Engineer Regulations

   Search     
Enter Search Value:
- without any prefix or suffix to find all records where a column contains the value you enter, e.g. Net
- with | prefix to find all records where a column starts with the value you enter, e.g. |Network
- with | suffix to find all records where a column ends with the value you enter, e.g. Network|
- with | prefix and suffix to find all records containing the value you enter exactly, e.g. |Network|

Pub Number Proponent Title Pub Date Latest Review Info
ER 1110-1-8100 CERD-C CECW-EG CEMP-RT Laboratory Investigations and Testing 12/31/1997 Prescribes the responsibilities, policies, and procedures for laboratory investigations, materials and chemistry testing, and analytical services performed in support of design, construction, and operation of Civil Works, Military, and Support-for-Others programs.
ER 1165-2-30 CECW-AG ACCEPTANCE AND RETURN OF REQUIRED, CONTRIBUTED OR ADVANCED FUNDS 12/31/1997 Establishes basic procedures returning appropriate portions of required, contributed or advanced funds from private parties, states, and political subdivisions in connection with Civil Works Projects.  And establishes basic procedures controlling and acceptance and return of such funds.
ER 1110-2-1403 CECW-EH, CERD-C Studies by Coastal, Hydraulic, and Hydrologic Facilities and Others 1/1/1998 Prescribes policy and procedures for approval and technical supervision of coastal, hydraulic, and hydrologic studies related to planning, design, construction, and operation of U.S. Army Corps of Engineers (USACE) civil works projects.
ER 1110-2-1458 CECW-EH Hydraulic Design of Shallow Draft Navigation Projects 4/30/1998 Prescribes the policy and design procedures for development of a new or replacement of an existing shallow draft navigation project.
ER 1110-1-2002 CECW-EG Cement, Slag, and Pozzolan Acceptance Testing 9/30/1998 Sets forth policy and responsibilities for acceptance testing of cementitious materials including Portland cement, blended cement, pozzolan, and ground granulated blast-furnace slag (hereinafter referred to as slag).
ER 1110-1-2005 CECW-EG Compilation of Concrete Aggregate and Stone Riprap Test Data 1/1/1999 Prescribes the procedures for the continuing compilation and distribution of test data on concrete aggregates and stone riprap from sources within the continental United States and Alaska.
ER 56-2-1 CELD-T Administrative Vehicles Management - Civil Works 1/15/1999 Prescribes the definition, methods, techniques and procedures for the management, operation, maintenance, and reporting of all civil works funded motor vehicles assigned the Corps of Engineers.
ER 1110-1-261 CECW-EG CECW-EH CECW-EC Quality Assurance of Laboratory Testing Procedures 4/28/1999 Prescribes responsibilities and procedures for materials and water quality testing performed by and for U.S. Army Corps of Engineers district offices.
ER 1110-3-1300 CEMP-EE Military Programs Cost Engineering 8/26/1999 Prescribes U.S. Army Corps of Engineers (USACE) cost engineering policies, requirements, and procedures for Military Programs.
ER 1110-2-1150 CECW-EP Engineering and Design for Civil Works Projects 8/31/1999 Defines engineering responsibilities, requirements, and procedures during the planning, design, construction, and operations phases of civil works projects. The regulation provides guidance for developing and documenting quality engineering analyses and designs for projects and products on time and in accordance with project management policy for civil works activities.
ER 1165-2-501 CECW-A CIVIL WORKS ECOSYSTEM RESTORATION POLICY 9/30/1999 Provides policy on COE involvement in ecosystem restoration and protection through Civil Works programs and activities.
ER 1105-2-100 CECW-P Planning Guidance Notebook 4/22/2000 Appendix H is superseded by EP 1105-2-61; Guidance for evaluation framework used in USACE flood damage reduction studies.
ER 200-1-1 CEMP-RA Policy and General Requirements for the Environmental Innovative Technology Program 5/30/2000 Provides specific policy and guidance for the development, implementation, and documentation of the Innovative Technology Program to foster the successful transfer of new and innovative environmental technologies to U.S. Army Corps of Engineers (USACE) projects.
ER 385-1-96 CESO-I USACE Ergonomics Program Policy 6/1/2000 Establishes responsibilities necessary to manage and execute an effective and compliant ergonomics program.
ER 415-345-38 CEMP-EC Transfer and Warranties 6/30/2000 Prescribes U.S. Army Corps of Engineers (USACE) policy and procedures for the transfer of completed construction projects and for implementing warranties.
ER 500-1-1 CECW-OE Emergency Employment of Army and Other Resources - Civil Emergency Management Program 9/30/2001 Prescribes policies for the Civil Emergency Management (CEM) Program of the US Army Corps of Engineers (USACE) under the authories of 33 USC 701n (commonly referred to as Public Law (PL) 84-99); the Robert T. Stafford Disaster Relief and Emergency Assistance Act (42 USC 5121 et seq) Army Regulation (AR) 500-60, Disaster Relief; and Engineer Regulation (ER) 1130-2-530, Flood Control Operations and Maintenance Policies.
