Communications and Health Care) Tj T* (Facilities may have special or seperately derived grounding) Tj T* (requirements.) Tj 27.12 -14.4 TD (b.) Tj 13.44 0 TD (Visual Inspection) Tj ET 58.56 404.88 69.36 0.72 re f BT 45.12 391.92 TD (Visual inspection should be made of all ground-system) Tj -27.12 -7.2 TD (conductors, connections and electrodes as the work progresses.) Tj 0 -7.2 TD (Ground resistance test: The resistance of all electrodes must be) Tj T* (tested to assure resistance to ground of 25 OHMS or less \(Job) Tj T* (specifications or NEC 250-84\).) Tj 27.12 -14.4 TD (c.) Tj 13.44 0 TD (Grounds to Metallic Water-Piping System) Tj ET 58.56 347.28 159.12 0.72 re f BT 45.12 334.32 TD (Grounds to metallic water\227piping system should be made on) Tj -27.12 -7.2 TD (the street side of the meter. Where this is impracticable, full) Tj 0 -7.2 TD (size jumper connections should be made around any piping system) Tj T* (elements which can be removed \(NEC 250-112\).) Tj 27.12 -14.4 TD (\(1\)) Tj 18 0 TD (Make sure that when the water piping system is used for) Tj -45.12 -7.2 TD (a ground, the water pipe is a metallic pipe and that no insulating) Tj 0 -7.2 TD (fitting has been interposed in the pipe between the ground wire) Tj T* (connection and earth. \(NEC 250-81\). An additional ground electrode) Tj T* (shall supplement the connection to the water pipe system \(NEC 250-) Tj T* (81 or NEC 250-83\).) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Where metallic water main is not available, driven) Tj -45.12 -7.2 TD (ground electrodes will be provided in conformance with) Tj 0 -7.2 TD (specifications \(NEC 250-83, and Project Specifications: Ground) Tj T* (Rods\).) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (Interior metallic water piping shall always be grounded) Tj -45.12 -7.2 TD (\(NEC 250\22780\(a\)\).) Tj 27.12 -14.4 TD (d.) Tj 13.44 0 TD (Bolted Connections) Tj ET 58.56 188.88 73.44 0.72 re f BT 45.12 175.92 TD (Bolted connections should be examined to make sure that) Tj -27.12 -7.2 TD (they are tight and that contact surfaces are cleaned and dry.) Tj 0 -7.2 TD (Contact surfaces will be metal-to-metal. Painted surfaces should) Tj T* (be cleaned to bare metal \(NEC 250-75\).) Tj 27.12 -14.4 TD (e.) Tj 13.44 0 TD (Exothermic Welding Connnections) Tj ET 58.56 138.48 126.48 0.72 re f BT 45.12 125.52 TD (Exothermic welding connections will be made in strict) Tj -27.12 -7.2 TD (accordance with the manufacturer) Tj 130.56 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s instructions and will employ) Tj -134.64 -7.2 TD (the proper type and size of mold for the type and size of) Tj 0 -7.2 TD (connection made.) Tj 27.12 -14.4 TD (f.) Tj 13.44 0 TD (Metallic Enclosures) Tj ET 58.56 88.08 77.52 0.72 re f BT 45.12 75.12 TD (Metallic enclosures for ground wires shall be electrically) Tj -27.12 -7.2 TD (continuous from the point of attachment to cabinets or equipment) Tj 0 -7.2 TD (to the grounding electrode and shall be securely fastened to the) Tj T* (ground clamp or fitting \(NEC 250-92\(a\)\).) Tj ET endstream endobj 263 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 264 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 30.72 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (16A-5) Tj -97.68 476.4 TD (g.) Tj 13.44 0 TD (Incoming Service Conduit) Tj ET 58.56 505.68 97.92 0.72 re f BT 45.12 492.72 TD (Incoming service conduit must be grounded by logs, pressure) Tj -27.12 -7.2 TD (Connectors or clamps. Locknuts and bushings are not acceptable for) Tj 0 -7.2 TD (grounding service conduit \(NEC 250-32, -71\(a\) and -72\).) Tj 27.12 -14.4 TD (h.) Tj 13.44 0 TD (Grounding Connection) Tj ET 58.56 462.48 81.6 0.72 re f BT 45.12 449.52 TD (Ground clamps for connection to water pipe or grounding) Tj -27.12 -7.2 TD (electrode should be compatible with the pipe or electrode and UL) Tj 0 -7.2 TD (approved for the purpose \(NEC 250-115\)) Tj 27.12 -14.4 TD (i.) Tj 13.44 0 TD (Ground Rods) Tj ET 58.56 419.28 44.88 0.72 re f BT 45.12 406.32 TD (\(1\)) Tj 18 0 TD (Check size, length, and material of ground rods or) Tj -45.12 -7.2 TD (electrodes against contract drawings and specifications \(NEC 250-) Tj 0 -7.2 TD (83, Project Specification: Grounding\)) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (If suitable water pipe is not available, and if ground) Tj -45.12 -7.2 TD (rods cannot be driven to a minimum depth of 8 feet, other means of) Tj 0 -7.2 TD (establishing a ground must be utilized \(NEC 250\22783 and C) Tj T* (250-84\)) Tj 27.12 -14.4 TD (j.) Tj 13.44 0 TD (System Neutral and Equipment Grounds) Tj ET 58.56 340.08 146.88 0.72 re f BT 45.12 327.12 TD (Grounding electrode conductor should be joined to grounding) Tj -27.12 -7.2 TD (electrodes as shown on drawings \(NEC 250-112\). Some special) Tj 0 -7.2 TD (electronic facilities may require additional isolated grounding) Tj T* (electrodes and conductors \(Project specification: Grounding.\)) Tj 27.12 -14.4 TD (k.) Tj 13.44 0 TD (System Neutral) Tj ET 58.56 289.68 57.12 0.72 re f BT 45.12 276.72 TD (System neutral \(Grounded circuit conductor\) should be) Tj -27.12 -7.2 TD (grounded \(connected to the grounding conductor\) on supply side of) Tj 0 -7.2 TD (the service disconnecting means \(main service switch\(es\). This) Tj T* (connection should be made within the service entrance equipment) Tj T* (enclosure \(NEC 250-23; 250-50\) \(Project Specifications:) Tj T* (Grounding.\)) Tj 27.12 -14.4 TD (l.) Tj 13.44 0 TD (Multiple Connections) Tj ET 58.56 224.88 81.6 0.72 re f BT 45.12 211.92 TD (The connecting of more than one grounding conductor to an) Tj -27.12 -7.2 TD (electode by a single clamp is prohibited, unless the clamp or) Tj 0 -7.2 TD (fitting is of a type of specifically designed and approved by the) Tj T* (Underwriters) Tj 48.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf ( Laboratory for such use \(NEC 250-115\).) Tj -25.92 -14.4 TD (m.) Tj 13.44 0 TD (Grounding Resistance) Tj ET 58.56 174.48 81.6 0.72 re f BT 45.12 161.52 TD (Grounding resistance should be verified by instrument) Tj -27.12 -7.2 TD (measurement \(Job Specification or NEC 250-84.\)) Tj 27.12 -14.4 TD (n. ) Tj 12.24 0 TD (Electrical Continuity) Tj ET 57.36 138.48 85.68 0.72 re f BT 45.12 125.52 TD (Electrical continuity should be verified throughout system,) Tj -27.12 -7.2 TD (usually by visual inspection.) Tj 0 -14.4 TD (16A-04 ) Tj 32.64 0 TD (WIRING METHODS) Tj ET 50.64 102.48 57.12 0.72 re f BT 107.76 103.92 TD ( \(NEC 300\)) Tj -89.76 -14.4 TD (a. ) Tj 16.32 0 TD (Rigid Metal Conduit. Intermediate Metal Conduit \(IMC\) and) Tj ET 34.32 88.08 232.56 0.72 re f BT 18 82.32 TD (Electrical Metallic Tubing \(EMT) Tj ET 18 80.88 126.48 0.72 re f BT 144.48 82.32 TD (\)) Tj ET endstream endobj 265 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 266 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -495.84 TD (16A-6) Tj -97.68 476.4 TD (Check to determine requirements and limitations on use of) Tj -27.12 -7.2 TD (rigid conduit, IMC, or EMT and special finishing or coating) Tj 0 -7.2 TD (material \(Steel with zinc coating or galvanizing is standard\)) Tj T* (other materials may be allowed or required \(Project) Tj T* (Specifications: Wiring Methods; NEC-345, 346, 347, and 348.\)) Tj 27.12 -14.4 TD (\(1\)) Tj 18 0 TD (The project specifications generally require the) Tj -45.12 -7.2 TD (service entrance raceway to be ) Tj 126.48 0 TD (rigid) Tj ET 144.48 455.28 20.4 0.72 re f BT 164.88 456.72 TD ( metal conduit \(Project) Tj -146.88 -7.2 TD (Specification: Aerial Service.\)) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Check size of installed conduit against plans and) Tj -45.12 -7.2 TD (specificatins and determine adequacy for number and size of) Tj 0 -7.2 TD (conductors to be installed. Refer to tables in NEC \(Project) Tj T* (Specifications and NEC 345-7, 346-6, and 348-6 and Tables in) Tj T* (Chapter 9.\)) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (Check minimum size of conduit permitted by) Tj -45.12 -7.2 TD (specifications for both electrical system and communication system) Tj 0 -7.2 TD (\(Project Specifications: Telephone and Sig. System Raceways and) Tj T* (NEC 345-6, 346-5, 347-11 and 348-5.\)) Tj 27.12 -14.4 TD (\(4\)) Tj 18 0 TD (Check to be sure that all required conduits are in) Tj -45.12 -7.2 TD (place before on\227grade slabs are placed. Check stub-up locations) Tj 0 -7.2 TD (against equipment shopdrawings.) Tj 27.12 -14.4 TD (\(a\)) Tj 18 0 TD (Generally, for slab-on-grade construction conduit must) Tj -45.12 -7.2 TD (be placed under the slab and must be rigid type. \(Check plans and) Tj 0 -7.2 TD (specifications\)) Tj 27.12 -14.4 TD (\(b\)) Tj 18 0 TD (Check project specifications for requirement that for) Tj -45.12 -7.2 TD (stub-ups, couplings be installed at finished floor level for free) Tj 0 -7.2 TD (standing equipment \(Project Speficification: Conduits.\)) Tj 27.12 -14.4 TD (\(c\)) Tj 18 0 TD (Exposed conduit should be installed so that bent) Tj -45.12 -7.2 TD (portion of stub-up will not extend above floor level.) Tj 27.12 -14.4 TD (\(d\)) Tj 18 0 TD (Be sure that all buried conduit has been surface) Tj -45.12 -7.2 TD (treated as required by specifications \(Project Specification:) Tj 0 -7.2 TD (Conduit and Tubing Systems.\)) Tj 27.12 -14.4 TD (\(5\)) Tj 18 0 TD (Inspect for damage and deformation of conduit systems) Tj -45.12 -7.2 TD (\(Project Specifications: Changes in Direction and NEC 345-10, 356-) Tj 0 -7.2 TD (10, 347-13 and 348-9.\)) Tj 27.12 -14.4 TD (\(6\)) Tj 18 0 TD (Is conduit system to be installed concealed or exposed?) Tj -45.12 -7.2 TD (Check project specification and plans.) Tj 27.12 -14.4 TD (\(7\)) Tj 18 0 TD (Check for the use of the proper type of conduit) Tj -45.12 -7.2 TD (fittings, i.e., concrete-tight, rain-tight cast fittings;) Tj 0 -7.2 TD (expansion joints \(NEC 345-9, 346-9, and 347-6 and 348-8\).) Tj 27.12 -14.4 TD (\(8\)) Tj 18 0 TD (Check for installation of sleeves for future work in) Tj -45.12 -7.2 TD (foundation walls and floors during correct stage of construction.) Tj 27.12 -14.4 TD (\(9\)) Tj 18 0 TD (Check maximum number of bends in any single conduit) Tj -45.12 -7.2 TD (run. Do not exceed:) Tj 27.12 -14.4 TD (\(a\)) Tj 18 0 TD (Electrical System -4 \(90 Degree\) bends, including those) Tj -45.12 -7.2 TD (bends located immediately at the outlet or fitting \(NEC 345-11,) Tj 0 -7.2 TD (346-11, 347-14, 348-10.\)) Tj 27.12 -14.4 TD (\(b\) Communication System - Check project specifications for) Tj -27.12 -7.2 TD (requirements. Generally, not more than 3 \(90) Tj 179.52 0 TD /F2 6.96 Tf 0.12 Tc (N) Tj 3.6 0 TD /F0 6.96 Tf -0.096 Tc ( \) bends.) Tj ET endstream endobj 267 0 obj <> endobj 268 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 269 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 30.72 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (16A-7) Tj -97.68 476.4 TD (\(10\)) Tj 22.32 0 TD (Make sure that ) Tj 61.2 0 TD (all) Tj ET 128.64 505.68 12.24 0.72 re f BT 140.88 507.12 TD ( the conduit required for circuits) Tj -122.88 -7.2 TD (involving equipment furnished by other sections of the) Tj 0 -7.2 TD (specifications and approved shop drawings, as well as the) Tj T* (electrical sections, is installed prior to placing of concrete,) Tj T* (closing the walls, ceilings, etc.) Tj 27.12 -14.4 TD (\(11\)) Tj 22.32 0 TD (Check for bushings on ends of conduit. Bushings are) Tj -49.44 -7.2 TD (not usually required on EMT fittings, because EMT connectors) Tj 0 -7.2 TD (should have smooth internal surfaces \(NEC 345-15, 346-8, 347-12\).) Tj 27.12 -14.4 TD (\(a\)) Tj 18 0 TD (Check for use of insulating bushings and double lock) Tj -45.12 -7.2 TD (nuts \(NEC 373-6\(c\).) Tj 27.12 -14.4 TD (\(b\)) Tj 18 0 TD (Check for use of double locknuts for circuits over 250) Tj -45.12 -7.2 TD (volts to ground \(NEC 250-76b\).) Tj 27.12 -14.4 TD (\(c\)) Tj 18 0 TD (See that locknuts, bushings, couplings, and connectors) Tj -45.12 -7.2 TD (are made up tight to insure ground continuity \(NEC 250-92\(b\).) Tj 27.12 -14.4 TD (\(12\)) Tj 22.32 0 TD (See that field cuts of conduits and EMT are made) Tj -49.44 -7.2 TD (square, ends reamed or filed, and cleaned of oil and filings, \(NEC) Tj 0 -7.2 TD (345-8, 346-7, 348-11: Project Specifications\).) Tj 27.12 -14.4 TD (\(13\)) Tj 22.32 0 TD (Use of running threads is not permitted at couplings) Tj -49.44 -7.2 TD (\(NEC 346\2279\).) Tj 27.12 -14.4 TD (\(14\)) Tj 22.32 0 TD (Correlate location of conduit terminations against) Tj -49.44 -7.2 TD (approved shop drawings, equipment and building plans.) Tj 27.12 -14.4 TD (\(15\)) Tj 22.32 0 TD (Tubing and conduit should be securely fastened in) Tj -49.44 -7.2 TD (place at intervals required. Means of support provided should be) Tj 0 -7.2 TD (in accord with specifications and NEC requirements \(Project) Tj T* (Specifications, NEC 348-12, 348-12, 347-8, 346-12, 345-12.\)) Tj 27.12 -14.4 TD (\(16\)) Tj 22.32 0 TD (Exposed conduit runs are to be installed parallel o) Tj -49.44 -7.2 TD (perpendicular to walls and structural members. Vertical conduit) Tj 0 -7.2 TD (runs should be plumb \(Project Specifications: Conduit and Tubing) Tj T* (Systems.) Tj 27.12 -14.4 TD (\(17\)) Tj 22.32 0 TD (Conduit runs in wet areas shall be mounted so that) Tj -49.44 -7.2 TD (there is at least 1/4\224 air space between it and the wall or) Tj 0 -7.2 TD (support surface \(NEC 300-6\(c\)\).) Tj 27.12 -14.4 TD (\(18\)) Tj 22.32 0 TD (Minimum radius of bends of conduit should be in) Tj -49.44 -7.2 TD (accordance with table in the NEC \(NEC 346-10, 348-9, 345-10\). This) Tj 0 -7.2 TD (table is based on utilizing conductors with 600-volt insulation.) Tj T* (For cables with higher voltage ratings, and special cables such as) Tj T* (telephone cable, consult manufacturer) Tj 150.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s recommendations for) Tj -155.04 -7.2 TD (minimum radius of bend.) Tj 27.12 -14.4 TD (\(19\)) Tj 22.32 0 TD (Check for supporting of vertical raceways at each) Tj -49.44 -7.2 TD (floor level of multi-story buildings \(Project Specifications\).) Tj 27.12 -14.4 TD (\(20\)) Tj 22.32 0 TD (Install galvanized pull-wires in empty conduits when) Tj -49.44 -7.2 TD (required by designs or specifications.) Tj 27.12 -14.4 TD (\(21\)) Tj 22.32 0 TD (Verify the use of corrosion-resistant materials in) Tj -49.44 -7.2 TD (areas where corrosive influences exist \(NEC 300-6: Project) Tj 0 -7.2 TD (Specifications\).) Tj 27.12 -14.4 TD (\(22\)) Tj 22.32 0 TD (Require means for prevention of entrance of foreign) Tj -49.44 -7.2 TD (matter in conduits during construction \(Project Specifications\).) Tj ET endstream endobj 270 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 271 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -495.84 TD (16A-8) Tj -97.68 476.4 TD (\(23\)) Tj 22.32 0 TD (Use UL listed flexible conduit, standard or liquid) Tj -49.44 -7.2 TD (tight, for connections to motors installed on slide rails,) Tj 0 -7.2 TD (resilient mounts, those subject to vibration, and elsewhere as) Tj T* (specified \(NEC 350, 351; Project Specifications\). Minimum size is) Tj T* (\275" except as allowed in NEC 350-3, and a bonding jumper may be) Tj T* (required.) Tj 27.12 -14.4 TD (\(24\)) Tj 22.32 0 TD (In areas classified as hazardous, be sure that) Tj -49.44 -7.2 TD (installation is ) Tj 65.28 0 TD (strictly) Tj ET 83.28 448.08 32.64 0.72 re f BT 115.92 449.52 TD ( in accord with Project Specifications and) Tj -97.92 -7.2 TD (applicable NEC articles 500 through 517. All questions should be) Tj 0 -7.2 TD (referred to qualified personnel. For Class 1, Division 1 areas,) Tj T* (the following items should be carefully verified:) Tj 27.12 -14.4 TD (\(a\)) Tj 18 0 TD (Only threaded steel IMC or threaded rigid metallic) Tj -45.12 -7.2 TD (conduit, or MI cable with approved connectors can be used, \(NEC) Tj 0 -7.2 TD (501-4\(a\) and threaded joints ) Tj 118.32 0 TD (must) Tj ET 136.32 397.68 16.32 0.72 re f BT 152.64 399.12 TD ( be up wrench tight, \(NEC 500-1\),) Tj -134.64 -7.2 TD (unless a bonding jumper is installed.) Tj 27.12 -14.4 TD (\(b\) At least five full threads must be engaged at each) Tj -27.12 -7.2 TD (threaded joint \(NEC 501-4\(a\). All field made threads must be) Tj 0 -7.2 TD (tapered \(NEC 500-1\)) Tj 27.12 -14.4 TD (\(c\)) Tj 18 0 TD (All fittings, fixtures, boxes, and enclosures must be) Tj -45.12 -7.2 TD (specifically involved. An Underwriter) Tj 150.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s approval seal is generally) Tj -155.04 -7.2 TD (affixed to the equipment. If not, secure other firm verification) Tj 0 -7.2 TD (of approval.) Tj 27.12 -14.4 TD (\(d\)) Tj 18 0 TD (Explosion proof fittings, boxes and enclosures have) Tj -45.12 -7.2 TD (screw or ground joints at openings. Be sure that surface of ground) Tj 0 -7.2 TD (joints is clean, unscratched and smooth, so that the mating) Tj T* (surfaces make intimate contact throughout their area. Covers must) Tj T* (be tight and gaskets are not to be used.) Tj 27.12 -14.4 TD (\(a\)) Tj 18 0 TD (Be sure that all required seals are installed in the) Tj -45.12 -7.2 TD (correct location and that they are of the correct type \(NEC 501-5) Tj 0 -7.2 TD (and 502-5\) . Be sure seals are the correct type of the) Tj T* (application, vertical or horizontal.) Tj 27.12 -14.4 TD (\(f\)) Tj 18 0 TD (Check the mounting method of equipment to be sure that) Tj -45.12 -7.2 TD (no holes have been drilled into the interior chamber of an) Tj 0 -7.2 TD (explosion proof enclosure.) Tj 27.12 -14.4 TD (\(g\)) Tj 18 0 TD (Be sure that all flexible conduits bear the) Tj -45.12 -7.2 TD (Underwriter) Tj 44.88 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s listing seal for the hazard involved.) Tj -21.84 -14.4 TD (\(h\)) Tj 18 0 TD (See that proper approved type sealing compound has been) Tj -45.12 -7.2 TD (installed in all sealing fittings. Follow manufacturer s) Tj 0 -7.2 TD (recommendations \(NEC 501-5\(c\)2\).) Tj 27.12 -14.4 TD (\(25\) Where rigid non-metallic conduits is installed under) Tj -27.12 -7.2 TD (the specification, it should be installed in accordance with NEC) Tj 0 -7.2 TD (347 and all special requirements of the Project Specifications.) Tj 27.12 -14.4 TD (\(26\)) Tj 22.32 0 TD (Provide conductor support in long vertical conduit) Tj -49.44 -7.2 TD (runs \(NEC 300-19\).) Tj 27.12 -14.4 TD (\(27\)) Tj 22.32 0 TD (Pull wires are provided and are of type specified.) Tj ET endstream endobj 272 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 273 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 30.72 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (16A-9) Tj -97.68 476.4 TD (b.) Tj 13.44 0 TD (Cable Systems) Tj ET 58.56 505.68 53.04 0.72 re f BT 45.12 492.72 TD (\(1\)) Tj 18 0 TD (Mineral, insulated metal sheathed cable, Type MI, will) Tj -45.12 -7.2 TD (be installed in accordance with Article 330 or the NEC and Project) Tj 0 -7.2 TD (Specification requirements.) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Metal clad cable Types MC and AC \(commonly called "BX"\)) Tj -45.12 -7.2 TD (should be installed in accord with Project Specification) Tj 0 -7.2 TD (requirements and Articles 333 and 334 of the NEC. See that) Tj T* (insulating bushings or equivalent protection are provided between) Tj T* (the conductors and the armor at terminations.) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (Non-metallic sheathed cables, Type NM and NMC commonly) Tj -45.12 -7.2 TD (called \223Romex", should be installed in accord with Project) Tj 0 -7.2 TD (Specification and Article 336 of the NEC.) Tj 27.12 -14.4 TD (\(a\)) Tj 18 0 TD (Type NM cable must not be used when non-metallic) Tj -45.12 -7.2 TD (sheathed cable is installed in the cells of masonry block walls) Tj 0 -7.2 TD (which are exposed or which are subject to excessive moisture or) Tj T* (dampness. This includes exterior masonry walls. In dry,) Tj T* (noncorrosive locations, type MN may be used. NMC is applicable in) Tj T* (wet locations \(NEC 336-3\).) Tj 27.12 -14.4 TD (\(b\)) Tj 18 0 TD (See that nails will not be driven into cable.) Tj -45.12 -7.2 TD (Protecting plates may be required \(NEC 300-4\).) Tj 27.12 -14.4 TD (\(c\)) Tj 18 0 TD (See that ground wire is properly fastened at) Tj -45.12 -7.2 TD (terminating points and outlet boxes. Attach to each box of fitting) Tj 0 -7.2 TD (by securely fastening the wire to the intended screw or with an) Tj T* (approved grounding device \(NEC 25C-114\).) Tj 27.12 -14.4 TD (\(d\)) Tj 18 0 TD (See that cable is secured as required by the National) Tj -45.12 -7.2 TD (Electrical Code, within 12\224 or every cabinet, outlet box of) Tj 0 -7.2 TD (fitting and otherwise at intervals not exceeding 4 \275 feet \(NEC) Tj T* (336-5\). See also NEC 370-7\(c\) for support of cable entering non-) Tj T* (metallic boxes.) Tj 27.12 -14.4 TD (\(4\)) Tj 18 0 TD (When authorized by the Project Specification, service) Tj -45.12 -7.2 TD (entrance cable. Types SE, and USE should be installed in accord) Tj 0 -7.2 TD (with NEC 338.) Tj 27.12 -14.4 TD (c.) Tj 13.44 0 TD (Busway Systems) Tj ET 58.56 210.48 57.12 0.72 re f BT 115.68 211.92 TD ( \(NEC 364; Project Specifications.