ER 37-1-24 CERM-B Operating Budgets 12/31/2001 Provides policy guidance for the preparation and utilization of operating budgets.
ER 37-1-31 CERM-B Financial Administration - Planning, Programming, Budgeting and Executing Operations 8/1/2002 Establishes the policies, responsibilities and basic procedures for the management of the U.S. Army Corps of Engineers (USACE) resources (Executive Direction and Management & Operation and Maintenance, Army) (ED&M & OMA).
ER 1110-1-8157 CECW-CT Geotechnical Data Quality Management for Hazardous Waste Remedial Activities 10/1/2002 Prescribes Geotechnical Data Quality Management responsibilities and requirements, from initial investigation through closeout at sites contaminated with hazardous, toxic, and radioactive waste
ER 55-1-2 CELD-T Transportation and Travel Management 10/1/2002 Contains policy, assigns responsibilities, and provides procedures for requesting, authorizing, funding, and performing official travel of U.S. Army Corps of Engineers (USACE) military and civilian personnel.
ER 200-1-5 CEMP-R, CECW-P Policy for Implementation and Integrated Application of the U.S. Army Corps of Engineers (USACE) Environmental Operating Principles (EOP) and Doctrine 10/30/2003 Provides specific policy and guidance for implementation and the integrated application of USACE's Environmental Operation Principle (EOP) and associated doctrine across the full spectrum of USACE's program management initiatives and business processes.
ER 690-1-1212 CEHR-E / CECW-E / CEMP-ZB Professional Registration as a Selective Placement Factor 3/31/2004
ER 37-1-18 CERM-B U.S. Army Corps of Engineers Sponsored and Co-sponsored Meetings 8/10/2004 Provides guidance and instructions for conducting all USACE sponsored/co-sponsored meetings and outlines specific procedures for all USACE non-training meetings/conferences/workshops that involve 25 or more Department of Army (DA) personnel in a TDY status.
ER 1110-2-8160 CECW-CE, CECW-CO, CECW-P Engineering and Design: Policies for Referencing Project Evaluation Grades To Nationwide Vertical Datums 3/1/2009 Establishes U.S. Army Corps of Engineers (USACE) policies for referencing project elevation grades to nationwide vertical datums established and maintained by the U.S. Department of Commerce.
ER 1110-2-8157 CECW-CE, CECW-CO Responsibility for Hydraulic Steel Structures 6/15/2009 Defines engineering responsibilities for design, construction and operation of hydraulic steel structures.
ER 5-1-16 CEMP-CN Management Capacity Development - International 6/30/2009 Establishes policies for capacity development (CD) for international programs and projects conducted by the US Army Corps of Engineers (USACE) and serves as requirements basis documents for CD planning and implementation for USACE international programs and projects.
ER 1130-2-551 CECW-CO HYDROPOWER OPERATIONS AND MAINTENANCE POLICY BULK POWER SYSTEM RELIABLILITY COMPLIANCE PROGRAM 9/30/2009 Establishes the requirement for a USACE corporate program for compliance with applicable Federal Energy Regulatory Commission.
ER 385-1-31 CESO The Control of Hazardous Energy 11/1/2009 Errata Sheet No.2, Page 7-4, Paragraph 7-3(a): change the word “oversee” to the phrase “coordinate with” To establish consistent procedures and criteria for the safe and reliable control of hazardous energy at USACE operated facilities with full implementation as is practical, but within no longer than two years from the date of this regulation only for items that require budget adjustments to accomplish.
ER 5-1-15 CESI-P Strategic Management 12/1/2009 Change 2 included, dated 31 May 2016
ER 37-5-3 CEMP-CEP EPA/USACE Superfund Program - Financial Closeout of Interagency Agreements 12/13/2009 Provides general policy and guidance for establishing procedures governing the financial closeout of Site-Specific Interagency Agreements (IAs), Generic IAs, and Site-Specific Work Authorization Forms (WAFs) issued by the U.S. Environmental Protection Agency (EPA) to the U.S. Army Corps of Engineers (USACE) for the EPA Superfund Program.
ER 385-1-99 CESO USACE Accident Investigation and Reporting 3/15/2010 Establishes policies and procedures and assigns responsibilities for initial notification, investigation, preparation and submission of reports of U.S. Army Corps of Engineers (USACE) accidents and accident recordkeeping procedures
ER 600-1-54 CEHR-Z FamilyReadiness Deployment Cycle or Families: Requirements to Assist Family Members During the Deployment of US Army Corps of Engineers Soldiers and Civilian employees. 5/17/2010 Assigns responsibilities and establish policies and procedures to assist USACE Soldiers, Department of the Army (DA) Civilian employees, and Family members during deployments in support of an overseas contingency operation or disaster response.