\)) Tj -70.56 -14.4 TD (\(1\)) Tj 18 0 TD (Support busways at specified intervals \(NEC 364-5;) Tj -45.12 -7.2 TD (Project Specifications.) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Install sway braces when needed to limit lateral) Tj -45.12 -7.2 TD (movement of busway \(Project Specifications\).) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (Busway position, vertical or horizontal, will determine) Tj -45.12 -7.2 TD (whether plugs are installed on the sides or on top and bottom. If) Tj 0 -7.2 TD (plans do not indicate desired position, determination of) Tj T* (appropriate location should be made.) Tj 27.12 -14.4 TD (\(4\)) Tj 18 0 TD (Install busway runs securely in straight alignment,) Tj -45.12 -7.2 TD (parallel to floors and walls, with sufficient space either above) Tj 0 -7.2 TD (and below, or on both sides, to permit installation, operation and) Tj T* (servicing of bus plugs.) Tj 27.12 -14.4 TD (\(5\)) Tj 18 0 TD (Check to be sure that types of duct furnished are in) Tj -45.12 -7.2 TD (accord with specification. Check conductor metal, enclosure type,) Tj 0 -7.2 TD (duct type, wall flanges, and fire stops.) Tj 27.12 -14.4 TD (\(6\)) Tj 18 0 TD (Ground duct housing \(NEC 250-33\).) Tj ET endstream endobj 274 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 275 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 122.88 -495.84 TD (16A-10) Tj -95.76 476.4 TD (\(7\)) Tj 18 0 TD (Vertical riser sections up to 6 feet above the floor) Tj -45.12 -7.2 TD (must be unventilated type \(NEC 364-6\).) Tj 27.12 -14.4 TD (\(8\)) Tj 18 0 TD (Check plug-in features and tap off devices against) Tj -45.12 -7.2 TD (specification.) Tj 27.12 -14.4 TD (\(9\)) Tj 18 0 TD (Check on trolley busways, trolleys, brushes, contact) Tj -45.12 -7.2 TD (rollers, and flexible cables for no binding and good contact.) Tj 27.12 -14.4 TD (\(10\)) Tj 22.32 0 TD (Component sections to be legibly marked with voltage) Tj -49.44 -7.2 TD (and current ratings and manufacturer) Tj 146.88 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s name \(NEC 364-15\).) Tj -123.84 -14.4 TD (\(11\)) Tj 22.32 0 TD (Installation and furnishing of busways usually require) Tj -49.44 -7.2 TD (that the contractor verify field dimensions. Be sure that timely) Tj 0 -7.2 TD (ordering of busway is not delayed.) Tj 27.12 -14.4 TD (\(12\)) Tj 22.32 0 TD (Provide for expansion as required by the manufacturer.) Tj -22.32 -14.4 TD (d.) Tj 13.44 0 TD (Continuous Rigid Cable Supports or Cable Trays) Tj ET 58.56 376.08 187.68 0.72 re f BT 45.12 363.12 TD (Cable trays are installed to support cables. Only certain) Tj -27.12 -7.2 TD (specified cables may be installed and loading of support is) Tj 0 -7.2 TD (limited. Cable trays should be installed in accordance with) Tj T* (Project Specification and NEC 318. Tray system with cable) Tj T* (installed must not downgrade fire barriers \(NEC 318-5\(g\), 300-21\).) Tj 27.12 -14.4 TD (e.) Tj 13.44 0 TD (Wireways) Tj ET 58.56 318.48 32.64 0.72 re f BT 45.12 305.52 TD (Wireways or inclosed troughs are installed to house and) Tj -27.12 -7.2 TD (protect wire and cable. In general, wires of the building wire) Tj 0 -7.2 TD (type, such as TW, may be installed in approved wireways. The) Tj T* (installation should be made in accordance with Project) Tj T* (Specification and NEC 362. particular attention should be paid to) Tj T* (NEC 362-5, which limits the number of conductors approved for) Tj T* (wireway installation.) Tj 27.12 -14.4 TD (f.) Tj 13.44 0 TD (Auxilliary Gutters) Tj ET 58.56 246.48 73.44 0.72 re f BT 45.12 233.52 TD (The gutters commonly used for interconnecting large panels) Tj -27.12 -7.2 TD (and switches fall under this article. Installation should comply) Tj 0 -7.2 TD (with NEC 374.) Tj 27.12 -14.4 TD (g.) Tj 13.44 0 TD (Underfloor Duct Systems) Tj ET 58.56 203.28 93.84 0.72 re f BT 152.4 204.72 TD ( \(NEC 354, 356\)) Tj -107.28 -14.4 TD (\(1\)) Tj 18 0 TD (Install underfloor raceways of steel construction) Tj -45.12 -7.2 TD (parallel with floor construction, and in straight alignment.) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Check to see that sufficient setting depth is available) Tj -45.12 -7.2 TD (for junction boxes. These are the deepest elements of underfloor) Tj 0 -7.2 TD (raceway systems.) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (Check for tight joints between underfloor raceway) Tj -45.12 -7.2 TD (sections and at junction boxes to keep water out of raceway) Tj 0 -7.2 TD (systems \(NEC 354-13, 356-9\).) Tj 27.12 -14.4 TD (\(4\)) Tj 18 0 TD (Inserts of both the preset and after-set type will be) Tj -45.12 -7.2 TD (mechanically secured to the underfloor raceway and set level with) Tj 0 -7.2 TD (the floor \(NEC 354-14, 356-10\).) Tj 27.12 -14.4 TD (\(5\)) Tj 18 0 TD (Splices and tapes in underfloor raceway systems will) Tj -45.12 -7.2 TD (not be made in outlets at inserts, but only at junction boxes to) Tj 0 -7.2 TD (keep water out of raceway systems \(NEC 354-13, 356-9\).) Tj ET endstream endobj 276 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 277 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 140.88 30.72 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (16A-11) Tj -95.76 476.4 TD (\(6\)) Tj 18 0 TD (provide markers at ends of underfloor raceway runs, but) Tj -45.12 -7.2 TD (the plans and specifications may require more \(NEC 354-9, 356-8\)) Tj 27.12 -14.4 TD (\(7\)) Tj 18 0 TD (Install end caps at ends of all underfloor raceway) Tj -45.12 -7.2 TD (systems \(NEC 354-10\).) Tj 27.12 -14.4 TD (\(8\)) Tj 18 0 TD (Check tap-off locations to cabinets, panel boards, and) Tj -45.12 -7.2 TD (receptacles against drawings.) Tj 27.12 -14.4 TD (\(9\)) Tj 18 0 TD (Verify from shop drawings relative positions of) Tj -45.12 -7.2 TD (services in compartments. To be uniform throughout system.) Tj 27.12 -14.4 TD (\(10\)) Tj 22.32 0 TD (Check cross-sectional dimensions for adequate size) Tj -49.44 -7.2 TD (\(NEC 354-5, 356-5; Project Specifications\).) Tj 27.12 -14.4 TD (\(11\)) Tj 22.32 0 TD (Be sure that grounding continuity is maintained at all) Tj -49.44 -7.2 TD (connections in the system \(NEC 250-75\).) Tj 27.12 -14.4 TD (h.) Tj 13.44 0 TD (Movable Partition) Tj ET 58.56 376.08 69.36 0.72 re f BT 45.12 363.12 TD (Movable partitions, and similar enclosures unless) Tj -27.12 -7.2 TD (specifically listed as raceways, cannot be used as enclosures for) Tj 0 -7.2 TD (general wiring conductors. Instead raceways \(such as conduit\) must) Tj T* (he installed: or else cable \(such as type MI\) appropriate for the) Tj T* (application must be installed. See NEC restrictions for kitchen) Tj T* (vent hoods \(NEC 410-9\).) Tj 27.12 -14.4 TD (i.) Tj 13.44 0 TD (Conductors) Tj ET 58.56 311.28 40.8 0.72 re f BT 99.36 312.72 TD ( \(NEC 310\)) Tj -54.24 -14.4 TD (\(l\)) Tj 18 0 TD (Check type of insulation and jacket, conductor) Tj -45.12 -7.2 TD (material, conductor size and stranding in each circuit \(Project) Tj 0 -7.2 TD (Specifications and NEC\).) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Observe pulling of wires and cables to detect damage to) Tj -45.12 -7.2 TD (sheaths, jackets and insulation. This damage is usually caused) Tj 0 -7.2 TD (when runs are \223paid out\224 in a debris-laden area and then stepped) Tj T* (on, or by raceways having sharp edges or contamination. Pulling-) Tj T* (eyes or cable-gripping devices will be required for large cables.) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (Install all conductors of a circuit, including neutral,) Tj -45.12 -7.2 TD (in same raceway in conformance with NEC limitations \(NEC 300-20;) Tj 0 -7.2 TD (215-4\).) Tj 27.12 -14.4 TD (\(4\)) Tj 18 0 TD (Connections and joints will be clean and tight, with) Tj -45.12 -7.2 TD (listed pressure-type connectors, and made in junction and outlet) Tj 0 -7.2 TD (boxes, not in raceways \(NEC 110-14, 300-15\).) Tj 27.12 -14.4 TD (\(5\)) Tj 18 0 TD (Connectors, lugs and clamps used to connect copper and) Tj -45.12 -7.2 TD (aluminum conductors must be suitable for use with the conductor) Tj 0 -7.2 TD (material to prevent galvanic corrosion \(NEC 110-14\). Aluminum) Tj T* (conductors must be covered with antioxidant before connection.) Tj 27.12 -14.4 TD (\(6\)) Tj 18 0 TD (Use only white or natural grey identified conductors) Tj -45.12 -7.2 TD (for the grounded circuit conductor. Neutral \(white or grey\)) Tj 0 -7.2 TD (conductor of the wiring system will be insulated throughout \(NEC) Tj T* (200-7\). Conductors having white or grey identified coverings shall) Tj T* (only be used as the grounded circuit conductor except as allowed) Tj T* (in exceptions 1 thru 3 in NEC 200-7. Generally, use the same white) Tj T* (color for the entire system grounded conductors.) Tj ET endstream endobj 278 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 279 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 122.88 -495.84 TD (16A-12) Tj -95.76 476.4 TD (\(7\)) Tj 18 0 TD (When a grounding conductor for equipment is run with) Tj -45.12 -7.2 TD (circuit conductors it shall be bare, or green covered \(NEC 250-) Tj 0 -7.2 TD (57\(b\)\). Project specifications may require insulated conductors.) Tj 27.12 -14.4 TD (\(8\)) Tj 18 0 TD (Enforce color coding of conductors of branch circuits) Tj -45.12 -7.2 TD (when required by project specification.) Tj 27.12 -14.4 TD (\(9\)) Tj 18 0 TD (Branch-circuit conductors within 3\224 of a ballast within) Tj -45.12 -7.2 TD (the ballast compartment shall be recognized for use at) Tj 0 -7.2 TD (temperatures not lower than 90 degree C \(194 degree F\) \(NEC 410-) Tj T* (31\).) Tj 27.12 -14.4 TD (\(10\)) Tj 22.32 0 TD (Check that branch circuit wiring is not undersized.) Tj -49.44 -7.2 TD (Specification may require increased wire size when runs from panel) Tj 0 -7.2 TD (board to center of load equal or exceed 100 feet for 120 volt) Tj T* (circuits or 230 feet for 277 volt circuit.) Tj 27.12 -14.4 TD (\(11\)) Tj 22.32 0 TD (See that correct fixture wiring installation is made) Tj -49.44 -7.2 TD (\(NEC 410-22 to 34\).) Tj 0 -14.4 TD (16A-05 ) Tj 32.64 0 TD (OUTLETS) Tj ET 50.64 361.68 28.56 0.72 re f BT 45.12 348.72 TD (Check for requirements of cast boxes in exposed work,) Tj -27.12 -7.2 TD (exterior work, wet locations, and hazardous locations \(Project) Tj 0 -7.2 TD (Specifications\)) Tj 27.12 -14.4 TD (b.) Tj 13.44 0 TD (Require hub-type cast boxes when specified \(Project) Tj -40.56 -7.2 TD (Specifications\)) Tj 27.12 -14.4 TD (c.) Tj 13.44 0 TD (Check size of junction and pull boxes \(NEC 370-6, 18,) Tj -40.56 -7.2 TD (20\).) Tj 27.12 -14.4 TD (d.) Tj 13.44 0 TD (Do not permit overcrowding of boxes with excessive) Tj -40.56 -7.2 TD (number of conductors \(NEC 370-6\).) Tj 27.12 -14.4 TD (e.) Tj 13.44 0 TD (Check identification requirements of power and control) Tj -40.56 -7.2 TD (conductors at terminals and in pull boxes and junction boxes.) Tj 0 -7.2 TD (Fenders should be tagged to indicate electrical characteristics,) Tj T* (circuit number, and panel designation \(Project Specifications\).) Tj 27.12 -14.4 TD (f.) Tj 13.44 0 TD (Check for boxes to be securely and rigidly supported) Tj -40.56 -7.2 TD (\(NEC 370-13\). \(Project Specifications: Boxes and Supports.\)) Tj 27.12 -14.4 TD (q.) Tj 13.44 0 TD (Fit concealed boxes into walls and ceilings. On) Tj -40.56 -7.2 TD (noncombustible construction, the front edge of box should be) Tj 0 -7.2 TD (within 1/4 inch of finished surface, and on combustible) Tj T* (construction flush with finished surface or project therefrom) Tj T* (\(NEC 370-10\)) Tj 27.12 -14.4 TD (h.) Tj 13.44 0 TD (Any masonry or dry wall work required for installation) Tj -40.56 -7.2 TD (of outlet, pull, of junction boxes is to be done by skilled) Tj 0 -7.2 TD (workmen. The masonry section of the specifications requires the) Tj T* (cutting) Tj ET 18 131.28 28.56 0.72 re f BT 46.56 132.72 TD ( of block for fitting installed items. Electrician should) Tj -28.56 -7.2 TD (not be permitted to chop away masonry or dry wall work.) Tj 0 -7.2 TD (Coordination is necessary between the electrical trade and masons) Tj T* (and carpenters to effect a suitable installation. \(Project) Tj T* (Specifications\).) Tj 27.12 -14.4 TD (i.) Tj 13.44 0 TD (Check for air space between box and wall or supporting) Tj -40.56 -7.2 TD (surface in wet locations where surface-type units are used \(NEC) Tj 0 -7.2 TD (300-6\).) Tj ET endstream endobj 280 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 281 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 140.88 30.72 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (16A-13) Tj -95.76 476.4 TD (j.) Tj 13.44 0 TD (Are outlets that are exposed to the weather a weather-) Tj -40.56 -7.2 TD (proof type \(NEC 370-5 and 300-6, Project Specification\).) Tj 27.12 -14.4 TD (k.) Tj 13.44 0 TD (Pull and junction boxes shall have free access \(NEC) Tj -40.56 -7.2 TD (370-19\).) Tj 27.12 -14.4 TD (l.) Tj 13.44 0 TD (Floor outlets shall be of required type and properly) Tj -40.56 -7.2 TD (located.) Tj 27.12 -14.4 TD (m.) Tj 13.44 0 TD (Light outlets in mechanical and equipment rooms are) Tj -40.56 -7.2 TD (located to suit servicing and maintenance and extend below ducts.) Tj 0 -14.4 TD (16A-06 ) Tj 32.64 0 TD (DEVICE PLATES) Tj ET 50.64 419.28 53.04 0.72 re f BT 45.12 406.32 TD (See that device plates are of specified material and finish) Tj -27.12 -7.2 TD (and that all surfaces are in contact with wall \(Project) Tj 0 -7.2 TD (Specifications and NEC 410-56\). On surface mounted boxes the) Tj T* (plates should be compatible with the box and without overhanging) Tj T* (corners. Also, NEC 380-0. Plates should be plumb and not dished or) Tj T* (bowed.) Tj 0 -14.4 TD (16A-07 ) Tj 32.64 0 TD (RECEPTACLES) Tj ET 50.64 354.48 44.88 0.72 re f BT 45.12 341.52 TD (a.) Tj 13.44 0 TD (Check all receptacles to be sure that specified voltage,) Tj -40.56 -7.2 TD (ampere, color, slots, etc., are furnished. Also be sure that plug) Tj 0 -7.2 TD (is furnished if specified \(Project Specifications\).) Tj 27.12 -14.4 TD (b.) Tj 13.44 0 TD (Be sure that grounding continuity is maintained between) Tj -40.56 -7.2 TD (grounded metal box and receptacle and that bonding jumper is) Tj 0 -7.2 TD (installed when required or approved bonding type receptacle. Some) Tj T* (designs require ground wire from panel to receptacle \(NEC) Tj T* (250\22774\).) Tj 0 -14.4 TD (16A-08 ) Tj 32.64 0 TD (WALL SWITCHES) Tj ET 50.64 268.08 53.04 0.72 re f BT 45.12 255.12 TD (a.) Tj 13.44 0 TD (Check wall switches for proper ampere rating, voltage) Tj -40.56 -7.2 TD (rating, and type. Usually "A-C only\224 is required. AC only switches) Tj 0 -7.2 TD (are marked \223AC\224 or "AC only" on yoke, never \223AC/DC.\224 They can be) Tj T* (used for alternating current only \(Project Specification and NEC) Tj T* (380-14\).) Tj 27.12 -14.4 TD (b.) Tj 13.44 0 TD (Wall switches will be in hot leg of circuit, not in) Tj -40.56 -7.2 TD (neutral, and should be installed with the "on" position \223up\224 \(NEC) Tj 0 -7.2 TD (380-6\)) Tj 27.12 -14.4 TD (c.) Tj 13.44 0 TD (Check for requirements of installing pilot lights on) Tj -40.56 -7.2 TD (switches \(Project Specifications\).) Tj 0 -14.4 TD (16A-09 ) Tj 32.64 0 TD (SERVICE EQUIPMENT) Tj ET 50.64 160.08 69.36 0.72 re f BT 45.12 147.12 TD (a.) Tj 13.44 0 TD (Check to be sure that the proper type of enclosure is) Tj -40.56 -7.2 TD (furnished \(such as drip-proof, totally enclosed, etc.\) \(Project) Tj 0 -7.2 TD (Specifications.\)) Tj 27.12 -14.4 TD (b.) Tj 13.44 0 TD (Standard NEMA \(KS-1\) designations are used to describe) Tj -40.56 -7.2 TD (various enclosures for switches. The designations are as follows:) Tj 27.12 -14.4 TD (Type 1 \227 Indoor \227 General Purpose) Tj 0 -14.4 TD (Type 2 \227 Outdoor \227 Dusttight, Raintight and Sleet \(Ice\) ) Tj -27.12 -7.2 TD (Resistant) Tj ET endstream endobj 282 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 283 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 122.88 -495.84 TD (16A-14) Tj -95.76 476.4 TD (Type 4 - Indoor/Outdoor - Watertight and Dusttight) Tj 0 -14.4 TD (Type 5 - Indoor Dustproof) Tj T* (Type 7 - Class I, Groups A, B, C and/or D \227 Indoor) Tj -27.12 -7.2 TD (Hazardous Locations - Airbreak Equipment) Tj 27.12 -14.4 TD (Type 9 - Class II, Group\(s\) E, F and/or C - Indoor) Tj -27.12 -7.2 TD (Hazardous Locations - Airbreak Equipment) Tj 27.12 -14.4 TD (Type 12 - Indoor - Industrial Use, Dusttight and Driptight) Tj -27.12 -7.2 TD (with Knockouts \223Weatherproof\224 is defined in the NEC as so) Tj 0 -7.2 TD (constructed or protected that exposure to the weather will not) Tj T* (interfere with successful operation \(NEC 100\) and raintight,) Tj T* (rainproof or watertight equipment can fulfill the requirements for) Tj T* (weatherproof.) Tj 27.12 -14.4 TD (c.) Tj 13.44 0 TD (Check whether fusible-type or circuit-breaker type of) Tj -40.56 -7.2 TD (service switch is required \(Project Specifications\)) Tj 27.12 -14.4 TD (d.) Tj 13.44 0 TD (Check that the service-switch enclosure is bonded to the) Tj -40.56 -7.2 TD (ground system \(NEC 230-62, 63\).) Tj 27.12 -14.4 TD (e.) Tj 13.44 0 TD (Check voltage rating and ampere rating of switch. Also) Tj -40.56 -7.2 TD (circuit breaker trip and fuse sizes and interrupting capacities) Tj 0 -7.2 TD (\(Project Specifications and Plans\)) Tj 27.12 -14.4 TD (f.) Tj 13.44 0 TD (Check ground fault protection of service equipment when) Tj -40.56 -7.2 TD (required by NEC 230-95, or Design.) Tj 27.12 -14.4 TD (g.) Tj 13.44 0 TD (Check meter location when specified.) Tj -40.56 -14.4 TD (16A-10 ) Tj 32.64 0 TD (LOAD CENTER TYPE PANEL BOARDS) Tj ET 50.64 275.28 118.32 0.72 re f BT 45.12 262.32 TD (Load center type panelboards are sometimes authorized for) Tj -27.12 -7.2 TD (less critical applications compared to regular panelboards.) Tj 0 -7.2 TD (Compliance with Project Specifications, Federal Specifications,) Tj T* (and NEC 384-13 through 19 is required.) Tj 0 -14.4 TD (16A-11 ) Tj 32.64 0 TD (PANELBOARDS) Tj ET 50.64 224.88 44.88 0.72 re f BT 45.12 211.92 TD (a.) Tj 13.44 0 TD (Be sure to inspect plug-in panel board devices to) Tj -40.56 -7.2 TD (determine tightness of fit.) Tj 27.12 -14.4 TD (b.) Tj 13.44 0 TD (Check loads on panels to be sure of approximate balance) Tj -40.56 -7.2 TD (among the phases. This is best done by use of clamp-on type) Tj 0 -7.2 TD (ammeters on feeders while panel is carrying its normal load) Tj T* (\(operational test\)) Tj 27.12 -14.4 TD (c.) Tj 13.44 0 TD (Be sure the panelboards typed directory is properly) Tj -40.56 -7.2 TD (filled out so that area and devices served can be quickly) Tj 0 -7.2 TD (identified \(Project Specifications\).) Tj 27.12 -14.4 TD (d.) Tj 13.44 0 TD (Circuit-breakers: switches, and fuses in panelboards) Tj -40.56 -7.2 TD (should be inspected to determine that they have correct number of) Tj 0 -7.2 TD (poles, proper voltage, current-rating, and proper interrupting) Tj T* (capacity. Refer to contract drawings and project specifications.) Tj 27.12 -14.4 TD (e.) Tj 13.44 0 TD (Check panelboards for inclusion of blanked-off spaces) Tj -40.56 -7.2 TD (for future circuit breaker installation. Space to be adequately) Tj 0 -7.2 TD (sized for the rating of future circuit breaker. Also see that) Tj T* (spare breakers required are in place in addition to blanked-off) Tj T* (spaces.) Tj ET endstream endobj 284 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 285 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 140.88 30.72 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (16A-15) Tj -95.76 476.4 TD (f.) Tj 13.44 0 TD (Check mounting height of top switch or curcuit breaker.) Tj -40.56 -7.2 TD (It should be less than six feet six inches.) Tj 0 -14.4 TD (16A-12 ) Tj 32.64 0 TD (CABINETS) Tj ET 50.64 484.08 32.64 0.72 re f BT 83.28 485.52 TD ( \(NEC 373; Project Specifications\)) Tj -38.16 -14.4 TD (a.) Tj 13.44 0 TD (Check on size of gutter space. A minimum of 5 inches is) Tj -40.56 -7.2 TD (required for panelboards with thru feeders. Load centers should be) Tj 0 -7.2 TD (in accordance with NEC 373-6\(a\).) Tj 27.12 -14.4 TD (b.) Tj 13.44 0 TD (Telephone cabinets are to be checked for inclusion of) Tj -40.56 -7.2 TD (backboard painted with insulation varnish.) Tj 27.12 -14.4 TD (c.) Tj 13.44 0 TD (Compare size of telephone cabinets against contract) Tj -40.56 -7.2 TD (drawings.) Tj 27.12 -14.4 TD (d.) Tj 13.44 0 TD (Mounting is to be rigid and independent of the support) Tj -40.56 -7.2 TD (by conduits. In damp locations, there should be 1/4 inch minimum) Tj 0 -7.2 TD (air space at back of panel \(NEC 373-2\).) Tj 27.12 -14.4 TD (e.) Tj 13.44 0 TD (Connections to conduits are to be tight, assuring) Tj -40.56 -7.2 TD (electrical continuity \(NEC 250-71 through 79\)) Tj 27.12 -14.4 TD (f.) Tj 13.44 0 TD (Look for special features of construction and) Tj -40.56 -7.2 TD (installation for areas other than normal, such as hazardous, wet,) Tj 0 -7.2 TD (exposed to fumes, etc. \(NEC 110-li\).) Tj 27.12 -14.4 TD (g.) Tj 13.44 0 TD (Examine for galvanized metal construction.) Tj -13.44 -14.4 TD (h.) Tj 13.44 0 TD (Check mounting height of panelboard cabinets. Distance) Tj -40.56 -7.2 TD (from the highest position of top switch or circuit-breaker to) Tj 0 -7.2 TD (floor should not exceed 6 feet, 6 inches \(Project Specifications\)) Tj 0 -14.4 TD (16A-13 ) Tj 32.64 0 TD (FUSES) Tj ET 50.64 275.28 20.4 0.72 re f BT 71.04 276.72 TD ( \(NEC 240-6 and 8\)) Tj -25.92 -14.4 TD (Inspect for the following:) Tj 0 -14.4 TD (a.) Tj 13.44 0 TD (Specified voltage rating.) Tj -13.44 -14.4 TD (b.) Tj 13.44 0 TD (Specified amperage and interrupting rating.) Tj -13.44 -14.4 TD (c.) Tj 13.44 0 TD (Non-renewable cartridge types for over 30 AMP capacity) Tj -40.56 -7.2 TD (\(Project Specifications\)) Tj 27.12 -14.4 TD (d.) Tj 13.44 0 TD (Are dual element time-delay fuses or current limiting) Tj -40.56 -7.2 TD (fuses with special \223reject\224 holders required? \(Project) Tj 0 -7.2 TD (Specifications\)) Tj 0 -14.4 TD (16A-14 ) Tj 32.64 0 TD (UNDERGROUND SERVICE CONDUITS) Tj ET 50.64 167.28 114.24 0.72 re f BT 164.88 168.72 TD ( \(NEC 230-30 and 31\)) Tj -119.76 -14.4 TD (a.) Tj 13.44 0 TD (Check detail requirements of plans and specifications) Tj -40.56 -7.2 TD (\(Project Specifications\).) Tj 27.12 -14.4 TD (b.) Tj 13.44 0 TD (Check requirement for painting or coating of conduits) Tj -40.56 -7.2 TD (\(Project Specifications\)) Tj 27.12 -14.4 TD (c.) Tj 13.44 0 TD (Check method and location of termination of conduit ends) Tj -40.56 -7.2 TD (and grounding \(NEC 230-55\).) Tj 27.12 -14.4 TD (d.) Tj 13.44 0 TD (Seal building ends of raceways entering from UG) Tj -40.56 -7.2 TD (distribution system \(NEC 230-48\).) Tj ET endstream endobj 286 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 287 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 122.88 -495.84 TD (16A-16) Tj -122.88 476.4 TD (16A-15 ) Tj 32.64 0 TD (AERIAL SERVICE) Tj ET 50.64 505.68 57.12 0.72 re f BT 45.12 492.72 TD (a.) Tj 13.44 0 TD (Locate the splice between service drop and service) Tj -40.56 -7.2 TD (entrance \(NEC 100\) conductor at a level lower than the service) Tj 0 -7.2 TD (entrance fitting \(head\), and bend conductors to form a \223drip loop\224) Tj T* (at the entrance fitting. These precautions will prevent entrance) Tj T* (of water into the service equipment \(NEC 230-24\).) Tj 27.12 -14.4 TD (b.) Tj 13.44 0 TD (Support aerial service-drops on buildings, providing) Tj -40.56 -7.2 TD (required clearances from ground, building openings, and from roof) Tj 0 -7.2 TD (where service crosses roofs \(NEC 230-24\).) Tj 27.12 -14.4 TD (c.) Tj 13.44 0 TD (Service-drop cable type is to be in accordance with) Tj -40.56 -7.2 TD (specification requirements \(NEC 230-22 and 23; Project) Tj 0 -7.2 TD (Specifications\)) Tj 27.12 -14.4 TD (d.) Tj 13.44 0 TD (If connections are aluminum to copper, insure that the) Tj -40.56 -7.2 TD (type of connectors specified \(usually tinned bronze\) are utilized) Tj 0 -7.2 TD (and that anti-oxidant compound is properly applied, if specified.) Tj 0 -14.4 TD (16A-16 ) Tj 32.64 0 TD (MOTORS) Tj ET 50.64 361.68 24.48 0.72 re f BT 45.12 348.72 TD (a.) Tj 13.44 0 TD (Check motors for conformance with NEMA classification) Tj -40.56 -7.2 TD (standards. NEMA classification is according to mechanical) Tj 0 -7.2 TD (protection and methods of cooling. Installation should be made in) Tj T* (accordance with project specifications. Dripproof and/or splash-) Tj T* (proof motors when specified shall be installed with ventilation) Tj T* (openings faced down to exclude moisture, dirt, etc.) Tj 27.12 -14.4 TD (b.) Tj 13.44 0 TD (Check motors to see that proper terminal connections are) Tj -40.56 -7.2 TD (made for the operating voltage. A connection table should be) Tj 0 -7.2 TD (securely attached to the motor by the manufacturer if several) Tj T* (alternate connections are possible.) Tj 27.12 -14.4 TD (c.) Tj 13.44 0 TD (Be sure motor revolves in direction correct for driven) Tj -40.56 -7.2 TD (device, Usually an arrow is placed on fans and pumps to show) Tj 0 -7.2 TD (correct directions of rotation. Motor rotation and speed must be) Tj T* (verified before connection to the load e.g. pumps, fans, etc.) Tj 27.12 -14.4 TD (d.) Tj 13.44 0 TD (Check reversing types of motors and multi\227speed motors) Tj -40.56 -7.2 TD (to insure that direction of rotation and speed of motor) Tj 0 -7.2 TD (corresponds to setting of control.) Tj 27.12 -14.4 TD (e.) Tj 13.44 0 TD (Make ground connections of motor enclosure through) Tj -40.56 -7.2 TD (conduit system or by separate grounding conductor \(NEC 430-141,) Tj 0 -7.2 TD (142\)) Tj 27.12 -14.4 TD (f.) Tj 13.44 0 TD (Check motor against specifications and UL listings for) Tj -40.56 -7.2 TD (class of insulation, starting torque characteristics, class, and) Tj 0 -7.2 TD (design. Assure high efficiency motors are used where indicated.) Tj 27.12 -14.4 TD (g.) Tj 13.44 0 TD (Check motors for proper voltage. When 208V, three-phase) Tj -40.56 -7.2 TD (is specified, do not permit substitution of 230V, three phase and) Tj 0 -7.2 TD (vice versa. A 200 volt rating is the correct name plate rating for) Tj T* (application on 208 volt system. Proposed substitutions should be) Tj T* (referred to an electrical specialist.) Tj 27.12 -14.4 TD (h.) Tj 13.44 0 TD (Note conditions of windings; to be free from moisture) Tj -40.56 -7.2 TD (and dust. See that appropriate provisions are made to protect) Tj 0 -7.2 TD (equipment prior to turn-over of project.) Tj ET endstream endobj 288 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 289 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 140.88 30.72 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (16A-17) Tj -95.76 476.4 TD (i. Motors should be operated under connected load to) Tj -27.12 -7.2 TD (determine following operating characteristics:) Tj 27.12 -14.4 TD (\(1\)) Tj 18 0 TD (Voltage and current to detect possible overloaded) Tj -45.12 -7.2 TD (conditions) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Speed of motor) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Direction of rotation) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Overheating) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Vibration) Tj -18 -14.4 TD (\(6\)) Tj 18 0 TD (Abnormal sounds or odors) Tj -18 -14.4 TD (If connected load is not possible, refer to the Resident) Tj -27.12 -7.2 TD (Engineer. This normally can be done in conjunction with test) Tj 0 -7.2 TD (driven equipment.) Tj 27.12 -14.4 TD (j.) Tj 13.44 0 TD (Connect motors subject to vibration, and motors on) Tj -40.56 -7.2 TD (adjustable slide basis, with flexible conduit. Liquid-tight or) Tj 0 -7.2 TD (explosion-proof flexible conduit may be required by installation) Tj T* (conditions. Bonding jumpers may be required \(Project) Tj T* (Specification; NEC 349, 350, 351, 501-4\(a\)\).) Tj 27.12 -14.4 TD (k.) Tj 13.44 0 TD (Motors installed in hazardous locations are to bear an) Tj -40.56 -7.2 TD (Underwriters Laboratory nameplate, indicating the classification) Tj 0 -7.2 TD (of areas in. which the motor is listed for use.) Tj 27.12 -14.4 TD (1.) Tj 13.44 0 TD (Check lubrication requirements of motor prior to motor) Tj -40.56 -7.2 TD (operation \(Manufacturers Instructions\).) Tj 0 -14.4 TD (16A-17 ) Tj 32.64 0 TD (MOTOR CONTROL) Tj ET 50.64 268.08 53.04 0.72 re f BT 45.12 247.92 TD (a.) Tj 13.44 0 TD (Check with the contractor to assure that all motor) Tj -40.56 -7.2 TD (controllers required by all sections of the specifications have) Tj 0 -7.2 TD (been ordered. Quite often, controllers are not ordered due to) Tj T* (disputes between subcontractors. The QAR should insure that the) Tj T* (prime contractor has made necessary arrangements to insure timely) Tj T* (procuring of motor controllers.) Tj 27.12 -14.4 TD (b.) Tj 13.44 0 TD (Check motor controllers for:) Tj -13.44 -14.4 TD (\(1\)) Tj 18 0 TD (Horsepower, voltage and current rating of least equal) Tj -45.12 -7.2 TD (to the rating of the motor which it controls.) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Automatic control devices such as thermostats, float or) Tj -45.12 -7.2 TD (pressure switches directly used as motor controllers, should be) Tj 0 -7.2 TD (adequately rated.) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (Magnetic-coil voltage rating same as the control-) Tj -45.12 -7.2 TD (circuit voltage \(may be different from the motor voltage\)) Tj 27.12 -14.4 TD (\(4\)) Tj 18 0 TD (Selection of proper motor overload heaters; based on) Tj -45.12 -7.2 TD (the nameplate full-load current of the motor, ambient temperature) Tj 0 -7.2 TD (of controller location, temperature-rise limit of motor. Refer to) Tj T* (instruction sheet pasted on inside cover of motor controller.) Tj T* (Determine if automatic or manual reset is required for overload) Tj T* (protection \(NEC 430-34\) \(Project Specifications.\)) Tj ET endstream endobj 290 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 291 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 122.88 -495.84 TD (16A-18) Tj -95.76 476.4 TD (\(5\)) Tj 18 0 TD (Requirements for furnishing reduced voltage starters.) Tj -45.12 -7.2 TD (\(Project Specifications.\)) Tj 27.12 -21.6 TD (\(6\)) Tj 18 0 TD (Excessive humming or noise under operating conditions.) Tj -18 -14.4 TD (\(7\)) Tj 18 0 TD (Requirements for furnishing pilot circuit devices such) Tj -45.12 -7.2 TD (as \223Hand \227 Off - Automatic\224 selector switches, pilot lights) Tj 0 -7.2 TD (\(Project Specifications.) Tj 27.12 -14.4 TD (\(8\)) Tj 18 0 TD (Note three-phase motors are provided with the overload) Tj -45.12 -7.2 TD (element in each ungrounded conductor \(NEC Table 430-37\).) Tj 27.12 -14.4 TD (\(9\)) Tj 18 0 TD (Be sure control enclosure is as specified in Project) Tj -45.12 -7.2 TD (Specifications and is suitable for conditions of installation.) Tj 27.12 -14.4 TD (\(10\)) Tj 22.32 0 TD (Spare interlocks, if specified.) Tj -22.32 -14.4 TD (\(11\)) Tj 22.32 0 TD (Shipping blocking has been removed.) Tj -22.32 -14.4 TD (\(12\)) Tj 22.32 0 TD (Control and safety devices should be wired into the) Tj -49.44 -7.2 TD (\223hot leg\224, not the neutral leg of the control circuit. If motor is) Tj 0 -7.2 TD (connected to a grounded power supply, control power circuit should) Tj T* (also have a grounded conductor. The control power should be) Tj T* (disconnected from all power sources by its disconnect means) Tj T* (\(NEC 430\22774\).) Tj 0 -14.4 TD (16A-18 ) Tj 32.64 0 TD (MOTOR DISCONNECT MEANS) Tj ET 50.64 311.28 89.76 0.72 re f BT 45.12 291.12 TD (a.) Tj 13.44 0 TD (Disconnecting means that open all ungrounded conductors) Tj -40.56 -7.2 TD (will be provided for motor driven equipment installations. By) Tj 0 -7.2 TD (locking provisions or by being \223in sight\224 the disconnect\(s\) will) Tj T* (provide protection for persons working on control, motor, and) Tj T* (driven equipment \(NEC 430-101 thru 113\).) Tj 27.12 -14.4 TD (b.) Tj 13.44 0 TD (Ratings of switches are to be checked against contract) Tj -40.56 -7.2 TD (specifications.) Tj 0 -14.4 TD (16A-19 ) Tj 32.64 0 TD (LAMPS AND LIGHTING FIXTURES) Tj ET 50.64 224.88 110.16 0.72 re f BT 45.12 211.92 TD (Lighting fixtures should be examined for:) Tj 0 -14.4 TD (a.) Tj 13.44 0 TD (Chipped porcelain, cracked glass and plastics, bent) Tj -40.56 -7.2 TD (louvers, over-all finish, detachable sockets on RLM dome fixtures) Tj 0 -7.2 TD (\(when specified\) and \223push type\224 sockets on open fluorescent) Tj T* (fixtures \(when specified\). \(OCE standard fixture drawings.\)) Tj 27.12 -14.4 TD (b. Required lamp type, wattage, and color characteristics.) Tj 0 -14.4 TD (c. Ballasts for fluorescent and mercury-vapor lamps) Tj -27.12 -7.2 TD (suitable for circuit voltage and of high power-factor type;) Tj 0 -7.2 TD (overload protection for ballasts, if specified ballasts should be) Tj T* (suitable for low temperature operation. Ballasts for fixtures to) Tj T* (be recessed in fire rated or insulated ceiling construction may be) Tj T* (required to be \223low loss\224 type to bold ambient temperature down.) Tj 27.12 -14.4 TD (d.) Tj 13.44 0 TD (Plumb installation and horizontal and vertical) Tj -40.56 -7.2 TD (alignment.) Tj ET endstream endobj 292 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 293 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 140.88 30.72 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (16A-19) Tj -95.76 476.4 TD (e.) Tj 13.44 0 TD (End-caps, canopies, louvers, side panel guards, globes) Tj -40.56 -7.2 TD (in place and tight-glass side panels, if specified. Acrylic) Tj 0 -7.2 TD (plastic lens when specified.) Tj 27.12 -14.4 TD (f.) Tj 13.44 0 TD (Aiming of floodlights and all other adjustable fixtures.) Tj -13.44 -14.4 TD (g.) Tj 13.44 0 TD (Lamps that are to be installed for the project shall be) Tj -40.56 -7.2 TD (new, and installed just prior to completion \(Project) Tj 0 -7.2 TD (Specifications\)) Tj 27.12 -14.4 TD (h.) Tj 13.44 0 TD (Storage battery powered emergency lighting sets should) Tj -40.56 -7.2 TD (be checked against applicable Federal Specification for) Tj 0 -7.2 TD (requirement of Underwriters listing and other features. They) Tj T* (should be permanently installed strictly in accordance with) Tj T* (project specifications and NEC Article 700.) Tj 27.12 -14.4 TD (i.) Tj 13.44 0 TD (Emergency lighting circuits should be installed in) Tj -40.56 -7.2 TD (accordance with project specifications and NEC Article 700.) Tj 0 -7.2 TD (Circuit wiring should be kept independent of all other wiring) Tj T* (\(NEC 700-17\).) Tj 27.12 -14.4 TD (j.) Tj 13.44 0 TD (End-to-end mounted flourescent fixtures must have) Tj -40.56 -7.2 TD (Underwriters approval for mounting end-to-end \(NEC 410-31\) when) Tj 0 -7.2 TD (used as raceways.) Tj 27.12 -14.4 TD (k.) Tj 13.44 0 TD (Required characteristics specified.) Tj -13.44 -14.4 TD (l.) Tj 13.44 0 TD (Grounded properly.) Tj -40.56 -14.4 TD (16A-20 ) Tj 32.64 0 TD (EQUIPMENT CONNECTIONS) Tj ET 50.64 296.88 85.68 0.72 re f BT 45.12 283.92 TD (a.) Tj 13.44 0 TD (Refer to applicable paragraphs of this chapter.) Tj -13.44 -14.4 TD (b.) Tj 13.44 0 TD (Check plans and specifications for any special features.) Tj -13.44 -14.4 TD (c.) Tj 13.44 0 TD (If Government-furnished equipment is involved, insure) Tj -40.56 -7.2 TD (the timely availability of all connection drawings.) Tj 0 -14.4 TD (16A-21 ) Tj 28.56 0 TD (TRANSFORMER STATIONS) Tj ET 46.56 232.08 81.6 0.72 re f BT 128.16 233.52 TD ( \(NEC 450\)) Tj -83.04 -14.4 TD (a.) Tj 13.44 0 TD (Dry Type Transformers) Tj ET 58.56 217.68 85.68 0.72 re f BT 45.12 204.72 TD (Check enclosure for indoor or outdoor service. Install so) Tj -27.12 -7.2 TD (that air circulation will not be restricted around the) Tj 0 -7.2 TD (transformers. Close-to-ceilings installations should be avoided.) Tj 27.12 -14.4 TD (b.) Tj 13.44 0 TD (Transformer Taps) Tj ET 58.56 174.48 65.28 0.72 re f BT 45.12 161.52 TD (Connect to produce specified voltage under normal load.) Tj 0 -14.4 TD (c.) Tj 13.44 0 TD (Liquid-filled Transformers) Tj ET 58.56 145.68 106.08 0.72 re f BT 45.12 132.72 TD (Check to see that they are filled to proper level. Level) Tj -27.12 -7.2 TD (mark is indicated on transformer.) Tj 27.12 -14.4 TD (d.) Tj 13.44 0 TD (Nameplate Data) Tj ET 58.56 109.68 57.12 0.72 re f BT 45.12 96.72 TD (Check against specification requirements and approved shop) Tj -27.12 -7.2 TD (drawings \(NEC 450-11\).) Tj ET endstream endobj 294 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 295 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 122.88 -495.84 TD (16A-20) Tj -95.76 476.4 TD (e.) Tj 13.44 0 TD (Accessories) Tj ET 58.56 505.68 44.88 0.72 re f BT 45.12 492.72 TD (Check liquid-filled transformers for compliance with) Tj -27.12 -7.2 TD (specifications or with specified standards. Such include:) Tj 0 -7.2 TD (Connections for sampling, draining and filtering of insulating) Tj T* (liquid; level gage; thermometer; pressure and vacuum gages;) Tj T* (external tap changer; provisions for jacking, rolling and lifting;) Tj T* (provisions for pole, platform or slab mounting; provision) Tj T* (grounding of case and windings; and alarm devices actuated by) Tj T* (abnormal liquid level, temperature or pressure; and automatic) Tj T* (control devices for operation of forced air or other oil cooling) Tj T* (equipment which will permit operation of transformers at higher-) Tj T* (than-normal ratings.) Tj 27.12 -14.4 TD (f.) Tj 13.44 0 TD (Bushings) Tj ET 58.56 404.88 32.64 0.72 re f BT 45.12 391.92 TD (Check to see that bushings are free of moisture, dust,) Tj -27.12 -7.2 TD (chips and cracks.) Tj 27.12 -14.4 TD (g.) Tj 13.44 0 TD (Insulating Liquid) Tj ET 58.56 368.88 69.36 0.72 re f BT 45.12 355.92 TD (Check against requirements. Non-flammable fluid insulated) Tj -27.12 -7.2 TD (power transformers are generally required indoors.) Tj 27.12 -14.4 TD (h.) Tj 13.44 0 TD (Grounding) Tj ET 58.56 332.88 36.72 0.72 re f BT 45.12 319.92 TD (Check grounding connections of metal housing, neutrals of) Tj -27.12 -7.2 TD (primary and secondary winding to the grounding system \(NEC 450-9) Tj 0 -7.2 TD (and 250-26\).) Tj 27.12 -14.4 TD (i.) Tj 13.44 0 TD (Ventilation) Tj ET 58.56 289.68 44.88 0.72 re f BT 45.12 276.72 TD (See that ventilation is adequate \(NEC 450-45\)) Tj -27.12 -14.4 TD (16A-22 ) Tj 32.64 0 TD (SWITCHGEAR) Tj ET 50.64 260.88 40.8 0.72 re f BT 91.44 262.32 TD ( \(NEC 384\)) Tj -46.32 -14.4 TD (Switchboard and Free-Standing Panel Installation - Check) Tj -27.12 -7.2 TD (for:) Tj 27.12 -14.4 TD (a.) Tj 13.44 0 TD (Level floor location for gear and any roll\227out) Tj -40.56 -7.2 TD (equipment.) Tj 27.12 -14.4 TD (b.) Tj 13.44 0 TD (Anchor bolts and floor plates in proper location.) Tj -40.56 -7.2 TD (Consult approved shop drawings and contract drawings.) Tj 27.12 -14.4 TD (c.) Tj 13.44 0 TD (Conduit entrances and wiring trenches in proper) Tj -40.56 -7.2 TD (location.) Tj 27.12 -14.4 TD (d.) Tj 13.44 0 TD (Bus duct connection provisions suitable for duct) Tj -40.56 -7.2 TD (attachment.) Tj 27.12 -14.4 TD (e.) Tj 13.44 0 TD (Ground bus connections brought to proper location.) Tj -40.56 -7.2 TD (Consult approved shop drawings.) Tj 27.12 -14.4 TD (f.) Tj 13.44 0 TD (Plumb and level installation of gear.) Tj -13.44 -14.4 TD (g.) Tj 13.44 0 TD (Installation in accordance with manufacturer) Tj 179.52 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s) Tj -224.16 -7.2 TD (instructions.) Tj 27.12 -14.4 TD (h.) Tj 13.44 0 TD (Blocking removed from instrument and relays.) Tj -13.44 -14.4 TD (i.) Tj 13.44 0 TD (Adjustments made where required, taps and plugs at) Tj -40.56 -7.2 TD (proper settings. Consult manufacturer) Tj 150.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s installation instructions.) Tj ET endstream endobj 296 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 297 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 140.88 30.72 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (16A-21) Tj -95.76 476.4 TD (j.) Tj 13.44 0 TD (Fuses in place and of proper type ) Tj 138.72 0 TD /F3 3.84 Tf -0.0787 Tc -0.0288 Tw (- ) Tj 2.16 0 TD /F0 6.96 Tf -0.096 Tc 0 Tw (voltage, current,) Tj -181.44 -7.2 TD (interrupting capacity ) Tj 89.76 0 TD /F3 3.84 Tf -0.0787 Tc -0.0288 Tw (- ) Tj 2.16 0 TD /F0 6.96 Tf -0.096 Tc 0 Tw (current limiting.) Tj -64.8 -14.4 TD (k.) Tj 13.44 0 TD (Indicating lamps with proper color caps in place.) Tj -13.44 -14.4 TD (l.) Tj 13.44 0 TD (Furnishing of spare fuses and lamps and any operating) Tj -40.56 -7.2 TD (handles or cranks.) Tj 27.12 -14.4 TD (m.) Tj 13.44 0 TD (Manufacturer) Tj 48.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s instruction books, wiring diagrams. etc.,) Tj -93.6 -7.2 TD (delivered to responsible individual accepting installation. Make a) Tj 0 -7.2 TD (list and have it signed and filed.) Tj 27.12 -14.4 TD (n.) Tj 13.44 0 TD (Terminals marked in accordance with approved shop) Tj -40.56 -7.2 TD (drawings and specifications.) Tj 27.12 -14.4 TD (o.) Tj 13.44 0 TD (All wiring connections made up tight.) Tj -13.44 -14.4 TD (p.) Tj 13.44 0 TD (If switchgear is to be installed in any hazardous) Tj -40.56 -7.2 TD (locations, check the specifications and drawings for any required) Tj 0 -7.2 TD (special constructions features.) Tj 27.12 -14.4 TD (q.) Tj 13.44 0 TD (Check for sufficient clearance between back of) Tj -40.56 -7.2 TD (switchboard and wall. Minimum of 30 inches required if equipment) Tj 0 -7.2 TD (or wiring is accessible only from back. Additional clearance may) Tj T* (be required \(NEC 110-16 and 34\).) Tj 27.12 -14.4 TD (r.) Tj 13.44 0 TD (Check to be sore switchboard frame is grounded.) Tj -13.44 -14.4 TD (s.) Tj 13.44 0 TD (Check to be sure conduit stub\227ups have coupling) Tj -40.56 -7.2 TD (installed at floor level if required by Project Specifications.) Tj 27.12 -14.4 TD (t.) Tj 13.44 0 TD (Check to be sure that proper phase relationship and) Tj -40.56 -7.2 TD (identification of connections including instrumentation has been) Tj 0 -7.2 TD (accomplished.) Tj 27.12 -14.4 TD (u.) Tj 13.44 0 TD (Special requirements, such as seismic.) Tj -40.56 -14.4 TD (16A-23 ) Tj 32.64 0 TD (ENGINE GENERATOR SETS) Tj ET 50.64 239.28 85.68 0.72 re f BT 45.12 226.32 TD (a.) Tj 13.44 0 TD (See Chapter 130 for installation of sets.) Tj -13.44 -14.4 TD (b.) Tj 13.44 0 TD (Inspect for overall compliance with the specifications) Tj -40.56 -7.2 TD (as to type and rating of components ) Tj 146.88 0 TD /F3 3.84 Tf -0.0787 Tc -0.0288 Tw (- ) Tj 2.16 0 TD /F0 6.96 Tf -0.096 Tc 0 Tw (kva, ) Tj 20.4 0 TD /F0 7.92 Tf 0.048 Tc (kw, horsepower, rpm,) Tj -169.44 -7.2 TD /F0 6.96 Tf -0.096 Tc (voltage ) Tj 32.64 0 TD /F3 3.84 Tf -0.0787 Tc -0.0288 Tw (- ) Tj 2.16 0 TD /F0 6.96 Tf -0.096 Tc 0 Tw (and in particular as to the following:) Tj -7.68 -14.4 TD (\(1\)) Tj 18 0 TD (Engine will be suitable for operation on the fuel) Tj -45.12 -7.2 TD (specified.) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Voltage ratings of starter, battery, and battery) Tj -45.12 -7.2 TD (charger will be the same. Voltage regulator may need to be reset) Tj 0 -7.2 TD (if nickel cadmium batteries are furnished.) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (Check spare parts provided with unit to see that the) Tj -45.12 -7.2 TD (supply is complete and that they fit the unit furnished.) Tj 27.12 -14.4 TD (\(4\)) Tj 18 0 TD (Installation should be in accord with NFPA 30, 31, and) Tj -45.12 -7.2 TD (37, as required by Project Specifications. Check for proper) Tj 0 -7.2 TD (calibration of gagestick.) Tj 27.12 -14.4 TD (\(5\)) Tj 18 0 TD (That ventilation is adequate.) Tj -18 -14.4 TD (\(6\)) Tj 18 0 TD (See that operation and maintenance manuals are posted) Tj -45.12 -7.2 TD (in engine room.) Tj ET endstream endobj 298 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 299 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 122.88 -495.84 TD (16A-22) Tj -95.76 476.4 TD (\(7\)) Tj 18 0 TD (Check operation of transfer switches.) Tj -18 -14.4 TD (\(8\)) Tj 18 0 TD (Check governor operation.) Tj -18 -14.4 TD (\(9\)) Tj 18 0 TD (Check cranking cycle for reset.) Tj -18 -14.4 TD (\(10\)) Tj 22.32 0 TD (Check to determine that emergency shut\227down prevents) Tj -49.44 -7.2 TD (recycling.) Tj 27.12 -14.4 TD (\(11\)) Tj 22.32 0 TD (Required field tests have been satisfactorily) Tj -49.44 -7.2 TD (completed.) Tj 27.12 -14.4 TD (\(12\)) Tj 22.32 0 TD (Check automatic transfer switch, lab test reports,) Tj -49.44 -7.2 TD (operation and settings.) Tj 0 -14.4 TD (16A-24 ) Tj 32.64 0 TD (ELEVATOR INSTALLATIONS) Tj ET 50.64 397.68 89.76 0.72 re f BT 140.4 399.12 TD ( \(NEC 620\)) Tj -95.28 -14.4 TD (a.) Tj 13.44 0 TD (See Chapter 14A for installation features.) Tj -13.44 -14.4 TD (b.) Tj 13.44 0 TD (Check voltage rating of hoisting machinery.) Tj -13.44 -14.4 TD (c.) Tj 13.44 0 TD (Provide safety interlocks as specified and check) Tj -40.56 -7.2 TD (operation.) Tj 27.12 -14.4 TD (d.) Tj 13.44 0 TD (Record all performance of specified tests.) Tj -40.56 -14.4 TD (16A-25 ) Tj 32.64 0 TD (MISCELLANEOUS SYSTEMS) Tj ET 50.64 318.48 85.68 0.72 re f BT 136.32 319.92 TD ( \(NEC 720, 725, 760, 770, 800, 810\)) Tj -91.2 -14.4 TD (Include several types of audible and visual paging systems,) Tj -27.12 -7.2 TD (nurses call, central dictation, intercommunication systems of) Tj 0 -7.2 TD (loudspeaker and telephone type, fire alarm systems, clock systems) Tj T* (and supervisory systems, and often these which combine more than) Tj T* (one function in a single system. Products of different) Tj T* (manufacturers of like systems may differ greatly. Manufacturer) Tj 252.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s) Tj -257.04 -7.2 TD (installation instructions will be rigidly adhered to. The) Tj 0 -7.2 TD (following will apply to all systems generally:) Tj 27.12 -14.4 TD (a.) Tj 13.44 0 TD (Master sets and main or central station equipment and) Tj -40.56 -7.2 TD (switchboards of miscellaneous systems will be so placed as to be) Tj 0 -7.2 TD (easily accessible for operation and maintenance in locations) Tj T* (having adequate ventilation.) Tj 27.12 -14.4 TD (b.) Tj 13.44 0 TD (Generally, component parts of miscellaneous systems will) Tj -40.56 -7.2 TD (be products of one manufacturer.) Tj 27.12 -14.4 TD (c.) Tj 13.44 0 TD (Wiring between system components may be of special) Tj -40.56 -7.2 TD (character. Inspect for requirement for use of optical fiber cable,) Tj 0 -7.2 TD (shielded cables, twisted pairs, and isolation of any system from) Tj T* (another.) Tj 27.12 -14.4 TD (d.) Tj 13.44 0 TD (Check installation of miscellaneous systems equipment to) Tj -40.56 -7.2 TD (see that the proper type and sizes of fuses have been used, that) Tj 0 -7.2 TD (leads are connected to proper terminals and that the equipment is) Tj T* (designed to operate on the available supply voltage.) Tj 0 -14.4 TD (16A-26 ) Tj 32.64 0 TD (TESTS) Tj ET 50.64 109.68 20.4 0.72 re f BT 45.12 96.72 TD (a.) Tj 13.44 0 TD (All Testing) Tj ET 58.56 95.28 44.88 0.72 re f BT 45.12 82.32 TD (\(1\)) Tj 18 0 TD (When testing of any electrical equipment or system is) Tj -45.12 -7.2 TD (required, advise the electrical inspector or engineer and obtain) Tj 0 -7.2 TD (his assistance. The following paragraphs cover a wide range of) Tj T* (testing and it will be your responsibility to obtain assistance) Tj T* (when such testing is beyond your capabilities or knowledge.) Tj ET endstream endobj 300 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 301 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 140.88 30.72 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (16A-23) Tj -95.76 476.4 TD (\(2\)) Tj 18 0 TD (Unless otherwise specified, testing should be performed) Tj -45.12 -7.2 TD (by the contractor when the inspector is present. All arrangements) Tj 0 -7.2 TD (for test should be made by the contractor. For tests of major) Tj T* (equipment and high voltage cables, the contractor should also) Tj T* (notify the manufacturers so they may witness the tests.) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (The Using Agency should be notified when any unusual) Tj -45.12 -7.2 TD (testing is to he performed so that they may be present to witness) Tj 0 -7.2 TD (the test. Using Agency cooperation should be obtained well in) Tj T* (advance for any tests which may affect their facilities or) Tj T* (operations.) Tj 27.12 -14.4 TD (b.) Tj 13.44 0 TD (Precautions) Tj ET 58.56 419.28 44.88 0.72 re f BT 45.12 406.32 TD (Precautions should be taken to insure that test voltages) Tj -27.12 -7.2 TD (are applied only to equipment or circuits under test, and that all) Tj 0 -7.2 TD (instrument and control circuits are disconnected during the test.) Tj T* (Verify that all electrical equipment can be ) Tj 179.52 0 TD (LOCK-OUT/TAG-OUT) Tj ET 197.52 383.28 65.28 0.72 re f BT 262.8 384.72 TD (.) Tj -217.68 -14.4 TD (c.) Tj 13.44 0 TD (Electrical Tests) Tj ET 58.56 368.88 65.28 0.72 re f BT 45.12 355.92 TD (Electrical tests should not be conducted under ambient) Tj -27.12 -7.2 TD (conditions unsuitable for testing, such as excessively high) Tj 0 -7.2 TD (humidity conditions.) Tj 27.12 -14.4 TD (d.) Tj 13.44 0 TD (Records of Tests) Tj ET 58.56 325.68 65.28 0.72 re f BT 45.12 312.72 TD (Records of tests should be complete, including ambient) Tj -27.12 -7.2 TD (temperatures and weather conditions, circuit designation and) Tj 0 -7.2 TD (extent or wiring systems tested, name and serial number of the) Tj T* (machine tested, and signatures of those witnessing the tests.) Tj 27.12 -14.4 TD (e.) Tj 13.44 0 TD (Description of Tests) Tj ET 58.56 275.28 81.6 0.72 re f BT 45.12 262.32 TD (\(1\)) Tj 18 0 TD (De-energized operational testing will determine that) Tj -45.12 -7.2 TD (moving parts do not bind, rotating parts work freely and are not) Tj 0 -7.2 TD (obstructed by foreign materials, that they are lubricated as) Tj T* (required, and that such limits or stops as may be necessary to) Tj T* (restrict the motion of moving parts are in place and functioning.) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Operational testing will show that the equipment) Tj -45.12 -7.2 TD (performs all functions for which it is designed in accordance with) Tj 0 -7.2 TD (the design and manufacturer) Tj 110.16 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s specifications.) Tj -87.12 -14.4 TD (\(3\)) Tj 18 0 TD (Continuity testing will determine that circuits are) Tj -45.12 -7.2 TD (continuous through out the circuit.) Tj 27.12 -14.4 TD (\(4\)) Tj 18 0 TD (High potential testing will determine that the) Tj -45.12 -7.2 TD (insulation has sufficient dielectric strength to withstand the) Tj 0 -7.2 TD (surges to which it might be subjected and to insure freedom from) Tj T* (pinholes and any other possible damage.) Tj 27.12 -14.4 TD (\(5\)) Tj 18 0 TD (Megger tests will determine that the wiring system and) Tj -45.12 -7.2 TD (equipment is free from short circuits and grounds and will measure) Tj 0 -7.2 TD (the insulation resistances of the circuit and/or equipment under) Tj T* (test.) Tj ET endstream endobj 302 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 303 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 122.88 -495.84 TD (16A-24) Tj -95.76 476.4 TD (f.) Tj 13.44 0 TD (Megger Tests) Tj ET 58.56 505.68 48.96 0.72 re f BT 45.12 492.72 TD (Megger tests of insulation resistance should be made when) Tj -27.12 -7.2 TD (specified and approved if satisfactory.) Tj 27.12 -14.4 TD (g.) Tj 13.44 0 TD (Method of Testing) Tj ET 58.56 469.68 69.36 0.72 re f BT 45.12 456.72 TD (\(1\)) Tj 18 0 TD (High-potential field tests should be made in strict) Tj -45.12 -7.2 TD (compliance with the applicable standards listed in the) Tj 0 -7.2 TD (specifications and with the recommendations of the manufacturer of) Tj T* (the equipment.) Tj 27.12 -14.4 TD (\(a\)) Tj 18 0 TD (Tests should not be repeated unless the necessity for) Tj -45.12 -7.2 TD (repetition has been determined by an electrical engineer or) Tj 0 -7.2 TD (specified.) Tj 27.12 -14.4 TD (\(b\)) Tj 18 0 TD (Make only after all safety precautions relative to) Tj -45.12 -7.2 TD (grounding of the test equipment have been checked.) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Insulation resistance and high-potential tests of) Tj -45.12 -7.2 TD (wiring systems should be made when required between one conductor) Tj 0 -7.2 TD (and ground with all other conductors and sheath or conduit) Tj T* (connected to the same ground. Tests should be made on each) Tj T* (conductor in this manner. Windings of rotating equipment and) Tj T* (transformers should be connected together and tested to ground.) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (Rotating equipment operational tests should include an) Tj -45.12 -7.2 TD (inspection for alignment with driven machine, proper lubrication,) Tj 0 -7.2 TD (freedom from excessive vibration in operation, proper direction of) Tj T* (rotation, voltage and current drain check against motor nameplate) Tj T* (ratings, check of R.P.M. and excessive heating.) Tj 27.12 -14.4 TD (\(4\)) Tj 18 0 TD (Rotating equipment operational tests should include an) Tj -45.12 -7.2 TD (inspection for alignment with driven machine, proper lubrication,) Tj 0 -7.2 TD (freedom from excessive vibration in operation, proper direction of) Tj T* (rotation, voltage and current drain check against motor nameplate) Tj T* (ratings, check of R.P.M. and excessive heating.) Tj 27.12 -14.4 TD (\(5\)) Tj 18 0 TD (Switch and manual motor starter operational tests) Tj -45.12 -7.2 TD (should include an examination for proper operation, alignment of) Tj 0 -7.2 TD (contacts and contact pressure.) Tj 27.12 -14.4 TD (\(6\)) Tj 18 0 TD (Motor-starter operational tests should include manually) Tj -45.12 -7.2 TD (operating the armature or plunger and contact-bar to determine) Tj 0 -7.2 TD (that movement is free, contacts are in alignment, contact pressure) Tj T* (is adequate and that auxiliary contacts function properly. The) Tj T* (starter should be energized from all control points and the) Tj T* (operation of all control-circuit interlocks should be checked.) Tj 27.12 -14.4 TD (\(7\)) Tj 18 0 TD (Reduced voltages starters should be checked for correct) Tj -45.12 -7.2 TD (sequence and timing of application of incremental and full) Tj 0 -7.2 TD (voltages.) Tj 27.12 -14.4 TD (\(8\)) Tj 18 0 TD (Variable and adjustable speed motor controls should be) Tj -45.12 -7.2 TD (checked to see that operating speeds corresponds to the position) Tj 0 -7.2 TD (of the speed control device.) Tj 27.12 -14.4 TD (\(9\)) Tj 18 0 TD (Circuit-breaker operational tests for large air) Tj -45.12 -7.2 TD (circuit-breakers operating and test positions under manual) Tj 0 -7.2 TD (operation and through control circuits from each control point.) Tj T* (Checking of breaker mechanisms for alignment; freedom of motion) Tj T* (and adequate pressure of contacts; tripping, devices; inspection) Tj ET endstream endobj 304 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 305 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 140.88 30.72 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (16A-25) Tj -122.88 476.4 TD (to insure that breaker cannot be moved from operating position) Tj 0 -7.2 TD (while closed. Indicating lights, targets, annunciators and alarms) Tj T* (should be observed for operation in connection with associated) Tj T* (circuit- breakers, control switches and other operating devices to) Tj T* (insure that the signal indication corresponds to the switch) Tj T* (position of the indicating device.) Tj 27.12 -14.4 TD (\(10\)) Tj 22.32 0 TD (Protective relays should be checked to see that time) Tj -49.44 -7.2 TD (and current settings have been made as specified.) Tj 27.12 -14.4 TD (\(11\)) Tj 22.32 0 TD (Operational tests of relays should include: Checking) Tj -49.44 -7.2 TD (of operation at specified current or voltage and time values.) Tj 0 -7.2 TD (Checking of peak current of instantaneous elements; checking of) Tj T* (differential elements for operation only under condition of proper) Tj T* (direction of power flow.) Tj 27.12 -14.4 TD (\(12\)) Tj 22.32 0 TD (Rod electrodes should be tested for resistance to) Tj -49.44 -7.2 TD (ground. If resistance is greater than the specified resistance, or) Tj 0 -7.2 TD (maximum of 25 ohms, additional rods or longer rods should be) Tj T* (installed. Consult specifications \(Project Specifications: NEC) Tj T* (250-83\).) Tj 27.12 -14.4 TD (\(13\)) Tj 22.32 0 TD (Miscellaneous systems, for intercommunication, paging,) Tj -49.44 -7.2 TD (clock-control fire alarms, etc., shall be given operational tests) Tj 0 -7.2 TD (at all operating points to demonstrate that they will perform all) Tj T* (specified functions. In particular, it shall be demonstrated that) Tj T* (sounding devices are audible under normal ambient sound-level) Tj T* (conditions in areas for which coverage is specified, that false) Tj T* (signals cannot be transmitted over fire alarm systems specified to) Tj T* (be of the non-interfering type, that reserve\227power attachments for) Tj T* (clock system will operate for the specified length of time, and) Tj T* (that all special features and accessories specified for each) Tj T* (system have been incorporated therein.) Tj 27.12 -14.4 TD (\(14\)) Tj 22.32 0 TD (Engine-generator tests include, but may not be limited) Tj -49.44 -7.2 TD (to, the following:) Tj 27.12 -14.4 TD (\(a\)) Tj 18 0 TD (If diesel engine driven, reference is usually made to) Tj -45.12 -7.2 TD (MIL-STD7058. This publication details electrical test requirement.) Tj 0 -7.2 TD (Be sure all factory or shop tests have been completed as) Tj T* (specified.) Tj 27.12 -14.4 TD (\(b\)) Tj 18 0 TD (Demonstrate starting of all units from all manual) Tj -45.12 -7.2 TD (control points and from automatic control as specified.) Tj 27.12 -14.4 TD (\(c\)) Tj 18 0 TD (Demonstrate voltage and frequency regulation are held) Tj -45.12 -7.2 TD (within specified limits under all load conditions.) Tj 27.12 -14.4 TD (\(d\)) Tj 18 0 TD (Establish load requirements for testing of units.) Tj -45.12 -7.2 TD (Either connected load or created load such as obtained with salt) Tj 0 -7.2 TD (water rheostat or other satisfactory method. Determine who will) Tj T* (furnish load banks, if required.) Tj 27.12 -14.4 TD (\(e\)) Tj 18 0 TD (Engine-generator tests should incorporate full load) Tj -45.12 -7.2 TD (tests. Specifications will at times required 110% load testing for) Tj 0 -7.2 TD (a limited time.) Tj 27.12 -14.4 TD (\(f\)) Tj 18 0 TD (Satisfactory operation of transfer switch installation) Tj -45.12 -7.2 TD (in accordance with specifications requirements should be) Tj 0 -7.2 TD (demonstrated.) Tj ET endstream endobj 306 0 obj <>/ProcSet 389 0 R>>/Rotate 0/Type/Page>> endobj 307 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 122.88 -495.84 TD (16A-26) Tj -95.76 476.4 TD (\(g\)) Tj 18 0 TD (Operational check of all safety controls should be) Tj -45.12 -7.2 TD (made. This will include operation of safety stop switches,) Tj 0 -7.2 TD (operation of high water temp, low oil pressure, over\227speed, and) Tj T* (any other safety circuit required by the specifications.) Tj 27.12 -14.4 TD (\(h\)) Tj 18 0 TD (Demonstrate full load continuous operation without) Tj -45.12 -7.2 TD (overheating of the engine.) Tj 27.12 -14.4 TD (\(i\)) Tj 18 0 TD (Be sure all field tests specified are performed and) Tj -45.12 -7.2 TD (recorded.) Tj 27.12 -14.4 TD (\(15\)) Tj 22.32 0 TD (Transformers should be checked for shipping damage,) Tj -49.44 -7.2 TD (leakage, proper voltage and tap settings, grounding, and for signs) Tj 0 -7.2 TD (of water in the oil.) Tj 27.12 -14.4 TD (\(16\)) Tj 22.32 0 TD (Service equipment should be tested for ground fault) Tj -49.44 -7.2 TD (protection as specified and NEC 230-95.) Tj 27.12 -14.4 TD (\(17\)) Tj 22.32 0 TD (Operational test should be made on all switches,) Tj -49.44 -7.2 TD (dimmers, lighting, battery units and miscellaneous equipment.) Tj ET endstream endobj 308 0 obj <>/ProcSet 310 0 R>>/Rotate 0/Type/Page>> endobj 309 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 150.96 30.72 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (i) Tj -20.4 476.4 TD (CHAPTER 16B) Tj ET 130.56 505.68 44.88 0.72 re f BT 114.24 492.72 TD (EXTERIOR ELECTRICAL) Tj ET 114.24 491.28 77.52 0.72 re f BT 142.8 478.32 TD (INDEX) Tj -88.8 -14.4 TD (Para.) Tj ET 54 462.48 20.4 0.72 re f BT 144 463.92 TD (Title) Tj ET 144 462.48 20.4 0.72 re f BT 243.12 463.92 TD (Page) Tj ET 243.12 462.48 16.32 0.72 re f BT 54 449.52 TD (16B-01) Tj 49.44 0 TD (GENERAL) Tj 139.68 0 TD (16B-1) Tj -189.12 -14.4 TD (16B-02) Tj 49.44 0 TD (AERIAL DISTRIBUTION) Tj 139.68 0 TD (16B-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Wood Poles) Tj 121.68 0 TD (16B-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Crossarms) Tj 121.68 0 TD (16B-2) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Hardware) Tj 121.68 0 TD (16B-2) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Insulators) Tj 121.68 0 TD (16B-2) Tj -139.68 -7.2 TD (e.) Tj 18 0 TD (Conductors \(Aerial\)) Tj 121.68 0 TD (16B-2) Tj -139.68 -7.2 TD (f.) Tj 18 0 TD (Guying) Tj 121.68 0 TD (16B-3) Tj -139.68 -7.2 TD (g.) Tj 18 0 TD (Transformers) Tj 121.68 0 TD (16B-4) Tj -139.68 -7.2 TD (h.) Tj 18 0 TD (Primary and Secondary) Tj 0 -7.2 TD (Fuse Cutouts) Tj 121.68 0 TD (16B-5) Tj -139.68 -7.2 TD (i.) Tj 18 0 TD (Lightning Arrestors) Tj 121.68 0 TD (16B-5) Tj -139.68 -7.2 TD (j.) Tj 18 0 TD (Pole Top Switches) Tj 121.68 0 TD (16B-5) Tj -139.68 -7.2 TD (k.) Tj 18 0 TD (Grounding) Tj 121.68 0 TD (16B-6) Tj -139.68 -7.2 TD (l.) Tj 18 0 TD (Street Lighting) Tj 121.68 0 TD (16B-6) Tj -139.68 -7.2 TD (m.) Tj 18 0 TD (Underground Risers) Tj 121.68 0 TD (16B-7) Tj -189.12 -14.4 TD (16B-03) Tj 49.44 0 TD (UNDERGROUND DISTRIBUTION) Tj 139.68 0 TD (16B-7) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Duct System) Tj 121.68 0 TD (16B-7) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Manholes, Handholes, and) Tj 0 -7.2 TD (Underground Vaults) Tj 121.68 0 TD (16B-8) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Primary Cables) Tj 121.68 0 TD (16B-9) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Direct Burial Cable) Tj 121.68 0 TD (16B-9) Tj -139.68 -7.2 TD (e.) Tj 18 0 TD (Potheads) Tj 121.68 0 TD (16B-10) Tj -139.68 -7.2 TD (f.) Tj 18 0 TD (Transformers in Fenced) Tj 0 -7.2 TD (Enclosures) Tj 121.68 0 TD (16B-10) Tj -139.68 -7.2 TD (g.) Tj 18 0 TD (Pad Mounted Transformers) Tj 0 -7.2 TD (Without Fenced Enclosures) Tj 121.68 0 TD (16B-11) Tj -139.68 -7.2 TD (h.) Tj 18 0 TD (Testing) Tj 121.68 0 TD (16B-11) Tj -189.12 -14.4 TD (16B-04) Tj 49.44 0 TD (CATHODIC PROTECTION) Tj 139.68 0 TD (16B-11) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (General) Tj 121.68 0 TD (16B-11) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Shop drawings) Tj 121.68 0 TD (16B-12) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Anodes) Tj 121.68 0 TD (16B-12) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Conductors) Tj 121.68 0 TD (16B-12) Tj -139.68 -7.2 TD (e.) Tj 18 0 TD (Conductor Connections) Tj 121.68 0 TD (16B-12) Tj -139.68 -7.2 TD (f.) Tj 18 0 TD (Insulating Joints) Tj 121.68 0 TD (16B-12) Tj -139.68 -7.2 TD (g.) Tj 18 0 TD (Bonding) Tj 121.68 0 TD (16B-12) Tj -139.68 -7.2 TD (h.) Tj 18 0 TD (Test Points) Tj 121.68 0 TD (16B-12) Tj -139.68 -7.2 TD (i.) Tj 18 0 TD (Foreign Pipes) Tj 0 -7.2 TD (and Structures) Tj 121.68 0 TD (16B-13) Tj -139.68 -7.2 TD (j.) Tj 18 0 TD (Backfill for Underground) Tj 0 -7.2 TD (Metallic Structures) Tj 121.68 0 TD (16B-13) Tj -139.68 -7.2 TD (k.) Tj 18 0 TD (Auxiliary Equipment) Tj 121.68 0 TD (168-13) Tj -139.68 -7.2 TD (l.) Tj 18 0 TD (Electrical Measurements) Tj 121.68 0 TD (168-13) Tj -139.68 -7.2 TD (m.) Tj 18 0 TD (Starting and Adjusting) Tj 121.68 0 TD (16B-13) Tj -139.68 -7.2 TD (n.) Tj 18 0 TD (Record of Testing) Tj 121.68 0 TD (16B-13) Tj -189.12 -14.4 TD (16B-05) Tj 49.44 0 TD (ENERGY MONITORING AND) Tj 139.68 0 TD (16B-13) Tj -139.68 -7.2 TD (CONTROL SYSTEMS) Tj -49.44 -14.4 TD (16B\22706) Tj 49.44 0 TD (RF SHIELDED FACILITY) Tj 139.68 0 TD (16B-14) Tj ET endstream endobj 310 0 obj [/PDF/Text] endobj 311 0 obj <>/ProcSet 392 0 R>>/Rotate 0/Type/Page>> endobj 312 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (16B-1) Tj -12.24 469.2 TD (CHAPTER 16B) Tj ET 130.56 505.68 44.88 0.72 re f BT 114.24 492.72 TD (EXTERIOR ELECTRICAL) Tj ET 114.24 491.28 77.52 0.72 re f BT 18 478.32 TD (16B-01 ) Tj 32.64 0 TD (GENERAL) Tj ET 50.64 476.88 28.56 0.72 re f BT 45.12 463.92 TD (This chapter covers exterior electrical distribution) Tj -27.12 -7.2 TD (systems, aerial and underground, and transformer stations.) Tj 27.12 -14.4 TD (Make an inspection of materials prior to installation for) Tj -27.12 -7.2 TD (conformance with specifications, plans, and approved shop) Tj 0 -7.2 TD (drawings. ENG Form 4288, Submittal Register, which lists approved) Tj T* (materials, is essential to this inspection. Components for) Tj T* (distribution systems will be inspected before they are installed) Tj T* (and energized. Initial inspection and follow-up inspections will) Tj T* (follow work as required by ER 1180-1-6.) Tj 0 -14.4 TD (16B-02 ) Tj 32.64 0 TD (AERIAL DISTRIBUTION) Tj ET 50.64 383.28 77.52 0.72 re f BT 45.12 370.32 TD (a. ) Tj 12.24 0 TD (Wood Poles) Tj ET 57.36 368.88 40.8 0.72 re f BT 45.12 355.92 TD (Note: If concrete or steel poles are provided be sure that) Tj -27.12 -7.2 TD (the poles meet the strength and other criteria provided in the) Tj 0 -7.2 TD (specifications.) Tj 27.12 -14.4 TD (\(1\)) Tj 18 0 TD (Check strength \(class\), length, conditions, and) Tj -45.12 -7.2 TD (treatment of poles against design requirements. \(A current edition) Tj 0 -7.2 TD (of ANSI Standard 05.1, \223Specifications and Dimensions for Wood) Tj T* (Poles,\224 should be available to the inspector\). Be sure that) Tj T* (certification of compliance with applicable AWPA preservation) Tj T* (specification has been submitted.) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Be sure that contractor) Tj 93.84 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s provisions for storage and) Tj -143.04 -7.2 TD (handling of poles are in accordance with specification) Tj 0 -7.2 TD (requirements.) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (Usually, specifications require poles to be full) Tj -45.12 -7.2 TD (treated rather than butt treated. The preservation specification) Tj 0 -7.2 TD (should be checked for verification.) Tj 27.12 -14.4 TD (\(4\)) Tj 18 0 TD (Poles should be turned, chamfered, trimmed, roofed,) Tj -45.12 -7.2 TD (gained, and bored prior to pressure treatment. When field boring) Tj 0 -7.2 TD (or gaining is necessary, additional preservation should be applied) Tj T* (to bared surfaces.) Tj 27.12 -14.4 TD (\(5\)) Tj 18 0 TD (Examine type of handling tools.) Tj -18 -14.4 TD (\(6\)) Tj 18 0 TD (Be sure that gains have been made for all cross- arms.) Tj -18 -14.4 TD (\(7\)) Tj 18 0 TD (A site check of the pole line route and pole locations) Tj -45.12 -7.2 TD (should be made to be sure that pole lengths furnished will be) Tj 0 -7.2 TD (suitable to carry all intended circuits \(including communications\)) Tj T* (and still maintain required vertical and horizontal clearances) Tj T* (from the ground and other obstructions. \(A current edition of) Tj T* (ANSI-C2, National Electrical Safety Code, should be available to) Tj T* (the inspector.\)) Tj 27.12 -14.4 TD (\(8\)) Tj 18 0 TD (Be sure that the depths of pole holes are equal to) Tj -45.12 -7.2 TD (minimum specification requirements, and that the width of each) Tj 0 -7.2 TD (hole is adequate for backfilling and tamping in 6\227inch lifts when) Tj T* (required by the specifications. Surplus earth should be piled) Tj T* (around the pole and tightly tamped to assist in drainage away from) Tj T* (the pole and to compensate for shrinkage of the backfill.) Tj ET endstream endobj 313 0 obj <>/ProcSet 392 0 R>>/Rotate 0/Type/Page>> endobj 314 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (16B-2) Tj -97.68 469.2 TD (\(9\)) Tj 18 0 TD (If design requires numbering of poles, see that this is) Tj -45.12 -7.2 TD (done correctly.) Tj 27.12 -14.4 TD (\(10\)) Tj 22.32 0 TD (See that the grading of pole tops is even.) Tj -22.32 -14.4 TD (\(11\)) Tj 22.32 0 TD (When it is necessary to shorten a pole, see that the) Tj -49.44 -7.2 TD (cut is made at the top and that it is treated with hot) Tj 0 -7.2 TD (preservative.) Tj 27.12 -14.4 TD (b.) Tj 13.44 0 TD (Crossarms) Tj ET 58.56 440.88 36.72 0.72 re f BT 45.12 427.92 TD (\(1\)) Tj 18 0 TD (Check material meets specification requirements.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Verify wooden crossarms use proper preservation) Tj -45.12 -7.2 TD (treatment.) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (Examine fastening.) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Inspect installation, bolting, setting angle, number,) Tj -45.12 -7.2 TD (type and length of crossarm and secureness obtained.) Tj 27.12 -14.4 TD (\(b\)) Tj 18 0 TD (Check vertical spacing of multiple crossarms.) Tj -18 -14.4 TD (\(c\)) Tj 18 0 TD (Check pin hole spacing.) Tj -18 -14.4 TD (c.) Tj 13.44 0 TD (Hardware) Tj ET 58.56 325.68 32.64 0.72 re f BT 45.12 312.72 TD (\(1\)) Tj 18 0 TD (Be sure that all ferrous hardware \(braces, bolts,) Tj -45.12 -7.2 TD (lamps, pins, nuts, washers, screws, etc.\) is standard pole line) Tj 0 -7.2 TD (galvanized hardware.) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Be sure that all hardware is of the specified strength) Tj -45.12 -7.2 TD (size and length.) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (Be sure crossarm pins are of the specified strength and) Tj -45.12 -7.2 TD (height.) Tj 27.12 -14.4 TD (\(4\)) Tj 18 0 TD (Bolts should not protrude more than approximately 2-) Tj -45.12 -7.2 TD (inches or less than 1/8-inch beyond the nut.) Tj 27.12 -14.4 TD (d.) Tj 13.44 0 TD (Insulators) Tj ET 58.56 217.68 40.8 0.72 re f BT 45.12 204.72 TD (\(1\)) Tj 18 0 TD (Check furnished insulators against specification) Tj -45.12 -7.2 TD (requirements.) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Inspect for damage.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Check types and spacing of pins.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Determine location of guy insulators.) Tj -18 -14.4 TD (e.) Tj 13.44 0 TD (Conductors) Tj ET 58.56 138.48 40.8 0.72 re f BT 99.36 139.92 TD ( \(Aerial\)) Tj -54.24 -14.4 TD (\(1\)) Tj 18 0 TD (Compare furnished supports with plans and) Tj -45.12 -7.2 TD (specifications:) Tj 27.12 -14.4 TD (\(a\)) Tj 18 0 TD (Stranded or solid.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Copper, aluminum, or combinations of copper and steel) Tj -45.12 -7.2 TD (of aluminum and steel sized according to the specifications.) Tj 27.12 -14.4 TD (\(c\)) Tj 18 0 TD (Bare, weatherproof covered, or insulated conductors.) Tj -45.12 -7.2 TD (Insure that insulation meets the project specifications.) Tj ET endstream endobj 315 0 obj <>/ProcSet 392 0 R>>/Rotate 0/Type/Page>> endobj 316 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (16B-3) Tj -97.68 469.2 TD (\(d\)) Tj 18 0 TD (If messengers are used to support cables check to see) Tj -45.12 -7.2 TD (that the are sized, attached and grounded properly.) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Check during installation:) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Tree trimming.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Line Sag and Tension are within the specified) Tj -45.12 -7.2 TD (requirements of the contract or NESC.) Tj 27.12 -14.4 TD (\(c\)) Tj 18 0 TD (Handling Watch for methods which will produce twists,) Tj -45.12 -7.2 TD (kinks, abrasions, or cuts.) Tj 27.12 -14.4 TD (\(d\)) Tj 18 0 TD (Method of dead ending.) Tj -18 -14.4 TD (\(e\)) Tj 18 0 TD (Connectors and treatment of conductors at connectors or) Tj -45.12 -7.2 TD (splices.) Tj 27.12 -14.4 TD (\(f\)) Tj 18 0 TD (Armor rod and/or armor tapes on aluminum conductors at) Tj -45.12 -7.2 TD (supports.) Tj 27.12 -14.4 TD (\(g\)) Tj 18 0 TD (Tie wires and methods of securing conductors to) Tj -45.12 -7.2 TD (insulators.) Tj 27.12 -14.4 TD (\(h\)) Tj 18 0 TD (Installations requiring racks and utilization of same.) Tj -18 -14.4 TD (\(i\)) Tj 18 0 TD (Horizontal and vertical clearance between conductors) Tj -45.12 -7.2 TD (\(ANSI C2\).) Tj 27.12 -14.4 TD (\(j\)) Tj 18 0 TD (Installation and location of drip loops.) Tj -18 -14.4 TD (\(k\)) Tj 18 0 TD (Connectors on service drops - If dissimilar metals are) Tj -45.12 -7.2 TD (connected be sure that approved connector is used.) Tj 27.12 -14.4 TD (\(l\)) Tj 18 0 TD (Dead ending with approved clamps with strength not less) Tj -45.12 -7.2 TD (than that of the conductor.) Tj 27.12 -14.4 TD (\(m\) Area requiring special protection.) Tj 0 -14.4 TD (\(n\)) Tj 18 0 TD (Requirements for neutrals.) Tj -18 -14.4 TD (f.) Tj 13.44 0 TD (Giving) Tj ET 58.56 210.48 24.48 0.72 re f BT 45.12 197.52 TD (\(1\)) Tj 18 0 TD (Compare the type of guy with its intended use.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Check type and size of anchors against ground) Tj -45.12 -7.2 TD (conditions.) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (Check materials to be used especially in areas where) Tj -45.12 -7.2 TD (anchor rod corrosion may be a problem.) Tj 27.12 -14.4 TD (\(a\)) Tj 18 0 TD (Check for protective thimbles and thimble eye bolts.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Examine three-bolt clamps at guy terminals.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Check during installation:) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Anchor distance from poles \(Anchor and guy strength is) Tj -45.12 -7.2 TD (based on 1 to 1 slope. If the distance between pole and anchor) Tj 0 -7.2 TD (rods has to be decreased, strengths must be increased\)) Tj 27.12 -14.4 TD (\(b\)) Tj 18 0 TD (Location of guy insulator if required.) Tj ET endstream endobj 317 0 obj <>/ProcSet 392 0 R>>/Rotate 0/Type/Page>> endobj 318 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (16B-4) Tj -97.68 469.2 TD (\(c\)) Tj 18 0 TD (Point of attachment on pole.) Tj -18 -14.4 TD (\(d\)) Tj 18 0 TD (Installation of rock anchors.) Tj -18 -14.4 TD (\(e\)) Tj 18 0 TD (Location of expansion anchors and log anchor rods.) Tj -18 -14.4 TD (\(f\)) Tj 18 0 TD (Need for additional guys.) Tj -18 -14.4 TD (\(g\)) Tj 18 0 TD (Installation of guy protectors.) Tj -18 -14.4 TD (\(h\)) Tj 18 0 TD (Gaining of poles for push braces.) Tj -18 -14.4 TD (\(i\)) Tj 18 0 TD (Identification of primary phases stamped on all) Tj -45.12 -7.2 TD (transition poles and at all substations entering and leaving.) Tj 27.12 -14.4 TD (\(j\)) Tj 18 0 TD (Length of anchor rods.) Tj -18 -14.4 TD (\(k\)) Tj 18 0 TD (Grounding and bonding of guys when specified.) Tj -18 -14.4 TD (\(l\)) Tj 18 0 TD (Guy markers are in place.) Tj -18 -14.4 TD (g.) Tj 13.44 0 TD (Transformers) Tj ET 58.56 354.48 48.96 0.72 re f BT 45.12 341.52 TD (\(1\)) Tj 18 0 TD (Check method of mounting:) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Determine capacity of transformer or banks of) Tj -45.12 -7.2 TD (transformers.) Tj 27.12 -14.4 TD (\(b\)) Tj 18 0 TD (See if method of mounting is similar to adjacent) Tj -45.12 -7.2 TD (connected system, and notify supervisor of deviation.) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Check materials:) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Conformance with applicable ANSI and IEEE Standards.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Primary and secondary voltage rating, kva capacity, and) Tj -45.12 -7.2 TD (taps.) Tj 27.12 -14.4 TD (\(c\)) Tj 18 0 TD (Applicable ANSI and IEEE Standards for accessories of) Tj -45.12 -7.2 TD (different capacity transformers, such as thermometers, liquid) Tj 0 -7.2 TD (level indicators, liquid sampling devices, external tap changers.) Tj 27.12 -14.4 TD (\(d\)) Tj 18 0 TD (Transformer hangers for rigid mounting on the) Tj -45.12 -7.2 TD (crossarms.) Tj 27.12 -14.4 TD (\(e\)) Tj 18 0 TD (Transformer bushings for rigid mounting with no) Tj -45.12 -7.2 TD (evidence of cracks of chips.) Tj 27.12 -14.4 TD (\(f\)) Tj 18 0 TD (Transformer tanks for pin hole leaks.) Tj -18 -14.4 TD (\(g\)) Tj 18 0 TD (Impulse test certification if required by) Tj -45.12 -7.2 TD (specification.) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (Check during installation:) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Correct tap setting.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Even distribution of weight of transformer banks.) Tj -18 -14.4 TD (\(c\)) Tj 18 0 TD (Mounting, crossmans, braces, wiring on pole mounting of) Tj -45.12 -7.2 TD (H frame mountings.) Tj ET endstream endobj 319 0 obj <>/ProcSet 392 0 R>>/Rotate 0/Type/Page>> endobj 320 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (16B-5) Tj -97.68 469.2 TD (\(d\)) Tj 18 0 TD (Primary and secondary connections.) Tj -18 -14.4 TD (\(e\)) Tj 18 0 TD (Grounding of transformer tanks.) Tj -18 -14.4 TD (\(f\)) Tj 18 0 TD (Rating of protective fuses.) Tj -18 -14.4 TD (\(g\)) Tj 18 0 TD (Accessibility of fused cutouts on pole.) Tj -18 -14.4 TD (\(h\)) Tj 18 0 TD (Type of electrical connections.) Tj -18 -14.4 TD (\(i\)) Tj 18 0 TD (Fused cutouts and lightning arrestors installed on the) Tj -45.12 -7.2 TD (primary side of each transformer supplied from an exterior) Tj 0 -7.2 TD (distribution system.) Tj 27.12 -14.4 TD (h.) Tj 13.44 0 TD (Primary and Secondary Fuse Cutouts) Tj ET 58.56 404.88 138.72 0.72 re f BT 45.12 391.92 TD (\(l\)) Tj 18 0 TD (See that approved type is used. Is it indicating or) Tj -45.12 -7.2 TD (dropout; enclosed or open?) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Check current and voltage rating and short circuit) Tj -45.12 -7.2 TD (interrupting capacity against design requirements.) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (Be sure fuse links are of the capacity and delay) Tj -45.12 -7.2 TD (specified and that they do not exceed the capacity of connected) Tj 0 -7.2 TD (conductors. \(Capacity tables for conductors may be found in NFPA) Tj T* (Handbook 70, National Electrical Code\).) Tj 27.12 -14.4 TD (\(4\)) Tj 18 0 TD (Check connection points of line conductors and load) Tj -45.12 -7.2 TD (conductors.) Tj 27.12 -14.4 TD (\(5\)) Tj 18 0 TD (Examine type of bracket. Be sure bracket is secure,) Tj -45.12 -7.2 TD (clear of adjoining structure, and convenient for operation.) Tj 27.12 -14.4 TD (i.) Tj 13.44 0 TD (Lightning Arrestors) Tj ET 58.56 268.08 77.52 0.72 re f BT 45.12 255.12 TD (Check:) Tj 0 -14.4 TD (\(1\)) Tj 18 0 TD (Location.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Voltage rating and type against specification) Tj -45.12 -7.2 TD (requirement.) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (Mounting bracket.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Grounding connectors.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Ground resistance prior to energizing the line.) Tj -18 -14.4 TD (\(6\)) Tj 18 0 TD (Arrestors are not used as insulators to support) Tj -45.12 -7.2 TD (conductors.) Tj 27.12 -14.4 TD (j.) Tj 13.44 0 TD (Pole Top Switches) Tj ET 58.56 138.48 69.36 0.72 re f BT 45.12 125.52 TD (\(1\)) Tj 18 0 TD (Compare switches with approval, making sure that) Tj -45.12 -7.2 TD (correct current and voltage rated ones are used.) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Assure that contact surfaces will operate under ice) Tj -45.12 -7.2 TD (conditions.) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (Watch arcing horns for contact during operation.) Tj ET endstream endobj 321 0 obj <>/ProcSet 392 0 R>>/Rotate 0/Type/Page>> endobj 322 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (16B-6) Tj -97.68 469.2 TD (\(4\)) Tj 18 0 TD (See that operating rods are provided with an insulator) Tj -45.12 -7.2 TD (in the rod if specified.) Tj 27.12 -14.4 TD (\(5\)) Tj 18 0 TD (Make sure operating handle is equipped with lock and) Tj -45.12 -7.2 TD (keys. If interlocking keying is specified, be sure it is) Tj 0 -7.2 TD (furnished. Check out interlocking.) Tj 27.12 -14.4 TD (\(6\)) Tj 18 0 TD (Examine location of operating handle for convenience) Tj -45.12 -7.2 TD (and safety.) Tj 27.12 -14.4 TD (k.) Tj 13.44 0 TD (Grounding) Tj ET 58.56 433.68 36.72 0.72 re f BT 45.12 420.72 TD (\(1\)) Tj 18 0 TD (Check type of ground conductors against design.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Inspect exothermic welded ground connections for size) Tj -45.12 -7.2 TD (rod, connector and powder charge against manufacturer) Tj 216.24 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s) Tj -220.32 -7.2 TD (recommendations.) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (verify that ground rods are properly spaced relative to) Tj -45.12 -7.2 TD (the pole.) Tj 27.12 -14.4 TD (\(4\)) Tj 18 0 TD (Examine mechanical grounding connectors.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Check connectors to aluminum conductors. Connectors) Tj -45.12 -7.2 TD (must be approved for aluminum.) Tj 27.12 -14.4 TD (\(6\)) Tj 18 0 TD (See that grounding conductors are protected from) Tj -45.12 -7.2 TD (mechanical injury.) Tj 27.12 -14.4 TD (\(7\)) Tj 18 0 TD (Determine and record ground resistance; also determine) Tj -45.12 -7.2 TD (need for additional ground rods.) Tj 27.12 -14.4 TD (\(8\)) Tj 18 0 TD (Record driven depth of ground rods.) Tj -18 -14.4 TD (\(9\)) Tj 18 0 TD (Insure that all noncurrent carrying metal parts on pole) Tj -45.12 -7.2 TD (are grounded when specified.) Tj 27.12 -14.4 TD (\(10\)) Tj 22.32 0 TD (Check for separate grounding conductors and rods for) Tj -49.44 -7.2 TD (lightning arrestor and equipment when required by specifications.) Tj 27.12 -14.4 TD (l.) Tj 13.44 0 TD (Street Lighting) Tj ET 58.56 217.68 61.2 0.72 re f BT 45.12 204.72 TD (\(1\)) Tj 18 0 TD (Examine all street lighting components.) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Check lighting bracket.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (When inspecting fixtures watch for:) Tj -18 -14.4 TD (-) Tj 13.44 0 TD (Light diffusing pattern.) Tj -13.44 -14.4 TD (-) Tj 13.44 0 TD (Open or enclosed type.) Tj -13.44 -14.4 TD (-) Tj 13.44 0 TD (Gaskets to protect the globe.) Tj -13.44 -14.4 TD (-) Tj 13.44 0 TD (Film cutouts on series systems.) Tj -13.44 -14.4 TD (-) Tj 13.44 0 TD (Free access for maintenance.) Tj -13.44 -14.4 TD (-) Tj 13.44 0 TD (Insulating transformers.) Tj -13.44 -14.4 TD (\(c\)) Tj 18 0 TD (Inspect regulator for kw rating, input voltage, and) Tj -45.12 -7.2 TD (output current.) Tj ET endstream endobj 323 0 obj <>/ProcSet 392 0 R>>/Rotate 0/Type/Page>> endobj 324 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (16B-7) Tj -97.68 469.2 TD (\(d\)) Tj 18 0 TD (Verify protector and control equipment voltage rating.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Check during installation:) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Height of fixture.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Lightning arrestors and fused cutouts installed on each) Tj -45.12 -7.2 TD (phase of the supply to the protector.) Tj 27.12 -14.4 TD (\(c\)) Tj 18 0 TD (All ferrous surfaces hot dip galvanized.) Tj -18 -14.4 TD (\(d\)) Tj 18 0 TD (Each fixture will be secured with required number of) Tj -45.12 -7.2 TD (through bolts of correct size.) Tj 27.12 -14.4 TD (\(e\)) Tj 18 0 TD (All metallic poles or standards.) Tj -18 -14.4 TD (m.) Tj 13.44 0 TD (Underground Risers) Tj ET 58.56 390.48 73.44 0.72 re f BT 45.12 377.52 TD (\(1\)) Tj 18 0 TD (Examine conduit clamps for size and number.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Check duct seal at the conduit terminations.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Look for listed insulated bushings at the conduit) Tj -45.12 -7.2 TD (termination.) Tj 27.12 -14.4 TD (\(4\)) Tj 18 0 TD (Check cable terminations.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Inspect during installation:) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Lag screws used on the conduit clamps.