ER 385-1-80 CESO Ionizing Radiation Protection 6/30/2010 Assigns safety and health responsibilities to Safely and effectively, use radioactive materials.
ER 385-1-40 CESO Occupational Health Program 9/20/2010 Prescribes policies, outlines responsibilities, and provides procedures for the development and execution of the U.S. Army Corps of Engineers (USACE) Occupational Health (OH) Program
ER 11-1-321 CECW-CE Army Programs - Value Engineering 1/1/2011 Provides general policy, procedures, and a framework for the execution of the Value Engineering (VE) elements within the Project Management Business Process (PMBP) of  the USACE.
ER 500-1-28 CECW-HS Emergency Employment of Army and Other Resources - National Response Planning Guide 1/31/2011 Establishes policy, provides planning guidance and assigns responsibilities to ensure timely execution of Emergency Support Function (ESF) #3, Public Works and Engineering, in support of the National Response Framework (NRF), and for high impact, low probability catastrophic events, as determined by Headquarters, USACE (HQUSACE).
ER 1125-2-307 CECW-CO SUBSISTENCE, QUARTERS, AND ALLOWANCES 2/1/2011 Prescribes procedures for the operation of messing and quartering facilities on Civil Works floating plant and the requirements and conditions for furnishing subsistence and/or quarters.
ER 690-1-1214 CEHR-D Civilian Personnel - USACE Leadership Development Program (LDP) 2/28/2011 To develop results oriented, agile leaders with broad perspectives who lead people and lead change successfully in complex environments.  The Corps will use the DoD Civilian Leader Development Framework to develop our leaders.
ER 1110-2-500 CEMP-CE EPA/USACE Superfund Program Funding and Reporting Requirements 10/31/2011 Provides general policy and guidance for establishing procedures governing the funds management and reporting requirements for Interagency
Agreements (IAAs) issued by the U.S. Environmental Protection Agency (EPA) to the U.S. Army Corps of Engineers (USACE) for the EPA Superfund Program.
ER 1110-1-8152 CEMP CECW Professional Registration and Signature on Design Documents 1/24/2012 Provides policy and guidance on professional registration of USACE civilian team members in all occupations included in career program (CP)-18 (Engineers & Scientists � Resources & Construction).
ER 415-1-17 CECW-CE Construction Contractor Performance Evaluations 1/24/2012 Establishes procedures for evaluating construction contractor performance.
ER 1180-1-9 CECW-CE DESIGN-BUILD CONTRACTING 3/31/2012 Prescribes authorities and procedures for the use of design-build contracting by USACE.
ER 10-1-50 CERM-CE U.S. Army Corps of Engineers Environmental and Munitions Mandatory Center of Expertise 4/30/2012 Defines the mission and the organization of the U.S. Army Corps of Engineers (USACE) Environmental and Munitions Mandatory Center of Expertise (EMMCE).
ER 415-1-10 CECW-CE Contractor Submittal Procedures 4/30/2012
ER 350-3-3 CEHR-M USACE/USMA/ROTC Cadet Training Program (CDEP) 5/12/2012 Defines procedures for the USACE/Military Academy (USMA) /Cadet Command (USACC) Cadet Engineer Program (CDEP).
ER 385-1-224 CESO USACE Safety Award and Recognition Program 6/29/2012 Establishes the criteria and procedures for the Chief of Engineers Safety Awards and Recognition Program, guidance for USACE participation in Department of the Army Safety Awards, and guidance for the establishment of safety award and recognition programs at Subordinate Commands
ER 1110-1-8156 CECW-CE Policies, Guidance, and Requirements for Geospatial Data and Systems 9/1/2012 Provides a framework that promotes interoperability through the use of data standards and an open platform to move data seamlessly throughout the organization
ER 10-1-51 CECW-CE Roles and Responsibillities - Dam Safety Modification Mandatory Center of Expertise 9/28/2012 Establishes the roles and responsibilities of the Dam Safety Modification Mandatory Center of Expertise (DSMMCX) located within the Huntington District, U.S. Army Corps of Engineers (USACE).
ER 385-1-89 CESO Hearing Conservation Program 10/15/2012 The purpose of this document is to prevent occupational related hearing loss among U.S. Army Corps of Engineers (USACE) personnel
ER 415-1-11 CECW-CE Biddability, Constructability, Operability, Environmental and Sustainability (BCOES) Reviews 1/1/2013 Establishes policy and systematic procedures for conducting effective reviews of a project's Biddability, Environmental, and Sustainability (BCOES) characteristics.
Page 3  of  6 First Previous 1 2 [3] 4 5 6 Next Last