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Cable supports to eliminate weight on the cable) Tj -45.12 -7.2 TD (terminations.) Tj 27.12 -14.4 TD (\(c\)) Tj 18 0 TD (Metallic conduit below grade has approved protective) Tj -45.12 -7.2 TD (finish as required.) Tj 27.12 -14.4 TD (\(d\)) Tj 18 0 TD (Stress cones on shielded cable.) Tj -18 -14.4 TD (\(e\)) Tj 18 0 TD (Safe climbing space.) Tj -45.12 -14.4 TD (16B-03 ) Tj 32.64 0 TD (UNDERGROUND DISTRIBUTION) Tj ET 50.64 210.48 97.92 0.72 re f BT 45.12 197.52 TD (a.) Tj 13.44 0 TD (Duct System) Tj ET 58.56 196.08 44.88 0.72 re f BT 45.12 183.12 TD (\(1\)) Tj 18 0 TD (Check:) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Materials) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Method of encasement) Tj -18 -14.4 TD (\(c\)) Tj 18 0 TD (Painting) Tj -18 -14.4 TD (\(d\)) Tj 18 0 TD (Duct supports and spacers for size to maintain duct) Tj -45.12 -7.2 TD (spacing.) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Check during installation:) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (End bells and bushings at duct terminations.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Ground bushings at all conduit terminations.) Tj ET endstream endobj 325 0 obj <>/ProcSet 392 0 R>>/Rotate 0/Type/Page>> endobj 326 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (16B-8) Tj -97.68 469.2 TD (\(c\)) Tj 18 0 TD (Strength of concrete and presence of reinforcing steel) Tj -45.12 -7.2 TD (where required under roads, paved areas, etc.) Tj 27.12 -14.4 TD (\(d\)) Tj 18 0 TD (Compacted subgrade.) Tj -18 -14.4 TD (\(e\)) Tj 18 0 TD (Spacers and spacing between ducts and minimum concrete) Tj -45.12 -7.2 TD (cover all sides of ductbank.) Tj 27.12 -14.4 TD (\(f\)) Tj 18 0 TD (Spacing between electric and signal ducts.) Tj -18 -14.4 TD (\(g\)) Tj 18 0 TD (Alignment and grade of conduits, especially during) Tj -45.12 -7.2 TD (encasement with concrete.) Tj 27.12 -14.4 TD (\(h\)) Tj 18 0 TD (Staggering of conduit joints.) Tj -18 -14.4 TD (\(i\)) Tj 18 0 TD (Adapters for joining dissimilar types of duct \(see that) Tj -45.12 -7.2 TD (they are not field fabricated\)) Tj 27.12 -14.4 TD (\(j\)) Tj 18 0 TD (Changes in direction made with factory fabricated) Tj -45.12 -7.2 TD (devices.) Tj 27.12 -14.4 TD (\(k\)) Tj 18 0 TD (Ducts secured in the forms.) Tj -18 -14.4 TD (\(l\)) Tj 18 0 TD (Ducts pitched to drain.) Tj -18 -14.4 TD (\(m\)) Tj 18 0 TD (Duct plugs used during construction and on all spare) Tj -45.12 -7.2 TD (ducts.) Tj 27.12 -14.4 TD (\(n\)) Tj 18 0 TD (Cleaning of ducts.) Tj -18 -14.4 TD (\(o\)) Tj 18 0 TD (Seal duct entrances into manholes.) Tj -18 -14.4 TD (\(p\)) Tj 18 0 TD (Cover over ducts.) Tj -18 -14.4 TD (\(q\)) Tj 18 0 TD (Pull wires in place.) Tj -18 -14.4 TD (\(r\)) Tj 18 0 TD (Minimum curve radius of duct line in accordance with) Tj -45.12 -7.2 TD (specification.) Tj 27.12 -14.4 TD (\(s\)) Tj 18 0 TD (Installation of marker if required by specifications.) Tj -18 -14.4 TD (b.) Tj 13.44 0 TD (Manholes, Handholes. and Underground Vaults) Tj ET 58.56 210.48 175.44 0.72 re f BT 45.12 197.52 TD (\(1\)) Tj 18 0 TD (Verify size according to specifications.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Check that duct entrances are located to avoid sharp) Tj -45.12 -7.2 TD (cable bends or sufficient space is allotted to permit a reverse) Tj 0 -7.2 TD (cable bend.) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (Determine strength of concrete.) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Check quantity and size of reinforcing steel.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Check strength of cover and frame, marking of cover,) Tj -45.12 -7.2 TD (and machine finished joint between frame and cover.) Tj 27.12 -14.4 TD (\(6\)) Tj 18 0 TD (Be sure that approved cable racks, pulling irons,) Tj -45.12 -7.2 TD (steps, ground rod, etc., are provided in the specified quantity.) Tj 27.12 -14.4 TD (\(7\)) Tj 18 0 TD (Check during installation:) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Sequence of concrete placement \(Construction joints are) Tj -45.12 -7.2 TD (undesirable between the base and walls.\)) Tj ET endstream endobj 327 0 obj <>/ProcSet 392 0 R>>/Rotate 0/Type/Page>> endobj 328 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (16B-9) Tj -97.68 469.2 TD (\(b\)) Tj 18 0 TD (Seal around duct entrances and plug unused ducts.) Tj -18 -14.4 TD (\(c\)) Tj 18 0 TD (Pull irons are located opposite duct entrances.) Tj -18 -14.4 TD (\(d\)) Tj 18 0 TD (Waterproofing.) Tj -18 -14.4 TD (\(e\)) Tj 18 0 TD (Sump or drain.) Tj -18 -14.4 TD (\(f\)) Tj 18 0 TD (Quantity and location of cable racks, hooks, and) Tj -45.12 -7.2 TD (insulators.) Tj 27.12 -14.4 TD (\(g\)) Tj 18 0 TD (Ground rod and ground cable.) Tj -18 -14.4 TD (\(h\)) Tj 18 0 TD (Grounding of cable racks and lead cable sheaths.) Tj -18 -14.4 TD (c.) Tj 13.44 0 TD (Primary Cables) Tj ET 58.56 397.68 57.12 0.72 re f BT 45.12 384.72 TD (\(1\)) Tj 18 0 TD (Inspect splicing kits and methods.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Check qualification of cable splicer.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Check cables for insulation, shielding, stranding,) Tj -45.12 -7.2 TD (jacket or sheath and voltage rating.) Tj 27.12 -14.4 TD (\(4\)) Tj 18 0 TD (Examine potheads and pothead compounds.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Check during installation that proper cable limits,) Tj -45.12 -7.2 TD (pulling techniques and equipment are used to prevent cable damage.) Tj 27.12 -14.4 TD (\(a\)) Tj 18 0 TD (Type of pulling compounds: Verify that the compound is) Tj -45.12 -7.2 TD (compatible with the cable and does not affect the flame) Tj 0 -7.2 TD (retardation of the cable.) Tj 27.12 -14.4 TD (\(b\)) Tj 18 0 TD (Setup of reels \(Do not kink\).) Tj -18 -14.4 TD (\(c\)) Tj 18 0 TD (Cables sealed for pulling.) Tj -18 -14.4 TD (\(d\)) Tj 18 0 TD (Abrasion to sheaths on manhole frames.) Tj -18 -14.4 TD (\(e\)) Tj 18 0 TD (Even tension used in cable pulling.) Tj -18 -14.4 TD (\(f\)) Tj 18 0 TD (Cable routing in manhole.) Tj -18 -14.4 TD (\(g\)) Tj 18 0 TD (Splicing or terminating of cable.) Tj -18 -14.4 TD (\(h\)) Tj 18 0 TD (Conductor identification tags.) Tj -18 -14.4 TD (\(i\)) Tj 18 0 TD (Stress cones at splices and terminations.) Tj -18 -14.4 TD (\(j\)) Tj 18 0 TD (Ground shielding at splices and potheads.) Tj -18 -14.4 TD (\(k\)) Tj 18 0 TD (Abrasion or damage to cable by dragging on ground.) Tj -18 -14.4 TD (\(l\)) Tj 18 0 TD (Fireproofing cables in manhole when specified.) Tj -18 -14.4 TD (\(m\) Required tests.) Tj 0 -14.4 TD (d.) Tj 13.44 0 TD (Direct Burial Cable) Tj ET 58.56 95.28 77.52 0.72 re f BT 45.12 82.32 TD (\(1\)) Tj 18 0 TD (Verify cable burial depth.) Tj ET endstream endobj 329 0 obj <>/ProcSet 392 0 R>>/Rotate 0/Type/Page>> endobj 330 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 122.88 -488.64 TD (16B-10) Tj -95.76 469.2 TD (\(2\)) Tj 18 0 TD (Check protective covering or armor. Check) Tj -45.12 -7.2 TD (manufacturer) Tj 48.96 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s designation for use. Compare material with approval) Tj -53.04 -7.2 TD (data.) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (Check during installation:) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Type of bedding and covering \(should be smooth and free) Tj -45.12 -7.2 TD (of stones and sharp objects\)) Tj 27.12 -14.4 TD (\(b\)) Tj 18 0 TD (Use of untreated plank over cable when specified.) Tj -18 -14.4 TD (\(c\)) Tj 18 0 TD (Method of laying.) Tj -18 -14.4 TD (\(d\)) Tj 18 0 TD (Weaving of cable in trench.) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Radius of bends.) Tj -18 -14.4 TD (\(f\)) Tj 18 0 TD (Splices \(minimization\).) Tj -18 -14.4 TD (\(g\)) Tj 18 0 TD (Use of approved splicing kits.) Tj -18 -14.4 TD (\(h\)) Tj 18 0 TD (Installation of concrete cable markers with letter and) Tj -45.12 -7.2 TD (arrow or tape markers as specified..) Tj 27.12 -14.4 TD (\(i\)) Tj 18 0 TD (Concrete encased conduits with bushings under traffic) Tj -45.12 -7.2 TD (crossings.) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (Spacing between cables.) Tj -18 -14.4 TD (\(k\)) Tj 18 0 TD (Compaction over cables.) Tj -18 -14.4 TD (a.) Tj 13.44 0 TD (Potheads) Tj ET 58.56 282.48 32.64 0.72 re f BT 45.12 269.52 TD (\(1\)) Tj 18 0 TD (Check size of the conductors or cables.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Check stuffing box or wiping sleeve.) Tj -18 -14.4 TD (\(3\)) Tj 18 0 TD (Verify that compound is approved and installed as) Tj -45.12 -7.2 TD (required.) Tj 27.12 -14.4 TD (\(4\)) Tj 18 0 TD (Make sure that installer is a qualified splicer.) Tj -18 -14.4 TD (\(5\)) Tj 18 0 TD (Check stress cones.) Tj -18 -14.4 TD (\(6\)) Tj 18 0 TD (Test compound for correct pouring temperature.) Tj -18 -14.4 TD (f.) Tj 13.44 0 TD (Transformers in Fenced Enclosures) Tj ET 58.56 174.48 134.64 0.72 re f BT 45.12 161.52 TD (\(1\)) Tj 18 0 TD (See that ferrous materials are protected with) Tj -45.12 -7.2 TD (galvanized finish or are painted per specifications.) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Insure transformers, potheads, fused cutouts and) Tj -45.12 -7.2 TD (lightning arrestors conform with the electrical characteristics) Tj 0 -7.2 TD (specified and/or approved.) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (Check installation of primary and secondary cabling for) Tj -45.12 -7.2 TD (stress cones, waterproof connections, and insulators.) Tj 27.12 -14.4 TD (\(4\)) Tj 18 0 TD (Check during installation:) Tj -18 -14.4 TD (\(a\)) Tj 18 0 TD (Swing of gates.) Tj ET endstream endobj 331 0 obj <>/ProcSet 392 0 R>>/Rotate 0/Type/Page>> endobj 332 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 140.88 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (16B-11) Tj -95.76 469.2 TD (\(b\)) Tj 18 0 TD (Drainage of transformer pad.) Tj -18 -14.4 TD (\(c\)) Tj 18 0 TD (Elevation of transformer off pad.) Tj -18 -14.4 TD (\(d\)) Tj 18 0 TD (Grounding of all noncurrent carrying metal within the) Tj -45.12 -7.2 TD (enclosure.) Tj 27.12 -14.4 TD (\(e\)) Tj 18 0 TD (Grounding of the fence and gate.) Tj -18 -14.4 TD (\(f\)) Tj 18 0 TD (Proper grounding of primary \(e.g. surge arresters\) and) Tj -45.12 -7.2 TD (secondary \(e.g. neutral\) equipment.) Tj 27.12 -14.4 TD (\(g\)) Tj 18 0 TD (Space available in transformer enclosure) Tj -18 -14.4 TD (\(h\)) Tj 18 0 TD (Bonding of all metal conduits terminating in the) Tj -45.12 -7.2 TD (transformer enclosure to the ground system.) Tj 27.12 -14.4 TD (\(i\)) Tj 18 0 TD (Proper warning signs affixed to enclosure fence.) Tj -18 -14.4 TD (\(j\)) Tj 18 0 TD (Welds on fence structure are protected in accordance) Tj -45.12 -7.2 TD (with specifications.) Tj 27.12 -14.4 TD (g.) Tj 13.44 0 TD (Pad Mounted Tranformers without Fenced Enclosures) Tj ET 58.56 347.28 199.92 0.72 re f BT 45.12 334.32 TD (\(1\)) Tj 18 0 TD (See 16B-02g, and 16B-03f.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (See that tamper proof enclosure has not exposed bolts,) Tj -45.12 -7.2 TD (nuts, or fittings, the removal of which would give access to live) Tj 0 -7.2 TD (internal parts and that meters, valves and other accessories are) Tj T* (within locked enclosure or otherwise resistant to tampering, and) Tj T* (that ventilation openings are so protected that a wire cannot be) Tj T* (inserted to contact a live part.) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (Verify that accessories, such as lightning arrestors,) Tj -45.12 -7.2 TD (switches, gauges, etc., are furnished as specified.) Tj 27.12 -14.4 TD (h.) Tj 13.44 0 TD (Testing) Tj ET 58.56 246.48 28.56 0.72 re f BT 87.12 247.92 TD ( General discussion with the contractor on ) Tj 175.44 0 TD (LOCK-) Tj ET 262.56 246.48 20.4 0.72 re f BT 18 240.72 TD (OUT/TAG-OUT) Tj ET 18 239.28 44.88 0.72 re f BT 62.88 240.72 TD (procedure before any testing.) Tj -44.88 -14.4 TD (16B-04 ) Tj 32.64 0 TD (CATHODIC PROTECTION) Tj ET 50.64 224.88 77.52 0.72 re f BT 45.12 211.92 TD (a.) Tj 13.44 0 TD (General) Tj ET 58.56 210.48 28.56 0.72 re f BT 45.12 197.52 TD (\(1\)) Tj 18 0 TD (Cathodic protection is provided to preserve underground) Tj -45.12 -7.2 TD (or underwater metallic structures including submerged interior) Tj 0 -7.2 TD (surface of water storage tanks from corrosion. Corrosion takes) Tj T* (place at points where electrical current leaves the metal and) Tj T* (travels through the ground or electrolyte to another metal or to a) Tj T* (different place on the same pipe or structure. Corrosion is) Tj T* (arrested when an electromotive force is impressed on an) Tj T* (underground or underwater metallic structure in such a way as to) Tj T* (make the entire structure cathodic with respect to the adjacent) Tj T* (soil or water.) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Cathodic protection can be provided as described above) Tj -45.12 -7.2 TD (or in the following manner: Sacrificial galvanic anodes are used) Tj 0 -7.2 TD (having a difference of potential with respect to the structure to) Tj T* (be protected. The anodes are made of a material, such as magnesium) Tj T* (or zinc, which is anodic with respect to the protected structure.) Tj T* (The galvanic \227 anode system is designed to deliver relatively) Tj T* (small current from a large number of anodes.) Tj ET endstream endobj 333 0 obj <>/ProcSet 392 0 R>>/Rotate 0/Type/Page>> endobj 334 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 122.88 -488.64 TD (16B-12) Tj -95.76 469.2 TD (\(3\)) Tj 18 0 TD (In addition to the following, complete the CP) Tj -45.12 -7.2 TD (Acceptance Criteria during the Quality Assurance inspection.) Tj 27.12 -14.4 TD (b.) Tj 13.44 0 TD (Shop drawings) Tj ET 58.56 484.08 53.04 0.72 re f BT 45.12 471.12 TD (\(1\)) Tj 18 0 TD (The following items, if required in the work, must be) Tj -45.12 -7.2 TD (approved prior to installation:) Tj 27.12 -14.4 TD (Anodes) Tj 44.88 0 TD ( Electrical boxes) Tj -44.88 -7.2 TD (Conductors) Tj 44.88 0 TD ( Splicing materials) Tj -44.88 -7.2 TD (Rectifiers) Tj 44.88 0 TD ( Anode Hanger for tanks) Tj -44.88 -7.2 TD (Conduit) Tj 44.88 0 TD ( Transformer) Tj -44.88 -14.4 TD (\(2\)) Tj 18 0 TD (Check material brought to the job site against approved) Tj -45.12 -7.2 TD (shop drawings.) Tj 27.12 -14.4 TD (c.) Tj 13.44 0 TD (Anodes) Tj ET 58.56 390.48 24.48 0.72 re f BT 45.12 377.52 TD (\(1\)) Tj 18 0 TD (Be sure the anodes are not broken while being installed) Tj -45.12 -7.2 TD (\(Some anodes, such as duriron, are very brittle\)) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Do not vary the spacing of the anodes more than 5%) Tj -45.12 -7.2 TD (either way.) Tj 27.12 -14.4 TD (\(3\)) Tj 18 0 TD (The location of the anode bed should not be changed) Tj -45.12 -7.2 TD (without consulting your supervisor.) Tj 27.12 -14.4 TD (\(4\)) Tj 18 0 TD (Be sure the anodes are installed in accordance with) Tj -45.12 -7.2 TD (design and specifications.) Tj 27.12 -14.4 TD (d.) Tj 13.44 0 TD (Conductors) Tj ET 58.56 289.68 40.8 0.72 re f BT 45.12 276.72 TD (The insulation on the conductors must not be damaged during) Tj -27.12 -7.2 TD (construction on impressed current systems. If it is damaged, the) Tj 0 -7.2 TD (conductor may be soon be destroyed by electrolytic action.) Tj 27.12 -14.4 TD (e.) Tj 13.44 0 TD (Conductor Connections) Tj ET 58.56 246.48 85.68 0.72 re f BT 45.12 233.52 TD (Assure that joints are mechanically secure and that they) Tj -27.12 -7.2 TD (are water tight.) Tj 27.12 -14.4 TD (f.) Tj 13.44 0 TD (Insulating Joints) Tj ET 58.56 210.48 69.36 0.72 re f BT 45.12 197.52 TD (Determine if insulating joints in pipe structures are) Tj -27.12 -7.2 TD (required. Install in accordance with construction drawings. The) Tj 0 -7.2 TD (insulating joints are used to accomplish the following: Isolate) Tj T* (dissimilar metals; sectionalize pipe lines with dissimilar) Tj T* (coatings; sectionalize one cathodic protection systems from) Tj T* (another.) Tj 27.12 -14.4 TD (g.) Tj 13.44 0 TD (Bonding) Tj ET 58.56 145.68 28.56 0.72 re f BT 45.12 132.72 TD (\(1\)) Tj 18 0 TD (See that pipe joints are bonded \(if called for in the) Tj -45.12 -7.2 TD (contract\) before the pipe line is backfilled.) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Be sure that bonds to other piping systems or) Tj -45.12 -7.2 TD (structures are installed. If they are the resistor type, see that) Tj 0 -7.2 TD (they are adjusted.) Tj 27.12 -14.4 TD (h.) Tj 13.44 0 TD (Test Points) Tj ET 58.56 80.88 44.88 0.72 re f BT 45.12 67.92 TD (Test points must be located exactly as shown on contract) Tj -27.12 -7.2 TD (drawings.) Tj ET endstream endobj 335 0 obj <>/ProcSet 392 0 R>>/Rotate 0/Type/Page>> endobj 336 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 140.88 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (16B-13) Tj -95.76 469.2 TD (i.) Tj 13.44 0 TD (Foreign Pipes and Structures) Tj ET 58.56 505.68 114.24 0.72 re f BT 45.12 492.72 TD (\(1\)) Tj 18 0 TD (Foreign pipes and structures may require cathodic) Tj -45.12 -7.2 TD (protection.) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (If you should discover, in the vicinity of the cathodic) Tj -45.12 -7.2 TD (protection system, underground metal pipes or tanks that were) Tj 0 -7.2 TD (unknown to the designer, bring them to your supervisor) Tj 220.32 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s) Tj -224.4 -7.2 TD (attention.) Tj 27.12 -14.4 TD (j.) Tj 13.44 0 TD (Backfill for Underground Metallic Structure) Tj ET 58.56 433.68 175.44 0.72 re f BT 45.12 420.72 TD (\(1\)) Tj 18 0 TD (Backfill of pipes and tanks must not contain rock or) Tj -45.12 -7.2 TD (materials which would damage the coating on the structure or pipe.) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Check to see that only specified type of backfill is) Tj -45.12 -7.2 TD (used. Cinder backfill should never he used.) Tj 27.12 -14.4 TD (k.) Tj 13.44 0 TD (Auxiliary Eguipment) Tj ET 58.56 376.08 77.52 0.72 re f BT 45.12 363.12 TD (Check the installation of the rectifiers, transformers,) Tj -27.12 -7.2 TD (conduit, and other electrical equipment using applicable parts of) Tj 0 -7.2 TD (Chapter 16.) Tj 27.12 -14.4 TD (l.) Tj 13.44 0 TD (Electrical Measurements) Tj ET 58.56 332.88 93.84 0.72 re f BT 45.12 319.92 TD (\(1\)) Tj 18 0 TD (Impressed current system \227 Inform your supervision when) Tj -45.12 -7.2 TD (the installation is complete.) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Sacrificial type anode system \(using metallic anodes) Tj -45.12 -7.2 TD (without external power supply\) - Inform your supervisor when) Tj 0 -7.2 TD (system is complete, prior to bonding the anodes to the structure.) Tj 27.12 -14.4 TD (m.) Tj 13.44 0 TD (Starting and Adjusting) Tj ET 58.56 268.08 89.76 0.72 re f BT 45.12 255.12 TD (Do not start the system to make adjustments. Request your) Tj -27.12 -7.2 TD (supervisor or the CQC representative to obtain the services of one) Tj 0 -7.2 TD (qualified in cathodic protection systems to perform these) Tj T* (functions.) Tj 27.12 -14.4 TD (n.) Tj 13.44 0 TD (Record of Testing) Tj ET 58.56 217.68 69.36 0.72 re f BT 45.12 204.72 TD (Obtain a copy of the readings taken by the cathodic) Tj -27.12 -7.2 TD (protection expert, including the potential measurements of the) Tj 0 -7.2 TD (pipe before and after protection is applied, rectifier current and) Tj T* (voltage readings for each set of potential measurements after the) Tj T* (system is connected. These readings should be kept in the job) Tj T* (records and turned over to the using agency when the work has been) Tj T* (completed.) Tj 0 -14.4 TD (16B-05 ) Tj 32.64 0 TD (ENERGY MONITORING AND CONTROL SYSTEMS \(EMCS) Tj ET 50.64 145.68 175.44 0.72 re f BT 226.08 147.12 TD (\)) Tj -180.96 -14.4 TD (When inspecting Energy Monitoring and Control Systems use) Tj -27.12 -7.2 TD (Huntsville Division) Tj 77.52 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s publication, CEHND-SP-91-005-DE-ME, April) Tj -81.6 -7.2 TD (1991 or as updated, Quality Verification Guidelines for EMCS. In) Tj 0 -7.2 TD (order to provide the best product for the customers, the) Tj T* (District) Tj 32.64 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s Construction Division EMCS Technical Coordinator must) Tj -36.72 -7.2 TD (be actively involved during the construction phase. Any questions) Tj 0 -7.2 TD (which the Area/Resident Engineer cannot answer, should go to the) Tj T* (technical Coordinator. The District can then call a Special) Tj T* (Evaluation Group meeting to resolve any unusual or) Tj ET endstream endobj 337 0 obj <>/ProcSet 392 0 R>>/Rotate 0/Type/Page>> endobj 338 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 122.88 -488.64 TD (16B-14) Tj -122.88 469.2 TD (precedent setting questions. All Value Engineering proposals) Tj 0 -7.2 TD (presented during any phase of the project must be reviewed by the) Tj T* (Mandatory Center of Expertise \(MCX\) for EMCS at Huntsville) Tj T* (Division.) Tj 0 -14.4 TD (16B-08 ) Tj 32.64 0 TD (RF SHIELDED FACILITY) Tj ET 50.64 469.68 81.6 0.72 re f BT 45.12 456.72 TD (Direct all questions which arise during the construction) Tj -27.12 -7.2 TD (phase of a C41 \(RF Shielded\) facility to the Protective Design) Tj 0 -7.2 TD (Mandatory Center of Expertise \(PD-MCX\)) Tj ET endstream endobj 339 0 obj <>/ProcSet 341 0 R>>/Rotate 0/Type/Page>> endobj 340 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 150.96 30.72 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (i) Tj -20.4 476.4 TD (CHAPTER 16C) Tj ET 130.56 505.68 44.88 0.72 re f BT 116.4 492.72 TD (ELECTRICAL HEATING) Tj ET 116.4 491.28 73.44 0.72 re f BT 142.8 478.32 TD (INDEX) Tj -88.8 -14.4 TD (Para.) Tj ET 54 462.48 20.4 0.72 re f BT 144 463.92 TD (Title) Tj ET 144 462.48 20.4 0.72 re f BT 243.12 463.92 TD (Page) Tj ET 243.12 462.48 16.32 0.72 re f BT 54 449.52 TD (16C-01) Tj 49.44 0 TD (GENERAL) Tj 139.68 0 TD (16C-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Definition) Tj 121.68 0 TD (16C-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Approvals) Tj 121.68 0 TD (16C-l) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Storage and Handling) Tj 121.68 0 TD (16C-1) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Coordination of Work) Tj 121.68 0 TD (16C-1) Tj -139.68 -7.2 TD (e.) Tj 18 0 TD (Layout of Work) Tj 121.68 0 TD (16C-1) Tj -189.12 -14.4 TD (16C-02) Tj 49.44 0 TD (ELECTRIC WATER HEATERS) Tj 139.68 0 TD (16C-1) Tj -189.12 -14.4 TD (16C-03) Tj 49.44 0 TD (ELECTRIC HEATERS) Tj 139.68 0 TD (16C-2) Tj -189.12 -14.4 TD (16C-04) Tj 49.44 0 TD (COORDINATION WITH MECHANICAL WORK) Tj 0 -7.2 TD (FOR ELECTRIC WATER HEATERS) Tj 139.68 0 TD (16C-2) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Pressure \227 Temperature) Tj 0 -7.2 TD (Relief Valve) Tj 121.68 0 TD (16C-2) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Piping and Insulation) Tj 121.68 0 TD (16C-2) Tj ET endstream endobj 341 0 obj [/PDF/Text] endobj 342 0 obj <>/ProcSet 393 0 R>>/Rotate 0/Type/Page>> endobj 343 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (16C-1) Tj -12.24 469.2 TD (CHAPTER 16C) Tj -14.16 -14.4 TD (ELECTRICAL HEATING) Tj ET 116.4 491.28 73.44 0.72 re f BT 21.6 478.32 TD (16C-01 ) Tj 32.64 0 TD (GENERAL) Tj ET 54.24 476.88 28.56 0.72 re f BT 45.12 463.92 TD (a.) Tj 13.44 0 TD (Definition) Tj ET 58.56 462.48 40.8 0.72 re f BT 45.12 449.52 TD (This chapter covers materials, equipment, and good) Tj -23.52 -7.2 TD (workmanship practices for the installation of electrical heating) Tj 0 -7.2 TD (system.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Approvals) Tj ET 58.56 419.28 36.72 0.72 re f BT 45.12 406.32 TD (Insure that all material, equipment, and shop drawings are) Tj -23.52 -7.2 TD (approved prior to the Preparatory Inspection meeting and prior) Tj 0 -7.2 TD (to installation of the electrical heating equipment. Obtain any) Tj T* (helpful manufacturers installation information.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Storage and Handling) Tj ET 58.56 368.88 81.6 0.72 re f BT 45.12 355.92 TD (\(1\)) Tj 18 0 TD (Insure that all materials and equipment are handled) Tj -41.52 -7.2 TD (carefully to prevent damage.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Reject damaged material and equipment. Have it removed) Tj -41.52 -7.2 TD (from the site.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Check storage facility for adequate weather) Tj -41.52 -7.2 TD (protection, possible damage, and safety hazard.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (When outside storage is necessary, store materials and) Tj -41.52 -7.2 TD (equipment above ground.) Tj 23.52 -14.4 TD (d.) Tj 13.44 0 TD (Coordination of Work) Tj ET 58.56 268.08 81.6 0.72 re f BT 45.12 255.12 TD (Continually check for interferences between electrical,) Tj -23.52 -7.2 TD (mechanical, architectural, and structural features.) Tj 23.52 -14.4 TD (e.) Tj 13.44 0 TD (Layout of Work) Tj ET 58.56 232.08 57.12 0.72 re f BT 45.12 219.12 TD (\(1\)) Tj 18 0 TD (The contractor must provide equipment and mechanical) Tj -41.52 -7.2 TD (room layout drawings, which include location of hot water) Tj 0 -7.2 TD (heater, for review and approval.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check location of water heater for accessability for) Tj -41.52 -7.2 TD (mechanical and electrical, maintenance, and future replacement) Tj 0 -7.2 TD (if necessary.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (The contractor must coordinate installation of) Tj -41.52 -7.2 TD (electric heaters with work of other trades, to avoid obstruction) Tj 0 -7.2 TD (to heating pattern and overheatings of adjacent surfaces.) Tj T* (Coordinate changes in heater layout with supervisor.) Tj 0 -14.4 TD (16C-02 ) Tj 32.64 0 TD (ELECTRIC WATER HEATERS) Tj ET 54.24 124.08 89.76 0.72 re f BT 144 125.52 TD ( \(Project Specifications,) Tj -122.4 -7.2 TD (Plumbing\)) Tj 23.52 -14.4 TD (a.) Tj 13.44 0 TD (Check for the required number of heating elements) Tj -36.96 -7.2 TD (\(Federal Specification\).) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Check to determine that each heating element is) Tj -36.96 -7.2 TD (controlled by a separate thermostat \(Federal Specification\).) Tj ET endstream endobj 344 0 obj <>/ProcSet 393 0 R>>/Rotate 0/Type/Page>> endobj 345 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (16C-2) Tj -97.68 469.2 TD (c.) Tj 13.44 0 TD (Check for manual-reset type high-limit cutout. High-) Tj -36.96 -7.2 TD (limit cutout to open all electrical connects to all heating) Tj 0 -7.2 TD (elements \(Federal Specification\).) Tj 23.52 -14.4 TD (d.) Tj 13.44 0 TD (Voltage rating of heaters to be in accordance with) Tj -36.96 -7.2 TD (specification requirements. 240 volt units, if operated on 208V,) Tj 0 -7.2 TD (will only deliver approximately 75% of design heating capacity.) Tj 0 -14.4 TD (16C-03 ) Tj 32.64 0 TD (ELECTRIC HEATERS) Tj ET 54.24 448.08 65.28 0.72 re f BT 45.12 435.12 TD (a.) Tj 13.44 0 TD (Check voltage rating of equipment furnished.) Tj -13.44 -14.4 TD (b.) Tj 13.44 0 TD (Check wattage rating of heater \(Project Specification) Tj -36.96 -7.2 TD (or Design\)) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Check to see whether a high-limit switch is required) Tj -36.96 -7.2 TD (\(Project Specification\)) Tj 23.52 -14.4 TD (d.) Tj 13.44 0 TD (Check physical requirements of heater. Embedded) Tj -36.96 -7.2 TD (elements are usually specified.) Tj 23.52 -14.4 TD (e.) Tj 13.44 0 TD (Heaters for hazardous areas are to bear a tag) Tj -36.96 -7.2 TD (indicating Underwriters Laboratories approval.) Tj 23.52 -14.4 TD (f.) Tj 13.44 0 TD (A functional test is required on electric heaters.) Tj -13.44 -14.4 TD (g.) Tj 13.44 0 TD (Check thermostats for range of operation, differential,) Tj -36.96 -7.2 TD (locking facilities, thermometer, and lock-shield requirements) Tj 0 -7.2 TD (\(Project Specifications\).) Tj 0 -14.4 TD (16C-04 ) Tj 32.64 0 TD (COORDINATION WITH MECHANICAL WORK FOR ELECTRIC WATER) Tj ET 54.24 289.68 212.16 0.72 re f BT 21.6 283.92 TD (HEATERS) Tj ET 21.6 282.48 28.56 0.72 re f BT 45.12 269.52 TD (a.) Tj 13.44 0 TD (Pressure \227 Temperature Relief Valve) Tj ET 58.56 268.08 142.8 0.72 re f BT 45.12 255.12 TD (Check to see that relief valve is stamped for the) Tj -23.52 -7.2 TD (specified pressure and temperature. Check to see that relief) Tj 0 -7.2 TD (valve is correctly positioned and piped to safely discharge.) Tj T* (Check to see if relief valve will reset after being manually) Tj T* (activated. Relief valves may be separate or combination pressure) Tj T* (and relief on equipment used for heating water or storing hot) Tj T* (water.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Piping and Insulation) Tj ET 58.56 196.08 85.68 0.72 re f BT 45.12 183.12 TD (See Section 15A for piping and Section 15C for Insulation.) Tj ET endstream endobj 346 0 obj <>/ProcSet 348 0 R>>/Rotate 0/Type/Page>> endobj 347 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 150.96 30.72 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (i) Tj -20.4 476.4 TD (CHAPTER 16D) Tj ET 130.56 505.68 44.88 0.72 re f BT 100.08 492.72 TD (ALARM AND DETECTION SYSTEM) Tj ET 100.08 491.28 106.08 0.72 re f BT 142.8 478.32 TD (INDEX) Tj -88.8 -14.4 TD (Para.) Tj ET 54 462.48 20.4 0.72 re f BT 144 463.92 TD (Title) Tj ET 144 462.48 20.4 0.72 re f BT 243.12 463.92 TD (Page) Tj ET 243.12 462.48 16.32 0.72 re f BT 54 449.52 TD (16D-01) Tj 49.44 0 TD (GENERAL) Tj 139.68 0 TD (16D-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Definition) Tj 121.68 0 TD (16D-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Approvals) Tj 121.68 0 TD (16D-1) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Storage and Handling) Tj 121.68 0 TD (16D-1) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Layout of Work) Tj 121.68 0 TD (16D-1) Tj -139.68 -7.2 TD (e.) Tj 18 0 TD (Coordination of Work) Tj 121.68 0 TD (16D-1) Tj -189.12 -14.4 TD (16D-02) Tj 49.44 0 TD (FIRE DETECTING DEVICES) Tj 139.68 0 TD (16D-2) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Smoke Detectors,) Tj 0 -7.2 TD (Ionization Type) Tj 121.68 0 TD (16D-2) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Smoke Detectors, Photo) Tj 0 -7.2 TD (electric Type.) Tj 121.68 0 TD (16D-2) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Heat Detectors) Tj 121.68 0 TD (16D-2) Tj -189.12 -14.4 TD (16D-03) Tj 49.44 0 TD (FIRE ALARM STATIONS) Tj 139.68 0 TD (16D-2) Tj -189.12 -14.4 TD (16D-04) Tj 49.44 0 TD (SIGNALING DEVICES) Tj 139.68 0 TD (16D-2) Tj -189.12 -14.4 TD (16D-05) Tj 49.44 0 TD (CONTROL UNITS) Tj 139.68 0 TD (16D-2) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Smoke Detector Panel) Tj 121.68 0 TD (16D-3) Tj -139.68 -7.2 TD (b. Annunciator Panel) Tj 139.68 0 TD (16D-3) Tj -189.12 -14.4 TD (16D-06) Tj 49.44 0 TD (POWER SUPPLY) Tj 139.68 0 TD (16D-3) Tj -189.12 -14.4 TD (16D-07) Tj 49.44 0 TD (TESTING) Tj 139.68 0 TD (16D-3) Tj ET endstream endobj 348 0 obj [/PDF/Text] endobj 349 0 obj <>/ProcSet 394 0 R>>/Rotate 0/Type/Page>> endobj 350 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (16D-1) Tj -12.24 469.2 TD (CHAPTER 16D) Tj ET 130.56 505.68 44.88 0.72 re f BT 97.92 492.72 TD (ALARM AND DETECTION SYSTEMS) Tj ET 97.92 491.28 110.16 0.72 re f BT 18 478.32 TD (16D-01 ) Tj 32.64 0 TD (GENERAL) Tj ET 50.64 476.88 28.56 0.72 re f BT 45.12 463.92 TD (a.) Tj 13.44 0 TD (Definition) Tj ET 58.56 462.48 40.8 0.72 re f BT 45.12 449.52 TD (This chapter covers materials, equipment, and good) Tj -27.12 -7.2 TD (workmanship practices for the installation of fire alarm and) Tj 0 -7.2 TD (detector system. The inspector must closely coordinate this) Tj T* (chapter with Chapter 15A, 16A and 16B. It is important that the) Tj T* (inspector have a thorough knowledge of the NEC and applicable NFPA) Tj T* (codes, contract specifications, and the fire protection plan for) Tj T* (the whole building. Any missing or non consistent application of) Tj T* (the various fire protection parts should be called to the) Tj T* (attention of your supervisor. See specification and 1984 NEC,) Tj T* (Article 760, Fire Protective Signaling System. Paragraph 760-1) Tj T* (lists NFPA codes applicable to the several protective systems.) Tj 27.12 -14.4 TD (b.) Tj 13.44 0 TD (Approvals) Tj ET 58.56 361.68 36.72 0.72 re f BT 45.12 348.72 TD (Insure that all materials, equipment, and shop drawings are) Tj -27.12 -7.2 TD (approved prior to preparatory inspection and installation. Obtain) Tj 0 -7.2 TD (helpful manufacturer's installation information.) Tj 27.12 -14.4 TD (c.) Tj 13.44 0 TD (Storage and Handling) Tj ET 58.56 318.48 81.6 0.72 re f BT 45.12 305.52 TD (\(1\)) Tj 18 0 TD (Insure that all materials and equipment are new and) Tj -45.12 -7.2 TD (handled carefully to prevent damage. Reject damaged materials or) Tj 0 -7.2 TD (equipment and have it removed from the site.) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Check storage facility for adequate weather protection,) Tj -45.12 -7.2 TD (possible damage, and safety hazard.) Tj 27.12 -14.4 TD (d.) Tj 13.44 0 TD (Layout of Work) Tj ET 58.56 253.68 57.12 0.72 re f BT 45.12 240.72 TD (\(1\)) Tj 18 0 TD (Check equipment requirements and locations on contract) Tj -45.12 -7.2 TD (drawings and specifications.) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Check approved shop drawings for complete wiring and) Tj -45.12 -7.2 TD (schematic diagram for equipment furnished, equipment layout, and) Tj 0 -7.2 TD (other details required to demonstrate that the system has been) Tj T* (coordinated and will function as a unit.) Tj 27.12 -14.4 TD (\(3\) Check contract specification for requirements for) Tj -27.12 -7.2 TD (contractor to furnish spare parts and spare parts data, operating) Tj 0 -7.2 TD (instruction manual, maintenance instructions manual, and) Tj T* (performance test reports. Note requirement in specifications which) Tj T* (items are to be turned over and which items are to be posted) Tj T* (permanently in the building.) Tj 27.12 -14.4 TD (a.) Tj 13.44 0 TD (Coordination of Work) Tj ET 58.56 131.28 81.6 0.72 re f BT 45.12 118.32 TD (\(1\)) Tj 18 0 TD (Continually check for interferences between electrical,) Tj -45.12 -7.2 TD (mechanical, architectural, and structural features. Insure that) Tj 0 -7.2 TD (paint is not accidently applied to sensors, nameplates on) Tj T* (equipment, or on posted operating instructions.) Tj 27.12 -14.4 TD (\(2\)) Tj 18 0 TD (Electrical work is to be installed under the guidance) Tj -45.12 -7.2 TD (of Section, 16A Interior Electrical. Other coordination ) Tj ET endstream endobj 351 0 obj <>/ProcSet 394 0 R>>/Rotate 0/Type/Page>> endobj 352 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (16D-2) Tj -124.8 469.2 TD (requirements are with Section 15H; Fire Protection Systems; and) Tj 0 -7.2 TD (15A, Piping Systems. Mechanical installation will normally be in) Tj T* (accordance with NFPA 13 unless otherwise specified in the contract) Tj T* (specification.) Tj 0 -14.4 TD (16D-02 ) Tj 32.64 0 TD (FIRE DETECTING DEVICES) Tj ET 50.64 469.68 89.76 0.72 re f BT 45.12 456.72 TD (Fire detecting device will be located as shown or otherwise) Tj -27.12 -7.2 TD (indicated. Unless otherwise shown the devices will be surface) Tj 0 -7.2 TD (mounted. Smoke detectors will not be located in direct supply air) Tj T* (flow nor closer than 3 feet from an air supply diffuser.) Tj 27.12 -14.4 TD (a.) Tj 13.44 0 TD (Smoke Detectors, Ionization Types) Tj ET 58.56 419.28 134.64 0.72 re f BT 45.12 406.32 TD (Check for dual chamber design. Check for sensitive) Tj -27.12 -7.2 TD (adjustment. Check for correct operating voltage and type of) Tj 0 -7.2 TD (current \(AC or DC\). Check for indicator lamp. Check duct-mounted) Tj T* (detector to see if the air sampling tube length is equal to width) Tj T* (of duct. Smoke detectors located in the underfloor spaces will) Tj T* (only be mounted in upper portion of the space with the detector) Tj T* (facing downwards, or mounted sideways.) Tj 27.12 -14.4 TD (b.) Tj 13.44 0 TD (Smoke Detectors, Photo-eletric Type) Tj ET 58.56 347.28 142.8 0.72 re f BT 45.12 334.32 TD (Check for factor calibration and not field adjustment.) Tj -27.12 -7.2 TD (Check for light source lamp or LEO of specified voltage.) Tj 27.12 -14.4 TD (c.) Tj 13.44 0 TD (Heat Detectors) Tj ET 58.56 311.28 57.12 0.72 re f BT 45.12 298.32 TD (1.) Tj 13.44 0 TD (Check heat detector requirements for fixed temperature) Tj -40.56 -7.2 TD (or combination fixed temperature and rate-of-rise ratings. Check) Tj 0 -7.2 TD (for replaceable fixable elements. Check for specified locations of) Tj T* (detectors.) Tj 27.12 -14.4 TD (2. Heat detectors located in spaces where the ambient) Tj -27.12 -7.2 TD (temperature can be over 100 degrees F will be rated higher than) Tj 0 -7.2 TD (ordinary temperature; e.g. Detectors located in attic spaces) Tj T* (should have an intermediate temperature rating.) Tj 0 -14.4 TD (16D-03 ) Tj 32.64 0 TD (FIRE ALARM STATIONS) Tj ET 50.64 224.88 77.52 0.72 re f BT 45.12 211.92 TD (Check for type of station specified. Check for coded or) Tj -27.12 -7.2 TD (non-coded requirement. Check for test key requirement. Check locks) Tj 0 -7.2 TD (for being keyed alike with fire alarm control panel. Check) Tj T* (mounting requirements.) Tj 0 -14.4 TD (16D-04 ) Tj 32.64 0 TD (SIGNALING DEVICES) Tj ET 50.64 174.48 69.36 0.72 re f BT 45.12 161.52 TD (Check for locations as indicated on contract documents.) Tj -27.12 -7.2 TD (Bells are normally mounted on removable adapter plates over) Tj 0 -7.2 TD (electrical outlet boxes. Exterior bells: check for weather proof) Tj T* (type bells with metal housing and protection grills. Visual fire) Tj T* (alarm indicators are mounted same as bells. Trouble Indicators are) Tj T* (normally mounted in flush mounted panels.) Tj 0 -11.52 TD (16D-05 ) Tj 32.64 0 TD (CONTROL UNITS) Tj ET 50.64 112.56 53.04 0.72 re f BT 45.12 102.48 TD (Check control unit for complying with approved shop) Tj -27.12 -7.2 TD (drawings. Check for proper operating voltage. Check to see that) Tj 0 -7.2 TD (upon failure of power supply, that system shall operate from back-) Tj T* (up power supply. Check panel for metal construction, with factory) Tj T* (applied red enamel finish, accessable from the front, and surface) Tj T* (mounted unless otherwise indicated. Check for proper labeling of) Tj T* (control panels such as descriptive labeling of zones.) Tj ET endstream endobj 353 0 obj <>/ProcSet 394 0 R>>/Rotate 0/Type/Page>> endobj 354 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (16D-3) Tj -97.68 469.2 TD (a.) Tj 13.44 0 TD (Smoke Detector Panel) Tj ET 58.56 505.68 81.6 0.72 re f BT 45.12 492.72 TD (Check for proper voltage power supply. Check for back up) Tj -27.12 -7.2 TD (power system. Panel fabrication; paint color, and mounting same as) Tj 0 -7.2 TD (control units.) Tj 27.12 -14.4 TD (b.) Tj 13.44 0 TD (Annunciator Panel) Tj ET 58.56 462.48 69.36 0.72 re f BT 45.12 449.52 TD (Check annunciation panel for complying with approved unit.) Tj -27.12 -7.2 TD (Check for tamper proof.) Tj 0 -14.4 TD (16D-06 ) Tj 32.64 0 TD (POWER SUPPLY) Tj ET 50.64 426.48 48.96 0.72 re f BT 45.12 413.52 TD (Check specifications for power feed, overload protection,) Tj -27.12 -7.2 TD (conductor hook-up equipment. Check specifications for back up) Tj 0 -7.2 TD (power requirements, i.e. primary, batteries, and charges.) Tj 0 -14.4 TD (16D-07 ) Tj 32.64 0 TD (TESTING) Tj ET 50.64 383.28 28.56 0.72 re f BT 45.12 370.32 TD (Check specifications for 30 day contractor) Tj 171.36 0 TD /F1 6.96 Tf (*) Tj 4.08 0 TD /F0 6.96 Tf (s notification) Tj -202.56 -7.2 TD (to contracting office before conducting performance end acceptance) Tj 0 -7.2 TD (tests. Test to be conducted in presence of CO or his authorized) Tj T* (representative. Check specification for description of tests to be) Tj T* (conducted. Check to see that all quality control records, teat) Tj T* (reports, and records of corrective actions are furnished to the) Tj T* (Government.) Tj ET endstream endobj 355 0 obj <>/ProcSet 357 0 R>>/Rotate 0/Type/Page>> endobj 356 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 150.96 30.72 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (i) Tj -20.4 476.4 TD (CHAPTER 16E) Tj ET 130.56 505.68 44.88 0.72 re f BT 114.24 492.72 TD (ALUMINUM CONDUCTORS) Tj ET 114.24 491.28 77.52 0.72 re f BT 142.8 478.32 TD (INDEX) Tj -88.8 -14.4 TD (Para.) Tj ET 54 462.48 20.4 0.72 re f BT 144 463.92 TD (Title) Tj ET 144 462.48 20.4 0.72 re f BT 243.12 463.92 TD (Page) Tj ET 243.12 462.48 16.32 0.72 re f BT 54 449.52 TD (16E-01) Tj 49.44 0 TD (GENERAL) Tj 139.68 0 TD (16E-1) Tj -189.12 -14.4 TD (16E-02) Tj 49.44 0 TD (MATERIAL) Tj 139.68 0 TD (16E-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Conductors) Tj 121.68 0 TD (16E-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Bolts, Nuts, and Washers) Tj 121.68 0 TD (16E-1) Tj -189.12 -14.4 TD (16E-03) Tj 49.44 0 TD (INSTALLATION) Tj 139.68 0 TD (16E-1) Tj -139.68 -14.4 TD (a.) Tj 18 0 TD (Conductor Size) Tj 121.68 0 TD (16E-1) Tj -139.68 -7.2 TD (b.) Tj 18 0 TD (Removing Insulation) Tj 121.68 0 TD (16E-2) Tj -139.68 -7.2 TD (c.) Tj 18 0 TD (Surface Preparation) Tj 121.68 0 TD (16E-2) Tj -139.68 -7.2 TD (d.) Tj 18 0 TD (Connections) Tj 121.68 0 TD (16E-2) Tj -139.68 -7.2 TD (a.) Tj 18 0 TD (Connection to Vibrating) Tj 0 -7.2 TD (or Cycling \(Intermittent) Tj T* (Duty\) Equipment) Tj 121.68 0 TD (16E-3) Tj -189.12 -14.4 TD (16E-04) Tj 49.44 0 TD (ENVIRONMENTAL CONDITIONS) Tj 139.68 0 TD (16E-3) Tj -189.12 -14.4 TD (16E-05) Tj 49.44 0 TD (INSPECTION AND ANALYSIS) Tj 139.68 0 TD (16E-3) Tj ET endstream endobj 357 0 obj [/PDF/Text] endobj 358 0 obj <>/ProcSet 395 0 R>>/Rotate 0/Type/Page>> endobj 359 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (16E-1) Tj -12.24 469.2 TD (CHAPTER 16E) Tj ET 130.56 505.68 44.88 0.72 re f BT 114.24 492.72 TD (ALUMINUM CONDUCTORS) Tj ET 114.24 491.28 77.52 0.72 re f BT 21.6 478.32 TD (16E-01 ) Tj 32.64 0 TD (GENERAL) Tj ET 54.24 476.88 28.56 0.72 re f BT 45.12 463.92 TD (The information included is important because of recurring) Tj -23.52 -7.2 TD (and serious problems in public and private construction where) Tj 0 -7.2 TD (aluminum conductors are used in the wiring system. We permit a) Tj T* (limited use of aluminum conductors. Special skills and tools are) Tj T* (required when making connections and terminations with aluminum) Tj T* (conductors.) Tj 0 -14.4 TD (16E-02 ) Tj 32.64 0 TD (MATERIAL) Tj ET 54.24 412.08 32.64 0.72 re f BT 45.12 399.12 TD (a.) Tj 13.44 0 TD (Conductors) Tj ET 58.56 397.68 40.8 0.72 re f BT 45.12 384.72 TD (\(1\)) Tj 18 0 TD (The electrical systems shown on drawings indicate) Tj -41.52 -7.2 TD (copper wire size given in gauge number, American Wire Gauge) Tj 0 -7.2 TD (\(AWG\).) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Aluminum is permitted only for copper wire sizes No. 6) Tj -41.52 -7.2 TD (AWG and larger.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Aluminum wire size substitutions for copper wire must) Tj -41.52 -7.2 TD (have ampacity of not less than the copper wire size shown. The) Tj 0 -7.2 TD (tables in Article 310 of the National Electric Code \(NEC\) show) Tj T* (the allowable ampacities of insulated copper and insulated) Tj T* (aluminum conductors. The correct size aluminum wire can be) Tj T* (determined by using the ampacity value for copper wire in a) Tj T* (given size in the aluminum conductor table. The equivalent) Tj T* (temperature rating of the conductor must match-up with the) Tj T* (conductor being installed.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Bolts, Nuts and Washers) Tj ET 58.56 260.88 93.84 0.72 re f BT 45.12 247.92 TD (\(1\)) Tj 18 0 TD (Check these materials for proper alloy and finish. An) Tj -41.52 -7.2 TD (anodized finish may be required.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Plain, standard series flat washers are required;) Tj -41.52 -7.2 TD (Narrow series washers cannot be used) Tj ET 21.6 217.68 146.88 0.72 re f BT 168.48 219.12 TD (.) Tj -123.36 -14.4 TD (\(3\)) Tj 18 0 TD (Antioxidant Joint Compound) Tj ET 63.12 203.28 106.08 0.72 re f BT 45.12 190.32 TD (Use approved oxide-inhibiting joint compound when making-) Tj -23.52 -7.2 TD (up aluminum conductor/pressure fitting connections and at bus) Tj 0 -7.2 TD (bar connections.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Connectors) Tj ET 63.12 160.08 40.8 0.72 re f BT 45.12 147.12 TD (\(a\)) Tj 18 0 TD (Pressure connectors must be tinned aluminum bodies.) Tj -18 -14.4 TD (\(b\)) Tj 18 0 TD (Must be rated for use with aluminum conductors.) Tj -18 -14.4 TD (\(c\)) Tj 18 0 TD (Must be required size, material, and tightened to) Tj -41.52 -7.2 TD (specified torque.) Tj 0 -14.4 TD (16E-23 ) Tj 32.64 0 TD (INSTALLATION) Tj ET 54.24 95.28 48.96 0.72 re f BT 45.12 82.32 TD (a.) Tj 13.44 0 TD (Conductor Size) Tj ET 58.56 80.88 57.12 0.72 re f BT 45.12 67.92 TD (\(1\)) Tj 18 0 TD (Aluminum wire used must be number 4, AWG or larger.) Tj ET endstream endobj 360 0 obj <>/ProcSet 395 0 R>>/Rotate 0/Type/Page>> endobj 361 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (16E-2) Tj -97.68 469.2 TD (\(2\)) Tj 18 0 TD (Check for the equivalent aluminum gauge size as the) Tj -41.52 -7.2 TD (size shown on the drawings is for copper.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Removing Insulation) Tj ET 58.56 484.08 77.52 0.72 re f BT 45.12 471.12 TD (\(1\)) Tj 18 0 TD (Check removal or stripping method; wire should not be) Tj -41.52 -7.2 TD (damaged. Recommended methods are:) Tj 23.52 -14.4 TD (Whittling) Tj ET 45.12 448.08 36.72 0.72 re f BT 81.84 449.52 TD ( - Using a knife as in sharpening a pencil.) Tj -36.72 -14.4 TD (Peeling) Tj ET 45.12 433.68 28.56 0.72 re f BT 73.68 435.12 TD ( - Using a knife from the end of the conductor to) Tj -52.08 -7.2 TD (peel back, and cut off the insulation, cutting away from the) Tj 0 -7.2 TD (wire.) Tj 23.52 -14.4 TD (Stripping) Tj ET 45.12 404.88 36.72 0.72 re f BT 81.84 406.32 TD ( - Using the proper size stripping tool. A tool) Tj -60.24 -7.2 TD (that will nick or ring the wire shall not be used. \(Ringing is) Tj 0 -7.2 TD (to cut the wire over its circumference\)) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Wire conductors which are nicked or ringed should have) Tj -41.52 -7.2 TD (damaged portion removed and the conductor properly prepared.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (A nick or ring reduces conductor ampacity and) Tj -41.52 -7.2 TD (introduces a weak point.) Tj 23.52 -14.4 TD (c.) Tj 13.44 0 TD (Surface Preparation) Tj ET 58.56 332.88 77.52 0.72 re f BT 45.12 319.92 TD (\(1\)) Tj 18 0 TD (Check for clean surface.) Tj -18 -14.4 TD (\(2\)) Tj 18 0 TD (Wire may require wire brushing to assure aluminum) Tj -41.52 -7.2 TD (oxide is removed.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Cleaning may require a coating of antioxident joint) Tj -41.52 -7.2 TD (compound and a second wire brushing.) Tj 23.52 -14.4 TD (\(4\)) Tj 18 0 TD (Check for the required costing of antioxident joint) Tj -41.52 -7.2 TD (compound on wire immediately before the connection is made.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (On aluminum bus bars check for silver plating at) Tj -41.52 -7.2 TD (connection point surfaces.) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Also check for a light coating of antioxidant joint) Tj -41.52 -7.2 TD (compound at bus bar connections.) Tj 23.52 -14.4 TD (d.) Tj 13.44 0 TD (Connections) Tj ET 58.56 196.08 44.88 0.72 re f BT 45.12 183.12 TD (\(1\)) Tj 18 0 TD (Are bolted connections tightened with an approved) Tj -41.52 -7.2 TD (calibrated torque wrench?) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check that compression connectors are applied with the) Tj -41.52 -7.2 TD (proper tool and force.) Tj 23.52 -14.4 TD (\(3\)) Tj 18 0 TD (Are screw connections properly torqued?) Tj -18 -14.4 TD (\(4\)) Tj 18 0 TD (Are terminal lugs and connectors made from approved) Tj -41.52 -7.2 TD (materials? Must be of aluminum and tin and so labeled. Also cap) Tj 0 -7.2 TD (be nickel plated copper.) Tj 23.52 -14.4 TD (\(5\)) Tj 18 0 TD (Are compression terminals and connectors tightened) Tj -41.52 -7.2 TD (with the special tool?) Tj 23.52 -14.4 TD (\(6\)) Tj 18 0 TD (Screws of bolt type terminals and connectors must be) Tj -41.52 -7.2 TD (tightened with an approved, calibrated torque wrench.) Tj ET endstream endobj 362 0 obj <>/ProcSet 395 0 R>>/Rotate 0/Type/Page>> endobj 363 0 obj <>stream q 234.48 532.32 53.28 7.68 re W n BT 239.04 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj ET Q q 250.8 524.64 36.96 7.68 re W n BT 255.36 526.56 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (1 Dec 92) Tj ET Q BT 142.8 37.92 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (16E-3) Tj -97.68 469.2 TD (\(7\)) Tj 18 0 TD (Check torque wrenches for calibration by an approved) Tj -41.52 -7.2 TD (testing firm. These wrenches are designed to slip when the) Tj 0 -7.2 TD (present torque is exceeded.) Tj 23.52 -14.4 TD (e.) Tj 13.44 0 TD (Connection to Vibrating or Cycling \(Intermittent Duty\)) Tj ET 58.56 476.88 220.32 0.72 re f BT 21.6 471.12 TD (Equipment) Tj ET 21.6 469.68 36.72 0.72 re f BT 45.12 456.72 TD (Aluminum conductors are not recommended for this) Tj -23.52 -7.2 TD (equipment. Use standard or solid copper conductors as specified.) Tj 23.52 -14.4 TD (\(1\)) Tj 18 0 TD (Check for use of aluminum conductors to vibrating) Tj -41.52 -7.2 TD (equipment. Extreme movement and vibration induces stresses in) Tj 0 -7.2 TD (aluminum wire. Aluminum wire has poor workability.) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Check for use of aluminum conductors in cycling) Tj -41.52 -7.2 TD (equipment. The aluminum conductor receives high current and) Tj 0 -7.2 TD (stress each time equipment is energized. This causes connections) Tj T* (to loosen from creep.) Tj 0 -14.4 TD (16E-04 ) Tj 32.64 0 TD (ENVIRONMENTAL CONDITIONS) Tj ET 54.24 368.88 97.92 0.72 re f BT 45.12 355.92 TD (Conditions which can effect Aluminum Conductors) Tj ET 45.12 354.48 191.76 0.72 re f BT 45.12 341.52 TD (\(a\)) Tj 18 0 TD (Salt water, air pollution and high relative humidity) Tj -41.52 -7.2 TD (conditions or corrosive soil will accelerate corrosion of) Tj 0 -7.2 TD (unprotected aluminum wire.) Tj 23.52 -14.4 TD (\(b\)) Tj 18 0 TD (Extreme changes in the ambient temperature will) Tj -41.52 -7.2 TD (adversely affect workability and the extent of creep and) Tj 0 -7.2 TD (oxidation.) Tj 23.52 -14.4 TD (\(c\)) Tj 18 0 TD (When any of these conditions are present check for use) Tj -41.52 -7.2 TD (of aluminum conductors. When used, check for a protection tape) Tj 0 -7.2 TD (wrap for the exposed bare aluminum wire. Apply oxide\227 inhibiting) Tj T* (joint compound to the surface of exposed connectors and) Tj T* (terminals.) Tj 0 -14.4 TD (16E-05 ) Tj 32.64 0 TD (INSPECTION AND ANALYSIS) Tj ET 54.24 239.28 93.84 0.72 re f BT 45.12 226.32 TD (a.) Tj 13.44 0 TD (Wrong wire size? Aluminum wire gauge must be No. 4 AWC) Tj -36.96 -7.2 TD (or larger. See Article 310, NEC, for aluminum equivalent size) Tj 0 -7.2 TD (for copper size shown.) Tj 23.52 -14.4 TD (b.) Tj 13.44 0 TD (Is the conductor ringed or nicked? Disapprove and) Tj -36.96 -7.2 TD (require a new section of undamaged conductor be prepared using) Tj 0 -7.2 TD (proper methods.) Tj 23.52 -14.4 TD (c. Terminal material must be bi-metalic when copper and) Tj -23.52 -7.2 TD (aluminum are used on the same terminal or bus. Check for stamped) Tj 0 -7.2 TD (letters \223AL-CU\224 for an approved bi-metalic terminal. Check for) Tj T* (both proper size and type of terminals and connectors.) Tj 23.52 -14.4 TD (d.) Tj 13.44 0 TD (Is aluminum bus, silver plated at the connection point) Tj -36.96 -7.2 TD (surfaces? If not, disapprove, as it must be factory plated.) Tj 23.52 -14.4 TD (e.) Tj 13.44 0 TD (Is aluminum wire cleaned and coated with oxide-) Tj -36.96 -7.2 TD (inhibiting joint compound immediately before making connections?) Tj 23.52 -14.4 TD (f.) Tj 13.44 0 TD (Is an approved, calibrated torque wrench used to) Tj -36.96 -7.2 TD (tighten bolted and screwed connections? Check calibration date) Tj 0 -7.2 TD (for being recent.) Tj ET endstream endobj 364 0 obj <>/ProcSet 395 0 R>>/Rotate 0/Type/Page>> endobj 365 0 obj <>stream BT 18 534.24 TD 0 0 0 rg /F0 6.96 Tf -0.096 Tc 0 Tw (EP 415-1-261) Tj 0 -7.68 TD (1 Dec 92) Tj 124.8 -488.64 TD (16E-4) Tj -97.68 469.2 TD (g.) Tj 13.44 0 TD (Check for proper crimping tool use in compression) Tj -36.96 -7.2 TD (connections.) Tj 23.52 -14.4 TD (h.) Tj 13.44 0 TD (Is connection loose or otherwise poorly made? After) Tj -36.96 -7.2 TD (electrical system is activated check for:) Tj 23.52 -14.4 TD (\(1\)) Tj 18 0 TD (Voltage drop across the connection \(there is no) Tj -41.52 -7.2 TD (voltage drop across a good connection\)) Tj 23.52 -14.4 TD (\(2\)) Tj 18 0 TD (Discoloration of the aluminum wire and/or insulation) Tj -41.52 -7.2 TD (at the connection : gray-white color coating on the wire) Tj 0 -7.2 TD (indicates aluminum oxide corrosion. A brown-black color on the) Tj T* (insulation, or if the insulation is brittle, indicates a) Tj T* (failure.) Tj 23.52 -14.4 TD (i.) Tj 13.44 0 TD (A \223Hot Spot Check\224 with an infra-red scan will indicate) Tj -36.96 -7.2 TD (thermal build-up at points of failure.) Tj ET endstream endobj 366 0 obj <> endobj 367 0 obj <> endobj 368 0 obj <> endobj 369 0 obj <> endobj 370 0 obj <> endobj 371 0 obj [/PDF/Text/ImageB] endobj 372 0 obj <> endobj 373 0 obj [/PDF/Text] endobj 374 0 obj [/PDF/Text] endobj 375 0 obj [/PDF/Text] endobj 376 0 obj [/PDF/Text] endobj 377 0 obj [/PDF/Text] endobj 378 0 obj [/PDF/Text] endobj 379 0 obj [/PDF/Text] endobj 380 0 obj [/PDF/Text] endobj 381 0 obj [/PDF/Text] endobj 382 0 obj [/PDF/Text] endobj 383 0 obj [/PDF/Text] endobj 384 0 obj [/PDF/Text] endobj 385 0 obj [/PDF/Text] endobj 386 0 obj [/PDF/Text] endobj 387 0 obj [/PDF/Text] endobj 388 0 obj [/PDF/Text] endobj 389 0 obj [/PDF/Text] endobj 390 0 obj <> endobj 391 0 obj <> endobj 392 0 obj [/PDF/Text] endobj 393 0 obj [/PDF/Text] endobj 394 0 obj [/PDF/Text] endobj 395 0 obj [/PDF/Text] endobj 396 0 obj <> endobj 397 0 obj <> endobj 398 0 obj <> endobj 399 0 obj <> endobj 400 0 obj <> endobj 401 0 obj <> endobj 402 0 obj <> endobj 403 0 obj <> endobj 404 0 obj <> endobj 405 0 obj <> endobj 406 0 obj <> endobj 407 0 obj <> endobj 408 0 obj <> endobj 409 0 obj <> endobj 410 0 obj <> endobj 411 0 obj <> endobj 412 0 obj <> endobj 413 0 obj <> endobj 414 0 obj <> endobj 415 0 obj <> endobj 416 0 obj <> endobj 417 0 obj <> endobj 418 0 obj <> endobj 419 0 obj <> endobj 420 0 obj <> endobj 421 0 obj <> endobj 422 0 obj <> endobj 423 0 obj <> endobj 424 0 obj <> endobj 425 0 obj <> endobj 426 0 obj <> endobj 427 0 obj <> endobj 428 0 obj <> endobj 429 0 obj <> endobj 430 0 obj <> endobj 431 0 obj <> endobj 432 0 obj <> endobj 433 0 obj <> endobj 434 0 obj <> endobj 435 0 obj <> endobj 436 0 obj <> endobj 437 0 obj [/CalGray<>] endobj 438 0 obj [/CalRGB<>] endobj 439 0 obj <>stream application/pdf A: STPAGE2.PDF Friday, June 12, 1998 10:31:34 AM Adobe Acrobat 10.1.5 Paper Capture Plug-in A: STPAGE2.WPD 2013-02-06T10:34:45-05:00 2013-02-06T10:34:45-05:00 uuid:586cfbc8-e3d7-4d4a-aa8f-174c1642a5ae uuid:534f16e6-d463-44f1-a164-5bfbf1c756d5 endstream endobj 440 0 obj <> endobj xref 0 441 0000000000 65535 f 0000004111 00000 n 0000004327 00000 n 0000004896 00000 n 0000122798 00000 n 0000122991 00000 n 0000123020 00000 n 0000123151 00000 n 0000125137 00000 n 0000125171 00000 n 0000126052 00000 n 0000126216 00000 n 0000129961 00000 n 0000130125 00000 n 0000130941 00000 n 0000131104 00000 n 0000132566 00000 n 0000132594 00000 n 0000132758 00000 n 0000136234 00000 n 0000136409 00000 n 0000139807 00000 n 0000139971 00000 n 0000143577 00000 n 0000143752 00000 n 0000147139 00000 n 0000147303 00000 n 0000150303 00000 n 0000150477 00000 n 0000152216 00000 n 0000152244 00000 n 0000152419 00000 n 0000156302 00000 n 0000156477 00000 n 0000160520 00000 n 0000160684 00000 n 0000163035 00000 n 0000163198 00000 n 0000164887 00000 n 0000164915 00000 n 0000165090 00000 n 0000168784 00000 n 0000168959 00000 n 0000172771 00000 n 0000172946 00000 n 0000177064 00000 n 0000177228 00000 n 0000180942 00000 n 0000181106 00000 n 0000183980 00000 n 0000184143 00000 n 0000188048 00000 n 0000188076 00000 n 0000188251 00000 n 0000191820 00000 n 0000191984 00000 n 0000195084 00000 n 0000195248 00000 n 0000199003 00000 n 0000199178 00000 n 0000202495 00000 n 0000202670 00000 n 0000205995 00000 n 0000206159 00000 n 0000209252 00000 n 0000209427 00000 n 0000212667 00000 n 0000212842 00000 n 0000216181 00000 n 0000216356 00000 n 0000219679 00000 n 0000219843 00000 n 0000223108 00000 n 0000223283 00000 n 0000226661 00000 n 0000226836 00000 n 0000230440 00000 n 0000230615 00000 n 0000234320 00000 n 0000234484 00000 n 0000237667 00000 n 0000237842 00000 n 0000240790 00000 n 0000240965 00000 n 0000244004 00000 n 0000244168 00000 n 0000247285 00000 n 0000247460 00000 n 0000248941 00000 n 0000249104 00000 n 0000250629 00000 n 0000250657 00000 n 0000250832 00000 n 0000254943 00000 n 0000255118 00000 n 0000259116 00000 n 0000259291 00000 n 0000262888 00000 n 0000263062 00000 n 0000264956 00000 n 0000264984 00000 n 0000265161 00000 n 0000269277 00000 n 0000269454 00000 n 0000272849 00000 n 0000273026 00000 n 0000276247 00000 n 0000276424 00000 n 0000278042 00000 n 0000278071 00000 n 0000278248 00000 n 0000282284 00000 n 0000282461 00000 n 0000286160 00000 n 0000286337 00000 n 0000289094 00000 n 0000289260 00000 n 0000292579 00000 n 0000292608 00000 n 0000292774 00000 n 0000296347 00000 n 0000296513 00000 n 0000299967 00000 n 0000300144 00000 n 0000303797 00000 n 0000303974 00000 n 0000307603 00000 n 0000307769 00000 n 0000311313 00000 n 0000311479 00000 n 0000314612 00000 n 0000314789 00000 n 0000318378 00000 n 0000318555 00000 n 0000321939 00000 n 0000322116 00000 n 0000325667 00000 n 0000325844 00000 n 0000329302 00000 n 0000329468 00000 n 0000332972 00000 n 0000333149 00000 n 0000336568 00000 n 0000336734 00000 n 0000338092 00000 n 0000338258 00000 n 0000339621 00000 n 0000339650 00000 n 0000339827 00000 n 0000343647 00000 n 0000343813 00000 n 0000347344 00000 n 0000347510 00000 n 0000348978 00000 n 0000349144 00000 n 0000351225 00000 n 0000351254 00000 n 0000351431 00000 n 0000355273 00000 n 0000355439 00000 n 0000359025 00000 n 0000359191 00000 n 0000362893 00000 n 0000363059 00000 n 0000366568 00000 n 0000366745 00000 n 0000370036 00000 n 0000370202 00000 n 0000371993 00000 n 0000372022 00000 n 0000372199 00000 n 0000376248 00000 n 0000376414 00000 n 0000380164 00000 n 0000380330 00000 n 0000383315 00000 n 0000383344 00000 n 0000383521 00000 n 0000387228 00000 n 0000387394 00000 n 0000390481 00000 n 0000390658 00000 n 0000393827 00000 n 0000394004 00000 n 0000397292 00000 n 0000397458 00000 n 0000401064 00000 n 0000401230 00000 n 0000404418 00000 n 0000404584 00000 n 0000407735 00000 n 0000407901 00000 n 0000411520 00000 n 0000411697 00000 n 0000415415 00000 n 0000415592 00000 n 0000418696 00000 n 0000418862 00000 n 0000422432 00000 n 0000422609 00000 n 0000426123 00000 n 0000426300 00000 n 0000429804 00000 n 0000429981 00000 n 0000433386 00000 n 0000433552 00000 n 0000435512 00000 n 0000435541 00000 n 0000435718 00000 n 0000439378 00000 n 0000439544 00000 n 0000442541 00000 n 0000442707 00000 n 0000445844 00000 n 0000446021 00000 n 0000448102 00000 n 0000448268 00000 n 0000451507 00000 n 0000451536 00000 n 0000451702 00000 n 0000455208 00000 n 0000455374 00000 n 0000459035 00000 n 0000459212 00000 n 0000463060 00000 n 0000463237 00000 n 0000466333 00000 n 0000466499 00000 n 0000469284 00000 n 0000469461 00000 n 0000472507 00000 n 0000472673 00000 n 0000475814 00000 n 0000475980 00000 n 0000479145 00000 n 0000479322 00000 n 0000482553 00000 n 0000482719 00000 n 0000485985 00000 n 0000486151 00000 n 0000489986 00000 n 0000490152 00000 n 0000492402 00000 n 0000492431 00000 n 0000492608 00000 n 0000496113 00000 n 0000496279 00000 n 0000499562 00000 n 0000499739 00000 n 0000503505 00000 n 0000503682 00000 n 0000506993 00000 n 0000507159 00000 n 0000510973 00000 n 0000511150 00000 n 0000514046 00000 n 0000514212 00000 n 0000518361 00000 n 0000518527 00000 n 0000522425 00000 n 0000522602 00000 n 0000526951 00000 n 0000527128 00000 n 0000531097 00000 n 0000531274 00000 n 0000535151 00000 n 0000535328 00000 n 0000539324 00000 n 0000539572 00000 n 0000539749 00000 n 0000543931 00000 n 0000544108 00000 n 0000547992 00000 n 0000548158 00000 n 0000552282 00000 n 0000552459 00000 n 0000556284 00000 n 0000556450 00000 n 0000560377 00000 n 0000560543 00000 n 0000564260 00000 n 0000564426 00000 n 0000568085 00000 n 0000568251 00000 n 0000571837 00000 n 0000572003 00000 n 0000575592 00000 n 0000575758 00000 n 0000579647 00000 n 0000579813 00000 n 0000583319 00000 n 0000583485 00000 n 0000586879 00000 n 0000587045 00000 n 0000590486 00000 n 0000590663 00000 n 0000594090 00000 n 0000594278 00000 n 0000598494 00000 n 0000598671 00000 n 0000602432 00000 n 0000602609 00000 n 0000606425 00000 n 0000606591 00000 n 0000610522 00000 n 0000610688 00000 n 0000614657 00000 n 0000614823 00000 n 0000616153 00000 n 0000616319 00000 n 0000620591 00000 n 0000620620 00000 n 0000620797 00000 n 0000624802 00000 n 0000624968 00000 n 0000628042 00000 n 0000628208 00000 n 0000631345 00000 n 0000631511 00000 n 0000634298 00000 n 0000634464 00000 n 0000637516 00000 n 0000637693 00000 n 0000640708 00000 n 0000640874 00000 n 0000643661 00000 n 0000643827 00000 n 0000646804 00000 n 0000646970 00000 n 0000649803 00000 n 0000649980 00000 n 0000652836 00000 n 0000653002 00000 n 0000656893 00000 n 0000657059 00000 n 0000660420 00000 n 0000660597 00000 n 0000664702 00000 n 0000664868 00000 n 0000665628 00000 n 0000665794 00000 n 0000667510 00000 n 0000667539 00000 n 0000667705 00000 n 0000671162 00000 n 0000671328 00000 n 0000674015 00000 n 0000674181 00000 n 0000676356 00000 n 0000676385 00000 n 0000676551 00000 n 0000680405 00000 n 0000680571 00000 n 0000684505 00000 n 0000684682 00000 n 0000686523 00000 n 0000686689 00000 n 0000688472 00000 n 0000688501 00000 n 0000688667 00000 n 0000692242 00000 n 0000692408 00000 n 0000695831 00000 n 0000695997 00000 n 0000699823 00000 n 0000699989 00000 n 0000701104 00000 n 0000701196 00000 n 0000701286 00000 n 0000701535 00000 n 0000701637 00000 n 0000702684 00000 n 0000702720 00000 n 0000702822 00000 n 0000702851 00000 n 0000702880 00000 n 0000702909 00000 n 0000702938 00000 n 0000702967 00000 n 0000702996 00000 n 0000703025 00000 n 0000703054 00000 n 0000703083 00000 n 0000703112 00000 n 0000703141 00000 n 0000703170 00000 n 0000703199 00000 n 0000703228 00000 n 0000703257 00000 n 0000703286 00000 n 0000703315 00000 n 0000704386 00000 n 0000704483 00000 n 0000704512 00000 n 0000704541 00000 n 0000704570 00000 n 0000704599 00000 n 0000704696 00000 n 0000704831 00000 n 0000704934 00000 n 0000705031 00000 n 0000705128 00000 n 0000705225 00000 n 0000705322 00000 n 0000705419 00000 n 0000705516 00000 n 0000705613 00000 n 0000705711 00000 n 0000705814 00000 n 0000705916 00000 n 0000706018 00000 n 0000706120 00000 n 0000706222 00000 n 0000706324 00000 n 0000706427 00000 n 0000706529 00000 n 0000706631 00000 n 0000706733 00000 n 0000706835 00000 n 0000706937 00000 n 0000707040 00000 n 0000707142 00000 n 0000707244 00000 n 0000707346 00000 n 0000707448 00000 n 0000707550 00000 n 0000707653 00000 n 0000707755 00000 n 0000707857 00000 n 0000707959 00000 n 0000708061 00000 n 0000708163 00000 n 0000708266 00000 n 0000708368 00000 n 0000708470 00000 n 0000708572 00000 n 0000708674 00000 n 0000708776 00000 n 0000708846 00000 n 0000708994 00000 n 0000712902 00000 n trailer <<7014E39E46F05C4EB83F96A4912C7329>]>> startxref 116 %%EOF